INDUSTRIAL TRAINING INDUSTRIAL TRAINING PRESENTATION PRESENTATION IEK YAN YEE IEK YAN YEE 21077 21077
INDUSTRIAL TRAINING INDUSTRIAL TRAINING PRESENTATIONPRESENTATION
IEK YAN YEEIEK YAN YEE
2107721077
COMPANY BACKGROUNDCOMPANY BACKGROUND
Gamuda Sdn BhdGamuda Sdn Bhd– Turnkey and B.O.TTurnkey and B.O.T– Projects and Investments - South East and Projects and Investments - South East and
Far East Asia, Indochina, South Asia and Far East Asia, Indochina, South Asia and Middle EastMiddle East
– Scope of Expertise – highways and Scope of Expertise – highways and expressways, bridges, tunnels, dams and expressways, bridges, tunnels, dams and hydropower, hydraulic engineering and hydropower, hydraulic engineering and water treatment, railways and mass-rapid water treatment, railways and mass-rapid transit, marine works and ports, and transit, marine works and ports, and buildingsbuildings
MMC-Gamuda Joint MMC-Gamuda Joint VentureVenture
Project Delivery Partner (PDP)Project Delivery Partner (PDP)– Serve as a single point of accountabilityServe as a single point of accountability– Deliver the project within agreed time and Deliver the project within agreed time and
costcost– Packaging the worksPackaging the works– Calling tenderCalling tender– Evaluating bidsEvaluating bids– Selecting work packages contractsSelecting work packages contracts– Making the awards to work contractorsMaking the awards to work contractors
KLANG VALLEY MASS KLANG VALLEY MASS RAPID TRANSIT (KVMRT) RAPID TRANSIT (KVMRT) PROJECTPROJECT
SBK LINESBK LINE– First lineFirst line– From Sungai Buloh to KajangFrom Sungai Buloh to Kajang– Cut through Kuala Lumpur City Cut through Kuala Lumpur City
CenterCenter– Plan to serve 1.2 million passengersPlan to serve 1.2 million passengers
List of StationsList of Stations
SBK LINESBK LINE
LENGTHLENGTH 51km51km
LENGTH OF UNDERGROUNDLENGTH OF UNDERGROUND 9.5km9.5km
NUMBER OF STATIONSNUMBER OF STATIONS 3535
NUMBER OF INTERCHANGE NUMBER OF INTERCHANGE STATIONSSTATIONS
44
NUMBER OF PARK AND RIDENUMBER OF PARK AND RIDE 1313
CONSTRUCTION PERIODCONSTRUCTION PERIOD 2011 TO 2011 TO 20162016
SUMMARY OF ACTIVITIESSUMMARY OF ACTIVITIES
AutoCAD and MX RoadAutoCAD and MX Road GeotechnicalGeotechnical
AutoCAD and MX RoadAutoCAD and MX Road
AutoCADAutoCAD– User-friendly, User-friendly, – easy to learn and useeasy to learn and use
MX RoadMX Road– Has a lot of function to design Has a lot of function to design
alignmentalignment– Complicated, not easy to familiarizeComplicated, not easy to familiarize– Only useful if one is familiar with itOnly useful if one is familiar with it
GeotechnicalGeotechnical
Analyzing the soil characteristics Analyzing the soil characteristics – Deep Bore LogDeep Bore Log
Soil improvementSoil improvement– Compensation GroutingCompensation Grouting– Compaction GroutingCompaction Grouting
Compensation Compensation GroutingGrouting
Compaction GroutingCompaction Grouting
THANK YOUTHANK YOU