Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 5/97
3. INTRODUCTION
3.1 PURPOSE
3.1.1.1.1 This document specifies the general methodology and strategy for testing of the RBC-RBC Safe Communication Interface.
3.1.1.1.2 The objective of this specification is to check whether different implementations of the RBC-RBC Safe Communication Interface are able to interwork.
3.1.1.1.3 It is applicable to RBC-RBC safe communication interface providing communication services for safety-related applications.
3.1.1.1.4 The required test cases are specified in Parts 5 and 6 of this specification.
3.2 REFERENCES
3.2.1.1.1 This specification incorporates provisions from other publications by means of dated or undated references. The normative references are cited in the text in the appropriate places, the publications are listed hereafter. As to dated references, subsequent amendments to or revisions of any of these publications apply to this architecture specification only when incorporated by amendment or revision. For undated references, the latest edition of the publication referred to applies.
Name Date Description EN 50159-1 03.01 Safety-Related Communication in Closed Transmission
Systems EN 50159-2 03.01 Safety-Related Communication in Open Transmission
Systems Subset-026 02.06 ETCS/ERTMS Class 1; System Requirements Specification,
v2.3.0 Subset-037 10.05 Euroradio FIS, v2.3.0 Subset-092-2 02.06 Euroradio Test Cases, v.2.3.0 Subset-097 06.05 RBC-RBC Safe Communication Interface; Requirements,
v1.1.0 Subset-098 05.07 RBC-RBC Safe Communication Interface, v 1.0.0 Subset-108 06.06 ETCS/ERTMS Class 1; Interoperability consolidation on TSI
annex A documents, v 1.1.0
3.3 TERMS AND DEFINITIONS The definitions of the standards EN 50159-1,EN 50159-2 and [Subset-098] are used in this document.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 7/97
4. TEST STRATEGY
4.1 GENERAL
4.1.1.1.1 The test specification defines only test cases that are needed to prove interworking between two implementations of the RBC-RBC Safe Communication Interface.
4.1.1.1.2 Interworking means that two implementations are able to successfully exchange PDUs via the transmission system. This requires:
• to establish, maintain and release a safe connection;
• to agree the relevant configuration parameters between the peers;;
• to exchange data and manage messages;
• to handle the implemented defence techniques.
4.1.1.1.3 The purpose for tests on interworking are:
• to check the correct responses on PDUs of the peer implementation;
• to check the correct response in case of protocol errors and failures.
4.1.1.1.4 Tests of specific error cases that shall be performed are listed in parts 5 and 6 of this specification.
4.1.1.1.5 Since the real protocol implementations are used, the only degraded tests that can be carried out are those which can be performed without the use of a internal error generator. For example, tests are run on the reaction of the subsystems in the case of connection loss, while it is impossible to verify the reaction of real systems in the case of reception of the wrong sequence code.
4.1.1.1.6 The complete coverage of all the characteristics and aspects of the SAI protocol is beyond the aim of the current test specification. This type of coverage has to be ensured by the activities of the Compliance Test, which has to be carried out independently by each company, using specific Protocol Stack Simulators with the capability of generating errors.
4.1.1.1.7 No testing of features or functions that are ‘local matters’ is intended.
4.1.1.1.8 The functionality sets that an implementation must be able to manage are defined in parts 5 and 6 of this specification.
4.1.1.1.9 It assumend that the Euroradio Safety Layer has been tested according to Subset-092-2 on both sides.
4.2 TEST PROCEDURE
4.2.1.1.1 These tests are performed using two real equipments. The type of connection between the two implementations depends on the type of physical ports available on the real equipment. The equipments will be referred to as equipment under test (EUT) and partner equipment (PE):
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 8/97
this naming does not have any link with the role (initiator or responder) played by each equipment in the test.
4.3 TEST DEFINITION
4.3.1.1.1 For each test, the following parameters are specified:
a) Identification of Test Case: a unique Test Case Identifier and Title;
b) Configuration Data: each Test Case has to specify explicitly the configuration data that is relevant for its execution, to permit evaluation of the influence on functions caused by varying each set of configuration data;
c) Traceability: to allow traceability with respect to the communication protocol stack specification documents;
d) Testing Steps: list of steps to be performed to realise the whole Test Case;
e) Expected Results: Test Cases will be implemented in order to validate the correct operation of a EUT against particular test criteria. Test Specifications include also the verification of correct operation of a EUT as designed for nominal or degraded conditions.
4.3.1.1.2 Testing is described in four steps:
a) initial conditions: state of the equipment before performing the test;
b) preliminary steps: the set of actions to perform in order to begin the test;
c) test initiator: the list of actions that have to be performed to set the RBC-RBC connection in the state that allows the test execution;
d) expected results and verifications: definition of the expected results and the method of controlling the test run.
4.3.1.1.3 This method of describing the tests is used as a default for all test descriptions for tests and sub-tests throughout this document.
4.4 TEST REPORTING
4.4.1.1.1 For test reporting, a test form must been written, containing at least the following information:
a) reference to this test specification document;
b) the identifier of the test;
c) the result of the test;
d) any miscellaneous information such as date and tester identity.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 9/97
4.5 TEST ARCHITECTURE
4.5.1.1.1 The test architecture specifies the test environment.
4.5.1.1.2 For testing the two implementations of the RBC-RBC Safe Communication Interface for correct interworking, a passive PDU-Logger is recommended to monitor the data exchange (see Figure 1: Possible test architecture using PDU-Logger).
4.5.1.1.3 The testing steps that are defined in the different test cases are initiated within one of the two implementations and are then monitored by the PDU-Logger. The results can then be checked and verified against the expected results defined in the test case.
4.5.1.1.4 Another possibilty is using an Ethernet monitor instead of the PDU-Logger.
PE (RBC) EUT (RBC)
PDU-Logger
Communication
Functional Module
Safe Functional
Module
Logger
Figure 1: Possible test architecture using PDU-Logg er
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 10/97
5. SAI TEST
5.1 OVERVIEW OF THE SAI TEST PROCEDURE
5.1.1 INTRODUCTION
5.1.1.1.1 The Safe Application Interface specifies three defence techniques (see Subset-098):
a) Sequence numbering defence technique;
b) The Triple Time Stamping;
c) The Execution Cycle.
5.1.1.1.2 This section is divided into three sub-sections, one related to the Sequence Number defence technique, the second related to the Execution Cycle defence technique and the last related to the Triple Time Stamp defence technique. The tests related to the initialisation of the connection and data transfer between SAI layers are specified in the section related to the Sequence Number defence technique.
5.1.2 TEST STRATEGY
5.1.2.1.1 The following table provides a list of the safety defences that have to be tested internally by each company. This list is not exhaustive and some additional test cases could be requested depending on the protocol implementation.
Safety defence Reference
Message deletion (detected by SN) Subset-098
Message resequencing (detected by SN) Subset-098
Message repetition (detected by SN) Subset-098
Non valid message type Subset-098
Delayed messages during initialisation procedures Subset-098
Delayed application messages Subset-098
Message masquerade Subset-092-2
Message corruption Subset-092-2
Message insertion Subset 092-2
Table 1: Safety defences to be tested internally
5.1.3 FUNCTIONALITY SET OF THE SAI USER
5.1.3.1.1 The SAI user implements at least the following functions:
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 11/97
a) Connection management: initiate a connection at the SAI level;
b) Connection management: transmission of application data;
c) Connection management: reception of application data.
5.1.3.1.2 The implementation of these functions is a local matter.
5.1.4 SAI CONFIGURATION PARAMETERS
5.1.4.1.1 The SAI configuration parameters are defined in Subset-098.
5.1.4.1.2 These parameters should to be fixed using the guideline defined in Subset-098.
5.2 SEQUENCE NUMBER DEFENCE TECHNIQUE
5.2.1 LIST OF SN FUNCTIONAL TESTS
5.2.1.1.1 Test 1: connection and SN initialisation (connection requested by the peer entity). - this test checks that the EUT is able to accept an initialisation of the connection between SAI layers using a random initial sequence number.
5.2.1.1.2 Test 2: connection and SN initialisation (connection requested to the peer entity). - this test checks that the EUT is able to request an initialisation of the connection between SAI layers (including the initialisation of the sequence number).
5.2.1.1.3 TEST 3: SN incrementation in reception. - this test checks that the EUT accepts, in reception, a nominal incrementation of the SN.
5.2.1.1.4 TEST 4: SN incrementation in transmission. - this test checks that the EUT increments the SN, in transmission, in accordance with the test specification.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 12/97
5.2.2 TEST 1: CONNECTION AND SN INITIALISATION (CONNECTION REQUESTED BY THE PE)
5.2.2.1 Test overview
5.2.2.1.1 The current test must check that the EUT is able to accept a connection request at the SAI level and accept a random initialisation of the SN.
5.2.2.1.2 The following figure describes the initialisation procedure:
AU1 SaPDU
AU2 SaPDU
Sa-Data. Indication
Responder (EUT) Initiator (PE)
Sa-Data. Request
Sa-Data. Indication
Sa-Data. Request
E
U
R
O
R
A
D I O
E UR O R A D I O
S A I
S A I
Sa-Connect. Request
Sa-Connect. Confirm
AU3 SaPDU
AR SaPDU
DT SaPDU (ExecutionCycleStart or OffsetAnsw1 message)
DT SaPDU (ElxecutionCycleStart or OffsetStart message )
Sa-Connect. Indication
Sa-Connect. Response Set Timer
Stop Timer
Set Timer
Stop Timer
DT SaPDU (First Appl. or
OffsetAnsw2 message)
Figure 2: Initialisation procedure
5.2.2.1.3 The following purposes must be checked:
a) at the reception of the Sa-Connect indication, the connection must be established at the SAI level and the SAI of the EUT produces the Sa-Connect Response: Subtest 1.1.
b) at the reception of the first Sa-Data indication (ExecutionCycleStart or OffsetStart message), the SAI of the EUT must answer with a Sa-Data Request message, (including the ExecutionCycleStart or OffsetAnsw1 message), start the Tsyn timer and accept a random initial sequence number: Subtest 1.2.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 14/97
5.2.2.4.1 The target of the subtest 1.2. is to check that, at the reception of the first Sa-Data indication (ExecutionCycleStart or OffsetStart message), the EUT SAI:
a) Answers with a Sa-Data Request message, including the Execution Cycle start or OffsetAnsw1 message.
b) Starts the Tsyn timer
c) accepts a random initial sequence number
Test identifier TEST_SAI_1-2
Initial conditions No connection between the SS’s
Preliminary steps 1. Establishment of the connection at the TCP/IP level
2. Establishment of the connection at the ALE level
3. Exchange of the AU1 SaPDU, AU2 SaPDU, AU3 SaPDU and AR SaPDU messages between SL Euroradio layers.
Test initiator Reception of the first Sa-Data indication (ExecutionCycleStart or OffsetStart message) by the EUT SAI.
Expected result 1: The EUT SAI must answer with Sa-Data Request message, including the Execution Cycle start or OffsetAnsw1 message.
Verification :Reception by the PE SAI of the Execution Cycle start or OffsetAnsw1 message from the EUT, before the elapsing of the PE timer .
Expected result 2: Start the EUT timer.
Verification : Disconnection indication sent by EUT at the timer elapsing.
Expected results and verifications
Expected result 3: accepts a random initial sequence number
Verification : No connection release sent by the EUT SAI.
Table 3: TEST_SAI_1-2
5.2.2.5 SUB-TEST 1.3: TEST_SAI_1-3
5.2.2.5.1 The target of subtest 1.3. is to check that, at the reception of the first application message for the EC or at the reception of the OffsetAnsw2 message for the TTS, the SS EUT SAI:
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 16/97
5.2.3 TEST 2: CONNECTION AND SN INITIALISATION (CONNECTION REQUESTED TO THE PE)
5.2.3.1 Test overview
5.2.3.1.1 The current test must check that the SS Initiator is able to request a connection at the SAI level and to initialise correctly the SN.
5.2.3.1.2 The following figure describes the initialisation procedure:
AU1 SaPDU
AU2 SaPDU
Sa-Data. Indication
Responder (PE) Initiator (EUT)
Sa-Data. Request
Sa-Data. Indication
Sa-Data. Request
E
U
R
O
R
A
D I O
E UR O R A D I O
S A I
S A I
Sa-Connect. Request
Sa-Connect. Confirm
AU3 SaPDU
AR SaPDU
DT SaPDU (ExecutionCycleStart or OffsetAnsw1 message)
DT SaPDU (ExecutionCycleStart or OffsetStart message)
Sa-Connect. Indication
Sa-Connect. Response Set TSyn
Stop TSyn
Set TSyn
DT SaPDU (first Appl . or
OffsetAnsw2 message)
Stop TSyn
Figure 3: Initialisation procedure
5.2.3.1.3 The following purposes must be checked:
a) the ability of the EUT to initiate a connection between SAI: Subtest 2.1;
b) at the reception of the Sa-Connect confirm, the EUT SAI must be able to send the ExecutionCycle Start or the OffsetStart message, and to start the Tsyn timer: Subtest 2.2;
c) at the reception of the ExecutionCycle Start message, the SAI of the EUT must stop the Tsyn timer and accept the initial SN: Subtest 2.3.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 17/97
5.2.3.2 Traceability with Subset-098
5.2.3.2.1 The initialisation procedure is defined in Subset-098, § 5.4.5.1.
5.2.3.2.2 The sequence number format and initialisation requirements are defined in Subset-098, § 5.4.4 and 5.4.7.
5.2.3.2.3 The format of the initialisation message (ExecutionCycle Start or OffsetStart) is defined in Subset-098, § 5.4.8.4 and 5.4.9.3.8.
5.2.3.3 SUB-TEST 2.1: TEST_SAI_2-1
5.2.3.3.1 The target of subtest 2.1. is to check that the SS Initiator is able to initiate a connection at the SAI level.
Test identifier TEST_SAI_2-1
Initial conditions No connection between the RBC’s
Test initiator Request of a connection by the EUT SAI User.
The tested SAI must send a Sa-Connect request to the EUTSL Euroradio.
Intermediate steps The connection must be established at the TCP/IP, ALE and SL Euroradio level between the two devices.
Expected results and verifications
Expected result 1: At the reception of the “Sa-Connect confirm” from the SL Euroradio, the EUT SAI considers that the safe connection is established with the peer SAI.
Verification : Implicitly by the performing of the following tests.
Table 5: TEST_SAI_2-1
5.2.3.4 SUB-TEST 2.2: TEST_SAI_2-2
5.2.3.4.1 The target of subtest 2.2 is to check that, at the reception of the Sa-Connect confirm, the EUT SAI:
a) answers sending the ExecutionCycle or OffsetStart message;
b) starts the EUT timer (Tsyn). There is no requirement on the SN initialisation - the value can be fixed or randomly chosen.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 20/97
5.2.4 TEST 3: SN INCREMENTATION IN RECEPTION
5.2.4.1 Test overview
5.2.4.1.1 The current test must check that the RBC properly processes the SN incrementation in reception. This test does not include zero crossing. The check of zero crossing could be performed in a reasonable time only if it is possible to force the initialisation value used for the sequence number.
5.2.4.1.2 The following figure describes the test procedure:
SS1 (PE
)
SS2 (EU
T)
Message SS1 to SS2 #X
Message SS1 to SS2 #X+1
Message SS1 to SS2 #X+6
TIM
E
Message SS1 to SS2 #X+3 Message SS1 to SS2 #X+4
Message SS1 to SS2 #X+5
Message SS1 to SS2 #X+2
Note : Only the messages from the SS1 to SS2 are indicated
Figure 4: SN incrementation in reception
5.2.4.1.3 The initial value of the SN must be low enough to enable the test of the SN on a sufficient number of messages (e.g. initial SN << 64535).
5.2.4.2 Traceability with the Subset 098
5.2.4.2.1 SN incrementation is described in Subset-098, § 5.4.7.
5.2.4.3 TEST 3: TEST_SAI_3
5.2.4.3.1 The target of test 3 is to check that the SS processes incrementation of the received SN in the right way.
Test identifier TEST_SAI_3
Initial conditions No connection between the RBC’s
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 22/97
5.2.5 TEST 4: SN INCREMENTATION IN TRANSMISSION
5.2.5.1 Test overview
5.2.5.1.1 The current test must check that the RBC generates the SN using the proper incrementation process. This test doesn’t include the zero-crossing.
5.2.5.1.2 The following figure describes the test procedure:
SS1 (EU
T)
SS2 (PE
)
Message SS1 to SS2 #X
Message SS1 to SS2 #X+1
Message SS1 to SS2 #X+6
TIM
E
Message SS1 to SS2 #X+3 Message SS1 to SS2 #X+4
Message SS1 to SS2 #X+5
Message SS1 to SS2 #X+2
Note : Only the messages from the SS1 to SS2 are indicated
Figure 5: SN incrementation in transmission
5.2.5.1.3 The initial value of the SN must be low enough to enable the test of the SN on a sufficient number of messages (e.g. initial SN << 64535).
5.2.5.2 Traceability with Subset-098
5.2.5.2.1 The SN incrementation is described in §5.4.4 of Subset-098.
5.2.5.3 TEST 4: TEST_SAI_4
5.2.5.3.1 The target of test 4 is to check that the SS processes incrementation of the SN in transmission in the right way.
Test identifier TEST_SAI_4
Initial conditions No connection between the RBC’s
Preliminary steps 1. Establishment of the connection between SAI layers.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 24/97
5.3 EXECUTION CYCLE DEFENCE TECHNIQUE
5.3.1 LIST OF EC FUNCTIONAL TESTS
5.3.1.1.1 TEST 5: initialisation procedure performed by the PE (connection requested by the peer entity) - this test checks that the EUT is able to accept the initialisation of a connection using the EC defence technique.
5.3.1.1.2 TEST 6: initialisation procedure performed by the EUT (connection requested to the peer entity) - this test checks that the EUT is able to perform the initialisation of a connection using the EC defence technique.
5.3.1.1.3 TEST 7: EC incrementation in reception - this test checks that the EUT accepts an EC value incremented by one at each EC period of the peer. This test does not include zero-crossing and long-term tests.
5.3.1.1.4 TEST 8: EC incrementation in transmission - this test checks that the EUT produces an EC value incremented by one at each EC period. This test does not include zero-crossing and long-term tests.
5.3.1.1.5 TEST 9: procedure for the detection of transmission delay initiated by the PE - this test checks that the EUT is able to process the procedure for detection of transmission delay initiated by the PE.
5.3.1.1.6 TEST 10: procedure for the detection of transmission delay initiated by the EUT - this test checks that the EUT is able to initiate and process the procedure for detection of transmission delay.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 25/97
5.3.2 TEST 5: INITIALISATION PROCEDURE PERFORMED BY THE PE
5.3.2.1 Test overview
5.3.2.1.1 This test is similar to the one performed in the section TEST 1: Connection and SN initialisation (connection requested by the PE).
5.3.2.1.2 This test assumes the above-mentioned test has been performed successfully. Only the functions not tested in the above-mentioned section are defined and performed:
a) the SS Responder must accept a random initial EC value;
b) the ratio R (cfr. § 5.4.9.4. of Subset-098) must be correctly computed.
5.3.2.2 Traceability with Subset-098
5.3.2.2.1 The initialisation procedure is defined in Subset-098, §5.4.5.1.
5.3.2.2.2 The Execution Cycle period format is defined in Subset-098, § 5.4.9.3.9.
5.3.2.2.3 The format of the initialisation message (ExecutionCycle Start) is defined in Subset-098, § 5.4.9.3.8.
5.3.2.2.4 The format of the primitives between the SLE and the SAI is compliant with Subset-037.
5.3.2.2.5 The computation of the parameters R is defined in §5.4.9.4.3 of Subset-098.
5.3.2.3 TEST 5: TEST_SAI_5
Test identifier TEST_SAI_5
Initial conditions No connection between the RBC’s
Preliminary steps 1. Establishment of the connection at the TCP/IP level
2. Establishment of the connection at the ALE level
3. Exchange of the AU 1 SaPDU, AU2 SaPDU, AU3 SaPDU and AR SaPDU messages between SLE layers.
Test initiator Reception of the first Sa-Data indication (ExecutionCycleStart message) by the PE.
Expected results and verifications
Expected result 1: The EUT SAI must accept a random “EC” value in the “ExecutionCycleStart” message.
Verification : The EUT must answer sending a ExecutionCycleStart message to the peer entity.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 26/97
5.3.3 TEST 6: INITIALISATION PROCEDURE PERFORMED BY THE EUT
5.3.3.1 Test overview
5.3.3.1.1 This test is similar to the one performed in the section TEST 2: Connection and SN initialisation (connection requested to the PE).
5.3.3.1.2 This test assumes the above-mentioned test has been performed successfully. Only the functions not tested in the above-mentioned section are defined and performed:
a) the PE must accept the initial EC sent in the ExecutionCycleStart message;
b) the ratio R (see. § 5.4.9.4. of Subset-098) must be correctly computed.
5.3.3.1.3 Note: There is no requirement on the initial EC value.
5.3.3.2 Traceability with Subset-098
5.3.3.2.1 The initialisation procedure is defined in Subset-098, §5.4.9.3.
5.3.3.2.2 The Execution Cycle period format is defined in Subset-098, § 5.4.9.2.
5.3.3.2.3 The format of the initialisation message (ExecutionCycle Start) is defined in Subset-098, § 5.4.9.3.
5.3.3.2.4 The format of the primitives between the SLE and the SAI is compliant with Subset-037.
5.3.3.2.5 The computation of the parameter R is defined in §. 5.4.9.4 of Subset-098.
5.3.3.3 TEST 6: TEST_SAI_6
Test identifier TEST_SAI_6
Initial conditions No connection between the RBC’s
Preliminary steps 1. Establishment of the connection at the TCP/IP level
2. Establishment of the connection at the ALE level
3. Exchange of the AU 1 SaPDU, AU2 SaPDU, AU3 SaPDU and AR SaPDU messages between SLE layers.
Test initiator Transmission of the first Sa-Data request (ExecutionCycleStart message) by the EUT.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 32/97
5.3.6 TEST 9: PROCEDURE FOR TRANSMISSION DELAY DETECTION INITIATED BY THE PE
5.3.6.1 Test overview
5.3.6.1.1 This test checks that EUT is able to answer a procedure for detection of transmission delay initiated byPE. The following figure illustrates this procedure:
Sa-Data. Indication
EUT PE
Sa-Data. Request
Sa-Data. Indication
Sa-Data. Request
E URORADI O
E U R O R A D I O
S A I
S A I
DT SaPDU (Appl. Message with
ACK)
DT SaPDU (Appl. Message with
request of ACK)
Set TSyn
Stop TSyn
Transmission of application data
Figure 8: Procedure for transmission delay detectio n initiated by peer PE
5.3.6.2 Traceability with the Subset 098
5.3.6.2.1 The procedure for detection of transmission delay is defined in Subset-098, § 5.4.9.6.
5.3.6.3 TEST 9: TEST_SAI_9
Test identifier TEST_SAI_9
Initial conditions No connection between the RBC’s
Preliminary steps 1. Establishment of the connection at the SAI level
2. Transmission of data between the RBC’s
Test initiator The PE must initiate the Procedure for “detection of transmission delay” (application message with “Request of Acknowledgement”)
Expected results and verifications
Expected result : The EUT must answer to the above-mentioned message with an application message with “ACK”
Verification : The PE checks that it receives the expected message within the expected time window (Tsyn)..
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 34/97
5.3.7 TEST 10: PROCEDURE FOR TRANSMISSION DELAY DETECTION INITIATED BY THE EUT
5.3.7.1 Test overview
5.3.7.1.1 These tests check that EUT is able to initiate a procedure for detection of transmission delay and the result of the procedure.
5.3.7.1.2 The first test (TEST 10.1) consists of checking that EUT is able to initiate the procedure and accept a valid answer from the peer PE received within the expected time window (Tsyn).
5.3.7.1.3 The second test (TEST 10.2) consists of checking that EUT is able to initiate the procedure and, after Tsucc_er following attempts, releases the connection if the answers from peer PE are always received outside the valid time window Tsyn or are not received.
5.3.7.1.4 The following figure illustrates the test:
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 36/97
Initial conditions No connection between the RBC’s
Preliminary steps 1. Establishment of the connection at the SAI level
2. Transmission of data between the RBC’s
Test initiator The EUT must initiate the Procedure for “detection of transmission delay” (application message with “Request of Acknowledgement”)
Expected results and verifications
Expected result : The PE must answer to the above-mentioned message with an application message with “ACK”, and this message must be delivered to the EUT within the valid time window.
Verification : Reception of the “ACK” message by the EUT initiating the procedure for “detection of transmission delay”.
Table 15: TEST_SAI_10-1
5.3.7.4 TEST 10.2: TEST_SAI_10-2
Test identifier TEST_SAI_10-2
Initial conditions No connection between the RBC’s
Preliminary steps 1. Establishment of the connection at the SAI level
2. Transmission of data between theRBC’s
Test initiator The EUT must initiate the Procedure for “detection of transmission delay” (application message with “Request of Acknowledgement”)
Expected results and verifications
Expected result : The PE must answer to the above-mentioned message with an application message with “ACK”, but this message must be delivered to the EUT outside of the valid time window.
Otherwise the PE must not answer to the above-mentioned message with an application message with “ACK”.
Verification : expiration of timer Tsyn for Tsucc_er times and then release of the safe connection.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 37/97
5.4 TRIPLE TIME STAMPING DEFENCE TECHNIQUE
5.4.1 LIST OF TTS FUNCTIONAL TESTS
5.4.1.1.1 TEST 11: Clock offset estimation performed by the EUT. - this test checks that the tested subsystem is able to initiate the clock offset estimation procedure.
5.4.1.1.2 TEST 12: Clock offset estimation performed by the PE. - this test checks that the tested subsystem is able to answer a clock offset estimation procedure initiated by the peer subsystem.
5.4.1.1.3 TEST 13: Exchange of application data. - this test checks that the EUT is able to sent and receive application data.
5.4.1.1.4 TEST 14: Initiation of clock offset update procedure. - this test checks that the EUT is able to initiate the clock offset update procedure.
5.4.1.1.5 TEST 15: Clock offset update procedure initiated by the PE. - this test checks that the EUT is able to answer a clock offset update procedure initiated by the PE.
Legend : − Tinit_start qnd Tres_start : Initialisation timers. If the timers elapse before receiving the offset answers
messages, the safe conection will be released and restarted. − TinitX and TresX : Xth time stamp of the initiator and the responder − Trescycl and Tinitcycl : Message transmission cycle of the responder and initiator. If non-cyclic
transmission, the parameter is set to « 0 ». − Tres_offset_min and Tinit_offset_min : Minimum offset estimations made by the initiator and the responder. − OK/notOK : Result of the offset estimation check.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 39/97
5.4.2.1.3 This test is similar to the one performed in the section “TEST 2: Connection and SN initialisation (connection requested to the PE)”
5.4.2.1.4 This test assumes that the above-mentioned test has been performed successfully. Only the functions not tested in the above-mentioned section are defined and performed:
a) Sending the OffsetAnsw2 message and starting the Tinit_start timer (SUB_TEST 11.1)
b) Processing the OffsetEst message and stopping the Tinit_start timer (SUB_TEST 11.2)
c) Sending the OffsetEnd message (SUB_TEST 11.2)
5.4.2.2 Traceability with the Subset 098
5.4.2.2.1 The messages are specified in § 5.4.8.4 of Subset-098
5.4.2.2.2 The clock offset estimation procedure is specified in Subset-098, §5.4.8.5 .
5.4.2.3 SUB-TEST 11.1: TEST_SAI_11-1
5.4.2.3.1 This subtest checks that the SS under test:
a) sends the OffsetAnsw2 message;
b) starts the Tinit_start timer.
Test identifier TEST_SAI_11-1
Initial conditions No connection between the RBC’s
Preliminary steps Request of a connection by the EUT SAI User.
The tested SAI must send a Sa-Connect request to the EUT SL Euroradio.
Test initiator The connection must be established at the TCP/IP, ALE and SL Euroradio level between the two devices.
The tested SAI must send the OffsetStart message and receive back the OffsetAnsw1 message
Expected result 1: The tested SAI must send the OffsetAnsw2 message to the PE SAI
Verification : Message OffsetAnsw2 received by the peer entity
Expected results and verifications
Expected result 2: Start the Tinit_start timer
Verification : Connection release at the timer elapsing
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 41/97
5.4.3 TEST 12: CLOCK OFFSET ESTIMATION PERFORMED BY THE PE
5.4.3.1 Test overview
5.4.3.1.1 The current test checks if the EUT is able to answer a clock offset estimation procedure.
5.4.3.1.2 Figure 10 illustrates the clock offset estimation procedure. The EUT test is the responder.
5.4.3.1.3 This test is similar to the one performed in the section “TEST 1: Connection and SN initialisation (connection requested by the PE)”.
5.4.3.1.4 This test assumes the above-mentioned test has been performed successfully. Only the functions not tested in the above-mentioned section are specified and performed:
a) sending the OffsetEst message (TEST 12.1);
b) starting the Tres_start timer (TEST 12.1);
c) processing the OffsetEnd message (TEST 12.2);
d) stopping the Tres_start timer (TEST 12.2).
5.4.3.2 Traceability with Subset-098
5.4.3.2.1 The messages are specified in §5.4.8.4 of Subset-098.
5.4.3.2.2 The clock offset estimation procedure is specified in Subset-098, §5.4.8.5.
5.4.3.3 TEST 12.1: TEST_SAI_12-1
5.4.3.3.1 This subtest checks that the EUT:
a) sends the OffsetEst message;
b) starts the Tres_start timer.
Test identifier TEST_SAI_12-1
Initial conditions No connection between the RBC’s
Preliminary steps Request of a connection by the PE SAI User.
The tested SAI must process the Sa-Connect request sent by the peer entity.
Test initiator The connection must be established at the TCP/IP, ALE and SL Euroradio level between the two devices.
The tested SAI must send the OffsetAnsw1 message and receive back the OffsetAnsw2 message
Update of the clock offset initiator : 1. TA_offset_max = TA(y) –
TB(n) 2. TA_offset_min = TA(x) –
TB(m)
TA(y) TB(n)
Legend : − TA(s) and TB(s) : time stamp of the A and B sub-systems. − TA_offset_max : Maximum offset estimations made by the sub-system A. − TA_offset_min : Minimum offset estimations made by the sub-system A.
Storage of TA(x) as the last received time stamp from the sub-system A
a) TEST 14.1: this test checks that the minimum and maximum estimations of the clock offset values are updated if the Clock offset estimation update answer is received during the valid time window.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 45/97
b) TEST 14.2: this test checks that, if the Clock offset estimation update answer is not received during the valid time window, the connection is released (conf Tinit_start near 0 and release of the connection at the first error). Note: this test is possible only if the Tinistart message can be modified after connection establishment.
5.4.5.1.4 The tested SAI shall be configured to release the connection if the Clock offset estimation update procedure fails.
5.4.5.2 Traceability with Subset-098
5.4.5.2.1 The Clock offset estimation update procedure is specified in § 5.4.8.7 of Subset-098.
5.4.5.3 TEST 14.1: TEST_SAI_14-1
Test identifier TEST_SAI_14-1
Initial conditions No connection between the RBC’s
Preliminary steps Establishment of connection, execution of the “Clock offset estimation” procedure and exchange of application data.
Test initiator NA
Expected result 1: The tested SAI shall initiate a “Clock offset estimation update” procedure by sending the “Clock offset update” request.
Verification : Reception and processing of the “Clock offset update” answer from the PE SAI entity.
Expected result 2: The Clock offset update” answer must be received within the valid time window.
Verification : No release of the connection.
Expected results and verifications
Expected result 3: The Clock offset update” answer must be processed by the tested SAI.
Verification : Check that the Toffset_min and Toffset_max values have been updated.
Table 22: TEST_SAI_14-1
5.4.5.4 TEST 14.2: TEST_SAI_14-2
5.4.5.4.1 The Tinit_start timer shall be set to 0 sec.
Test identifier TEST_SAI_14-2
Initial conditions No connection between the RBC’s
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 48/97
6. ALE TEST
6.1 FUNCTIONALITY SET OF THE ALE USER
6.1.1.1.1 The ALE user implements at least the following functions:
a) connection management: initiation of a connection at the ALE level;
b) transmission of application data (the content of the application data shall be predefined);
c) reception of application data (the content of the application data shall be predefined);
d) optionally, display to the user and record the history of the alarms and connection status provided by the ALE.
6.2 CONFIGURATION PARAMETERS
6.2.1 TCP/IP CONFIGURATION PARAMETERS
6.2.1.1.1 The TCP/IP configuration of the equipments EUT and PE shall be implemented in conformance with Subset-098.
6.2.1.1.2 The TCP/IP network shall have logical or physical redundant links to allow redundancy management to be tested.
6.2.2 ALE CONFIGURATION PARAMETERS
6.2.2.1.1 The following ALE configuration parameters are relevant for testing:
• Class (A or D)
• Missing packets tolerated for Class D (Y or N)
6.2.2.1.2 The same Class shall be used for the EUT and the PE.
6.2.2.1.3 Tolerance of missing packets can be different for the EUT and the PE.
6.3 LIST OF FUNCTIONAL TESTS FOR CLASS D
6.3.1
6.3.1.1.1 Test_ALE 1: ALEPKT correctly formed. Subset-098 defines the format of messages to be exchanged between two peers. These tests will check that the ALEPKTs are properly formed by the sender and properly interpreted by the receiver.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 49/97
6.3.1.1.2 Test_ALE 2: Creation of a Class D ALE connection.These tests check that Class D connections are properly created (two TCP links, correct transport sequence numbers etc).
6.3.1.1.3 Test_ALE 3: Data Transfer on a Class D connection. These tests check that data is correctly sent on both TCP channels and properly processed by the receiver.
6.3.1.1.4 Test_ALE 4: Connection Release for Class D connection. These tests check that normal and abnormal connection release takes place as specified.
6.3.1.1.5 Test_ALE 5: Redundancy Management of a Class D connection. These tests check that transmission error conditions are handled in accordance with the specification.
6.4 LIST OF FUNCTIONAL TESTS FOR CLASS A (OPTIONAL)
6.4.1.1.1 Test_ALE 6: ALEPKTs correctly formed. Subset-098 defines the format of messages to be exchanged between two peers. These tests check that the ALEPKTs are properly formed by the sender and properly interpreted by the receiver.
6.4.1.1.2 Test_ALE 7: Creation of a Class A ALE connectionThese tests check that Class A connections are properly created (two TCP links, correct transport sequence numbers etc).
6.4.1.1.3 Test_ALE 8: Data Transfer on a Class A connection. These tests check that data is correctly sent on one TCP channel and properly processed by the receiver.
6.4.1.1.4 Test_ALE 9: Connection Release for Class A connectionThese tests check that normal and abnormal connection release takes place as specified.
6.4.1.1.5 Test_ALE 10: Redundancy Management of a Class A connection. These tests check that transmission error conditions are handled in accordance with the specification.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 50/97
6.5 CLASS D TESTS
6.5.1 TEST_ALE 1: ALEPKT S CORRECTLY FORMED
6.5.1.1 Test objectives
6.5.1.1.1 The objective of these tests is to prove that ALEPKTs are properly formed.
6.5.1.2 Test overview
6.5.1.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management.
6.5.1.3 Traceability
Test Description Traceability with [Subset-098]
1.1 Correct formation of ALEPKT AU1 6.4.5/6.5.2.4
1.2 Correct formation of ALEPKT AU2 6.4.5/6.5.2.4
1.3 Correct formation of ALEPKT data 6.4.5/6.5.2.4/6.5.3.2
1.4 Correct formation of ALEPKT DI 6.4.5/6.5.2.4/6.5.4.4
1.5 Proper interpretation of ALEPKT AU1 6.4.5/6.5.2.4
1.6 Proper interpretation of ALEPKT AU2 6.4.5/6.5.2.4
1.7 Proper interpretation of ALEPKT data 6.4.5/6.5.2.4/6.5.3.2
1.8 Proper interpretation of ALEPKT DI 6.4.5/6.5.2.4/6.5.4.4
Note: Tests 1.3 and 1.7 cover ALEPKTs containing AU3.
6.5.1.4 TEST_ALE_1-1
6.5.1.4.1 The objective of this test is to ensure correct formation of AU1 ALEPKT.
6.5.1.4.2 EUT is the initiator, PE is the responder.
6.5.1.4.3 Test Description
Test identifier TEST_ALE_1-1
Initial conditions No connection between the EUT and PE
Preliminary steps 1. Establishment of the connections at the TCP/IP level
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 56/97
6.5.2 TEST 2: ESTABLISH CLASS D CONNECTION
6.5.2.1 Test objective
6.5.2.1.1 The objective of these tests is to show that data are transferred in accordance with the definitions contained in Subset-098.
6.5.2.2 Test overview
6.5.2.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to the specification Subset-098
6.5.2.3 Traceability
Test Description Traceability with [Subset-098]
2.1 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class D connection request.
6.5.2/6.6.2.1
2.2 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class D connection request, only one TCP link being available.
6.5.2/6.6.2.1
2.3 EUT initiates Class D call, both TCP connections available
6.5.2/6.6.2.1
2.4 EUT initiates Class D call, one TCP connection unavailable
6.5.2/6.6.2.1
2.5 EUT initiates Class D call, both TCP connections unavailable
6.5.2/6.6.2.1
6.5.2.4 Network prerequisites
6.5.2.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.5.2.5 TEST_ALE_2-1
6.5.2.5.1 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class D connection request.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 57/97
Test identifier TEST_ALE_2-1
Initial conditions No connection between the EUT and PE
Preliminary steps 1. PE and EUT must be physically connected by two physical routes
2. IP addresses of EUT configured in PE
3. Listen ports configured in EUT
Test initiator Connection request (AU1 SaPDU) from the PE ALE user.
Expected results Verification
Two TCP connections in progress
Monitor ethernet for appropriate TCP packets
The EUT ALE answers with an AU2 ALEPKT on both links.
Reception of “T-Connect Confirm” by the PE ALE from the local ALE
Status of the connection at the PE ALE is ‘connected’.
The PE ALE must consider that the connection is open at the ALE level with the peer entity.
Table 33: TEST_ALE_2-1
6.5.2.6 TEST_ALE_2-2
6.5.2.6.1 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class D connection request. One of the TCP connections between the PE and the EUT shall be in failure (not connected).
6.5.2.6.2 The test shall be performed twice : during the first test, the primary link shall be in failure and during the second test, the secondary link shall be in failure.
6.5.2.6.3 Test Description
Test identifier TEST_ALE_2-2
Initial conditions No connection between the EUT and PE
Preliminary steps 1. PE and EUT must be physically connected by only one physical route
2. IP addresses of EUT configured in PE
3. Listen ports configured in EUT
Test initiator Connection request (AU1 SaPDU) from the PE ALE user.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 59/97
6.5.2.8.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.5.2.8.3 Test Description
Test identifier TEST_ALE_2-4
Initial conditions No connection between the EUT and PE
Preliminary steps 1. PE and EUT must be physically connected by only one physical route (second route disabled)
2. IP addresses of PE configured in EUT
3. Listen ports configured in PE
4. One of PE ethernet ports is dis-connected.
Test initiator Connection request (AU1 SaPDU) from the EUT ALE user.
Expected results Verification
One TCP connection started by EUT
Monitor ethernet for appropriate TCP packets
The PE ALE should answer with an AU2 ALEPKT on the working TCP connection.
Reception of “T-Connect Confirm” by the EUT ALE from the local ALE
The EUT ALE must consider that the connection is open at the ALE level with the peer entity.
Status of the connection at the EUT ALE level.
TransportSequenceNumber has value “0”
Monitor ethernet for appropriate TCP packets on available TCP connection
Table 36: TEST_ALE_2-4
6.5.2.9 TEST_ALE_2-5
6.5.2.9.1 EUT initiates Class D call, both TCP connections unavailable.
6.5.2.9.2 Test Description
Test identifier TEST_ALE_2-5
Initial conditions No connection between the EUT and PE
Preliminary steps 1. PE and EUT must not be physically connected
2. IP addresses of PE configured in EUT
Test initiator Connection request (AU1 SaPDU) from the EUT ALE user.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 61/97
6.5.3 TEST 3: DATA TRANSFER OVER A CLASS D CONNECTION
6.5.3.1 Test objective
6.5.3.1.1 The objective of these tests is to show that data are transferred in accordance with Subset-098.
6.5.3.2 Test overview
6.5.3.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to Subset-098.
6.5.3.3 Traceability
Test Description Traceability with [Subset-098]
3.1 Normal data transmission from EUT operates correctly using a Class D connection (with two TCP connections)
6.4.5/6.5.3/6.6.2.2
3.2 Data Transfer from EUT using a Class D connection works correctly with failure of one TCP connection
6.4.5/6.5.3/6.6.2.2
3.3 Value of TSeqNum is correctly incremented in each message transmitted by the EUT
6.4.5/6.5.3/6.6.2.2
6.5.3.4 Network prerequisites
6.5.3.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.5.3.5 TEST_3-1
6.5.3.5.1 Normal data transmission from the EUT operates correctly using a Class D connection (with two TCP connections).
6.5.3.5.2 Test Description
Test identifier TEST_ALE_3-1
Initial conditions No connection between the EUT and PE
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 62/97
Preliminary steps 1. PE and EUT must be physically connected by two physical routes
2. IP addresses of PE configured in EUT
3. Listen addresses configured in PE
4. Establishment of the connection at the TCP/IP level by EUT
5. Establishment of the connection at the ALE level
6. Exchange of the AU 1 ALEPKT, AU2 ALEPKT.
Test initiator DT ALEPKT, containing AU3 SaPDU, sent by EUT
Expected results Verification
- Data ALEPKTs sent on both TCP connections.
Monitor ethernets for appropriate TCP packets
Table 38: TEST_ALE_3-1
6.5.3.6 TEST_ALE_3-2
6.5.3.6.1 Data Transfer from EUT using a Class D connection works correctly with failure of one TCP connection.
6.5.3.6.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.5.3.6.3 Test Description
Test identifier TEST_ALE_3-2
Initial conditions No connection between the EUT and PE
Preliminary steps 1. PE and EUT must be initially connected by two physical routes
2. IP addresses of PE configured in EUT
3. Listen addresses configured in PE
4. Establishment of the connection at the TCP/IP level by EUT
5. Establishment of the connection at the ALE level
6. Exchange of the AU 1 ALEPKT, AU2 ALEPKT.
7. Start data transfer
Test initiator With data transfer in normal operation disconnect one ethernet at PE.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 64/97
6.5.4 TEST 4: RELEASE OF A CLASS D CONNECTION
6.5.4.1 Test objective
6.5.4.1.1 The purpose of these tests is to demonstrate that the EUT ALE correctly handles all conditions that cause disconnection from the peer.
6.5.4.2 Test overview
6.5.4.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to Subset-098.
6.5.4.3 Scenarios and Traceability
Test Description Traceability with [Subset-098]
4.1 Normal release of Class D connection (with two TCP connections) by initiator (EUT)
6.5.4/6.6.2
4.2 Correct reaction by responder to normal release of Class D connection (with two TCP connections).
6.5.4/6.6.2
4.3 Normal release of Class D connection with one TCP connection already in failure
6.5.4/6.6.2
4.4 Normal release of Class D connection with one TCP connection already in failure initiated by EUT
6.5.4/6.6.2
4.5 Release due to failure of both TCP connections (e.g. remote peer failure)
6.5.4/6.6.2
6.5.4.4 Network prerequisites
6.5.4.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.5.4.5 TEST_ALE_4-1
6.5.4.5.1 Ensure that Normal release of Class D connection (with two TCP connections) by initiator (EUT) works correctly.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 66/97
6. Establishment of safe connection
7. Continuous data transfer.
Test initiator ALEPKT 4 received from remote user by EUT ALE.
Expected results Verification
Type 4 ALEPKT received from PE
Monitor ethernet for appropriate TCP packets
Release of the connection. All data delivered on both sides.
DI ALEPKT delivered on EUT.
Release of TCP connections.
ALE User connection released
Safe connection terminated.
Table 42: TEST_ALE_4-2
6.5.4.7 TEST_ALE_4-3
6.5.4.7.1 Normal release of Class D connection with one TCP connection already in failure : PE initiator of the disconnection.
6.5.4.7.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.5.4.7.3 Test Description
Test identifier TEST_ALE_4-3
Initial conditions No connection between RBC’s.
Preliminary steps 1. PE and EUT must be physically connected by one physical route
2. IP addresses of PE configured in EUT
3. Listen addresses configured in PE
4. Establishment of the connections at the TCP/IP level by EUT
5. Establishment of the connection at the ALE level
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 67/97
Expected results Verification
Type 4 ALEPKT sent to PE All data delivered on both sides.
DI ALEPKT delivered on EUT.
ALE User connection closed Safe connection released.
Remaining TCP Connection released.
Monitor ethernet for appropriate TCP packets (including TCP packet “FIN” + acks in both directions).
Table 43: TEST_ALE_4-3
6.5.4.8 TEST_ALE_4-4
6.5.4.8.1 Normal release of Class D connection with one TCP connection already in failure: EUT initiator of the disconnection.
6.5.4.8.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.5.4.8.3 Test Description
Test identifier TEST_ALE_4-4
Initial conditions No connection between RBC’s.
Preliminary steps 1. PE and EUT must be physically connected by one physical route
2. IP addresses of PE configured in EUT
3. Listen addresses configured in PE
4. Establishment of the connections at the TCP/IP level by EUT
5. Establishment of the connection at the ALE level
6. Establishment of safe connection
7. Continuous data transfer.
8. Disconnection of one link at PE
Test initiator DI ALEPKT sent by the EUT.
Expected results Verification
Type 4 ALEPKT sent to PE All data delivered on both sides.
DI ALEPKT delivered on PE.
ALE User connection closed Safe connection released.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 69/97
6.5.5 TEST 5: REDUNDANCY MANAGEMENT OF A CLASS D CONNECTION
6.5.5.1 Test objective
6.5.5.1.1 These tests are designed to show that redundancy management operates as defined in Subset-098 for a Class D connection between conformant peers.
6.5.5.2 Test overview
6.5.5.2.1 Packets are sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to Subset-098.
6.5.5.3 Scenarios and Traceability
Test Description Traceability with [Subset-098]
5.1 Network failure on one physical channel. Initiator (EUT) attempts restart.
6.5.4 / 6.6.2
5.2 Network failure of both physical channels. Initiator (EUT) attempts restart.
6.5.4 / 6.6.2
6.5.5.4 Network prerequisites
6.5.5.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.5.5.5 TEST_ALE_5-1
6.5.5.5.1 Network failure on one physical channel. Initiator (EUT) attempts restart.
6.5.5.5.2 Test Description
Test identifier TEST_ALE_5-1
Initial conditions No connection between RBC’s.
Preliminary steps 1. PE and EUT must be physically connected by two physical routes
2. IP addresses of PE configured in EUT
3. Listen addresses configured in PE
4. Establishment of the connections at the TCP/IP level by
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 72/97
6.6 CLASS A TESTS (OPTIONAL)
6.6.1 TEST_ALE_6: ALEPKT S CORRECTLY FORMED
6.6.1.1 Test objectives
6.6.1.1.1 The objective of these tests is to prove that ALEPKTs are properly formed.
6.6.1.2 Test overview
6.6.1.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management.
6.6.1.3 Traceability
Test Description Traceability with [Subset-098]
6.1 Correct formation of AU1 ALEPKT 6.4.5/6.5.2.4
6.2 Correct formation of AU2 ALEPKT 6.4.5/6.5.2.4
6.3 Correct formation of DT ALEPKT 6.4.5/6.5.2.4/6.5.3.2
6.4 Correct formation of DI ALEPKT 6.4.5/6.5.2.4/6.5.4.4
6.5 Correct formation of KAA ALEPKT 6.4.5/6.5.2.4/6.5.3.2/6.6.1.3
6.6 Correct interpretation of KANA ALEPKT 6.4.5/6.5.2.4/6.5.3.2/6.6.1.3
6.7 Proper interpretation of AU1 ALEPKT 6.4.5/6.5.2.4
6.8 Proper interpretation of AU2 ALEPKT 6.4.5/6.5.2.4
6.9 Proper interpretation of DT ALEPKT 6.4.5/6.5.2.4/6.5.3.2
6.10 Proper interpretation of DI ALEPKT 6.4.5/6.5.2.4/6.5.4.4
6.11 Correct interpretation of KAA ALEPKT 6.4.5/6.5.2.4/6.5.3.2/6.6.1.3
6.12 Correct interpretation of KANA ALEPKT 6.4.5/6.5.2.4/6.5.3.2/6.6.1.3
Notes:
• Tests 6.3 and 6.7 cover ALEPKTs containing AU3 SaPDU and AR SaPDU;
• The correct formation and interpretation of the message switch message (switchN2R and switchR2N) are tested by the tests TEST_ALE_10-1 to TEST_ALE_10-4.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 80/97
Note : The KAA ALEPKT’s are exchanged on the active link only.
Table 58: TEST_ALE_6-11
6.6.1.15 TEST_ALE_6-12
6.6.1.15.1 The objective of this test is to ensure correct interpretation of the KANA ALEPKT.
6.6.1.15.2 PE is the initiator, EUT is the responder.
6.6.1.15.3 Test Description
Test identifier TEST_ALE 6-12
Initial conditions No connection between the EUT and PE
Preliminary steps • Establishment of the connections at the TCP/IP level
• Establishment of the connection at ALE level : exchange of AU1 SaPDU, AU2 SaPDU, AU3 SaPDU and AR SaPDU
Test initiator AR SaPDU exchanged between the two equipments.
Expected results Verification
Reception, on non-active link, of KANA ALEPKT
Examination of trace from ethernet monitor or PDU logger. No connection release due to “Keep Alive” timer elapsing in the EUT.
Note : The KANA ALEPKT’s are exchanged on the non-active link only.
Table 59: TEST_ALE_6-12
6.6.2 TEST_ALE_7: E STABLISH CLASS A CONNECTION
6.6.2.1 Test objective
6.6.2.1.1 The objective of these tests is to show that data is transferred in accordance with the definitions contained in Subset-098.
6.6.2.2 Test overview
6.6.2.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to the specification Subset-098
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 81/97
6.6.2.3 Traceability
Test Description Traceability with [Subset-098]
7.1 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class A connection request.
6.5.2/6.6.1.2
7.2. EUT listen Class A call, one TCP connection unavailable
6.5.2/6.6.1.2
7.3 EUT initiates Class A call, both TCP connections available
6.5.2/6.6.1.2
7.4 EUT initiates Class A call, one TCP connection unavailable
6.5.2/6.6.1.2
7.5 EUT initiates Class a call, both TCP connections unavailable
6.5.2/6.6.1.2
6.6.2.4 Network prerequisites
6.6.2.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.6.2.5 TEST_ALE_7-1
6.6.2.5.1 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class A connection request.
6.6.2.5.2 Test Description
Test identifier TEST_ALE_7-1
Initial conditions No connection between the EUT and PE
Preliminary steps • PE and EUT must be physically connected by two physical routes
• IP addresses of EUT configured in PE
• Listen ports configured in EUT
Test initiator Connection request (AU1 SaPDU) from the PE ALE user on the active link.
Expected results Verification
Two TCP connections in progress
Monitor ethernet or PDU logger for appropriate TCP packets
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 82/97
The EUT ALE answers with an AU2 ALEPKT on the active links.
Reception by the PE ALE user of “T-Connect Confirm” from the local ALE
Status of the connection at the PE ALE is ‘connected’.
The PE ALE must consider that the connection is open at the ALE level with the peer entity.
Table 60: TEST_ALE_7-1
6.6.2.6 TEST_ALE_7-2
6.6.2.6.1 EUT listens for incoming TCP calls at configured addresses and accepts incoming Class A connection request. One of the TCP connection between the PE and the EUT shall be in failure (not connected).
6.6.2.6.2 The test shall be performed twice : during the first test, the primary link shall be in failure and during the second test, the secondary link shall be in failure.
6.6.2.6.3 Test Description
Test identifier TEST_ALE_7-2
Initial conditions No connection between the EUT and PE
Preliminary steps • PE and EUT must be physically connected by only one physical route
• IP addresses of EUT configured in PE
• Listen ports configured in EUT
Test initiator Connection request (AU1 SaPDU) from the PE ALE user.
Expected results Verification
Only one active TCP link Monitor ethernet for appropriate TCP packets
The EUT ALE answers with an AU2 ALEPKT on the active link.
Reception by the PE ALE of “T-Connect Confirm” from the local ALE
Status of the connection at the PE ALE is ‘connected’.
The PE ALE must consider that the connection is open at the ALE level with the peer entity.
Table 61: TEST_ALE_7-2
6.6.2.7 TEST_ALE_7-3
6.6.2.7.1 EUT initiates Class A call, both TCP connections available.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 83/97
Test identifier TEST_ALE_7-3
Initial conditions No connection between the EUT and PE
Preliminary steps • PE and EUT must be physically connected by two physical routes
• IP addresses of PE configured in EUT
• Listen ports configured in PE
Test initiator Connection request (AU1 SaPDU) from the EUT ALE user.
Expected results Verification
Two TCP connections started by EUT
Monitor ethernet for appropriate TCP packets
The PE ALE should answer with an AU2 ALEPKT on the active link.
Reception by the EUT ALE user of “T-Connect Confirm” from the local ALE
The EUT ALE must consider that the connection is opening with the peer entity.
Status of the connection at the EUT ALE level.
TransportSequenceNumber has value “0”
Monitor ethernet for appropriate TCP packets
Table 62: TEST_ALE_7-3
6.6.2.8 TEST_ALE_7-4
6.6.2.8.1 EUT initiates Class A call, one TCP connection unavailable.
6.6.2.8.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.6.2.8.3 Test Description
Test identifier TEST_ALE_7-4
Initial conditions No connection between the EUT and PE
Preliminary steps • PE and EUT must be physically connected by only one physical route (second route disabled)
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 85/97
6.6.3.2 Test overview
6.6.3.2.1 Packets will be sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to Subset-098.
6.6.3.3 Traceability
Test Description Traceability with [Subset-098]
8.1 Data transmission from EUT operates correctly using a Class A connection (with two TCP connections)
6.5.3/6.6.1.3
8.2 Data Transfer from EUT using a Class A connection works correctly with failure of one TCP connection
6.5.3/6.6.1.3
8.3 Value of TransportSequenceNumber is correctly incremented in each message transmitted by the EUT
6.5.3/6.6.1.3
6.6.3.4 Network prerequisites
6.6.3.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.6.3.5 TEST_8-1
6.6.3.5.1 Normal data transmission from the EUT operates correctly using a Class A connection (with two TCP connections).
6.6.3.5.2 Test Description
Test identifier TEST_ALE_8-1
Initial conditions No connection between the EUT and PE
Preliminary steps • PE and EUT must be physically connected by two physical routes
• IP addresses of PE configured in EUT
• Listen addresses configured in PE
• Establishment of the connection at the TCP/IP level by EUT
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 86/97
• Establishment of the connection at the ALE level
• Exchange of the AU 1 ALEPKT, AU2 ALEPKT.
Test initiator DT ALEPKT, containing AU3 SaPDU, sent by EUT
Expected results Verification
DT ALEPKT shall be exchanged only on the active link.
Monitor ethernets for appropriate TCP packets
KAA shall be periodically exchanged only on the active link while no user data are exchanged.
Monitor ethernets for appropriate TCP packets.
No connection release due to “Keep Alive” timer elapsing.
KANA shall be periodically exchanged only on the non-active link.
Monitor ethernets for appropriate TCP packets.
No connection release due to “Keep Alive” timer elapsing.
Table 65: TEST_ALE_8-1
6.6.3.6 TEST_ALE_8-2
6.6.3.6.1 Data Transfer from EUT using a Class A connection works correctly with failure of one TCP connection.
6.6.3.6.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.6.3.6.3 Test Description
Test identifier TEST_ALE_8-2
Initial conditions No connection between the EUT and PE
Preliminary steps • PE and EUT must be initially connected by two physical routes
• IP addresses of PE configured in EUT
• Listen addresses configured in PE
• Establishment of the connection at the TCP/IP level by EUT
• Establishment of the connection at the ALE level
• Exchange of the AU 1 ALEPKT, AU2 ALEPKT.
• Start data transfer
Test initiator With data transfer in normal operation disconnect one
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 88/97
6.6.4 TEST_ALE_9: R ELEASE OF A CLASS A CONNECTION
6.6.4.1 Test objective
6.6.4.1.1 The purpose of these tests is to demonstrate that the EUT ALE correctly handles all conditions that cause disconnection from the peer.
6.6.4.2 Test overview
6.6.4.2.1 Packets are sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to Subset-098.
6.6.4.3 Scenarios and Traceability
Test Description Traceability with [Subset-098]
9.1 Normal release of Class A connection (with two TCP connections) by initiator (EUT)
6.5.4/6.6.1.5/6.6.1.6
9.2 Normal release of Class A connection with one TCP connection already in failure, EUT being innitiator of the connection release.
6.5.4/6.6.1.5/6.6.1.6
9.3 Correct reaction by responder to normal release of Class A connection (with two TCP connections).
6.5.4/6.6.1.5/6.6.1.6
9.4 Normal release of Class A connection with one TCP connection already in failure,PE being innitiator of the connection release.
6.5.4/6.6.1.5/6.6.1.6
9.5 Release due to failure of both TCP connections (e.g. remote peer failure)
6.5.4/6.6.1.5/6.6.1.6
6.6.4.4 Network prerequisites
6.6.4.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.6.4.5 TEST_ALE_9-1
6.6.4.5.1 Ensure that Normal release of Class A connection (with two TCP connections) by initiator (EUT) works correctly.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 89/97
Test identifier TEST_ALE_9-1
Initial conditions No connection between RBC’s.
Preliminary steps • PE and EUT must be physically connected by two physical routes
• IP addresses of PE configured in EUT
• Listen addresses configured in PE
• Establishment of the connections at the TCP/IP level by EUT
• Establishment of the connection at the ALE level
• Establishment of safe connection
• Continuous data transfer.
Test initiator T-DISC.req (Disc SaPDU) received from EUT ALE user.
Expected results Verification
Release of the connection. All data delivered on both sides.
DI ALEPKT delivered to PE ALE on the active link.
ALE User connection closed Safe connection terminated.
TCP Connections released. Monitor ethernet for appropriate TCP packets (including TCP packet “FIN” + acks in both directions).
Table 68: TEST_ALE_9-1
6.6.4.6 TEST_ALE_9-2
6.6.4.6.1 Normal release of Class A connection with one TCP connection already in failure: EUT initiator of the disconnection.
6.6.4.6.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.6.4.6.3 Test Description
Test identifier TEST_ALE_9-2
Initial conditions No connection between RBC’s.
Preliminary steps • PE and EUT must be physically connected by one physical route
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 91/97
Expected results Verification
Release of the ALE connection.
All data delivered on both sides.
DI ALEPKT delivered on EUT ALE on the active link.
ALE User connection released
Safe connection terminated.
TCP Connections released. Monitor ethernet for appropriate TCP packets (including TCP packet “FIN” + acks in both directions).
Table 70: TEST_ALE_9-3
6.6.4.8 TEST_ALE_9-4
6.6.4.8.1 Normal release of Class A connection with one TCP connection already in failure : PE initiator of the disconnection.
6.6.4.8.2 The test shall be performed twice : during the first test, the primary link shall be not connected and during the second test, the secondary link shall be not connected.
6.6.4.8.3 Test Description
Test identifier TEST_ALE_9-4
Initial conditions No connection between RBC’s.
Preliminary steps • PE and EUT must be physically connected by one physical route
• IP addresses of PE configured in EUT
• Listen addresses configured in PE
• Establishment of the connections at the TCP/IP level by EUT
• Establishment of the connection at the ALE level
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 93/97
6.6.5 TEST_ALE_10: R EDUNDANCY MANAGEMENT OF A CLASS A CONNECTION
6.6.5.1 Tests objective
6.6.5.1.1 These tests are designed to show that redundancy management operates as defined in Subset-098 for a Class A connection between conformant peers.
6.6.5.2 Test overview
6.6.5.2.1 Packets are sent and received by the EUT during various types of activity such as connection establishment, connection release, data transfer and redundancy management. They can be captured by an ethernet monitor or PDU logger (as well as by the PE) to verify that they conform to Subset-098.
6.6.5.3 Scenarios and Traceability
Test Description Traceability with Subset-098
10.1 Switch from primary and active link to secondary link initiated by EUT
6.5.3 / 6.6.1.4
10.2 Switch from secondary and active link to primary link initiated by EUT
6.5.3 / 6.6.1.4
10.3 Switch from primary and active link to secondary link initiated by PE.
6.5.3 / 6.6.1.4
10.4 Switch from secondary and active link to primary link initiated by PE.
6.5.3 / 6.6.1.4
6.6.5.4 Network prerequisites
6.6.5.4.1 These tests should be conducted over physical connections that use at least two physical links (so that channels can be disturbed without losing layer 2 connections on the peer).
6.6.5.5 TEST_ALE_10-1
6.6.5.5.1 Network failure on primary and active link. EUT initiates the switch.
6.6.5.5.2 The EUT under tests could be forced to initiate the switch if the “Keep Awake “ and TCP keep awake timers of the PE is several times bigger than the ones of the EUT.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 94/97
Preliminary steps • PE and EUT must be physically connected by two physical links
• IP addresses of PE configured in EUT
• Listen addresses configured in PE
• Establishment of the connections at the TCP/IP level by EUT
• Establishment of the connection at the ALE level
• Establishment of safe connection
• Continuous data transfer.
Test initiator The primary link is disconnected.
Expected results Verification
EUT recognises loss of TCP connection.
Timer expiry causes reset of TCP connection.
Bi-directional data flow proceeds on remaining (redunded) channel.
SwitchN2R ALEPKT sent on the secondary link by the EUT.
Expected data are correctly received by both peers.
The KAA ALEPKT are sent and received on the secdondary and active link.
Monitor ethernet for appropriate TCP packets.
Test initiator The primary link is reconnected.
Expected results Verification
Primary link restoration TCP connection re-established.
The KANA ALEPKT are sent and received on the primary and non-active link.
Monitor ethernet for appropriate TCP packets.
Table 73: TEST_ALE_10-1
6.6.5.6 TEST_ALE_10-2
6.6.5.6.1 Network failure on secondary and active link. EUT initiates the switch. As after the previous test the secondary link is the active one, the current test could be performed just after the TEST_ALE_10-1.
6.6.5.6.2 The EUT under tests could be forced to initiate the switch if the “Keep Awake “ and TCP keep awake timers of the PE is several times bigger than the ones of the EUT.
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 95/97
Initial conditions No connection between RBC’s.
Preliminary steps • The secondary link shall be the active one and the two TCP connections shall be operational
Test initiator The secondary link is disconnected.
Expected results Verification
EUT recognises loss of TCP connection.
Timer expiry causes reset of TCP connection.
Bi-directional data flow proceeds on remaining (redunded) channel.
SwitchR2N ALEPKT sent on the primary link by the EUT.
All the expected data are correctly received by both peers.
The KAA ALEPKT are sent and received on the primary and active link.
Monitor ethernet for appropriate TCP packets.
Test initiator The secondary link is reconnected.
Expected results Verification
Secondary link restoration TCP connection re-established.
The KANA ALEPKT are sent and received on the secondary and non-active link.
Monitor ethernet for appropriate TCP packets.
Table 74: TEST_ALE_10-2
6.6.5.7 TEST_ALE_10-3
6.6.5.7.1 Network failure on primary and active link. PE initiates the switch.
6.6.5.7.2 The PE could be forced to initiate the switch if the “Keep Awake “ and TCP keep awake timers of the EUT is several times bigger than the ones of the PE.
6.6.5.7.3 Test Description
Test identifier TEST_ALE_10-3
Initial conditions No connection between RBC’s.
Preliminary steps • PE and EUT must be physically connected by two physical links
• IP addresses of PE configured in EUT
• Listen addresses configured in PE
• Establishment of the connections at the TCP/IP level by EUT
Subset-099 v1.0.0 RBC-RBC Safe Communication Interface - Test Specification Page 96/97
• Establishment of the connection at the ALE level
• Establishment of safe connection
• Continuous data transfer.
Test initiator The primary link is disconnected.
Expected results Verification
PE recognises loss of TCP connection.
Timer expiry causes reset of TCP connection.
Bi-directional data flow proceeds on remaining (redunded) channel.
SwitchN2R ALEPKT received on the secondary link from the PE.
All the expected data are correctly received by both peers.
The KAA ALEPKT are sent and received on the secdondary and active link.
Monitor ethernet for appropriate TCP packets.
Test initiator The primary link is reconnected.
Expected results Verification
Primary link restoration TCP connection re-established.
The KANA ALEPKT are sent and received on the primary and non-active link.
Monitor ethernet for appropriate TCP packets.
Table 75: TEST_ALE_10-3
6.6.5.8 TEST_ALE_10-4
6.6.5.8.1 Network failure on secondary and active link. PE initiates the switch. As after the previous test the secondary link is the active one, the current test could be performed just after the TEST_ALE_10-3.
6.6.5.8.2 The PE could be forced to initiate the switch if the “Keep Awake “ and TCP keep awake timers of the EUT is several times bigger than the ones of the PE.
Test identifier TEST_ALE_10-4
Initial conditions No connection between RBC’s.
Preliminary steps • The secondary link shall be the active one and the two TCP connections shall be operational
Test initiator The secondary link is disconnected.