Top Banner
3 500 MEN WORKER CAMP 3 500 MEN WORKER CAMP 3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / RAS LAFFAN / QATAR QATAR
21

RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

Jul 28, 2018

Download

Documents

lylien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

3 500 MENWORKER CAMP3 500 MENWORKER CAMP3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / RAS LAFFAN / QATARQATAR

Page 2: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / QATARRAS LAFFAN / QATAR

Type of Contract: Construction

Scope of Work: Building construction works, Electrical works, Mechanical works, Water heater units, A/Cunits

Total Building Area : 34 379 72 m²Total Building Area : 34.379,72 m

Duration of the Work: September 2006 ‐ January 2007

Page 3: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 4: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

2 400 PERSON CAMP PROJECT FOR2 400 PERSON CAMP PROJECT FOR2.400 PERSON CAMP PROJECT FOR 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT SOUTH YOLOTEN PIPELINE INST. PROJECT 

TURMENISTANTURMENISTAN

Page 5: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

2.400 PERSON CAMP PROJECT FOR SOUTH 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT YOLOTEN PIPELINE INST. PROJECT TURMENISTAN TURMENISTAN 

Type of Contract: Engineering & Supply

Scope of Work: Design works, Electrical works, Mechanical works, Water heater units, HVAC systems,Fire Fighting systems, Assembly supervision, Furnishing

Total Building Area: 30 188 86 m²Total Building Area: 30.188,86 m

Duration of the Work:May 2011‐ October 2011

Page 6: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 7: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

PALOUGE OPERATION BASE CAMP PALOUGE OPERATION BASE CAMP EXTENSIONEXTENSION PROJECTPROJECTEXTENSION EXTENSION PROJECTPROJECT

SUDANSUDAN

Page 8: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

OPERATING OPERATING BASE CAMP BASE CAMP ADAR / SUDANADAR / SUDAN

Type of ontract : Design & Build

Type of Work: Pre‐Engineered Steel Construction Buildings yp g g

Scope of Work : Building construction works, Electrical works, Mechanical works

Total Building Area:  5.835 m2g

Duration of the Work: January 2011‐April 2011

Page 9: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 10: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 11: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

TENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENT TENGIZ CHEVROIL MANAGEMENT BUILDING BUILDING 

TENGIZ / TENGIZ / KAZAKHSTANKAZAKHSTAN

Page 12: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ / KAZAKHSTANTENGIZ / KAZAKHSTAN

Type of Contract: Engineering & Supply

Scope of Work: Electrical works, Mechanical works, Assembly supervision

Total Building Area: 6.700 m²

Duration of the Work: February 2004 ‐ April 2004

Page 13: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 14: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 15: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER

Page 16: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER

Type of Contract: Design & Build

S f W k B ildi i k El i l k M h i l k F i hiScope of Work: Building construction works, Electrical works, Mechanical works, Furnishing

Total Building Area: 1.848 m²

D i f h W k J l 2012 N b 2012Duration of the Work: July 2012‐November 2012

Page 17: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 18: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NIGERIANIGERIA

Page 19: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NNIGERIAIGERIA

Type of Work : 6 Units of single‐storey Modular Sandwich Panel System Prefabricated Office & Canteen Buildings

Scope of Work : Supply of Modular Prefabricated Building including, floor covering, electrical and sanitary installation materials, A/C units  & Water Heaters  & Exhaust Fan Units, Addressable Fire Alarm System, transportation and supervision of erection

Total Building Area: 5.000 m2

Duration of the Work:  April 2010 ‐ June 2010

Page 20: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan
Page 21: RAS LAFFAN QATAR - Europages · 2 4002.400 person camp project for south yoloten pipeline inst. project turmenistan

HEAD OFFICE:Aşağı öveçler Mahallesi 1325. Sokak No:6, 06460, Ankara / TÜRKİYEPhone: +90 312 472 82 10 (pbx)  Fax    : +90 312 472 82 18‐19Web : www dorce com tr E‐mail: dorce@dorce com tr

FACTORY:

Ankara‐İstanbul Kara yolu, 29.km 06105 Sarayköy, Ankara / Türkiye

Phone: +90 312 815 51 65 ‐ 72 Fax  : +90 312 815 51 71 Web  :  www.dorce.com.tr E mail: [email protected]