Perhitungan Besi dan CetakanKode Balok : 1 InputKode Kolom : 2 Output AwalKode Pelat : 3 Output Final
Lantai KodeNama Struktur
Dia b=lebar h=tinggi Luas Panjang/m3 Banyak Pjg Total Tul utama Berat/m Begel Berat/m Jrk Rata-Rata Byk Begel Pjg 1 BegelBerat Besi CetakanNama Struktur(M) (M) (M) (M2) (M) (BH) (M) ( Dia ) Kg/M ( Dia ) Kg/M (M) (BH) (BH) (Kg) (M2)
3 Afworking Beton Volume = 0.3 x 2.9 x 2 = 1.74 56.36+ 0.9 x 1.8 x 8 = 12.96+ 0.3 x 2.25 x 8 = 5.4+ 1.65 x 1.8 x 1 = 2.97+ 1.05 x 0.9 x 2 = 1.89+ 2 x 5.1 x 1 = 10.2+ 2 x 5.3 x 2 = 21.2
= 56.36
4 Pekerjaan Profil 5x15 Volume = 3.9 x 2 x 2 = 15.6 15.6 M'
VI. PEKERJAAN PERLENGKAPAN1 Pasang Pintu Utama P1 Volume = 4.4 x 2 = 8.8 8.82 Pasang Pintu P2 Volume = 0.9 x 1.75 = 1.575 1.5753 Logo Kota Padang Volume = 1 1 Unit4 Logo Tut Wuri Handayani Volume = 1 1 Unit5 Huruf t-30 cm Volume = 14 14 Bh
Padang, 10 Mei 2012 Dibuat oleh :
CV. CHAKRA KARYA
Ir.H ANIS ULQUDY Direktur
M²
M²
M²
M²
M²
M²M²
DAFTAR HARGA UPAH, BAHAN DAN PEKERJAAN
PROGRAM : WAJIB BELAJAR 9 TAHUN
PEKERJAAN : PEMBANGUNAN PAGAR SDN 23/24 KOTA PADANG
LOKASI : JL. VETERAN - PADANG
HARGA KETERANGAN No. URAIAN SAT SATUAN /HARGA
(Rp) (Rp)
1 2 3 4 5
I UPAH1 Kepala Tukang hari 80,000.00 2 Mandor hari 60,000.00 3 Pekerja hari 45,000.00 4 Tukang Batu hari 65,000.00 5 Tukang Besi hari 65,000.00 6 Tukang Pipa hari 65,000.00 7 Tukang Listrik hari 65,000.00 8 Tukang Cat hari 65,000.00 9 Tukang Kayu hari 65,000.00
- II BAHAN -
BAHAN SEMEN - 1 Semen Type I @ 50 kg kg 1,100.00 2 Semen Putih @ 40 kg kg 4,500.00 3 Semen Warna (tepung AA) kg 7,500.00
- BAHAN BATU/PASIR -
1 Batu Bata (5x11x22)/ SII bh 725.00 2 Batu Kali (Bulat utuh) m3 110.00 3 Pasir Beton/pasir pasang m3 80,000.00 4 Pasir Urug m3 60,000.00 5 Kerikil Beton m3 100,000.00
- BAHAN KAYU -
1 Kayu Balok Marsawa Kls II m3 2,800,000.00 2 Kayu Balok Merantih Kls III m3 2,500,000.00 3 Kayu papan Kls IV (Bekisting) m3 2,250,000.00 4 Kayu Papan Marsawa Kls II m3 3,500,000.00 5 Plywood Tebal 9 mm Lbr 135,000.00
Dolken Kayu Ø-8 cm-4m btg 20,000.00 -
BAHAN BESI DAN KAWAT - 1 Besi Beton U.24 - KS kg 10,900.00 2 Kawat Beton kg 20,000.00 3 Besi Strip kg 15,000.00 4 Besi Siku L.50.50.5 kg 17,500.00 5 Plat Baja 4 mm kg 17,500.00 6 Rel pintu baja m' 250,000.00 7 Roda pintu baja bh 50,000.00 8 Kawat Las kg 30,000.00
BAHAN KACA - 1 Kaca Panasab blue 5 mm m2 90,000.00
HARGA KETERANGAN No. URAIAN SAT SATUAN /HARGA
(Rp) (Rp)
1 2 3 4 5 -
BAHAN PENGGANTUNG & PENGUNCI - 1 Engsel Nylon Motif (setara merk KEND) buah 25,000.00 2 Garendel Antik (setara merk KEND) buah 20,000.00 3 Tangan-tangan/Tarikan Jendela (setara merk KEND) buah 15,000.00 4 Pas. Engsel Jendela Alluminium Kasmen (setara merk KEND) buah 150,000.00 5 Pas. Ramcis (setara merk KEND) buah 75,000.00
-
BAHAN PAKU - 1 Besi Paku kg 17,500.00
-
BAHAN CAT - 1 Meni Kayu/Besi kg 25,000.00 2 Plammer Kayu kg 25,000.00 3 Plammer Tembok kg 9,500.00 4 Cat Minyak (setara Platon) kg 45,000.00 5 Cat Tembok Exterior (watersheld) kg 70,000.00 6 Cat Dasar kg 6,000.00 7 Minyak Bekisting ltr 3,000.00 8 Cat Propan Kg 55,000.00
-
BAHAN BATU TEMPEL - 1 Batu Napoli m2 85,000.00
-
BAHAN PLAMBING - 1 m' 60,000.00 2 m' 50,000.00 3 Piapa Galvanis 1/2" m' 50,000.00 4 Kran air 1/2" merek San Ei buah 45,000.00 5 Floor Drain Loal buah 30,000.00 6 Bak Fiber Uk. 65x65 cm buah 125,000.00 7 Klosed jongkok porselen setara KIA buah 175,000.00 8 Seal Tape buah 6,000.00
-
BAHAN, PERALATAN LAIN - 1 Amplas Kayu hl 3,000.00 2 Pasang Pintu Fiber Komplit (kozen dan daun + Acc) bh 350,000.00 3 Air ltr 20.00
Padang, 10 Mei 2012Dibuat oleh :
CV. CHAKRA KARYA
Ir.H ANIS ULQUDYDirektur
Pipa PVC Vinilon AW Ø 4"Pipa PVC Vinilon AW Ø 3"
DAFTARA ANALISA PEKEERJAANPROGRAM : WAJIB BELAJAR 9 TAHUN
PEKERJAAN : PEMBANGUNAN PAGAR SDN 23/24 KOTA PADANG
LOKASI : JL. VETERAN - PADANG
NO URAIAN H. SATUAN UPAH BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 Analisa Pembersihan Lapangan 0.1000 OH Tenaga Kerja Pekerja 45,000.00 4,500.00 0.0500 OH Mandor 60,000.00 3,000.00
Jumlah 7,500.00 7,500.00 Dibulatkan 7,500.00
2 Analisa Pasangan Bowplank Tiap-tiap 1 m'
0.0070 Bahan Papan Bekisting 2,500,000.00 17,500.00
0.0120 Tiang Kayu 5/7 2,500,000.00 30,000.00 0.0200 kg Paku 17,500.00 350.00 0.1000 OH Tenaga Kerja Tukang Kayu 65,000.00 6,500.00 0.0100 OH Kepala Tukang 80,000.00 800.00 0.1000 OH Pekerja 45,000.00 4,500.00 0.0050 OH Mandor 60,000.00 300.00
Jumlah 47,850.00 12,100.00 59,950.00 Dibulatkan 59,900.00
PEKERJAAN TANAH
1 0.7500 OH Tenaga Kerja Pekerja 45,000.00 33,750.00 0.0250 OH Mandor 60,000.00 1,500.00
Jumlah - 35,250.00 35,250.00 Dibulatkan 35,200.00
2 0.2500 OH Tenaga Kerja Pekerja 45,000.00 11,250.00 0.0080 OH Mandor 60,000.00 480.00
Jumlah - 11,730.00 11,730.00 Dibulatkan 11,700.00
3
1.2000 Bahan Pasir Urug 60,000.00 72,000.00 0.3000 OH Tenaga Kerja Pekerja 45,000.00 13,500.00 0.0100 OH Mandor 60,000.00 600.00
Jumlah 72,000.00 14,100.00 86,100.00 Dibulatkan 86,100.00
PEKERJAAN PONDASI
1
1.2000 Bahan Batu Kali 110.00 132.00
0.4320 Pasir Urug 60,000.00 25,920.00 0.7800 OH Tenaga Kerja Pekerja 45,000.00 35,100.00 0.3900 OH Tukang Batu 65,000.00 25,350.00 0.0390 OH Kepala Tukang 80,000.00 3,120.00 0.0390 OH Mandor 60,000.00 2,340.00
Jumlah 26,052.00 65,910.00 91,962.00 Dibulatkan 91,900.00
2
1.2000 Bahan Batu Kali 110.00 132.00 163.0000 kg Portland Cement 1,100.00 179,300.00
0.5200 Pasir Pasang 80,000.00 41,600.00 1.5000 OH Tenaga Kerja Pekerja 45,000.00 67,500.00 0.7500 OH Tukang Batu 65,000.00 48,750.00 0.0750 OH Kepala Tukang 80,000.00 6,000.00 0.0750 OH Mandor 60,000.00 4,500.00
Jumlah 221,032.00 126,750.00 347,782.00 Dibulatkan 347,700.00
m3
m3
Menggali 1 m3 tanah biasa sedalam 1 meter
Mengurug kembali 1 m3 galian
Mengurug 1 m3 pasir
m3
Memasang 1 m3 batu kosong (aanstampang)
m3
m3
Memasang 1 m3 pondasi batu kali, campuran 1 PC : 4 PP
m3
m3
NO URAIAN H. SATUAN UPAH BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.) PEKERJAAN BETON
1 230.0000 kg Bahan Portland Cement 1,100.00 253,000.00
0.6379 Pasir Beton 80,000.00 51,028.57
0.7607 Kerikil (Maksimum 30 mm) 100,000.00 76,074.07 200.0000 liter Air 20.00 4,000.00 1.2000 OH Tenaga Kerja Pekerja 45,000.00 54,000.00 0.2000 OH Tukang Batu 65,000.00 13,000.00 0.0200 OH Kepala Tukang 80,000.00 1,600.00 0.0600 OH Mandor 60,000.00 3,600.00
Jumlah 384,102.65 72,200.00 456,302.65 Dibulatkan 456,300.00
2 276.0000 kg Bahan Portland Cement 1,100.00 303,600.00
0.5914 Pasir Beton 80,000.00 47,314.29
0.7496 Kerikil (Maksimum 30 mm) 100,000.00 74,962.96 200.0000 liter Air 20.00 4,000.00 1.6500 OH Tenaga Kerja Pekerja 45,000.00 74,250.00 0.2750 OH Tukang Batu 65,000.00 17,875.00 0.0280 OH Kepala Tukang 80,000.00 2,240.00 0.0830 OH Mandor 60,000.00 4,980.00
Jumlah 429,877.25 99,345.00 529,222.25 Dibulatkan 529,200.00
3 371.0000 kg Bahan Portland Cement 1,100.00 408,100.00
0.4986 Pasir Beton 80,000.00 39,885.71
0.7756 Kerikil (Maksimum 30 mm) 100,000.00 77,555.56 215.0000 liter Air 20.00 4,300.00 1.6500 OH Tenaga Kerja Pekerja 45,000.00 74,250.00 0.2750 OH Tukang Batu 65,000.00 17,875.00 0.0280 OH Kepala Tukang 80,000.00 2,240.00 0.0830 OH Mandor 60,000.00 4,980.00
Jumlah 529,841.27 99,345.00 629,186.27 Dibulatkan 629,100.00
4 Pembesian 10 kg dengan besi polos atau besi ulir
10.5000 kg Bahan Besi beton (polos/ulir) 10,900.00 114,450.00
0.1500 kg Kawat Beton 20,000.00 3,000.00 0.0700 OH Tenaga Kerja Pekerja 45,000.00 3,150.00 0.0700 OH Tukang Besi 65,000.00 4,550.00 0.0070 OH Kepala Tukang 80,000.00 560.00 0.0040 OH Mandor 60,000.00 240.00
Jumlah 117,450.00 8,500.00 125,950.00 untuk 1 kg 12,595.00 Dibulatkan 12,500.00
5
0.0400 Bahan Kayu kelas III 2,250,000.00 90,000.00
0.3000 kg Paku 5 cm-10 cm 17,500.00 5,250.00
0.1000 liter Minyak Bekisting 3,000.00 300.00 0.5200 OH Tenaga Kerja Pekerja 45,000.00 23,400.00 0.2600 OH Tukang Kayu 65,000.00 16,900.00 0.0260 OH Kepala Tukang 80,000.00 2,080.00 0.0260 OH Mandor 60,000.00 1,560.00
Jumlah 95,550.00 43,940.00 Untuk 2 x Pemakaian 47,775.00 21,970.00 69,745.00
Dibulatkan 69,700.00
6
0.0450 Bahan Kayu kelas III 2,250,000.00 101,250.00
0.3000 kg Paku 5 cm-10 cm 17,500.00 5,250.00
0.1000 liter Minyak Bekisting 3,000.00 300.00 0.5200 OH Tenaga Kerja Pekerja 45,000.00 23,400.00 0.2600 OH Tukang Kayu 65,000.00 16,900.00 0.0260 OH Kepala Tukang 80,000.00 2,080.00 0.0260 OH Mandor 60,000.00 1,560.00
Jumlah 106,800.00 43,940.00 Untuk 2 x Pemakaian 53,400.00 21,970.00 75,370.00
Dibulatkan 75,300.00
Membuat 1 m3 beton mutu f'c = 7.4 MPa (K 100), slump (12 ± 2) cm, w/c = 0.87
m3
m3
Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 MPa (K 125), slump (3-6) cm, w/c = 0.87
m3
m3
Membuat 1 m3 beton mutu f'c = 19.3 MPa (K 225), slump (12 ± 2) cm, w/c = 0.58
m3
m3
Memasang 1 m2 bekisting untuk pondasi
m3
Memasang 1 m2 bekisting untuk sloof
m3
NO URAIAN H. SATUAN UPAH BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
7
0.0400 Bahan Kayu kelas III 2,250,000.00 90,000.00
0.4000 kg Paku 5 cm-10 cm 17,500.00 7,000.00
0.2000 liter Minyak Bekisting 3,000.00 600.00
0.0150 Balok kayu kelas II 2,800,000.00 42,000.00
0.3500 lbr Plywood tebal 9 mm 135,000.00 47,250.00
2.0000 btg Dolken kayu galam, Ø (8-10) cm, 20,000.00 40,000.00 0.6600 OH Tenaga Kerja Pekerja 45,000.00 29,700.00 0.3300 OH Tukang Kayu 65,000.00 21,450.00 0.0330 OH Kepala Tukang 80,000.00 2,640.00 0.0330 OH Mandor 60,000.00 1,980.00
Jumlah 226,850.00 55,770.00 Untuk 2 x Pemakaian 113,425.00 27,885.00 141,310.00
Dibulatkan 141,300.00
8
0.0400 Bahan Kayu kelas III 2,250,000.00 90,000.00
0.4000 kg Paku 5 cm-10 cm 17,500.00 7,000.00
0.2000 liter Minyak Bekisting 3,000.00 600.00
0.0180 Balok kayu kelas II 2,800,000.00 50,400.00
0.3500 lbr Plywood tebal 9 mm 135,000.00 47,250.00
2.0000 btg Dolken kayu galam, Ø (8-10) cm, 20,000.00 40,000.00 0.6600 OH Tenaga Kerja Pekerja 45,000.00 29,700.00 0.3300 OH Tukang Kayu 65,000.00 21,450.00 0.0330 OH Kepala Tukang 80,000.00 2,640.00 0.0330 OH Mandor 60,000.00 1,980.00
Jumlah 235,250.00 55,770.00 Untuk 2 x Pemakaian 117,625.00 27,885.00 145,510.00
Dibulatkan 145,500.00
9
0.0400 Bahan Kayu kelas III 2,500,000.00 100,000.00
0.4000 kg Paku 5 cm-12 cm 17,500.00 7,000.00
0.2000 liter Minyak Bekisting 3,000.00 600.00
0.0150 Balok kayu kelas II 2,800,000.00 42,000.00
0.3500 lbr Plywood tebal 9 mm 135,000.00 47,250.00
6.0000 btg Dolken kayu galam, Ø (8-10) cm, p 20,000.00 120,000.00 0.6600 OH Tenaga Kerja Pekerja 45,000.00 29,700.00 0.3300 OH Tukang Kayu 65,000.00 21,450.00 0.0330 OH Kepala Tukang 80,000.00 2,640.00 0.0330 OH Mandor 60,000.00 1,980.00
Jumlah 316,850.00 55,770.00 Untuk 2 x Pemakaian 158,425.00 27,885.00 186,310.00
RENCANA ANGGARAN BIAYA (RAB)PROGRAM : WAJIB BELAJAR 9 TAHUNPEKERJAAN : PEMBANGUNAN PAGAR SDN 23/24 KOTA PADANGLOKASI : JL. VETERAN - PADANG
HARGA JUMLAH JUMLAHNO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA BESAR
( Rp ) ( Rp ) ( Rp )1 2 3 4 5 6 7
A. PEKERJAAN PAGARI PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lapangan dan Bongkaran Pagar Lama Ls 1.000 1,500,000.00 1,500,000.00 2 Pas. Bouwplank M' 80.000 59,900.00 4,792,000.00
Jumlah 6,292,000.00 II. PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi M³ 84.567 35,200.00 2,976,758.40 2 Lapisan Pasir Bawah Pondasi M³ 2.752 86,100.00 236,947.20 3 Lantai Kerja Tebal 5 cm bawah pondasi (K-100) M³ 2.752 456,300.00 1,255,737.60 4 Pek. Pondasi Tapak Plat P1 (K-225) M³ 13.760 2,686,000.00 36,959,360.00 5 Pek. Kolom Pondasi P1 (K-225) M³ 2.580 2,751,000.00 7,097,580.00 6 Pek. Aanstampang Batu Kali M³ 3.626 91,900.00 333,229.40 7 Pasang Pondasi batu kali 1 : 4 M³ 3.122 347,700.00 1,085,519.40 8 Pek. Urugan Kembali galian M³ 53.223 11,700.00 622,709.10
Jumlah 50,567,841.10 III. PEKERJAAN BETON DAN DINDING
a. Beton 1 Pek. Sloof Beton uk. 15/20 cm (S1) (K-225) M³ 6.286 3,542,000.00 22,265,012.00 2 Pek. Kolom Beton uk. 20/20 cm (K1) (K-225) M³ 8.600 4,540,000.00 39,044,000.00 3 Pek. Kolom Beton uk. 13/13 cm (KP) (K-225) M³ 1.251 7,420,000.00 9,282,420.00 4 Pek. Angk. Klm Ke Dind. Bata + Angker Pondasi Batu Kali Kg 156.246 10,500.00 1,640,583.00 5 Pek. Balok Beton uk. 20/20 (B1) (K-225) M³ 1.936 3,876,000.00 7,503,936.00 6 Pek. Ring Balok Beton uk. 13/20 cm (RB) (K-225) M³ 4.189 5,390,000.00 22,578,710.00
b. Dinding 1 Pek. Pasangan Batu Bata 1 : 2 M² 63.678 96,300.00 6,132,191.40 2 Pek. Pasangan Batu Bata 1 : 4 M² 426.543 88,500.00 37,749,055.50 3 Plesteran Dinding Bata ad. 1 : 2 M² 117.855 36,600.00 4,313,493.00 4 Plesteran Dinding Bata ad. 1 : 4 M² 824.985 32,200.00 26,564,517.00 5 Pek. Afwerking Beton ad. 1 : 1 M² 131.058 43,600.00 5,714,128.80 6 Profil Hias Kepala Kolom Unit 86.000 75,000.00 6,450,000.00 7 Pek. Pagar Teralis Sesuai gambar M² 33.900 250,000.00 8,475,000.00 8 Pek. Pintu Plat Baja Lengkap (Lengkap Aksesories) M² 3.600 450,000.00 1,620,000.00
Jumlah 199,333,046.70 IV. PEKERJAAN PENGCATAN
1 Cat Tembok dengan cat exterior (arshield) M² 1,073.898 25,300.00 27,169,619.40 Jumlah 27,169,619.40
B. PEKERJAAN GAPURA & POS JAGAI. PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lapangan M² 31.573 7,500.00 236,797.50 2 Pas. Bouwplank M' 31.900 59,900.00 1,910,810.00
Jumlah 2,147,607.50 II. PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi M³ 9.940 35,200.00 349,888.00 2 Lapisan Pasir Bawah Pondasi M³ 0.256 86,100.00 22,041.60 3 Lantai Kerja Tebal 5 cm bawah pondasi (K-100) M³ 0.256 456,300.00 116,812.80 4 Pek. Pondasi Tapak Plat P1 (K-225) M³ 1.280 2,686,000.00 3,438,080.00 5 Pek. Kolom Pondasi P1 (K-225) M³ 0.405 3,798,000.00 1,538,190.00 6 Pek. Aanstampang Batu Kali M³ 0.609 91,900.00 55,967.10 7 Pasang Pondasi batu kali 1 : 4 M³ 0.979 347,700.00 340,398.30 8 Lapisan Pasir bawah pondasi bata M³ 0.056 86,100.00 4,821.60 9 Lantai Kerja Tebal 5 cm bawah pondasi Bata (K-100) M³ 0.056 456,300.00 25,552.80 10 Pasang Pondasi Batu Bata 1 : 2 M² 2.220 88,500.00 196,470.00 11 Urugan Kembali M³ 2.485 11,700.00 29,074.50
Jumlah 6,117,296.70 III. PEKERJAAN BETON DAN DINDING
a. Beton 1 Pek. Sloof Beton uk. 15/20 cm (S1) (K-225) M³ 0.351 3,542,000.00 1,243,242.00 2 Pek. Kolom Beton uk. L.15/30 cm (K1) (K-225) M³ 1.566 4,912,000.00 7,692,192.00 3 Pek. Kolom Beton uk. 15/15 cm (K2) (K-225) M³ 0.554 6,256,000.00 3,465,824.00 4 Pek. Kolom Beton uk.15/90 cm (K3) (K225) M³ 0.432 4,606,000.00 1,989,792.00 5 Pek. Balok uk. 15/20 cm (B.1) (K-225) M³ 0.324 5,382,000.00 1,743,768.00 6 Pek. Balok uk. 15/30 cm (B.2) (K-225) M³ 1.170 5,271,000.00 6,167,070.00 7 Pek. Balok uk. 10/80 cm (BPN.2) (K-225) M³ 0.554 6,947,000.00 3,848,638.00 8 Pek. Plat Beton Dak t-10 cm M³ 0.486 4,222,000.00 2,051,892.00 9 Pek. Balok uk. 13/20 cm Balok Meja Beton M³ 0.031 5,390,000.00 167,090.00 10 Pek. Meja Plat Beton t-10 cm M³ 0.072 4,222,000.00 303,984.00
HARGA JUMLAH JUMLAHNO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA BESAR
( Rp ) ( Rp ) ( Rp )1 2 3 4 5 6 7
b. Dinding 1 Pek. Pasangan Batu Bata 1 : 2 M² 7.950 96,300.00 765,585.00 2 Pek. Pasangan Batu Bata 1 : 4 M² 21.019 88,500.00 1,860,181.50
c. Kozen 1 Pek. Kozen Aluminium 4" M' 9.400 98,700.00 927,780.00 2 Pasang Daun Jendela Unit 2.000 509,400.00 1,018,800.00 3 Pasang Pintu Fiber Komplit (kozen dan daun + Acc) Unit 1.000 350,000.00 350,000.00 4 Pasang Jalusi Ventilasi Beton (kosong 10x40 cm) Unit 5.000 50,000.00 250,000.00
d. Pelesteran 1 Plesteran Dinding Bata ad. 1 : 2 M² 15.900 36,600.00 581,940.00 2 Plesteran Dinding Bata ad. 1 : 4 M² 42.038 32,200.00 1,353,623.60 3 Pek. Afwerking Beton ad. 1 : 1 M² 56.360 43,600.00 2,457,296.00 4 Pek. Profil Kepla Pilar 10x15 cm M' 15.600 65,000.00 1,014,000.00 5 Pek. Profil 10 x 10 cm M' 28.275 55,000.00 1,555,125.00 6 Pasang Batu Napoli M² 31.103 147,200.00 4,578,361.60
Jumlah 45,386,184.70 IV. PEK. LANTAI DAN PERLENGKAPAN DALAM
1 Urugan Pasir M³ 1.127 86,100.00 97,034.70 2 Cor Lantai t-7 cm M³ 0.789 456,300.00 360,020.70 3 Pasang Pipa PVC 3 " M' 4.000 73,700.00 294,800.00 4 Pasang Pipa PVC 4 " M' 6.000 85,700.00 514,200.00 5 Pasang Pipa Galvanis 1/2" M' 18.000 146,100.00 2,629,800.00 6 Pasang Kran 1/2" Unit 1.000 53,300.00 53,300.00 7 Pasang Klosed Jongkok Unit 1.000 454,500.00 454,500.00 8 Pasang Bak Fiber Unit 1.000 678,500.00 678,500.00 9 Pasang Floor Drain Unit 1.000 38,100.00 38,100.00 10 Pasang Septictank Kap 15 Orang Unit 1.000 1,639,422.00 1,639,422.00
Jumlah 6,759,677.40 V. PEKERJAAN PENGCATAN
1 Cat. Batu Candi dengan Cat Propan M² 31.103 25,300.00 786,905.90 2 Cat Tembok dengan cat exterior (watershield) M² 109.334 34,700.00 3,793,889.80
Jumlah 4,580,795.70 VI. PEKERJAAN PERLENGKAPAN LUAR
1 Pas. Pintu P1 (Lengkap Aksesories) M² 8.800 450,000.00 3,960,000.00 2 Pas. Pintu P2(Lengkap Aksesories) M² 1.575 450,000.00 708,750.00 3 Pas. Logo Kota Padang (stainles steel 1,2 mm) t-40 cm Bh 1.000 1,000,000.00 1,000,000.00 4 Pas.Logo Tutwuri handayani (stainles steel 1,2 mm) t-40 cm Bh 1.000 1,500,000.00 1,500,000.00 5 Pas. Huruf Stainless steel 1,2 mm t-30cm Bh 14.000 75,000.00 1,050,000.00
Jumlah 8,218,750.00
Padang, 10 Mei 2012` Dibuat oleh :
CV. CHAKRA KARYA
Ir.H ANIS ULQUDYDirektur
REKAPITULASI BIAYAPROGRAM : WAJIB BELAJAR 9 TAHUNPEKERJAAN : PEMBANGUNAN PAGAR SDN 23/24 KOTA PADANGLOKASI : JL. VETERAN - PADANG
A. PEKERJAAN PAGARI PEKERJAAN PENDAHULUAN Rp. 6,292,000.00
II. PEKERJAAN PONDASI Rp. 50,567,841.10 III. PEKERJAAN BETON DAN DINDING Rp. 199,333,046.70 IV. PEKERJAAN PENGCATAN Rp. 27,169,619.40
B. PEKERJAAN GAPURA & POS JAGAI. PEKERJAAN PENDAHULUAN Rp. 2,147,607.50 II. PEKERJAAN PONDASI Rp. 6,117,296.70 III. PEKERJAAN BETON DAN DINDING Rp. 45,386,184.70 IV. PEK. LANTAI DAN PERLENGKAPAN DALAM Rp. 6,759,677.40 V. PEKERJAAN PENGCATAN Rp. 4,580,795.70 VI. PEKERJAAN PERLENGKAPAN LUAR Rp. 8,218,750.00
JUMLAH Rp. 356,572,819.20
PPN 10 % Rp. 35,657,281.92
JUMLAH Rp. 392,230,101.12
DIBULATKAN Rp. 392,230,000.00
Terbilang :
Padang, 10 Mei 2012Dibuat oleh :
CV. CHAKRA KARYA
Ir.H ANIS ULQUDYDirektur
T I M E S C H E D U L EMobilisasi Tenaga Kerja
PROGRAM : WAJIB BELAJAR 9 TAHUNPROGRAM : PEMBANGUNAN PAGAR SDN 23/24 KOTA PADANGPEKERJAAN : JL. VETERAN - PADANG
NO. URAIAN PEKERJAANBOBOT
BULAN KE I BULAN KE II BULAN KE IIIM I N G G U K E KET
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 hr
Personil
1 Site Manager - -
2 Pelaksana -
3 Pembantu Pelaksana -
4 Logistik -
5 Adminiostrasi
Tenaga Kerja -
1 Kepala Kerja -
2 Kepala Tukang -
3 Tukang - -
4 Pekerja -
5 Jaga Malam -
JUMLAH -
RENCANA KEMAJUAN PERMINGGU
AKUMULASI
PENCAPAIAN BOBOT PERMINGGU
AKUMULASI
DEVIASI ( +/-)
Waktu Pelaksanaan 120 ( seratus Dua Puluh ) Hari Kelender Padang, 10 Mei 2012
Dibuat oleh :
CV. CHAKRA KARYA
Ir.H ANIS ULQUDY
Direktur
HARGA SATUAN PEKERJAANPROGRAM : WAJIB BELAJAR 9 TAHUNPEKERJAAN : PEMBANGUNAN PAGAR SDN 23/24 KOTA PADANGLOKASI : JL. VETERAN - PADANG
9 Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 MPa (K 125), slump (3-6) cm, w/c = 0.87 529,200.00
10 Membuat 1 m3 beton mutu f'c = 19.3 MPa (K 225), slump (12 ± 2) cm, w/c = 0.58 629,100.00 11 Pembesian 10 kg dengan besi polos atau besi ulir Kg 12,500.00
12 Memasang 1 m2 bekisting untuk pondasi 69,700.00
13 Memasang 1 m2 bekisting untuk sloof 75,300.00
14 Memasang 1 m2 bekisting untuk kolom 141,300.00
15 Memasang 1 m2 bekisting untuk balok 145,500.00
16 Memasang 1 m2 bekisting untuk lantai 186,300.00
17 Membuat (P1)/1 m3 Tapak Pondasi Beton Bertulang 2,686,000.00