Page 1
Copyright © 2015 The eVSM Group, All Rights Reserved
This tutorial will guide you through the steps to draw a simple map, perform
common calculations, and plot charts using the Quick Enterprise stencil.
Quick Enterprise Tutorial
3
Viewing/printing eVSM Tutorial:
This tutorial is designed for two
page layout. If printing, you will
need double-sided print.
For on-screen viewing, save the PDF
file to your PC and then open it in
Acrobat Reader (not in a web
browser). In the Acrobat menus,
click “View>Page Display", make
sure “Show Cover Page in Two Page
View” is checked and then select
"Two Page View”.
A070
Process
Control
Activity
A010
AST Plant
A050
ATLAS
WarehouseA040
A030
ATLAS Assembly
A020
Weekly Weekly
A060A090
A100
ACME Plant
A0010
PP
P
P
P
P
P
P
all
P
Page 2
Copyright © 2015 The eVSM Group, All Rights Reserved
On your Desktop, click
the “Start eVSM” icon.
1
Click to enable
macros.Click “Trust all from
publisher” to avoid the
security notice in future.
3
4
If you see a message like this,
you must “Enable” macros.
2
Start eVSMStep 1:
4
Page 3
Copyright © 2015 The eVSM Group, All Rights Reserved 5
Page 4
Copyright © 2015 The eVSM Group, All Rights Reserved Quick_eVSM
Learn eVSM BasicsStep 2:
Avoid re-sizing eVSM shapes. Instead
grow the drawing page when needed.
To resize the page, hold down the “Ctrl”
key, and then drag any page edge to the
required size. This method works on all
four edges of the page.
2
VSM
Save your Visio file and then
insert a new page via the right-
mouse menus on the page-tabs.
5
6
Page 5
Copyright © 2015 The eVSM Group, All Rights Reserved
Learn eVSM Basics
Blue icons in the main stencil
represent families of shapes. Drag
out the Transport icon.
3
Use the shape’s
right-mouse menus
to turn it into a car
4
eVSM Help resources are available in the
Learn module of the toolbar. Hover over
each help button and learn what it does.
1
7
Zooming:
-Ctrl + Shift = Drag Zoom Options
-Whole page view in Visio 2003/2007: Ctrl + W
-Whole page view in Visio 2010/2013: Ctrl + Shift + W
6
Page 6
Copyright © 2015 The eVSM Group, All Rights Reserved
Open the Quick Enterprise StencilsStep 3:
The Quick and Sketch
Enterprise stencils will
open on the left.
2
Click the Open button in the toolbar.
Select the Quick Enterprise Stencil
and click OK.
1
8
Open
Page 7
Copyright © 2015 The eVSM Group, All Rights Reserved
Open the Quick Enterprise Stencils
9
Page 8
Copyright © 2015 The eVSM Group, All Rights Reserved
Initiate the map for Quick EnterpriseStep 4:
Customer Center
Time and Unit Center
10
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Units
Drag out the red icons from the
Quick Enterprise LT stencil
first. This is very important!
This is the Time and Unit Center.
Cday refers to Calendar days and
Odays refers to Office days.
1
4
Page 9
Copyright © 2015 The eVSM Group, All Rights Reserved
Initiate the map for Quick Enterprise
11
allZ020
Process
Customer Demand
ItemWk
18000
Align all new
shapes to the grid
as you drop them.
Enter customer
demand here.
2
3
Page 10
Copyright © 2015 The eVSM Group, All Rights Reserved
Draw the flow Step 5:
Control Center
Plant Center
Transport Center
Warehouse Center
12
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
P
Units
A002
0
A003
0
A004
0
A005
0
A001
0
A010
0
A002
0
Control
Activity
Process
Process
Process
RM Inventory CDayx.xx
WIP Inventory CDayx.xx
FG Inventory CDayx.xx
Inventory CDayAuto
Processing Time
CMinxx
Transport Frequency
TripCDayxx
Transport Time
CHrxx
RM Inventory CDayx.xx
WIP Inventory CDayx.xx
FG Inventory CDayx.xx
Inventory CDayAuto
Processing Time
CMinxx
Transport Frequency
TripCDayxx
Transport Time
CHrxx
Transport Frequency
TripCDayxx
Transport Time
CHrxx
RM Inventory CDayx.xx
WIP Inventory CDayx.xx
FG Inventory CDayx.xx
Inventory CDayAuto
Processing Time
CMinxx
Activity Lead Time
ODay0
Info Processing
OMin0
Align all new shapes
to the grid as you
drop them.
Green icons are
called “Centers”.
Enter in zero for the
Control Activity’s
values.
Use the green
shapes to
represent the
flow.
3
1
4
2
P
PP
P
P
Page 11
Copyright © 2015 The eVSM Group, All Rights Reserved
Draw the flow
13
allA008
0
A007
0
A006
0
Process
Logistics Facility
Customer Demand
ItemWk
18000
Transport Frequency
TripCDayxx
Transport Time
CHrxx
Processing Time
CMinxx
Inventory CDayxx
P
P
Page 12
Copyright © 2015 The eVSM Group, All Rights Reserved
Complete the flow and enter dataStep 6:
14
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
P
Units
A001
0
A004
0
A003
0
A002
0
A009
0
A010
0
A001
0
Control
Activity
AST Plant
ATLAS Assembly
ACME Plant
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Inventory CDayAuto
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Inventory CDayAuto
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
Transport Frequency
TripWk1
Transport Time
CHr6
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Inventory CDayAuto
Processing Time
CMin15
Activity Lead Time
ODay0
Info Processing
OMin0
Complete drawing the map
as shown below, including
annotation and data values.
Double click on the unit
and change the unit to
Cday.
Do not change any blue
“Auto” values. These will get
calculated automatically later.
1
2
P
P P
P
P
P
Page 13
Copyright © 2015 The eVSM Group, All Rights Reserved
Complete the flow and enter data
15
Weekly
allA007
0
A005
0
A006
0
Process
ATLAS
Warehouse
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
Drag the arrows from the Main
stencil on right. Glue all arrows
at both ends where possible.
Double click on an
arrow to add text.
Use the right mouse button
menu to change the
straight arrow to “Push.”
Double click on the unit
and change the unit to
Cday.
5
3
4
6
P
P
Page 14
Copyright © 2015 The eVSM Group, All Rights Reserved
Add an Expedited TransportStep 7:
1
16
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
P
Units
A011
0
A001
0
A004
0
A003
0
A002
0
A010
0
A001
0
Control
Activity
AST Plant
ATLAS Assembly
Expedited
once a year
ACME Plant
Transport Frequency
TripWk1
Transport Time
CHr6
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Inventory CDay15.00
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Inventory CDay20.00
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Inventory CDayAuto
Processing Time
CMin15
Activity Lead Time
ODay0
Info Processing
OMin0
Use the right mouse button
menu to unselect “Framing” and
to change it to a Plane shape.
Then double click the transport
shape to add text.
Drag out a curved arrow
and right click to change
it to “Expedited.”
3
1
P
P
P P
P
P
Page 15
Copyright © 2015 The eVSM Group, All Rights Reserved
Add an Expedited Transport
17
Weekly
allA007
0
A005
0
A006
0
Customer
ATLAS
Warehouse
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
Drag the transport
shape from the Main
stencil on the right.
2
P
P
Page 16
Copyright © 2015 The eVSM Group, All Rights Reserved
Setup Sequence Arrows for Path 1Step 8:
20
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
P
Units
A002
0
A003
0
A006
0
A005
0
A004
0
A001
0
A002
0
Process
Control
Activity
AST Plant
ATLAS Assembly
Expedited
once a year
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Processing Time
CMin15
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
Transport Frequency
TripWk1
Transport Time
CHr6
Inventory CDayAuto
Inventory CDayAutoInventory CDayAuto
Activity Lead Time
ODay0
Info Processing
OMin0
Hold down the Shift key
and select the green
shapes in the order
shown here.
Click the Sequence
button.
1
2
Sequence
B
C
D
A
P
P
P P
P
P
Page 17
Copyright © 2015 The eVSM Group, All Rights Reserved
Setup Sequence Arrows for Path 1
21
Weekly
allA009
0
A007
0
A008
0
Customer
ATLAS
Warehouse
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
F
E
G
P
P
Page 18
Copyright © 2015 The eVSM Group, All Rights Reserved
Setup Sequence Arrows for Path 2Step 9:
22
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
P P
Units
A002
0
A003
0
A006
0
A005
0
A004
0
A001
0
A001
0
P
ACME Plant
Control
Activity
AST Plant
ATLAS Assembly
Expedited
once a year
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Processing Time
CMin15
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
Transport Frequency
TripWk1
Transport Time
CHr6
Inventory CDayAutoInventory CDayAuto
Inventory CDayAuto
Activity Lead Time
ODay0
Info Processing
OMin0
For the second path, start again, hold
the Shift key and select the green
shapes A to C in the order shown.
Then click the Sequence button.
B
C
A
PP
P
P
P
Page 19
Copyright © 2015 The eVSM Group, All Rights Reserved
Setup Sequence Arrows for Path 2
23
Weekly
allA009
0
A007
0
A008
0
Customer
ATLAS
Warehouse
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
These sequence
arrows show Path 1.
For the second path, start again, hold
the Shift key and select the green
shapes A to C in the order shown.
Then click the Sequence button.
1
2
P
P
Page 20
Copyright © 2015 The eVSM Group, All Rights Reserved
Use Auto Path to generate Path Locator TagsStep 10:
24
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
1
1
#2
#2
2
2
3Units
A001
0
A006
0
A005
0
A002
0
A003
0
A004
0
A010
0
Control
Activity
AST Plant
ATLAS Assembly
ACME Plant
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr6
Inventory CDayAutoInventory CDayAuto
Inventory CDayAuto
Activity Lead Time
ODay0
Info Processing
OMin0
Expedited
once a year
Click Auto Path to automatically
generate Path tags based on
Sequence arrows.
These Path tags are used to specify
paths. #2 implies that the shape is on 2
different paths. If you’d like to see the
path numbers the shape is on, right click
and select “Show paths on Center”. This
will display all the path numbers the
shape is on just above the path tag.
A single number
denotes that this
center is only on
path 2.
1
5
Auto Path
Page 21
Copyright © 2015 The eVSM Group, All Rights Reserved
Use Auto Path to generate Path Locator Tags
25
Weekly
#2
#2
#2A009
0
A007
0
A008
0
Customer
ATLAS
Warehouse
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
Sequence arrow visibility can
be switched On/Off with this
button. Try it.
Click Auto Tag to automatically order
the Operation Tags based on
Sequence arrows.
These Path tags are used to specify
paths. #2 implies that the shape is on 2
different paths. If you’d like to see the
path numbers the shape is on, right click
and select “Show paths on Center”. This
will display all the path numbers the
shape is on just above the path tag.
3
2
4
Show Seq.
Auto Tag
Page 22
Copyright © 2015 The eVSM Group, All Rights Reserved
Summary for Path 2Step 11:
Summary
26
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
1
1
#2
#2
2
2
3Units
A001
0
A006
0
A005
0
A002
0
A003
0
A004
0
A010
0
Control
Activity
AST Plant
ATLAS Assembly
ACME Plant
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Inventory CDay15
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Inventory CDay20
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Inventory CDay30.00
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr6
Activity Lead Time
ODay0
Info Processing
OMin0
Expedited
once a year
Page 23
Copyright © 2015 The eVSM Group, All Rights Reserved
Summary for Path 2
27
Weekly
#2
#2
#2
2 1
A009
0
A007
0
A008
0
Z014
0
Z015
0
Customer
ATLAS
Warehouse
SummarySummary
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
Lead Time CDay51.55
Total Processing Time
CMin45
Lead Time CDay66.31
Total Processing Time
CMin50
Drag out two
Summary Centers.
Click the “Solve” button to
calculate.
Click the “Check” button and fix
any problems flagged.
Double-click the Path Filter
List and use the Path Filter
Manager to select “2” and
“1” for each Summary.
1
4
3
2
Check
Solve
Page 24
Copyright © 2015 The eVSM Group, All Rights Reserved
Lead Time
Draw Lead Time chartStep 12:
Lead Time Chart
28
5
Wk
ODay
8
ODay
OHr
7
Wk
CDay
24
CDay
CHr
Weekly Weekly
1
1
#2
#2
2
2
3Units
A001
0
A006
0
A005
0
A002
0
A003
0
A004
0
A010
0
Control
Activity
AST Plant
ATLAS Assembly
ACME Plant
RM Inventory CDay10
WIP Inventory CDay2
FG Inventory CDay3
Inventory CDay15
Processing Time
CMin10
Transport Frequency
TripWk1
Transport Time
CDay4
RM Inventory CDay10
WIP Inventory CDay5
FG Inventory CDay5
Inventory CDay20
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr12
RM Inventory CDay10
WIP Inventory CDay10
FG Inventory CDay10
Inventory CDay30.00
Processing Time
CMin15
Transport Frequency
TripWk1
Transport Time
CHr6
Activity Lead Time
ODay0
Info Processing
OMin0
Lead Time Chart
0 10 20 30 40 50 60
A0010
AST Plant
A0020
A0050
ATLAS
Assembly
A0060
A0070
ATLAS
Warehouse
1
51.55
A0030
ACME Plant
A0050
ATLAS
Assembly
A0060
A0070
ATLAS
Warehouse
66.31
Expedited
once a year
Right click and
“Plot Chart”
Drag out the
Lead Time Chart
icon.
2
Page 25
Copyright © 2015 The eVSM Group, All Rights Reserved
Draw Lead Time chart
2920150630
Weekly
#2
#2
#2
2 1
A009
0
A007
0
A008
0
Z003
0
Z014
0
Customer
ATLAS
Warehouse
Summary Summary
Customer Demand
ItemWk
18000
Processing Time
CMin20
Inventory CDay12
Transport Frequency
TripCDay1
Transport Time
CHr0.5
Lead Time CDay66.31
Total Processing Time
CMin50
Lead Time CDay51.55
Total Processing Time
CMin45
Lead Time ChartCDay
60 70
1
A0070
ATLAS
Warehouse
2
Inventory
Legend
Processing Time
Transport Time
Drag out the
Lead Time Chart
icon.
Here is the chart
showing both
paths.
1
3