Pensacola Bay Bridge Replacement Project Development & Environment Study Presentation to: Florida-Alabama Transportation Planning Organization April 9, 2014
23

Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Mar 31, 2015

Download

Documents

Rylee Clymer
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Pensacola Bay Bridge ReplacementProject Development & Environment Study

Presentation to: Florida-Alabama Transportation Planning Organization April 9, 2014

Page 2: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Purpose

• Basis for performing the replacement bridge study• Lack of modern safety provisions • Does not meet current desirable navigation requirements• Deteriorating conditions indicate that the twin bridges

are structurally deficient• No facilities for bikes and pedestrians• FDOT maintenance costs are substantially increasing

without a high value of return on the investment• Will not adequately handle future traffic demand

• Study Purpose• Determine the best solution for replacement of the

existing bridge

Page 3: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Preferred Corridor

Central Corridor

Page 4: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Preferred Corridor – Central

• Least disruptive to community facilities• Pensacola Wayside Park• Gulf Breeze Wayside Parks – East & West• Gulf Breeze Boat Launch/Emergency Services• Pensacola Welcome Center• Escambia County Fishing Bridge

• Least Disruptive to the Marine Environment• Essential Fish Habitat• Endangered and Protected Species• Cultural Resources

• Least Disruptive to Residents and Businesses

• Preserved the greatest amount of shoreline

Page 5: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Central Corridor Design Alternatives

“Build” Alternatives• Central East• Central West

• FDOT/FHWA are also required to assess a “no build” condition throughout the PD&E study

Page 6: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Central East & West – Design Alternatives

Central West Central East

Page 7: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

17th Avenue – “Fly-over Ramp”

Welcome CenterBoat Launch

Flag Memorial

Fishing Bridge

Green Shores Restoration

Railroad Bridge

Fish & Wildlife Bldg

Page 8: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Wayside Park Concept Plan

Page 9: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

One – On – One

Meetings

Website

pensacolabaybridge.com

Newsletters

Community

Stakeholders

Neighborhood

Associations

Informal Public

Meetings

Special Interest

Groups

Project Advisory

Group (PAG)

Local, State

& Federal

Officials

Alternatives Public Meeting

Fall 2012

Federal, State &

Local Government

Public Outreach

Page 10: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Current Status and Ending Tasks

• Extensive coordination with local governments/state and federal agencies

• Refined the alternatives and completed the preliminary engineering analysis

• Completed the environmental documents• Air, noise, contamination evaluation• Wetlands, endangered species, essential fish habitat• Archeological & historic Sites (Marine Artifacts)• Parks & recreation sites

• Prepared a Draft Environmental Assessment /Section 4(f) National Environmental Policy Act (NEPA) Document

• Present the alternatives and the environmental documents to the public

• Evaluate comments, complete the Environmental Document and secure approval of the preferred alternative from the Federal Highway Administration

Page 11: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Build Alternatives – Matrix Evaluations

Businesses/ResidencesCommunity Services

Parks/Recreational Sites

Archaeological Sites

Public Comments

Project Cost

Natural Environmental

Currently Preferred AlternativeCENTRAL WEST

Page 12: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Avoidance of Park Property – Section 4(f)

• Section 4(f) of the 1966 Surface Transportation Act passed by the US Congress requires the Federal Highway Administration (FHWA) to evaluate alternatives that avoid parks, national historic sites, and waterfowl refuges

• Prior to the taking of land from any of the above named places FHWA must demonstrate that the avoidance alternatives are not reasonable or prudent .

• The Pensacola Bay bridge Replacement study has to comply with this statute. Three potential alternatives were examined:

• Avoidance to the East

• Avoidance to the West

• Remain inside the existing FDOT right of way

Page 13: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Avoidance of Park Property – Section 4(f)

• Section 4(f) of the 1966 Surface Transportation Act passed by the US Congress requires the Federal Highway Administration (FHWA) to evaluate alternatives that avoid parks, national historic sites, and waterfowl refuges

• Prior to the taking of land from any of the above named places FHWA must demonstrate that the avoidance alternatives are not reasonable or prudent .

• The Pensacola Bay bridge Replacement study has to comply with this statute. Three potential alternatives were examined:

• Avoidance to the East

• Avoidance to the West

• Remain inside the existing FDOT right of way

Page 14: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Park Avoidance Alternative - East

Page 15: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Park Avoidance Alternative - West

Page 16: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Park Avoidance Alternative - Central

Construction Detour via Navarre

Pensacola

I-10

Pensacola Bay Bridge

Navarre

Gulf Breeze

I-110

US 98

SR 281

Page 17: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Shared - use Path

Paths on each one of the twin bridges

Page 18: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Shared-use Path

• Path on one of the twin bridges (east bridge)

Page 19: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Shared-use Path

• Path on one of the twin bridges (east bridge)

Page 20: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Public Hearing

• “Build” Alternatives• Central East• Central West

• Multi-use path options

• Section 4(f) avoidance considerations

• Draft Environmental Assessment/Section 4(f) Document

• Engineering & Environmental Support Documents

• PUBLIC HEARING• June 10, 2014• Crowne Plaza Hotel (Adjacent to Civic Center)• Time: 5:30 PM to 6:30 PM

Page 21: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Project Schedule

PROJECT TASK

Notice to Proceed

Agency and Government Kick-Off Meetings

Data Collection

Corridors Analysis

Corridors Public Meeting

Engineering Analysis

Alternatives Public Workshop

Environmental Analysis

Public Hearing

Environmental Assessment (EA) Approval by FHWA

FHWA Location Design Concept Acceptance

2011 2012 2013 2014

J F M A M J J A S O N D J F M A M J J A S O N DJ F M A M J J A S O N D J F M A M J J A S O N D

Page 22: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Contact US!

www.PensacolaBayBridge.com

J. Brandon Bruner, PEDirector – Environmental Management OfficeFDOT, District 31074 Highway 90Chipley, FL 32428(850) 330-1509 [email protected]

Dan Kristoff, PEProject ManagerRS&H , Inc.10748 Deerwood Park Blvd. SouthJacksonville, FL 32256-0597(904) 256-2139 [email protected]

Nick Arnio, PE, PTOEDeputy Project ManagerRS&H, Inc.6265 Old Water Oak Road, Suite 202Tallahassee, FL 32312(850) 558-2800 [email protected]

Page 23: Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.

Pensacola Bay Bridge ReplacementProject Development & Environment Study