PUBLIC SUMMARY REPORT NAME OF CLIENT : STESEN PENYELIDIKAN MPOB STANDARD : MS 2530-3:2013 DATE OF - INITIAL AUDIT STAGE 1 : 08 th March 2019 INITIAL AUDIT STAGE 2 : 14 th , 16 th & 17 th May 2019 MS 2530-3 : 2013 Malaysian Sustainable Palm Oil (MSPO) Part 3: General Principles For Oil Palm Plantations And Organised Smallholders
17
Embed
PUBLIC SUMMARY REPORT - Shauffmantz Summary/PUBLIC... · 2019. 11. 6. · PUBLIC SUMMARY REPORT NAME OF CLIENT : STESEN PENYELIDIKAN MPOB STANDARD : MS 2530-3:2013 DATE OF - INITIAL
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
The audit approach consists of the following steps:
Contract review;
Appointment of team members and technical reviewer;
Contact client for relevant documentation according to the applicable MSPO standards;
Audit planning;
Background investigation, desk review of submitted documents;
On-Site assessment, inspections, interviews with operational personnel, stakeholders and its contractors; review of documentation;
On-site reporting
Resolution of non-conformance (NC) (if any)
Draft audit reporting
Technical review
Final audit reporting
Peer review
Address Peer Review Comments (if any)
Final approval and issuance of certificate
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
3
2.0 Methodology (Scope of Certification Audit)
2.1 Description of the certification unit
Reference for Audit Criteria:
Part 3: General principles for oil palm plantations and organized smallholders
Assessing past implementation from quality records that are required by the standard. (PAPER)
Assessing current implementation from observing current practices. (PRACTICE)
Assessing future maintenance from interviewing personnel on understanding and assessing competencies. (PEOPLE)
2.2 Description of the supply base
Name of Estate(s) Total Area
(Ha)
Planted Area
(Ha)
STESEN PENYELIDIKAN MPOB KLUANG, JOHOR
890.30 758.00
STESEN PENYELIDIKAN MPOB KERATONG, PAHANG
607.07 522.00
STESEN PENYELIDIKAN MPOB BAGAN DATUK, PERAK
425.00 391.00
STESEN PENYELIDIKAN MPOB LAHAD DATU, SABAH
1986.00 1,308.00
STESEN PENYELIDIKAN MPOB SESSANG, SARAWAK
1010.00 858.00
STESEN PENYELIDIKAN MPOB HULU PAKA, TERENGGANU
856.12 702.63
STESEN PENYELIDIKAN MPOB BELAGA, SARAWAK
328.60 106.40
STESEN PENYELIDIKAN MPOB JERANTUT, PAHANG
353.00 280.00
6,456.09 4,926.03
3.0 Organisation Information
3.1 Description of the certification unit
The MPOB Research Station Kluang, Johor was established in September 1979 and it was formerly known as the PORIM Research Station. It is located 13 km and 115 km from Kluang and Johor Bahru respectively (Route map). The station is makeup of two adjacent areas, main station (486 ha) and Bukit Lawiang (404 ha). The main function of the station is for research and development of oil palm. The oil palm breeding research is the main R&D activities of the station and this station has been recognized to have the largest oil palm germplasm collection in the world. MPOB has 8 research stations all over in Malaysia including Sabah and Sarawak. Under this group certification, MPOB has 3 sample site audits namely MPOB Research Station Kluang, MPOB Research Station Bagan Datuk and MPOB Research Station Keratong.
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
4
3.2 Description of the supply base
Name of Supply Base Coordinate
Latitude (N) Longitude (E)
STESEN PENYELIDIKAN MPOB KLUANG, JOHOR
1.956oN, 103.371OS
STESEN PENYELIDIKAN MPOB KERATONG, PAHANG
2.7830N, 102.9210S
STESEN PENYELIDIKAN MPOB BAGAN DATUK, PERAK
3.8180N, 100.9830S
STESEN PENYELIDIKAN MPOB LAHAD DATU, SABAH
5.030ON, 118.4170S
STESEN PENYELIDIKAN MPOB SESSANG, SARAWAK
1.7580N, 111.336OS
STESEN PENYELIDIKAN MPOB HULU PAKA, TERENGGANU
4.575oN, 103.315OS
STESEN PENYELIDIKAN MPOB BELAGA, SARAWAK
3.0480N , 113.9170S
STESEN PENYELIDIKAN MPOB JERANTUT, PAHANG
4.2890N, 102.4180S
3.3 Production volume
Name of Estate
2018 FFB Budget 2019
Mt/Ha Total FFB (Mt) FFB Production
(mt/ha)
KLUANG 13,800 18.21 15.92
KERATONG 10,500 20.11 19.14
BAGAN DATUK 8,000 20.46 18.36
LAHAD DATU 28,650 21.90 16.40
SESSANG 16,000 18.65 11.30
HULU PAKA 8,500 12.01 7.47
BELAGA 800 7.52 1.33
JERANTUT 1,500 5.36 3.50
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
5
3.4 Field planting details for each estate
Year / Estate (Planted Year)
KLUANG KERATONG BAGAN DATUK
LAHAD DATU
SESSANG HULU PAKA
BELAGA JERANTUT
1979 758.00
1992 522.00
1984 391.00
1989 1,308.00
1991 858.00
1982 702.63
2008 106.40
2013 280.00
3.5 Replanting programme for each estate
Bahagian Telupid
Field Name Planted Area (Ha) In Each Estate Total area to
be replanted (ha)
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
KLUANG
KERATONG
BAGAN DATUK
Not Applicable
LAHAD DATU
SESSANG
HULU PAKA
BELAGA
JERANTUT
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
6
3.6. Maps of Company Location, Plantations and Organised Smallholders
Stesen Penyelidikan MPOB Kluang (Ladang Kluang)
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
7
Stesen Penyelidikan MPOB Kluang (Ladang Bukit Lawiang)
Stesen Penyelidikan MPOB Keratong
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
8
Stesen Penyelidikan MPOB Bagan Datuk
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
9
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
10
Stesen Penyelidikan MPOB Lahad Datu
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
11
Stesen Penyelidikan MPOB Sessang
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
12
Stesen Penyelidikan MPOB Hulu Paka
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
13
Stesen Penyelidikan MPOB Belaga
Stesen Penyelidikan MPOB Jerantut
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
14
4.0 Certification Assessment
4.1 Stage 1 Audit
The Stage 1 audit was conducted on 8th March 2019. The objective of the Stage 1 is to assess the readiness of the documentation established and implemented in
accordance to MSPO 2530-3:2013 Part 3 (General Principal for Oil Palm Plantations and Organized Smallholders)
According to the Certification Scheme, an initial due-diligence audit for operators which are entering into the MSPO system, and which do not have any certification or those having management system certification e.g. ISO, COP.
These organizations shall undergo both Stage 1 and Stage 2 audit
The audit team has applied the Malaysian Sustainable Palm Oil Part 3
The Stage 1 audit was conducted on 8th March 2019 at Stesen MPOB Kluang covering the following activities:
Onsite interviews and inspections;
Review of documentation for compliance to relevant P & C requirements for plantation
Reporting of issues concern during Stage 1 audit
4.2 Stage 2 Audit
The Stage 1 audit was conducted on 14th, 16th & 17th May 2019.
The objective of the Stage 1 is to assess the readiness of the documentation established and implemented in accordance to MSPO 2530-3:2013 Part 3 (General Principal for Oil Palm Plantations and Organized Smallholders)
According to the Certification Scheme, an initial due-diligence audit for operators which are entering into the MSPO system, and which do not have any certification or those having management system certification e.g. ISO, COP.
These organizations shall undergo both Stage 1 and Stage 2 audit
The audit team has applied the Malaysian Sustainable Palm Oil Part 3
The Stage 1 audit was conducted on 14th, 16th & 17th May 2019 Stesen MPOB Bagan Datok and covering the following activities:
Onsite interviews and inspections;
Review of documentation for compliance to relevant P & C requirements for plantation
Reporting of issues concern during Stage 1 audit
4.3 Stakeholders’ Consultation
4.2.1 A stakeholders’ consultation meeting was conducted on 16th December 2019 to gather information from the local communities in accordance to Certification Scheme and Stakeholder Consultation requirements.
The topics of discussion are as below:
a. Introduction
b. Development of oil palm plantations
c. Community service and support provided wildlife management and wildlife corridor
d. Type of wildlife sighted.
e. Local communities’ development.
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
15
4.2.2 The following relevant Principles & Criteria of the applied standard have discussed during the stakeholders’ consultation
No. Subject discussed Audit team findings / Comment Company response and proposed action to be taken
1 Understanding of MSPO All of the stakeholders understand what MSPO is all about.
All the issues raised by the stakeholders have been informed
to the auditee during closing meeting.
2 Safety work The company provided all the PPE needs for the employees.
4 Health According to the estate dresser, there is no outbreak such as dengue or malaria happen until this time of audit.
5 FFB production It was confirmed that FFB quality was satisfactory. They have acknowledged and training their workers to harvest the good quality bunches and timing evacuate to the mill as possible to avoid rotten bunches.
6 High conservation value and endangered species.
People are aware on the habitat in the surrounding area. During the consultation they also understand the need to protect this environmental and HCV area. They have acknowledged that MSPO certification will further assist in protection of the environmental.
4.3. Status of Non-Conformities Previously Identified:
Kindly tick (/) to the related information / non-conformance
The Stage 1 audit findings of this system have been reviewed, in particular to assure appropriate correction and
corrective action has been implemented to address identified audit findings.
/ The last audit results of this system have been reviewed, in particular to assure appropriate correction and corrective
action has been implemented to address any nonconformity identified.
The last audit results of this system have been reviewed, in particular to assure appropriate correction and corrective
action has been implemented effectively. Non-conformity will be re-raised.
Not applicable. No non-conformity raised in previous audit.
Note 1: If a minor non-conformity raised in last audit, is not closed out, then this finding will be re-raised to a Major nonconformity.
Note 2: All minor NCs raise in last audit are required to capture in this report together with the closing of the non-compliance.
PLATINUM SHAUFFMANTZ VERITAS Management System Certification
Public Summary Report
Standard:
MS 2530:2013-3
File No.:
MASMSPO10101040
Client:
STESEN PENYELIDIKAN MPOB
Page
16
5.0 Conclusion
Detail of Audit Findings Identified During This Audit
Audit Outcome
Major NCR -
Minor NCR 15
Area of Concern (AOC) -
Opportunity for Improvement (OFI) 14
Observation (OBS) -
6.0 Recommendation
- The audit team conducted a process-based audit focussing on significant aspects/risks and objectives required by the standard(s). The audit methods used were interviews, observations, sampling of activities and review of documentation and records.
- The structure of the audit was in accordance with the audit plan included in to this summary report.
- The audit team concludes that the organisation has established and maintained its management system in line with the requirements of the standard(s) and demonstrated the ability of the system to achieve requirements for products and/or services within the scope and the organisation’s policy and objectives. Therefore, the audit team recommends that, based on the results of this audit and the system’s demonstrated state of development and maturity that this management system certification be :
No NCR recorded. Recommended to continue certification
/ Minor NCR(s) recorded. Corrective action plan has been accepted. Verification of the NCR(s) to be carried out in the next audit
Major NCR(s) recorded. Evidence of implementation of the corrective actions have been provided and accepted by the audit team. The NCR(s) have been satisfactorily closed out.
Recommended to continue certification
Major NCR(s) recorded. Evidence of implementation of the corrective actions have been provided but not fully accepted by the audit team. NCR(s) …………… have not been satisfactorily closed out within 60 days of the audit. Recommended for suspension of the certificate.