Top Banner
18
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PT.sta Company Profile
Page 2: PT.sta Company Profile

List of Content

No ITEM

1 Introduction Letter ( About SteelTech )

2 Process Mapping & interaction

3 List Of Client & Customer

4 Key Personal Contact Lista. Organization Chart

5 JOB Capability included

6 Facility

7 Welding Procedure Specification (WPS)Procedure Qualification Record (PQR)

a. Third Party Testing Reportb. Type Of Test

8 Welder Certificate

9 Company Licencesa. Worker Insurance (JAMSOSTEK)b. Government Notarize PT.SteeLTech Asiac. SIUPd. Tax Registered (NPWP, TDP)e. DEPNAKER APROVAL (Working Over Time)

Head OfficeKomp. Ruko Raflesia

Blok E No.2, Batam CentreBatam ( Indonesia )

Telp : 62 778 472747Fex : 62 778 468092

www.steeltechasia.comWorkshop

JL.Brigjend KatamsoKM.6, Tanjung Uncang,

Batam ( Indonesia )Telp : 62 778 395635Fex : 62 778 395637

Page 3: PT.sta Company Profile

About PT.SteeLTech Asia, PT.SteeLTech Asia as Sub-Contractor company establishment in BATAM since 2006, we are one of branch company in the Group of Winde Co.,Ltd where Located in China, it has Over 10 years experience for steel fabrication, Ship Building, Steel Structure and Steel Construction.

Ceremonial Moment

For over 3 years PT.SteeLTech Asia has established relationships with some of the largest and most well known contractors, and businesses, in Batam Island Region.

The Three-hectare site of yard provides the resources and capabilities to service a number of varied industries within the project able to starting.

www.steeltechasia.com

Page 4: PT.sta Company Profile

PT.SteeLTech Asia. Is fully insured and certified for all structural steel needs. PT.STA is growing and making an impression on the commercial construction market, and would like to work with your business on any future projects. Assemble Process ( DNV Class of Ship Construction )

All of these productivity are of according the specification standard to meet and exceed any goals. Provide the expertise Project Engineer to supervise and tightly control the manpower for Extended Productivity on schedule to comply with standard request to keep Client and Customer Satisfaction.

www.steeltechasia.com

Page 5: PT.sta Company Profile

PROJECT MANAGEMENT Project Management is widely recognised as a major strength of PT.SteeLTech Asia Engineering within. “One stop shop” environment. Our Project team offers a dynamic combination of collaboration qualified expertise overseas and local knowledge. This ensures every project is overseen by sound industry experience with materials and specialist labour sourced through an extensive and reliable network.

PROJECT MANAGEMENT CAPABILITIES

• Professional management team with recognised management systems • Qualified project managers and controllers • Detailed scheduling and critical path planning processes • High quality control procedures and standards • Highly motivated and skilled workforce with ongoing training • Capabilities and networks in sourcing specialist skills, labour and

materials • Advantage of offering the “one stop shop” environment at competitive

prices with value-add services.

www.steeltechasia.com

Page 6: PT.sta Company Profile

FABRICATION & WELDING

Repairs and fabrication work are the mainstay of PT.SteeLTech Asia and Engineering‘s day by day operations.

Our tradesmen have extensive experience in all facets of Fabrication, working on a variety of materials and Projects at any one time.

This area continues to grow whilst producing sound results. Its equipment and skilled personnel are at the forefront of Marine and Offshore industry standards.

www.steeltechasia.com

Page 7: PT.sta Company Profile

MACHINE SHOP The Machine Shop at PT.SteeLTech Asia and Engineering hosts a range of leading-edge machinery with skilled operators/ tradesmen.

Fabrication Process ( ABS Class of Pressure Vessel )

This specialist area caters not only to the marine industries but also to Offshore Industries, defence – anywhere that requires high-level engineering expertise. Our machinery is continually Improvement and serviced with all work performed to best practice standards. The scope of our work includes everything that is necessary for commercial building applications. We fabricate all structural framing, Ship Construction (Steelworks), Foundation, interior and exterior stairs, guardrails and handrails (Outfitting) on marine standard and Offshore, lintels and all other types of miscellaneous steel products. We also supply steel joist and deck packages.

www.steeltechasia.com

Page 8: PT.sta Company Profile

CLIENT DIR/GM ENGINEERING ESTIMATOR PROJECT PURCHASING PRODUCTION QA/QC OUTSOURCE Owner / 3rd

PARTYSUPPLIER Store

Received by Dir/GM

Analyzed by Engineering

Checked by Dir/GM

Biding Review

Approved and Submit to

Client

Project Estimator

Awarding

Request from Client

StopReceived PO from Client

Yes

No

Any changes with design?

Confirmed by Client

Yes

Project Planning & Scheduling

Material procurement

Any Deviation/Variation

Shipment Arrangement

No

Yes

NoProduct

received by Client

Material Delivery QA/QC Check

No

Yes

Material Control

Production Process

Inspection & Testing

Inspection

Outsource

Yes

Fabrication Process

Product Verification &

Validation (NDE Check)

Review and Approval

Propose PO

No

Process Mapping & Interaction

Project Contract

No

Page 9: PT.sta Company Profile

Map PT.SteeLTech Asia Location

Head Office WorkshopKomp. Ruko Raflesia JL.Brigjend KatamsoBlok E No.2, Batam Centre KM.6, Tanjung Uncang,Batam ( Indonesia ) Batam ( Indonesia )Telp : 62 778 472747 Telp : 62 778 395635Fex : 62 778 468092 Fex : 62 778 395637www.steeltechasia.com

Page 10: PT.sta Company Profile

List Of Client & Customer

1. PT.BATAMEC Shipyard

2. MacGregor

3. MacGregor plimsoll

4. PT.Nanindah Shipyard

5. Sealink Shipyard Co.Ltd

6. PT.JAYA Asiatic Shipyard

7. PT.VIKING Engineering

Head Office WorkshopKomp. Ruko Raflesia JL.Brigjend KatamsoBlok E No.2, Batam Centre KM.6, Tanjung Uncang,Batam ( Indonesia ) Batam ( Indonesia )Telp : 62 778 472747 Telp : 62 778 395635Fex : 62 778 468092 Fex : 62 778 395637www.steeltechasia.com

Page 11: PT.sta Company Profile

Key Personnel Contact

Name Destination Mobile Phone Number E-Mail AddressMr. Ruddy NG Derector 62 778 7023888 [email protected]

Mrs. Nina Finance Manager 62 778 7088818 [email protected]. Bruce Alan Robert Son Project Manager 62 778 7319996 - 6066669 [email protected]. Jemie Kynoch Rep.Management 61 778 7802209 [email protected]. Desi Eriska Accounting 62 778 6208226 [email protected]. Romeo Project Secretary 62 778 6205121 [email protected]. Arizal Supervisior 62 778 6203674Mr. Steve Snr.Proj.Engineer 62 778 6206371 [email protected]. Irawan Project Engineer 62 778 6213743Mr. Abdi Negara Project Engineer 62 778 6209597Mr. Andre QA/QC,Engineer 63 778 6191302

Head Office WorkshopKomp. Ruko Raflesia JL.Brigjend KatamsoBlok E No.2, Batam Centre KM.6, Tanjung Uncang,Batam ( Indonesia ) Batam ( Indonesia )Telp : 62 778 472747 Telp : 62 778 395635Fex : 62 778 468092 Fex : 62 778 395637www.steeltechasia.com

Page 12: PT.sta Company Profile

Mr. Ruddy NgDirector

Mr. Robert SoonProject Manager

Mr. Eisen HowerProject Secretary

Mr. StephanusSnr. Project Engineer

Mr. AndreQA/QC

Mr. SugiantoF. Fitter

Mr. WahyuF. Fitter

Mr. YustinL. Welder

Mr. KikiL. Welder

Acknowledge by,

Mr. Robert SoonProject Manager

Mr. Johnny LaiMarketing Manager

Mrs. NinaFinance Manager

Mr. Jamie KynochQHSE Manager

Mr. Johnny TeoMarketing

Mr. GintingF. Fitter

Mr. SiregarSafety

Mr. Hendra SantosSafety

Mr. DeniF. Helper

Mr. Agus SudaryonoL. Helper

Ms. DesiAccounting/Purchasing

Mr. TommyStore Keeper

Mrs. DelailaAdministration

Ms. AisahAdministration

Mr. SuriantoStore Man

Mr. DarwisF. Store Man

Mr. A. SayutiStore Man

Mr. Romeo FTIT

MANAGEMENT ORGANIZATION CHART

Mr. Abdi NegaraEngineer

Mr. IrawanProject Engineer

LindaAccounting

Mr. SafrizaSupervisor

Mr. SupriantoSupervisor

Mr. SupriadiSupervisor

Mr. AmirAsst.Supervisor

Mr. RianAsst.Supervisor

Mr. KurstuantoAsst. Supervisior

Mr. SonaliamanF. Helper

Page 13: PT.sta Company Profile

Mr. Ruddy NgDirector

Mr. Robert SoonProject Manager

Mr. StephanusS. Project Engineer

Mr. Romeo FTSecretary

Mr. SupriyantoSupervisor

Mr. SunardiQuality Control

Mr. IrawanEngineer

Mr. HardianAss. Supervisor

Mr. Redi IndraMarker

Mr. SukarminF. Fitter

Mr. JulimanF. Helper

Mr. HanafiF. Welder

Mr. SuhartoSafety

Welder

Mr. Aji PMr. MuslimMr. Efendi

Mr. Agung BMr. KhadikinMr. HartoyoMr. MarwanMr. PonimanMr. Tekad DMr. Razali

Mr. Darma AMr. Essuhaedi

Fitter

Mr. HidayatullahMr. SholihinMr. Murjito

Mr. SulaimanMr. Beni. S

Mr. Sal EfendiMr. Anang

Mr. SugiantoMr. Nurhuda

Mr. SuharyonoMr. Prima HeruMr. Sal Effendi

Mr. TantoMr. Ruddy Sartono

Mr. Abdul Hadi

Helper

Mr. ZulfikarMr. Yuami

Mr. AwaludinMr. ImamMr. Aldi

Mr. DamanMr. Irwansyah

Mr. AgusMr. Urif N.A

No. Telp :

1. Mr. Robert Soon 0778-60666692. Mr. Irawan 0812703534383. Mr. Supriyanto 0813724357464. Mr. Hardian 0813646989245. Mr. Sunardi 0813728800836. Mr. Redi Indra 0812702230517. Mr. Hanafi 0819336366288. Mr. Sukarmin 0813725203059. Mr. Juliman 081270904363

Organization ChartPROJECT H7071 – Ship Construction

Acknowledge by,

Mr. Robert SoonProject Manager

Rev.1 www.steeltechasia.com

Page 14: PT.sta Company Profile

Mr. Ruddy NgDirector

Mr. Robert SoonProject Manager

Mr. StephanusSnr. Project

Engineer

Mr. EisenSecretary

Mr. SupriadiSupervisor

Mr. MuisQuality Control

Mr. IrawanProject Engineer

Mr. AmirAsst. Supervisor

Mr. M.RioMarker

Mr. MustakimF. Fitter

Mr. M.SabarF. Helper

Mr. PandaF. Welder

Mr. HartoyoSafety

Welder

Mr. Amirrudin

Mr. SiswantoMr. DarsonoMr. Nurhuda

Mr. WiryoMr. BowoM. Wahyu

Mr. SuryadiMr. AhmadMr. M. Arbi

Zulkifli

Fitter

Mr. Marwan

Mr. M.RuliMr. Beni. SMr. ArmanMr. SuyitnoMr. Firdaus

Mr. WahyudiMr. SuhendraMr. RurwantoMr. MuhadiMr. Laode

Helper

Mr. M. Wawan HT

Mr. TogaMr. M.RegarMr. Robin. SMr. HermanMr. SaryonoMr. Adi. S

No. Telp :

1. Mr. Robert Soon 0778-60666692. Mr. Stephanus 0778-6206371

Organization ChartPROJECT

Acknowledge by,

Mr. Robert SoonProject Manager

www.steeltechasia.com

Page 15: PT.sta Company Profile

Mr. Ruddy NgDirector

Mr. Robert SoonProject Manager

Mr. StephanusSnr. Project

Engineer

Mr. EisenSecretary

Mr. SupriyantoSupervisor

Mr. SunardiQuality Control

Mr. IrawanProject Engineer

Mr. HardianAsst. Supervisor

Mr. Redi IndraMarker

Mr. SukarminF. Fitter

Mr. JulimanF. Helper

Mr. HanafiF. Welder

Mr. SuhartoSafety

Welder

Mr. Aji P

Mr. MuslimMr. Efendi

Mr. Agung BMr. KhadikinMr. HartoyoMr. MarwanMr. PonimanMr. Tekad DMr. Razali

Mr. Darma AMr. Essuhaedi

Fitter

Mr. Hidayatullah

Mr. SholihinMr. Murjito

Mr. SulaimanMr. Beni. S

Mr. Sal EfendiMr. Anang

Mr. SugiantoMr. Nurhuda

Mr. SuharyonoMr. Prima HeruMr. Sal Effendi

Mr. TantoMr. Ruddy Sartono

Mr. Abdul Hadi

Helper

Mr. Zulfikar

Mr. YuamiMr. Awaludin

Mr. ImamMr. Aldi

Mr. DamanMr. Irwansyah

Mr. AgusMr. Urif N.A

No. Telp :

1. Mr. Robert Soon 0778-60666692. Mr. Irawan 081270353438

Organization Chart Project

Acknowledge by,

Mr. Robert SoonProject Manager

Rev.1 www.steeltechasia.com

Page 16: PT.sta Company Profile

Mr. Ruddy NgDirector

Mr. Robert SoonProject Manager

Mr. StephanusS. Project Engineer

Mr. Romeo FTSecretary

Mr. SupriadiSupervisor

Mr. MuisQuality Control

Mr. IrawanEngineer

Mr. SuswantoAss. Supervisor

Mr. M.RioMarker

Mr. MustakimF. Fitter

Mr. M.SabarF. Helper

Mr. PandaF. Welder

Mr. HartoyoSafety

Welder

Mr. Amirrudin

Mr. SiswantoMr. DarsonoMr. Nurhuda

Mr. WiryoMr. BowoM. Wahyu

Mr. SuryadiMr. AhmadMr. M. Arbi

Zulkifli

Fitter

Mr. Marwan

Mr. M.RuliMr. Beni. SMr. ArmanMr. SuyitnoMr. FirdausMr. WahyudiMr. SuhendraMr. RurwantoMr. MuhadiMr. Laode

Helper

Mr. M. Wawan HT

Mr. TogaMr. M.RegarMr. Robin. SMr. HermanMr. SaryonoMr. Adi. S

No. Telp :

1. Mr. Robert Soon 0778-60666692. Mr. Stephanus 0778-62063713. Mr. Supriadi 08127773278

Organization ChartPROJECT H7040 – Forward Section Ship Construction

Acknowledge by,

Mr. Robert SoonProject Manager

www.steeltechasia.com

Page 17: PT.sta Company Profile

JOB Capability Included

1 Ship Building & Repair

2 Pressure Vessel

3 Crane Console

4 Outfitting Works

5 Steel Structure

6 Piping Works (Carbon Steel)

7 Insulation & Steel Ducting Heavy Gouge

8 Manpower Supply

Head Office WorkshopKomp. Ruko Raflesia JL.Brigjend KatamsoBlok E No.2, Batam Centre KM.6, Tanjung Uncang,Batam ( Indonesia ) Batam ( Indonesia )Telp : 62 778 472747 Telp : 62 778 395635Fex : 62 778 468092 Fex : 62 778 395637www.steeltechasia.com

Page 18: PT.sta Company Profile

OUR FACILITIES INCLUDE:

• 1 Unit PORTABLE CNC Cutting • 1 Unit Rolling Machine • 2 Unit Hydraulic Mobile Crane 20 tons • 1 Unit Over Head Crane 2,5 Tons • 2 Unit Forklift 3 Tons • Fully equipped heavy machinery shop • Fabrication shop • Workshop and clean room • Fitting and refit workshops • Abrasive blasting and painting • Recognised Quality Management Systems implemented

iimmpprroovveemmeenntt T

Teecchhnnoollooggyy ooff

M Maarriinnee IInndduussttrryy

www.steeltechasia.com