PT Yokogawa Indonesia Page.1 January 26, 2005 Maintenance Services for GC
Jan 04, 2016
PT Yokogawa Indonesia
Page.1
January 26, 2005
Maintenance Services for GC
Page.2
Evolution of Yokogawa Gas Chromatograph
GC6
GC8 GC1000MkII
GC1000
8110
1959
1979
1984
1994
2001
Start PGC Business
Micro-processor Model
Overseas Model
Air Bath type Model
Enhanced Model
Page.3
Indonesian Customers for Yokogawa GC
No Customer Name Plant KGC No.
1 Asahimas VCM 4105/4106
2 Asean Aceh Fertilizer (AAF) Ammonia 1706/4991
3 BANKO, INDNS, JICA Others 2189
4 IHI Indonesia City Gas, LNG
3399/3409
5 Pertamina LPG 2440 ~ 2443
6 Pertamina LPG 2619 ~ 2624
7 Pupuk Iskandar Muda Ammonia 3943
8 Nippon Shokubai Indonesia Acrylic Acid 4395 ~ 4398
9 Styrindo Mono Indonesia EB 4661 ~ 4664
10 Styrindo Mono Indonesia Styrene/BTX 3288/3289/3988
11 Badak NGL Company LNG 3411 ~ 3514/4562
12 Petrokimia Nusantara Interindo Etylene 2941 ~ 2949
13 Petrokimia Nusantara Interindo PE 4301 ~ 4310/4949
14 Petro Oxo Nusantara 4328/4329/4633
Customer List in Indonesia
Page.4
Indonesian Customers for Yokogawa GC
No Customer Name Plant KGC No.
15 Petnesia Resindo 4024
16 Tuban Petrochemical Complex BTX 4470 ~ 4479
17 Pertamina CO2 Removal Plant CO2 Removal
5862
18 Mitsubishi Chemical Indonesia PXY/NBA 6054
19 Pupuk Sriwijaya Ammonia 5713
Total System Installed = 70 system
Page.5
Status of Product Supply of Yokogawa GC
Based on Sales News No. SPMK 03E-025 Date October 20, 2003 :
1. Product
(1) 8111, 8114, GC6, GC6P, GC8AB, GC8AG, GC8P, GCSS, GC 1000
Not Available
(2) GC8AA Available only in Japanese Market
(3) GC1000MarkII, GCCU, GCCL, GCIU, GCHUB, GCAS On sale
2. Spare parts
(1) 8111, 8114, GC6, GC6P, GC8AB, GC8AG, GC8P
Not available except the valve seat and the valve gland
(2) GC8AA
Available until May 1, 2010
(3) GCSS
Available until February 1, 2005
(4) GC1000
Available until July 16, 2007
(5) GC1000MarkII, GCCU, GCCL, GCIU, GCHUB, GCAS
On sale
Page.6
Service Provided by YIN SVD
1. TrainingTitle : Basic Gas ChromatographyDuration : 3 DaysLocation : YEA Singapore
2. Installation Supervision
3. Start-up & Commissioning
4. Shutdown Maintenance
- Replacing some parts- Cleaning- Resetting flow and pressure requirement- Recalibration- Documentation
5. Maintenance Contract- Preventive Maintenance- Shutdown Maintenance
Page.7