Page 1: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Protecting the environment. Preserving the coast.

Page 2: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Recycled Water Program Advanced Water Treatment

SAN ELIJO JOINT POWERS AUTHORITY

2

Michael T. Thornton, P.E. General Manager

Page 3: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Who We Are… San Elijo JPA Member Agencies

City of Encinitas City of Solana Beach

Board of Directors

Chair Tom Campbell Vice-Chair Mark Muir Teresa Barth David Zito

3

Wastewater Service Area

Page 4: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

What We Do…

4

Vision - “We pursue innovative practices to produce clean water in an environmentally, socially, and fiscally responsible manner."

Page 5: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

A History of Coastal Stewardship Until the early 1950’s, sewage was discharged into the lagoon and coastal waters for Cardiff and Solana Beach.

San Elijo Water Pollution Control Facility was built in 1965 in response to water pollution in the San Elijo Lagoon.

Page 6: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Serving Today, Planning for Tomorrow.

Moving beyond wastewater treatment & disposal paradigm; the San Elijo JPA is focusing on maximizing recycling.

Page 7: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

RECYCLED WATER PROGRAM

7

Produces approx. 1350 AFY Operated in Partnership with other local

districts and cities San Dieguito Water District Santa Fe Irrigation District Olivenhain Municipal Water District City of Del Mar

Reduces Ocean Discharge by 40% Strong Community Support

Page 8: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

San Elijo Water Reclamation Facility Recycled Water Monthly Demands

Acre – Feet/Month

0

50

100

150

200

250

300

350

jan feb mar apr may jun jul aug sep oct nov dec

Ocean Discharge

Recycled

Page 9: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

RECYCLED WATER SERVICE AREA

9

Page 10: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

RECYCLED WATER SERVICE AREA

10

Customer Include: Del Mar Fairgrounds Golf Courses Caltrans Schools Parks Business Parks HOAs

Page 11: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

RECYCLED WATER SERVICE AREA

Potential New Markets

11

Page 12: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

PROGRAM CHALLENGES Maintain Financial Sustainability Develop & Grow the Program Maintain Excellent Water Quality

Page 13: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

TOTAL DISSOLVED SOLIDS (TDS) Measurement of dissolved salts and minerals (e.g. calcium, magnesium, sulfate, chloride, sodium, etc.) in the water.

Page 14: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

TOTAL DISSOLVED SOLIDS (TDS) Measurement of dissolved salts and minerals (e.g. calcium, magnesium, sulfate, chloride, sodium, etc.) in the water. Not a risk to human health Most plants have a limited tolerance Can impact some industrial processes Can limit the use of recycled water

Page 15: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

ADVANCED WATER TREATMENT (AWT) Treatment System Microfiltration (PALL ) Reverse Osmosis

15

Page 16: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

ADVANCED WATER TREATMENT (AWT) Treatment System Microfiltration (PALL ) Reverse Osmosis

AWT parallels existing recycled water sand filtration system New RW capacity = 3.0 MGD

(expandable to 3.5 MGD)

16

Page 17: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

ADVANCED WATER TREATMENT

17

Build Footprint: ~5,000 sq ft System Startup: April 2013 Cost: $5 million Grant: $850,000

Page 18: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

THE PROJECT

18

DynaSand Filtration

Chlorine Disinfection

Existing RW Treatment Train

Wastewater Treatment

Page 19: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

THE PROJECT

19

DynaSand Filtration

Chlorine Disinfection

Existing RW Treatment Train

AWT Filtration

New RW Treatment Train

Wastewater Treatment

Page 20: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

THE PROJECT

20

DynaSand Filtration

Chlorine Disinfection

Existing RW Treatment Train

AWT Filtration

New RW Treatment Train

Wastewater Treatment

Design provides:

Operational flexibility

Cost effective (E&C)

Expandability

New Opportunities

Page 21: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

THE PROJECT

21

DynaSand Filtration

Chlorine Disinfection

Existing RW Treatment Train

AWT Filtration

Future Opportunities?

Wastewater Treatment

Design provides:

Operational flexibility

Cost effective (E&C)

Expandability

New Opportunities

IPR

Page 22: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Better Wastewater = Better Recycled Water

22

Addition of an Anaerobic Selector in the Activated Sludge Bioreactor has removed P from an average of 4.8 mg/l to less than 0.5 mg/l

Page 23: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

IMPROVING COST EFFECTIVENESS Wastewater treatment process was improved to

produce “best water quality” for membrane filtration.

RESULTS: Low turbidity/more filterable water Reduced levels of orthophosphate (reduces scaling) Reduced chemical and energy use in secondary

treatment process Improved treatment process stability (reduced variance

in treated water quality) 23

Page 24: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Significant Power Savings Realized

90,000

110,000

130,000

150,000

170,000

190,000

210,000

Pow

er U

sage

(kW

h)

Month

Power Usage (kWh) w/o Recycled Water

2005

2009

Page 25: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Significant Power Savings Realized

90,000

110,000

130,000

150,000

170,000

190,000

210,000

Pow

er U

sage

(kW

h)

Month

Power Usage (kWh) w/o Recycled Water

2005

2009

2010

Page 26: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Significant Power Savings Realized

90,000

110,000

130,000

150,000

170,000

190,000

210,000

Pow

er U

sage

(kW

h)

Month

Power Usage (kWh) w/o Recycled Water

2005

2009

2010

2011

Page 27: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Significant Power Savings Realized

Current cost of biological treatment: 45.6 kW/MG (61 hp/MG) $109/MG, $107/acre-ft

90,000

110,000

130,000

150,000

170,000

190,000

210,000

Pow

er U

sage

(kW

h)

Month

Power Usage (kWh) w/o Recycled Water

2005

2009

2010

2011

2012

Page 28: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Partial Nitrification

Maximizing Treatment Performance: Temperature for SRT Target

Mixed Liquor Temp (F)

SRT

(day

s)

Page 29: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Seasonal Treatment Performance

Target SRT ~ 1.5 days in summer Target SRT ~ 2.5 days in winter

Month Mon

thly

Avg

Sec

onda

ry E

fflue

nt T

urbi

dity

(NTU

)

Page 30: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Secondary Effluent Improvements

*Implemented SRT based on temperature May 2011

Mon

thly

Avg

Sec

onda

ry E

fflue

nt T

urbi

dity

(NTU

)

Month

Page 31: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

PHOSPHOROUS REMOVAL

31

Anaerobic Selector resulted in biological removal of phosphorous.

Reduces: Chemicals & labor associated w/filter

cleaning.

Page 32: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

32

Treatment Optimization Results – Better Treatment - Lower Cost Energy use reduced by ~800,000 kWh annually (or

40% reduction to achieve 61 HP/MG) Well flocculated biology - no need for chemical

addition to control settling (no polymer or NaOCl) Temperature adjusted SRT produces consistent

effluent quality without nitrifying Significant improvements to water quality reduces

the need for chemicals for filtration Provides bio-P removal at low SRT

Page 33: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

MAXIMIZING COMMUNITY BENEFITS AWT provides the ability to do more than just produce

“really clean” recycled water.

New opportunity to strategically capture and treat urban runoff

Urban Runoff is one of the leading reasons for Beach and Lagoon pollution.

Impacts the City’s storm water permit compliance

Collaborated with the cities on a solution that leverages the treatment capacity of the proposed AWT.

33

Page 34: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

URBAN RUNOFF TREATMENT San Elijo Water Reclamation Facility

Page 35: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

URBAN RUNOFF TREATMENT

Storm Water System

Page 36: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

URBAN RUNOFF TREATMENT

Page 37: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

URBAN RUNOFF TREATMENT Construct diversion systems Use existing sewer system Treat at the SEWRF Protect coast waters New water to recycle

Page 38: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

PROJECT PROGRESS Design Completed (Kennedy/Jenks) Peer Review (Trussell Technology) Financial Feasibility Analysis (GDH) CEQA documentation completed (DUDEK) Grant funding awarded Project financing secured Construction Initiated

38

Page 39: Protecting the environment. Preserving the coast. Filtration Chlorine Disinfection . Existing RW Treatment Train Wastewater Treatment . THE PROJECT 19 DynaSand Filtration Chlorine

Questions

SAN ELIJO JOINT POWERS AUTHORITY

39

Wastewater, storm water, recycled water… Providing Clean Water for the Future.