PROJECT QUALITY
7/30/2019 project quality
2/22
PERFORM QUALITY CONTROL
7/30/2019 project quality
3/22
PERFORM QUALITY CONTROL Perform Quality process is concerned with
monitoring work results to determine whetherthey comply with the standards defined in thequality management plan.
This process identifies the causes of poor productquality or processes and makesrecommendations to bring them to requiredlevels.
Quality Control is practiced throughout theproject to identify and remove the causes of unacceptable result
7/30/2019 project quality
4/22
PERFORM QUALITY CONTROL
Project management plan Quality Metrics Quality checklists Work PerformanceMeasurement Approved change request Deliverables Organizational processassets
Cause & effect diagrams Control charts
Flowcharting Histogram Pareto chart Run chart Scatter diagram Statistical Sampling
Inspection Approved change requests review
Quality controlmeasurements Validated changes Validated deliverables Organizational Processassets update Change Requests Project ManagementPlan update Project documentUpdates
INPUTS
TOOLS &TECHNIQUES
PERFORMQUALITYCONTROL
OUTPUTS
7/30/2019 project quality
5/22
INPUTS OF PERFORM QUALITYCONTROL
Perform Management Plan . The projectmanagement plan contains the qualitymanagement plan which is used to carry out theperform Quality Control Process.
Quality Metrics. These provide the basis formeasuring project or product quality attributes inthe process.
Quality Checklists . Quality checklists in thisprocess are used to ensure that set of requiredsteps determined in the plan quality process arecompleted
7/30/2019 project quality
6/22
INPUTS OF PERFORM QUALITYCONTROL
Work performance Measurements . Thesemeasurements allow the [project team toevaluate actual versus planned progress in the
areas of technical performance, scheduleperformance and cost performance.
Approved Change Requests. ApprovedChange requests are required changes thatwere approved and submitted as an input forimplementation
7/30/2019 project quality
7/22
INPUTS OF PERFORM QUALITYCONTROL
Deliverables . Part of achieving quality is ensuringthat all deliverables are completed successfully.Deliverables will be valuated as part of this
process. Organizational Process assets . Organizational
Process assets utilized by this process includes Standards , policies and guidelines relating to quality
standards. Procedures for reporting and communicating issues
and defects.
7/30/2019 project quality
8/22
INPUTS OF PERFORM QUALITYCONTROL
Deliverables . Part of achieving quality is ensuringthat all deliverables are completed successfully.Deliverables will be valuated as part of this
process. Organizational Process assets . Organizational
Process assets utilized by this process includes Standards , policies and guidelines relating to quality
standards. Procedures for reporting and communicating issues
and defects.
7/30/2019 project quality
9/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
CAUSE AND EFFECT DIAGRAM. Also calledfishbone diagrams they show hypothesizedrelationships between potential causes andproblem under study.. Once the C & E diagramis constructed the analysis would proceed tofind out which of the potential causes were in
fact contributing to the problem
7/30/2019 project quality
10/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
CONTROL CHARTS. These are time sequencedcharts showing plotted values of a statisticincluding a centre line average and one ormore control limits. It is used to ensure thatchanges introduced are in statistical control
FLOW CHARTS. Give us a logical flow of anactivity or process. Can be applied whilechecking the quality
7/30/2019 project quality
11/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
PARETO CHART. These are named afterVilfredo Pareto who is credited for theorybehind Pareto Chart, also referred as 80:20rule. This rule as applied to quality says that asmall number of causes (20 %)create themajority of problems. Pareto theorized that
you get the most benefit by spending themajority of time fixing the most importantproblems.
7/30/2019 project quality
12/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
RUN CHARTS. Run charts are used to showvariations in trends in the process over time.They are similar to control charts, thoughwithout a displayed limit. Some otherinformation
Common causes of variations come about as a
result of circumstances or situations that arerelatively common the process you are using andeasily controllable at the operational level
7/30/2019 project quality
13/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
RUN CHARTS. Special causes variances that are not common to
the process Three type of variances that make up causes of
variances Random variances
Known or predictable variations Variations that are present in the process
7/30/2019 project quality
14/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
Scatter Diagram . This uses 2 variables , onecalled an independently variable and theother dependent , which is a output. Scatterdisplay the relationships between these twoelements as points on a graph. Therelationship is typically analyzed to prove or
disaprove cause and effect relationships.
7/30/2019 project quality
15/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
STATISTICAL SAMPLING. This involves taking asample number of parts from the wholepopulation and examine them to determinewhether they fall in acceptable variances. Thequality plan defines how to measure theresults
7/30/2019 project quality
16/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
INSPECTION. Inspection typically involvephysically looking at, measuring, or testingresults to determine whether they conform to
the requirements or quality standards.Inspection will tell you where problems existsand gives you the opportunities to correctthem, thus leading to quality improvements.
Inspection might occur after thr final product isproduced or at intervals during the developmentof the product to examine individual components
7/30/2019 project quality
17/22
TOOLS & TECHNIQUES FOR PERFORMQUALITY CONTROL
INSPECTION. Inspections are also known as reviews or peer
reviews Approved Change Requests Review. Change
requests that have been approved andimplemented are reviewed to ensure that they
are implemented correctly
7/30/2019 project quality
18/22
OUTPUTS OF PERFORM QUALITYCONTROL
QUALITY CONTROL MEASUREMENTS. Qualitycontrol measurements include the results of quality control activities performed during theprocess.
VALIDATED CHANGES. Validated changes arethe results of changes , defect repairs, orvariances that have been inspected andcorrected.
7/30/2019 project quality
19/22
OUTPUTS OF PERFORM QUALITYCONTROL
VALIDATED DELIVERABLES.Validateddeliverables ARE THOSE that have been takenthrough the tools and techniques of this
process to determine if the deliverable iscorrect and accurate. ORGANIZATIONAL PROCESS ASSETS UPDATE.
These includes:- Completed checklists Lessons learned documentation
7/30/2019 project quality
20/22
OUTPUTS OF PERFORM QUALITYCONTROL
CHANGE REQUESTS. Change requests to themanagement plan may result from carryingout this process and will be submitted to the
authorized personnel for approval PROJECT MANAGEMENT PLAN UPDATES .
Updates to the project management typicallyconsists of changes to the qualitymanagement plan and process improvementplan
7/30/2019 project quality
21/22
OUTPUTS OF PERFORM QUALITYCONTROL
PROJECT DOCUMENT UPDATE. ProjectDocument updates typically include updatesto quality standards.