Top Banner
Measurement of Training Effectiveness at Telcon By Harsha Ankola (MBA09001012)
17

Project presentation

Jun 14, 2015

Download

Business

Harrsh Ankola

PPT on my project of Training Effectiveness.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project presentation

Measurement of Training Effectiveness at Telcon

By Harsha Ankola (MBA09001012)

Page 2: Project presentation

Industry & Company OverviewOverview about construction equipment industry and Telcon.Info on Telcon Service network, departments, etc.

Page 3: Project presentation

Construction equipment industryHas only medium and large businesses.The leaders in this industry have SBU’s or

Collaboration in India.The customer are normally Road Contractors,

Mining Co’s, Govt. Institutions, Construction Co’s.

The companies are highly computerized and use advanced design software's and quality management techniques.

Page 4: Project presentation

About TelconStarted as department of Telco and floated as

separate company in 1999.Has 3 manufacturing plants at Kharagpur,

Jamshedpur and Dharwad.Has collaboration with John Deere, Hitachi,

Serviplem, Lebrero, CESAN, Tadano and Berco.

Leaders in excavators with 50% Market share and over all share of 11%.

Page 5: Project presentation

Vision & MissionVision

Global Top 25 in CE Industry by 2012.Mission

To be most trusted partner for Full line of Constructive Solutions.

While dominating Indian market try to get global.

Hall mark will motivated employees, superior technology and widespread customer support working with environment and society.

Page 6: Project presentation

Ownership & Capital Structure60% of shares are held by Hitachi and rest 40%

by Tata Motors.Initially HCM took 20%. Stakes in 2000,

another 20% in 2005 for `203.55 Cr., another 20% in 2009 for $220 million.

Equity capital is `1,000 million.Tata Motors took a debt of 70% of its tangible

net-worth in2008-09. The Y-o-Y growth in 06-07 was 39%, 07-08 was

50% and dropped to -20% in 08-09 due to recession.

Page 7: Project presentation

Service Network of TelconWith wide service network Telcon poses a strategic advantage over other competitors.

Page 8: Project presentation

DepartmentsFinancePlanningSCMDesignProductionQuality AssuranceHuman Resource & AdministrationEnvironment, Health & SafetyMarketing

Page 9: Project presentation

SWOT AnalysisStrengths

Telcon is leader in Hydraulic Excavators.Telcon has huge service network in India.

WeaknessR & D is not on par with Hitachi.

OpportunitiesGrowing domestic CE Industry.Globalization is helping expanding to foreign markets.

ThreatsJCB has become leader in Backhoe loaders.Higher attrition rate in industry.

Page 10: Project presentation

Measurement of Training EffectivenessKirkpatrick Model introduction. Evaluation methodology at Telcon.

Page 11: Project presentation

Kirkpatrick ModelDonald Kirkpatrick published this learning

evaluation model in 1959.The 4 levels are

Reaction of the student: What he thought about training.

Learning: The resulting increase in knowledge.

Behavior: Extent of behavior improvement in application of KSA’s.

Results: The effect on business and environment due to training.

Page 12: Project presentation

How needs are assed at Telcon?

Training Needs

Organizational Needs

Appraisal

Competency Mapping

Page 13: Project presentation

Training Process

Measurement of Training Effectiveness

Conduction of Training

Periodic Training Plan is prepared

Inidividual Training Plan is prepared

Departmental Training Booklet is prepared

Training Need Assessment

Page 14: Project presentation

QuestionnaireQuestions

Over all I was satisfied with this program.

I had the knowledge and/or skills required to start this program

The facilities and equipment were favourable to learning.

I was able to take this program when I needed it.

I clearly understood the program objectives.

The program met all its stated objectives.

The way course was delivered (such as classroom, training equipment) was an effective way to for me to learn the subject.

Study materials were useful during the programme.

I had enough time to learn the subject matter covered in the programme.

The program content was logically organized.

My knowledge and/or skills increased as a result of this programme.

My knowledge and skills gained through this program are directly applicable to my job.

Page 15: Project presentation

Level 1 Results

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q123.90

4.00

4.10

4.20

4.30

4.40

4.50

4.60

4.70

4.80

4.55

4.17

4.594.55

4.62

4.55 4.554.52

4.38

4.45

4.55

4.69

Communication and Interpersonal Skills

Average Rating Moving average (Average Rating)

Page 16: Project presentation

Training Results

6 Poi

nt S

afet

y Obs

erva

tion

Attach

men

t (M

idi)

Backh

oe L

oade

r (5T

& 3

036)

Bush

Press

ing

Crisp

Facili

tato

rs P

rogr

amm

e

Demin

g Sys

tem

Elect

rical

Circ

uits

Elect

rical

Saf

ety

Heavy

Exc

avat

ors

Mot

orgr

ader

& 1

0ton

Whe

el L

oade

r

PDCAI Met

hodo

logy

Pro E

CAD O

verv

iew

Risk m

anag

emen

t web

inar

ses

sion

Safet

y - E

lect

rical

Sho

ck F

irst A

id

SAP - FIC

O

Sub A

ssem

bly (M

ini)

Team

cent

er A

rchi

tech

ture

Team

cent

er O

pera

tion

Team

cent

er p

roce

sses

TPM

Track

fram

e Ass

embl

y (M

idi)

UT Tes

ting

Level

14.00

4.10

4.20

4.30

4.40

4.50

4.60

4.70

4.80

4.90

5.00

Participant Supervisor

Sample Data

Page 17: Project presentation

ConclusionConsider an example of TPM. The training session has aggregate score of 4.55 in Level 1. The pre-test aggregate were 50% and post-test aggregate were 50%. The supervisors provided rating of 4.35 and participants rated it as 4.75. The training resulted in 400 Kaizens resulting in cost cutting of `19.5 lacks. After evaluating all the 4 levels of Kirkpatrick model, the above shown training at Telcon, the training session can be judged as is effective.