NO. 1 TO THE DRAWINGS AND THE PROJECT MANUAL PROJECT NAME: A New Frisco High School Softball Locker Room CLIENT NAME: Frisco I.S.D. LOCATION: Frisco, Texas PROJECT NUMBER: 1777-02-01 PROPOSAL DATE: Thursday, June 13, 2019, 2:00 PM ADDENDUM DATE: Monday, June 10, 2019 For additional information regarding this project, contact Luke Powell at 800.687.1229. THIS ADDENDUM INCLUDES: Civil Items 1 Page Landscape Items 0 Pages Structural Items 0 Pages Architectural Items 4 Pages Plumbing Items 1 Page Mechanical Items 0 Pages Electrical Items 0 Pages Technology Items 0 Pages AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM 06.10.19
31
Embed
PROJECT NAME: CLIENT NAME: LOCATION: PROJECT NUMBER: …€¦ · NO. 1 TO THE DRAWINGS AND THE PROJECT MANUAL PROJECT NAME: A New Frisco High School Softball Locker Room CLIENT NAME:
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
NO. 1
TO THE DRAWINGS AND THE PROJECT MANUAL
PROJECT NAME: A New Frisco High School Softball Locker Room
CLIENT NAME: Frisco I.S.D.
LOCATION: Frisco, Texas
PROJECT NUMBER: 1777-02-01
PROPOSAL DATE: Thursday, June 13, 2019, 2:00 PM
ADDENDUM DATE: Monday, June 10, 2019
For additional information regarding this project, contact Luke Powell at 800.687.1229.
THIS ADDENDUM INCLUDES:
Civil Items 1 Page
Landscape Items 0 Pages
Structural Items 0 Pages
Architectural Items 4 Pages
Plumbing Items 1 Page
Mechanical Items 0 Pages
Electrical Items 0 Pages
Technology Items 0 Pages
AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM
06.10.19
Project Name: A New Frisco High School Softball Locker Room Client: Frisco I.S.D. Frisco, Texas Project Number: 1777‐02‐01
Civil Items For Addendum No. 1
Page 1 of 1
CIVIL ITEMS FOR ADDENDUM NO. 1 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above‐mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED: DRAWINGS: AD No 1, Civil Item 1: To the Drawings, Sheet CP‐1, “Paving & Dimension Control Plan,”
1) Added sidewalk to provide ADA access to public ROW.
AD No 1, Civil Item 2: To the Drawings, Sheet CWS‐1, “Water & Sanitary Sewer Plan,” 1) Added 8” valve and revised private fire line calls to include a tee and (cut‐in) valve.
END OF CIVIL ADDENDUM
Project Name: A New Frisco High School Softball Locker Room
Client: Frisco I.S.D.
Frisco, Texas
Project Number: 1777-02-01
Architectural Items For
Addendum No. #1
Page 1 of 4
ARCHITECTURAL ITEMS FOR ADDENDUM NO. 1NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had
been issued at the sampe time and incorporated integrally therewith. Where provisions of the following supplementary
data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this
Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and
supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal
form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
PROJECT MANUAL:
AD No 1, Arch. Item 1: To the Project Manual, Section 00-4200, “PROPOSAL FORM,”
Replaced section in its entirety with the attached revised section included as part of this addendum.
AD No 1, Arch. Item 2: To the Project Manual, Section 01-6210, “SCHEDULE OF MATERIALS AND COLORS,”
Revised schedule as noted below by highlighted cells.
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITESArchitectural Woodwork
KEY MATERIAL MANUFACTURER MODEL/SERIES COLOR/NUMBER COMMENTS
PL02 Plastic Laminate Wilsonart Gloss Line Finish8214K-28 Phantom Charcoal
Casework
DIVISION 9 - FINISHES
Tiling
KEY MATERIAL MANUFACTURER MODEL/SERIES COLOR/NUMBER COMMENTS
Project Name: A New Frisco High School Softball Locker Room
Client: Frisco I.S.D.
Frisco, Texas
Project Number: 1777-02-01
Architectural Items For
Addendum No. #1
Page 2 of 4
DIVISION 9 - FINISHESPainting and Coating
KEY MATERIAL MANUFACTURER MODEL/SERIES COLOR/NUMBER COMMENTS
PNT02 Paint Sherwin Williams Frank Blue; SW 6967
To match Frisco High School standard blue
PNT03 Paint Sherwin Williams Goldfinch; SW 6905
To match Frisco High School standard yellow
PNT05 Paint Sherwin Williams TBDTo match Frisco High School standard gray
DIVISION 10 - SPECIALTIES
Information Specialties
KEY TYPE MANUFACTURER MODEL/SERIES COLOR/NUMBER COMMENTS
TB Tack Board Frames Claridge Clear Anodized
Tack Board Cork Claridge Cork TBD
AD No 1, Arch. Item 3: To the Project Manual, Section 08-7100, “HARDWARE,”
Added section and associated schedule in their entirety with the attached section included as part of this addendum.
AD No 1, Arch. Item 4: To the Project Manual, Section 10-7300, “PROTECTIVE COVERS,”
Removed section from the project in its entirety.
DRAWINGS:
AD No 1, Arch. Item 5: To the Drawings, Sheet AS1.1, “SITE PLAN AND DETAILS,”
1) Refer to attached replacement drawing AS1.1 for revised graphics indicating change in required accessible sidewalk.
AD No 1, Arch. Item 6: To the Drawings, Sheet A1.1, “FLOOR PLAN AND WALL/ PARTITION TYPES,”
2) Refer to attached replacement drawing A1.1 for revised graphics indicating change in required storage.
3) Revised notes at all HC dressing benches to remove “BY OWNER.” All benches are to be provided by Contractor.
AD No 1, Arch. Item 7: To the Drawings, Sheet A4.1, “FINISH PLAN AND INTERIOR ELEVATIONS,
Detail 1 – FINISH PLAN
1) Refer to attached replacement drawing A4.1 for revised graphics indicating change in required storage.
2) Notes were added to indicate “18”D STL UTILITY SHELVING BY CONTRACTOR,” and “SHELF AND ROD (TYP OF 2).”
3) Revised painted graphic note in 1.05-HALL to indicate PNT05 background color.
4) Removed painted graphic note in 1.07-HALL.
5) Added note to show extents of PNT05 in 1.12-SHOWERS.
Detail 4 – INTERIOR ELEVATION
1) Revised height of TC01 in 1.01-TOILET and clarified location of “BULL-NOSED TILE EDGE”.
Project Name: A New Frisco High School Softball Locker Room
Client: Frisco I.S.D.
Frisco, Texas
Project Number: 1777-02-01
Architectural Items For
Addendum No. #1
Page 3 of 4
Detail 5 – INTERIOR ELEVATION
1) Revised height of TC02 in 1.01-TOILET.
2) Revised TC02 to TC01.
3) Revised EPNT01 ABOVE / TC02 TO 8’-0” to TC02.
Detail 8 – INTERIOR ELEVATION
1) Revised extents of PNT01 in 1.05-HALL and 1.07-HALL.
2) Added location of wall graphic and “PNT05 BEHIND GRAPHIC” in 1.05-HALL.
Detail 10 – INTERIOR ELEVATION
1) Refer to attached replacement drawing A4.1 for extents and location of painted accent stripes PNT02 and PNT03 in
1.06-DRESSING.
Detail 11 – INTERIOR ELEVATION
1) Refer to attached replacement drawing A4.1 for extents and location of painted accent stripes PNT02 and PNT03 in
1.06-DRESSING.
Detail 12 – INTERIOR ELEVATION
1) Refer to attached replacement drawing A4.1 for extents and location of painted accent stripes PNT02 and PNT03 in
1.06-DRESSING.
Detail 13 – INTERIOR ELEVATION
1) Refer to attached replacement drawing A4.1 for extents and location of painted accent stripes PNT02 and PNT03 in
1.06-DRESSING.
Detail 14 – INTERIOR ELEVATION
1) Revised height of TC01 in 1.01-TOILET and clarified location of “BULL-NOSED TILE EDGE”.
2) Revised EPNT01 ABOVE / TC01 TO 8’-0” to TC01.
3) Revised PNT01 to PNT05.
Detail 16 – INTERIOR ELEVATION
1) Revised height of TC02 in 1.11-TOILET.
2) Revised EPNT01 ABOVE / TC02 TO 8’-0” to TC02.
Detail 18 – INTERIOR ELEVATION
1) Revised height of TC02 in 1.11-TOILET.
2) Revised EPNT01 ABOVE / TC02 TO 8’-0” to TC02.
COMMENTS LEGEND
1) Added note “6. WALL GRAPHIC SHOWN IS FOR REFERENCE ONLY. COORDINATE FINAL GRAPHICS SELECTION
WITH OWNER.”
ROOM FINISH SCHEDULE
1) Revised schedule as noted below.
a. 1.01-TOILET
i. S FINISH: revised from PNT01/EPNT01/TC01/TC02 to PNT01/TC01.
ii. W FINISH: revised from EPNT01/TC02 to TC02.
b. 1.05-HALL
i. N FINISH: revised from PNT01 to PNT05.
ii. COMMENTS: added note 6.
Project Name: A New Frisco High School Softball Locker Room
Client: Frisco I.S.D.
Frisco, Texas
Project Number: 1777-02-01
Architectural Items For
Addendum No. #1
Page 4 of 4
c. 1.06-DRESSING
i. N FINISH: revised from PNT01 to PNT01/PNT02/PNT03.
ii. E FINISH: revised from PNT01 to PNT01/PNT02/PNT03.
iii. S FINISH: revised from PNT01 to PNT01/PNT02/PNT03.
iv. W FINISH: revised from PNT01 to PNT01/PNT02/PNT03.
d. 1.11-TOILET
i. E FINISH: revised from EPNT01/TC02 to TC02.
ii. W FINISH: revised from EPNT01/TC02 to TC02.
e. 1.12-SHOWERS
i. N FINISH: revised from EPNT01/TC01 to PNT01/TC01.
ii. E FINISH: revised from PNT01/EPNT01/TC01 to PNT05/TC01.
iii. S FINISH: revised from EPNT01/PNT01/TC01 to PNT01/TC01.
iv. W FINISH: revised from EPNT01/TC01 to TC01.
AD No 1, Arch. Item 8: To the Drawings, Sheet A8.1, “CASEWORK ELEVATIONS,”
Detail 4 – CASEWORK ELEVATION
1) Refer to attached replacement drawing A8.1 for replacement of TCF and OSS18 with utility shelving as indicated in
sheet A4.1 revision listed above.
Detail 5 – CASEWORK ELEVATION
1) Refer to attached replacement drawing A8.1 for replacement of TCF and OSS18 with shelves and rods as indicated in
sheet A4.1 revision listed above.
Detail 6 – CASEWORK ELEVATION
1) Refer to attached replacement drawing A8.1 for replacement of TCF and OSS18 with utility shelving, and shelves and
rods as indicated in sheet A4.1 revision listed above.
END OF ARCHITECTURAL ADDENDUM
Project Name: A New Frisco High School Softball Locker RoomClient: Frisco I.S.D.Frisco, TexasProject Number: 1777-02-01
Plumbing Items ForAddendum No. 1
Page 1 of 1
PLUMBING ITEMS FOR ADDENDUM NO. 1NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS:
AD No 1, Plumb. Item 1: To the Drawings, Sheet P2.1, “PLUMBING PLAN,”1) Refer to clouded area for fire line size change
END OF PLUMBING ADDENDUM
Frisco ISD - A New Frisco High School Softball Locker Room (1777-02-01)Frisco, Texas
A. Having carefully examined the project manual, drawings, and related documents entitled: A NewFrisco High School Softball Locker Room as prepared by Huckabee, as well as the premisesand conditions affecting the work, the undersigned proposes to furnish all materials, labor andequipment, and perform all work required by the contract documents for the construction of theA New Frisco High School Softball Locker Room project, in accordance with said documents, ofwhich this Proposal is a part, for the following sum:
B. PROPOSAL ITEM NO. 1: For the construction of A New Frisco High School Softball LockerRoom for Frisco ISD in compliance with and as shown on the drawings and herein specified forthe sum of:
$
Dollars
C. ALTERNATE NO. 1: Provide permanent irrigation in remainder of proposed area requested asshown on the irrigation plan, (choose one) Add / Deduct the sum of:
$
Dollars
(choose one) Add / Deduct __________ consecutive calendar days if alternate isaccepted.
D. ALTERNATE NO. 2: Excavate and provide decomposed granite in 3 existing grass parkingislands as shown on the landscape plan, (choose one) Add / Deduct the sum of:
$
Dollars
(choose one) Add / Deduct __________ consecutive calendar days if alternate isaccepted.
E. ALTERNATE NO. 3: Provide additional soil to level area and new sod near backstop as shownon the landscape plan, (choose one) Add / Deduct the sum of:
$
Dollars
(choose one) Add / Deduct __________ consecutive calendar days if alternate isaccepted.
06.10.19
Frisco ISD - A New Frisco High School Softball Locker Room (1777-02-01)Frisco, Texas
Huckabee 00 4200 - 2PROPOSAL FORM
F. Refer to Section 01 1400 Work Restrictions for specific project schedule. The Contractoracknowledges that they have read and understand the project schedule as stated in Section 01 1400. Please initial as acknowledged __________ (initials).
G. The undersigned acknowledges _______ addenda to the project manual and drawings.H. The undersigned agrees, if awarded the contract, to execute and deliver to the Owner, at the
time of the signing of the contract, a Performance and Payment Bond of approved form throughan approved bonding company duly authorized to do business in the State of Texas, andcurrently listed in the Department of Treasury Federal Register, which is acceptable suretywithin their Uni underwriting limitations on bonds, in favor of the Frisco ISD as specified in theInstructions To Proposers contained in the project manual.
I. The undersigned further agrees that the Certified Check, Cashier's Check, or Proposal (Bid)Bond in the amount of five (5%) percent of his Proposal, payable to the Frisco ISD,accompanying this Proposal, is left in escrow with the Architect, that it's amount is the measureof liquidated damages the Owner will sustain by the failure of the undersigned to execute anddeliver the above-named agreement, or in furnishing the 100% Payment and PerformanceBonds within ten (10) days of written notification of the award of the contract to him, then theCertified Check, Cashier's Check, or Proposal Bond shall become the property of the Owner;but if this Proposal is not accepted within forty-five (45) days of the time set for the submissionof proposals, or if the undersigned executes and delivers said contract and bonds, the checkshall be returned to him on receipt thereof.
J. For each day that the completion of the project extends beyond the stipulated completion dates,the Contractor agrees to pay to the Owner the sum of One Thousand Five Hundred and no/100Dollars ($1,500.00) per day, and that this is the amount of liquidated damages the Owner willsustain for each day the time of completion of the project extends beyond the stipulated dates.
K. If he is notified of the acceptance of this Proposal within forty-five (45) days of the time set forthe opening of proposals, he agrees to execute a contract for the above work for theabove-stated compensation in the form of the Standard Agreement of the American Institute ofArchitects.
L. The undersigned agrees that the following unit prices may apply on any additions to, ordeductions from the work, which prices shall include overhead, profit, taxes, and all otherrelated costs. The unit prices shall be installed, in-place prices for materials/systems asspecified. The quoted unit prices will be valid, and the quoted unit prices will be in force on anywork. A singular cost shall be provided below to be used for both additions and deductions. Ifdifferent prices are provided for additions and deductions the average of the absolute values willbe used. The materials and work shall be in compliance with the specifications. The Contractorshall not be compensated for work that is not authorized by the Architect or Owners Laboratory(e.g. over drilling of piers and additional concrete and reinforcement for over drilled piers)
UNIT PRICING MATERIAL/SYSTEM UNITS COST ($)/UNIT
Excavation (Dirt or Caliche) Cubic Yard ____________________
Excavation (Rock) Cubic Yard ____________________
Backfilling (On Site) Cubic Yard ____________________
Reinforcing Steel, Straight or Bent Pound ____________________
Frisco ISD - A New Frisco High School Softball Locker Room (1777-02-01)Frisco, Texas
Huckabee 00 4200 - 3PROPOSAL FORM
Uncased Drilled Piers - Complete including reinforcing, concrete,accessories and drilling
18" Diameter Lineal Foot ____________________
Cased Drilled Piers -Complete including reinforcing, concrete,accessories, drilling and casing
18" Diameter Lineal Foot ____________________
M. It is further agreed that extended periods of labor strikes, unusual and destructive weatherconditions that are beyond the normal weather patterns, and other generally recognized "Acts ofGod" will be cause for an approved extension of the above-stipulated completion of timeschedule. It is also agreed that a request for extension of time will be made in writing by theContractor to the Architect within fifteen (15) days after the time of occurrence for anyconsideration to be given the request. It is agreed that no additional funds are allowed forExtensions of Time.
N. Contractor has read and agrees with all provisions and articles of the contract documents.Respectfully submitted,
Contractor:
Per:
Frisco ISD - A New Frisco High School Softball Locker Room (1777-02-01)Frisco, Texas
Huckabee 00 4200 - 4PROPOSAL FORM
VENDOR COMPLIANCE TO STATE LAWFrisco ISDPlease answer the following questions and return with this bid:
Texas law prohibits cities and governmental units from awarding contracts to anon-resident unless the amount of such proposal by a Texas resident by the amount theTexas resident would be required to underbid in the non-resident bidder's state. Forinformation regarding this series of questions, see Article 601g of the Texas Civil Statutes.
Is your principal place of business in Texas? Yes No (Circle One)
If no, in which state is your principal place of business? __________
If your principal place of business is not Texas, does your state favor resident bidders inyour state by some dollar increment or percentage? Yes No (Circle One)
If yes, what is that dollar increment or percentage? _____
AUTHORIZED SIGNATURE
NAME OF COMPANY
ADDRESS
CITY STATE ZIP CODE
DATE
Frisco ISD - A New Frisco High School Softball Locker Room (1777-02-01)Frisco, Texas
Huckabee 00 4200 - 5PROPOSAL FORM
NOTIFICATION OF HAZARDOUS MATERIALS AFFIDAVIT
STATE OF TEXAS
__________ COUNTY
Before me, undersigned authority on this day personally appeared ,known to me to be the person whose name is subscribed below, who, on oath stated:
"As the appropriate official of the company, contractor, or subcontractor submitting this affidavitin conjunction with a bid submitted to the Frisco ISD, I acknowledge that this company,contractor, or subcontractor has been notified that copies of the Asbestos Hazard EmergencyResponse Act (AHERA) for the school(s) where such company, contractor or subcontractor hasbeen contracted to perform work are available at the Frisco ISD, Frisco, Texas. I understandthat it is our responsibility to familiarize ourselves with such plans and that it is our responsibilityto inform every worker that we use on this project as to the availability of these plans.
We also acknowledge that we will be required to obtain clearance from the Frisco ISD, prior toexecuting any work on this project.”
Name of Company:
By:
Title:
STATE OF TEXAS
COUNTY OF __________
Sworn to and subscribed before my hand at , Texas this theday of , 20 , A.D.
6" FIRE WATER SERVICE. PROVIDE BACK FLOW PROTECTION INSIDE BUILDINGAS REQUIRED BY LOCAL AUHTORITY. REFER TO CIVIL DRAWINGS FOR CONTINUATION.
P1
1"ø
1 1/4"ø
1 1/4"ø2 1/2"ø
FD1
DOMESTIC BACK FLOW PREVENTER. REFER TO SPEC SECTION 21 0000 FOR MORE INFORMATION
TMV-1
P15
ALL FLOOR DRAIN TRAPS IN BUILDING TO BE SERVED BY SINGLE TRAP PRIMING SYSTEM
P2
FD1
WH1
WH1
FD1
3/4"ø
DRESSING
1.12
OFFICE
1.01
TRAINER
1.02
HALL
1.04
HALL
1.03STORAGE
1.05
HALL
1.07
LAUNDRY
1.06
MECH/ ELEC
1.11
SHOWERS
1.09
TOILET
1.10
TOILET
1.13
1
HOT/TEMP. WATER
DESCRIPTION
PLUMBING FIXTURE CONNECTION SCHEDULE
ELECTRIC WATER COOLER/DRINKING FOUNTAIN
WATER CLOSET
URINAL
LAVATORY
SINK
MOP SINK
WATER HEATER (GAS)
WATER HEATER (ELECTRIC)
SHOWER
FLOOR DRAIN
FLOOR SINK
HUB DRAIN
WALL HYDRANT
HOSE BIB
-
-
1/2
1/2
-
1/2
NA
3/4
3/4
-
-
-
3/4
-
COLD WATER
1
3/4
1/2
NA
-
-
-
TRAP
-
-
1-1/4
1-1/2
1-1/4
2
-
-
2
3
3
3
-
-
WASTE
4
2
2
2
2
2
-
-
2
3
3
3
-
-
VENT
2
2
1-1/2
-
-
-
1-1/2
1-1/2
2
-
2
2
1-1/2
1-1/2
3/4
3/4
3/4
3/4
1/2
1/2
1/2
• REFER TO SPECIFICATIONS FOR FIXTURE TYPE AND CONFIGURATION.• REFER TO PLUMBING PLANS AND RISERS FOR ADDITIONAL LINE SIZES.• REFER TO ARCHITECTS DRAWINGS FOR ALL FIXTURE MOUNTING HEIGHTS.
SANITARY SEWER
ACID WASTE PIPING
COLD WATER
HOT WATER
TEMPERED WATER
HOT WATER RETURN
VENT
GAS PIPING
GAS PIPING - SLEEVED AND VENTED (ALL INTERIOR GAS PIPING)
CONDENSATE DRAIN
FLOOR DRAIN
FLOOR SINK
END CAP
BALL VALVE
WALL CLEAN OUT
CLEAN OUT
FLOOR SINK
DESCRIPTIONSYMBOL
PLUMBING SYMBOL LEGEND
YARD CLEAN OUT
FLOOR CLEAN OUT
WALL HYDRANT(NON-FREEZE, LOCKABLE)
WALL HYDRANT (MODERATE CLIMATE, LOCKABLE)
VENT THRU ROOF
BACK FLOW PREVENTER
ROOF DRAIN
EMERGENCY OVERFLOW DRAIN
PLUMBING FIXTURE IDENTIFICATION TAG. REFER TO SPECIFICATION FOR FIXTURE TYPE AND CONFIGURATION.
FD
FS
WCO
CO
FS1
YCO
FCO
WH
WH1
VTR
BFP
RD
OD
PXX
EXPANSION TANK
WATER HEATER. FLOOR OR WALL MOUNTED. PROVIDE ISOLATION VALVES AND THERMOMETER.
ROUTE AUXILIARY DRAIN TO OUTDOORS (6" AFG WITH TURN DOWN) OR APPROVED RECEPTOR. PIPE FULL SIZE.
ROUTE T&P TO OUTDOORS (6" AFG WITH TURN DOWN) OR APPROVED RECEPTOR. PIPE FULL SIZE.
2
1
HOT WATER
3" DEEP GALV. PAN WITH SOLDERED SEAMS.
ASME T&P VALVE
NOTE: REFER TO PLUMBING DETAILS FOR MORE
INFORMATION.
FINISHED FLOOR
BALL VALVE
BASEBOARD
TOP OF
MINIMUM
6
NOTES:1. INSTALL TRAP PRIMER & DISTRIBUTION UNIT PER
MANUFACTURER'S INSTRUCTIONS.2. WHERE ONLY ONE TRAP IS PRIMED NO DISTRIBUTION
UNIT IS INSTALLED.3. ACCESS PANEL SHALL BE LARGE ENOUGH TO RENDER
WORKING ACCESS TO THE INSTALLATION.4. TRAP PRIMER VALVE W/ 1/2" INLET / OUTLET,BACKFLOW
PREVENTER & VACUUM BREAKER PORT.5. MAXIMUM FOUR OUTLET DISTRIBUTION UNIT SHOWN.
TWO & THREE OUTLETS AVAILABLE AS REQUIRED.6. 1/2" COPPER MAKE-UP LINE TO FLOOR RECEPTOR OR
FLOOR RECEPTOR TAILPIECE. TAPPING SHALL BE A MINIMUM OF 1" ABOVE THE TRAP WATER LEVEL.
7. CONNECT TO TOP OF SERVICE LINE TO PREVENT FOREIGN MATTER FROM ENTERING PRIMER VALVE.
3
7
5
4
1/2"
SINGLE FIXTURE
SHOWN ON THE DRAWINGS AND/OR PER THE TABLES SHOWN ABOVE.IN LINE WITH WATER FLOW DIRECTION IF POSSIBLE. SIZE THE UNITS AS
HORIZONTAL OR VERTICAL POSITION, BUT NEVER UPSIDE DOWN. INSTALL201, ASSE # 1010 AND ANSI # A112.26.1M CERTIFICATION. INSTALL INEQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI #WH-BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS, WATTS OR APPROVEDPC TO PROVIDE AIR CHAMBERS OR WATER HAMMER ARRESTERS
SIZE
E
F
C
D
B
A
PDI
PDI SIZE "A"
HOTCOLDUNIT LOADSIZE FIXTURE
SHOWER/BATHTUB
LAVATORY/SINK
JANITOR'S SINK
TANK WATER CLOSET
VALVE WATER CLOSET
114-154
154-330 2"
1-1/2"
1"
1-1/4" 61-113
33-60
1/2"
3/4" 12-32
1-11
URINAL
3
2
3
2
--
1.5
5
1.5
--
--
5
10
HOT OR COLD WATER SUPPLY
MULTIPLE FIXTURES
FIXTURE UNIT TABULATIONPIPE FIXTURE
ZURN "SHOKTROL"HAMMER ARRESTOR,REFER TO RISERDIAGRAM FOR SIZES,PROVIDE BALL-TYPEISOLATION VALVE &THREADED COUPLING.
WATER PIPING IN WALL
PROVIDE 12"X12" LOCKING ACCESS COVER, PAINTED AS DIRECTED BY ARCHITECT.
IF HORIZONTAL BRANCH IS LESS THAN 20' LONG, PROVIDE ONE AT END OF LINE.
IF BRANCH IS GREATER THAN 20' LONG PROVIDE ANOTHER WHA IN MIDDLE, EACH SIZED FOR HALF THE FIXTURE UNITS.
INSTALL PER PDI STANDARDS AND MANUFACTURER'S INSTRUCTIONS
PR
OF
ESS
ONAL ENGIN
EE
R
I
SAXETFOETATS
LI CENSED
THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY: D.J.
P2 ICE MAKER VALVE BOX & 1/2" SUPPLY LINE, PROVIDE WITH SUPPLY STOP, EQUALTO 'OATEY' ICE MAKER OUTLET BOX. PROVIDE FINAL CONNECTION TO ICE MAKER.PROVIDE BACK FLOW PREVENTION TYPE BFP3.