Project Estimation:Demystifying the Black Art

Page 2: Project Estimation: Demystifying the Black Art. How good an estimator are you?

How good an estimator are you?

Page 3: Project Estimation: Demystifying the Black Art. How good an estimator are you?

For the following questions… • Give a range (upper and lower bounds)• Do not make your ranges either too wide or too narrow• Make the range so you believe there is a 90% chance of including the right value

Page 4: Project Estimation: Demystifying the Black Art. How good an estimator are you?

What is the surfacetemperature of the Sun?

Page 5: Project Estimation: Demystifying the Black Art. How good an estimator are you?

What is the weight ofthe heaviest blue whale

ever recorded?

Page 6: Project Estimation: Demystifying the Black Art. How good an estimator are you?

0%

5%

10%

15%

20%

25%

30%

0 1 2 3 4 5 6 7 8 9 10

Quiz Results

Page 7: Project Estimation: Demystifying the Black Art. How good an estimator are you?

We stink at estimation.

Page 8: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

Page 9: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

• Feeling of ignorance• Protection of pride• Influence from expectations

Page 10: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

• We don’t estimate accurately• We don’t plan accordingly• We don’t execute correctly• We don’t reflect properly

Page 11: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

• We don’t estimate accurately• We don’t plan accordingly• We don’t execute correctly• We don’t reflect properly

Page 12: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Artificially Narrow Ranges

Page 13: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Probability of correct estimation

100%

Page 14: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Quiz Expectations

90%

Page 15: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Business Expectations

25%

Page 16: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Single Point Estimations

> 1%

Page 17: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Under-estimation

• Reduced effectiveness of project plans• Reduced chance of on-time completion• Destructive late-project dynamics

Page 18: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Over-estimation

• Parkinson’s Law• Student Syndrome

Page 19: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Give Probability Ranges

Page 20: Project Estimation: Demystifying the Black Art. How good an estimator are you?

My Business Expectations

50%

25% 75%

Page 21: Project Estimation: Demystifying the Black Art. How good an estimator are you?

We don’t like ranges

Page 22: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Put uncertainty into your estimation practices

Page 23: Project Estimation: Demystifying the Black Art. How good an estimator are you?

The Golden Spiral

Page 24: Project Estimation: Demystifying the Black Art. How good an estimator are you?
Page 25: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Planning Poker

Page 26: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Tainting estimates with customer expectations

Page 27: Project Estimation: Demystifying the Black Art. How good an estimator are you?

We don’t know what we are estimating

Page 28: Project Estimation: Demystifying the Black Art. How good an estimator are you?

“Build me a house.”

Page 29: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Find your project’s estimation cornerstones

Page 30: Project Estimation: Demystifying the Black Art. How good an estimator are you?

How Many Bedrooms?

• 2 Bedrooms ~ 800 sq ft., 1 bathroom, 1 stall garage, small or shared yard.

• 4 Bedrooms ~ 1400 – 2200 sq ft., 2 bathrooms, 2 stall garage, yard

Page 31: Project Estimation: Demystifying the Black Art. How good an estimator are you?

How Many Bedrooms?

• Prioritizing size and complexity will trigger defensive responses

• Prioritizing details will trigger optimism (i.e. size and complexity will fit inside details)

Page 32: Project Estimation: Demystifying the Black Art. How good an estimator are you?

2 Day Crutch Method

Page 33: Project Estimation: Demystifying the Black Art. How good an estimator are you?

2 Day Crutch Method

• Forces further exploration of unknown or large features

Page 34: Project Estimation: Demystifying the Black Art. How good an estimator are you?

2 Day Crutch Method

• Forces further exploration of unknown or large features• Insists task break downs of lengthy known features

Page 35: Project Estimation: Demystifying the Black Art. How good an estimator are you?

2 Day Crutch Method

• Forces further exploration of unknown or large features• Insists task break downs of lengthy known features• Teaches the wisdom of knowing when something is really unknown

Page 36: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Modifying estimates with “control knobs”

Page 37: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

• We don’t estimate accurately• We don’t plan accordingly• We don’t execute correctly• We don’t reflect properly

Page 38: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Estimates ≠ Plans

Page 39: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Estimation = Planning

“Plans are worthless — but planning is everything.” —Dwight D. Eisenhower

Page 40: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

• We don’t estimate accurately• We don’t plan accordingly• We don’t execute correctly• We don’t reflect properly

Page 41: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Not forcing clarity on project uncertainty

Page 42: Project Estimation: Demystifying the Black Art. How good an estimator are you?

“It feels like 20 hours, but let’s put 24 hours to fudge it

a little bit…”

Page 43: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Cone of Uncertainty

Page 44: Project Estimation: Demystifying the Black Art. How good an estimator are you?

$100k5

0k 2

00

k

67

k 1

50

k

80

k 1

25

k

25

k 4

00

k

Page 45: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Hofstadter's Law

Page 46: Project Estimation: Demystifying the Black Art. How good an estimator are you?

The Gut Instinct Equation

Page 47: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology works against us.

• We don’t estimate accurately• We don’t plan accordingly• We don’t execute correctly• We don’t reflect properly

Page 48: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Estimates are for visibility, not accountability

Page 49: Project Estimation: Demystifying the Black Art. How good an estimator are you?

“A good estimate is a estimate that provides a clear enough view of the project reality to allow the

project leadership to make good decisions about how to control the project to hit

its targets”

[Steve McConnell, Software Estimation]

Page 50: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Psychology working for us.

• Be aware we don’t like being uncertain• Use estimates to humbly understand unknowns• Create team unity that is quick to extinguish unknowns

Page 51: Project Estimation: Demystifying the Black Art. How good an estimator are you?

Questions?

Page 52: Project Estimation: Demystifying the Black Art. How good an estimator are you?

http://gosquids.com/Estimation.pptxhttp://gosquids.com/Estimation.mp3