Project Development South America Region Project Development South America Region Bob Drabik - EGM PDSA 4 October 2012 4 October 2012
14

Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

May 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Project Development South America RegionProject Development South America Region

Bob Drabik - EGM PDSA4 October 20124 October 2012

Page 2: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Agenda

• Project Development Division overview, team and resources

• Project development challenges

• Xstrata - Bechtel Strategic Alliance

• Standard Concentrator Application

• Other Supplier Alliances

2

Antapaccay Concentrator Antapaccay 40 ft. SAG millLas Bambas Concentrator MassEarthworks

Page 3: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Project Development Division overview

• Project Development South America Region leading:

Greenfield and Brownfield projects in South America

– Antapaccay Project, Peru: in EPC/EPCM Execution with Bechtel – now being commissioned

– Las Bambas Project, Peru: in EPC/EPCM Execution with Bechtel – in construction

El P hó P j A i Fi l f ibili d d i h B h l i – El Pachón Project, Argentina: Final feasibility study update with Bechtel - nearing completion

– Agua Rica Project, Argentina: Feasibility study with Fluor - target Q2 2013 completion

Lomas Bayas Sulphides Project Chile: Pre feasibility study with Bechtel target Q4 – Lomas Bayas Sulphides Project, Chile: Pre-feasibility study with Bechtel - target Q4 2012 completion

– Coroccohuayco Project, Peru: Scoping study with AMEC - completed, looking at various options

– JV Support : Antamina Major Projects & Collahuasi Phase 2 and 3 Projects - ongoing

3

Page 4: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Project Development South America teamBased in Santiago, Chile

Overall organisation led by Bob Drabik Executive General Manager PDSA

Core team common support across all projects

PDSA Project teamsAntapaccay - Project Director Max CombesLas Bambas - Project Director Joe AlbrightEl P hó G l M X O h

projectsGeneral Manager Finance

Finance ManagersStudy Managers

El Pachón - General Manager Xavier Ochoa Agua Rica - GM Projects Dave DicaireJVs - GM JV Support Tony Maycock

y gCost Estimating Specialist

Process SpecialistSD Manager

4

HR Manager

Page 5: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Project Development has the right people

• Experience and depth across all projects

Strong and experienced owner’s teams

• Xstrata Copper owner’s team has directly relevant project experience

– EGM PDSA – 35 years

– PD Las Bambas – 39 years

– PD Antapaccay – 17 years

– GM El Pachón – 16 years

– GM Projects – 31 years

– GM JV Support – 40 years

– Next level of managers (engineering, commercial, business, project controls, finance, site) – average over 20 years each of project experience

– 270 project development staff across all projects with various levels of experience

• Bechtel team has key management on our projects that average 25 years experience each

5

Page 6: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Project development challengesIdentification and management of challenges

• Xstrata Copper recognised many of the key project development challenges in 2007:

– Social licence and community pressures, particularly in Peru– Government relations– Environmental and Social Impact Assessments– Permits to construct and access areas for infrastructure– Remote locations to construct in and transport people and equipment to– Simultaneous and sequential projects in execution in Peru– Massive infrastructure development requirements (water supply, power, roads, rail, ports)

Availability of sufficient resources to design and build projects in hot markets– Availability of sufficient resources to design and build projects in hot markets– Sufficient project management skills to control mega-projects– Availability of key materials and mining equipment to support projects– Cost pressures as global and regional economies heat up causing general and mining

l t d l tirelated escalation

• Created Project Development Division separate from operations to address these challenges

• Established clear division of responsibility and accountability to manage the challenges

6

Page 7: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Clear division of responsibilitiesOperations and Projects

South American Operations Project Development Division

ESIA application and response

Permits

Engineering, Procurement , Construction

Project controls

Community relations

Sustainable development

j

Traffic and logistics

Change managementSustainable development

Government interface

Operational readiness

Change management

Document management

Q lit f k hiOperational readiness

Production ramp-up

Quality of workmanship

Quality of performance

7

Page 8: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Xstrata - Bechtel Strategic AllianceEssential for Standard Concentrator, Synergies and Integration

• Established in Q4 2007

• 10 year Alliance for Replicable Copper Concentrators

• Studies completed or underway so far:

– Standard Concentrator Feasibility Study – completedStandard Concentrator Feasibility Study completed

– Antapaccay Feasibility Study – completed, project now being commissioned

– Las Bambas Feasibility Study - completed, project now in construction

Tampakan Feasibilit St d completed orking thro gh ESIAs and resettlement– Tampakan Feasibility Study – completed, working through ESIAs and resettlement

– El Pachón Final Feasibility Study Update – nearing completion

– Frieda River Pre-feasibility completed and Feasibility Study - being completed

l h d f b l d l– Lomas Bayas Sulphides Pre-feasibility study – nearing completion

• Projects in Execution so far:

– Antapaccay Project – first of the Replicable Copper Concentrators

8

– Las Bambas Project – second of the Replicable Copper Concentrators

Page 9: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Xstrata - Bechtel Strategic AllianceBrings benefits in current environment

• Secures access to large experienced pool of engineering resources and experienced project management skillsproject management skills

• Concurrently supports multiple projects at various development stages

• Retains key staff from project to project and enhances career opportunities across projects – plus continuity of people and knowledge

• Transfer resources from one project to next as required – integrates teams

• Xstrata Copper one of Bechtel’s major clients in South AmericaXstrata Copper one of Bechtel s major clients in South America

• Consistent approach across all projects – many synergies being captured

• Replication efficiencies and savings both in time and cost across;

− Engineering , Procurement , Construction, Commissioning (start-up and ramp-up)

• Apply lessons learned from one project to next – learning curve shorter

K iti t f f th i k th j t i i i i i

9

• Key mitigant for some of the risks other projects are experiencing in mining

Page 10: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Standard Concentrator

• Standard concentrator:

First in copper industry

– Divided into adjustable modules

– Primary crusher, grinding area, flotation area, concentrate and tailings area, re-grind and filter plantgrind and filter plant

– Truck shop, warehouse, offices, camps

– One grinding line or two grinding lines

Enclosed or open air structures– Enclosed or open air structures

• Each mine is unique, each ore is unique, but:

– Standard Concentrator philosophy

Antapaccay – 70 ktpd plant layout

Standard Concentrator philosophy applied as default base case

– Customize only when adds NPV

– Look for opportunities to replicate

10

pp p

– Apply where it makes sense

Antapaccay Concentrator – as constructed

Page 11: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Standard ConcentratorDesign evolves

• Standard Concentrator applied to Las Bambas modified from Antapaccay

A h SAG ll b ll ll h– Antapaccay has one SAG mill, two ball mills, one primary crusher

– Las Bambas has two SAG mills, two ball mills, two primary crushers

– Flotation circuit for Las Bambas is twice Antapaccay’s in capacity

• Next Standard Concentrator was applied to El Pachón

– Two SAG mill, four ball mills, two primary crushers, concentrator will be enclosed for high Andes climatic conditions

11

Extract from 3D model Las Bambas Las Bambas 140 Ktpd plant layout

Page 12: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Standard ConcentratorExtends to equipment suppliers

• Alliance approach extended to key manufacturers of mining equipmentSt d di i t lti l j t– Standardises equipment across multiple projects

– Part of Standard Concentrator approach and philosophy– Cost and time savings through replication– Takes equipment off critical path through early order capabilityq p p g y p y– Xstrata Copper becomes major customer, provides various opportunities

• First Supplier Alliance established with FL Smidth for all SAG mills, ball mills and primary crushers in Q1 2008

ll bl h d h f ll ll l• Next Alliance established with Siemens for all mill Gearless Motor Drives in Q1 2008

• Expanded Alliances where possible and created additional Alliances through 2010– Metso for Pebble Crushers and Apron Feeders

Siemens for Gas Insulated Switchgear– Siemens for Gas Insulated Switchgear– FL Smidth for Flotation Cells, then cyclones– Thyssen Krupp Robins for Overland Conveyors– Twenty further Alliances established

12

Page 13: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Conclusions so far

• Xstrata Copper recognised the project challenges, planned well in advance to execute a number of major projects in South Americaa number of major projects in South America

• Assembled experienced strong teams with right skills to manage and execute the mega-projects

• Xstrata - Bechtel Alliance provides overall project management capabilities track Xstrata Bechtel Alliance provides overall project management capabilities, track record, experienced people for replicable copper concentrators

• Standard Concentrator replication and approach saves time and money

• Innovative Supplier Alliances saves time and moneypp y

13

View of Antapaccay grindingarea

Antapaccay overland conveyorand stacker

Las Bambas concentrator platform

Page 14: Project Development South America Regiondb2520ce-8ed7-4729-9fca...Project Development Division overview • Project Development South America Region leading: Greenfield and Brownfield

Questions