PROJECT INDEX:- A) Introduction:- B) What is HRSG and function in power plant? Key features and factors (parameters) of selection of HRSG:-  Safety and Reliability  Number of boiler water level controllers  Number of fusible plugs  T ube overheat c ontroller  High stack alarm controller  Sinking time calculation  Fuel pressure monitoring system  Fuel temperature monitoring system  Combustion air pressure monitoring system  Steam pressure modulation  Steam pressure li mit switch  Safety valves  Automatic blow-down/ Continuous blow-down  Boiler water TDS meter/ Conductivity meter  Furnace water TDS meter  Furnace draft alarm for solid fuel boilers  Pilot flame i gnition  Electrical panel with Fuses, O/L Relays, ELCBs, Earthings, etc  Instrumentation for measurement of parameters related to safety of a boiler  Environmental Compliance  Efficiency  Availability to user for maintenance without stoppage  Mechanical and manual cleaning convenience  Chemicals cleaning convenience  Repair convenience  Operating convenience  Instrumentation reliability
6

Project Definition and Description

Apr 07, 2018

Download

Documents

Saumil Shah
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Definition and Description

8/6/2019 Project Definition and Description

http://slidepdf.com/reader/full/project-definition-and-description 1/6

PROJECT INDEX:-

A)  Introduction:-

B)  What is HRSG and function in power plant?

Key features and factors (parameters) of selection of HRSG:-

  Safety and Reliability

  Number of boiler water level controllers

  Number of fusible plugs

  T ube overheat controller

  High stack alarm controller

  Sinking time calculation

  Fuel pressure monitoring system 

  Fuel temperature monitoring system 

  Combustion air pressure monitoring system 

  Steam pressure modulation

  Steam pressure limit switch

  Safety valves

  Automatic blow-down/ Continuous blow-down

  Boiler water TDS meter/ Conductivity meter  Furnace water TDS meter

  Furnace draft alarm for solid fuel boilers

  Pilot flame ignition

  Electrical panel with Fuses, O/L Relays, ELCBs, Earthings, etc

  Instrumentation for measurement of parameters related to safety of a

boiler

  Environmental Compliance

  Efficiency

  Availability to user for maintenance without stoppage

  Mechanical and manual cleaning convenience

  Chemicals cleaning convenience

  Repair convenience

  Operating convenience

  Instrumentation reliability

Page 2: Project Definition and Description

8/6/2019 Project Definition and Description

http://slidepdf.com/reader/full/project-definition-and-description 2/6

  T rouble shooting logic diagnostics and support

  Life expectancy

  Space/ dimensions/ weight

  Site start-up time

  T ransportability  Aesthetics

  External facility dependence

  Water treatment system simplicity

Etc . . .

C)  Conclusion:-

PROJECT DETAIL:-

1)  Introduction2) 

Features:- 

Page 3: Project Definition and Description

8/6/2019 Project Definition and Description

http://slidepdf.com/reader/full/project-definition-and-description 3/6

 

Adv antages:-

Large Buildings

No Dust

Even Heat

Easy Customization

Quiet

Disadv antages:-

 Appearance

Page 4: Project Definition and Description

8/6/2019 Project Definition and Description

http://slidepdf.com/reader/full/project-definition-and-description 4/6

 

Energy Efficiency 

Maintenance 

 Applications

Heat recovery can be used extensively in energy projects.

In the energy-rich Persian Gulf region, the steam from the HRSG is used for desalination plants.

Universities are ideal candidates for HRSG applications. They can use a gas turbine to produce high

reliability electricity for campus use. The HRSG can recover the heat from the gas turbine to produce

steam/hot water for district heating or cooling.

Large ocean vessels (e.g.Emma Maersk) make use of heat recovery

C) PROBLEMS:

Swirling problem at boiler¶s start-up

CONCLUSION:-

H

ereIn the above sections we have given a synopsis about our project

´

titleµ thatwe are going to do in Arvind Ltd., Naroda. For that we are thankful to our college and

Arvind Ltd. for their feasible support and allowing us to do such a essential project for our

future career. We are thankful to Mr. (our college guide) to Mr. Kunal Waghmare (our

industry guide) for giving us a chance.

Page 5: Project Definition and Description

8/6/2019 Project Definition and Description

http://slidepdf.com/reader/full/project-definition-and-description 5/6

We will try our best to monitoring and controlling of Boiler conveniently by digital system 

and try to improve efficient and other features also. We will try our best for this for the

duration of 1 year for this project. We will try to solve some fault and try to solve them 

during this 7th Semester and also in 8th Semester.

Typical Supply Scope

¾ H.P. Drum 

¾ L.P. Drum 

¾ H.P. Super Heater

¾ H.P. Evaporator

¾ H.P. Economizer

¾ L.P. Super Heater

¾ L.P. Evaporator

¾ L.P. Economizer (Pre-heater)

¾ L.P. Economizer Recirculation Systems

¾ HRSG Casing and Internal Insulation

¾ HRSG Inlet and Exhaust T ransition

Ducts

¾ HRSG Structural Supporting Steel and

Platforms/Ladders/Stairways

¾ Exhaust Stack

¾ SCR Catalyst System and Ammonia

Injection Grid

Page 6: Project Definition and Description

8/6/2019 Project Definition and Description

http://slidepdf.com/reader/full/project-definition-and-description 6/6

¾ Space for Future CO Catalyst

¾ Natural Gas Fired Duct Burner and

Associated Equipment

Modular of HRSG