Progress of NIM's Smoke Stack Simulator

and Field Measurement in Power Plants NINIMM图标图标

Liang Zhang,

National Institute of Metrology, China

Page 2: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

01 Background

02 Smokestack Simulator of NIM China

03 Field Calibration System

04 Field Tests

05 Future Works

Page 3: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Need for Stack Gas Flowrate Measurement

Industry plant efficiency test

Air pollution emission monitoring

➢ Chinese Environmental Protection Agency has clear demand for

accurate flue gas flowrate measurement

Carbon trading

➢ In 2013, China has carried out pilot carbon trading in 7 provinces,

and extended to the national carbon trading market in 2017

➢ In 2013 NDRC issued first 10 industry sectors greenhouse gas

emission accounting methods and reporting guidelines

Page 4: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Measurement and Calibration Scheme

Industry plant efficiency test

➢S type pitot tube point by point measurement

➢Wind tunnel calibration at 0 pitch and 0 yaw angle

Air pollution emission monitoring

➢ On site velocity comparison using S type pitot tube.

➢ Wind tunnel calibration at 0 pitch and 0 yaw angle

Carbon trading

➢ Fuel based calculation method

Page 5: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Overall Research Plan

Stack flowrate calibration

➢Build calibration facilities to calibrate standard 3D pitot tubes

in different flow conditions

➢Study the pitot tube integration method

➢Field calibration system

Stack ultrasonic flowmeter calibration

➢Dry calibration

➢Real flow velocity calibration

Field tests

Page 6: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

01 Background

02 Smokestack Simulator of NIM China

03 Field Calibration System

04 Field Tests

05 Future Works

Page 7: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Flow Meter

LDA Standard

Wind Tunel

Swirl and Turbulent Generator

Pitot Tube Transverse

Muti-Path USM

Test Section

Axial Fan

DN 1000, DN700, 0.7m*1m

Smoke Stack Simulator of NIM Working Standard

Page 8: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Smoke Stack Simulator of NIM

Page 9: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Reference Section & Wind Tunnel

Velocity range of wind tunel: 0.5~70m/s

Turbulence intensity: 0.75%@50m/s

Page 10: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Dual LDA Test Windows (Downstream of Contraction)

Standard Flowmeters Nozzle and

Turbine Flowmeters

Vacuum Pump

NIM’s Dual LDA Flowrate Standard

Page 11: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Dual LDA Test Windows (Downstream of Contraction)

Inlet

Nozzle Standard Flowmeter Vacuum Pump

NIM’s Dual LDA Flowrate Standard

Page 12: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

NIM’s Dual LDA Flowrate Standard

Boundary layer LDV

Page 13: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Reference Section & Wind Tunnel

LDV primary standard of SMSS

Page 14: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Reference Section & Wind Tunnel

LDV seeding

Page 15: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

PIV

Reference Section & Wind Tunnel

Wind tunnel

Page 16: Progress of NIM's Smoke Stack Simulator and Field ...

Reference Section & Wind Tunnel

8-path USM working standard

NIM图标NIM图标

Page 17: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Reference Section & Wind Tunnel

USM lost signal

Electromagnetic interference

Page 18: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Test Section

Page 19: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Test Section

Contraction section and swirl generator

Page 20: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Test Section

USM under test

➢ Circular: 8-path (OWICS) + dual cross diametric path

➢ Rectangular: 8-path (OWIRS) +dual cross diametric

path

Page 21: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Test Section

USM under test

Page 22: Progress of NIM's Smoke Stack Simulator and Field ...

Test Section

Pitot tube automatic transverse system

NIM图标NIM图标

Page 23: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Test Section

Pitot tube automatic transverse system

Page 24: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Test Section

Fans

Page 25: Progress of NIM's Smoke Stack Simulator and Field ...

Test Data

Flow stability

NIM图标NIM图标

Page 26: Progress of NIM's Smoke Stack Simulator and Field ...

Test Data

LDV calibrate USM

Set flowrate(m3/h) 750 1700 3500 8500 17000 32000 50000 80000

Velocity in the Center of

the pipe 0.5 1 2 5 10 20 30 50

(m/s)

LDV flowrate(Nm3/h) 755.467 1684.68

NIMNIM3494.48

图标图标8496.88 17375.7 32617.2 50932.2 84476.6

USM flowrate(Nm3/h) 745.971 1681.39 3517.49 8588.96 17542.3 32830.1 51358.4 84381.5

Indication error 1.26% 0.19% -0.66% -1.08% -0.96% -0.65% -0.84% 0.11%

Page 27: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

01 Background

02 Smokestack Simulator of NIM China

03 Field Calibration System

04 Field Tests

05 Future Works

Page 28: Progress of NIM's Smoke Stack Simulator and Field ...

Field Calibration System

NIM图标NIM图标

Standard 3D Pitot Tube

Automatic positioning

system

Traceable

Stack

Flow

Flowmeter Under Test

Geometric Calibration

Wind Tunnel

Page 29: Progress of NIM's Smoke Stack Simulator and Field ...

Field Calibration System

Geometric calibration device 2nd Generation

NIM图标NIM图标

1st Generation

80mm

Page 30: Progress of NIM's Smoke Stack Simulator and Field ...

Field Calibration System

Geometric calibration device 2nd Generation

NIM图标NIM图标

Page 31: Progress of NIM's Smoke Stack Simulator and Field ...

Field Calibration System

Automatic pitot tube positioning system

NIM图标NIM图标

Page 32: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

01 Background

02 Smokestack Simulator of NIM China

03 Field Calibration System

04 Field Tests

05 Future Works

Page 33: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Pitot tubes calibration in NIST wind tunnel

NIM图标NIM图标

Page 34: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Natural gas power plant Install 6-Path Ultrasonic Flowmeter

e

m NIM图标NIM图标

Pitot TubTest

Platfor

Page 35: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Natural gas power plant

NIM图标NIM图标

Page 36: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Field Tests

Coal-fired power plant

Pitot TubeTest

Platform

Install 6-Path Ultrasonic Flowmeter

Page 37: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Field Tests

Page 38: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

NIM图标NIM图标

Page 39: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

NIM图标NIM图标

Page 40: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

NIM图标NIM图标

Page 41: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – 3D laser scanner

NIM图标NIM图标

Comparison

Page 42: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – 3D laser scanner

NIM图标NIM图标

Page 43: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – 3D laser scanner

NIM图标NIM图标

Page 44: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – Flowrate Measurement

NIM图标NIM图标

Page 45: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – Flowrate Measurement

NIM图标NIM图标

Page 46: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Field Tests

Coal-fired power plant – Flowrate Measurement by pitot tube @

10Hz

Page 47: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – Flowrate Measurement

NIM图标NIM图标

Page 48: Progress of NIM's Smoke Stack Simulator and Field ...

Field Tests

Coal-fired power plant – Flowrate Measurement

NIM图标NIM图标

Page 49: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

01 Background

02 Smokestack Simulator of NIM China

03 Field Calibration System

04 Field Tests

05 Future Works

Page 50: Progress of NIM's Smoke Stack Simulator and Field ...

气相色谱仪及光谱分析

流速式烟气流量计

自动标定系统

Future Work

Close loop wind tunnel which can change the gas

composition (simulated flue gas) and temperature.

Online Auto Calibration GC System

NIM图标NIM图标

烟气超声流量计

E-1

轴流风机

激光多普勒测速仪LDV

E-2

真空泵

P-1 混气池

E-3

水泵

天平

V-1

I-1

MFC

V-2

I-2

V-3

I-3

V-4

I-4

V-5

气瓶

V-6

烟气温度调节装置

LDV

Simulated

Flue Gas

USM Fan

Moisture

Generater

Page 51: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Future Work

Dry calibration facility for flue gas USM

Page 52: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Future Work

Other industry sectors (test 30 sites in 3 years)

➢Cement production

➢Glass production

➢Ceramic production

➢Chemical production

➢Non-ferrous metal production

➢ Iron and steel production

Page 53: Progress of NIM's Smoke Stack Simulator and Field ...

NIM图标NIM图标

Thank you for your attention

[email protected]