Top Banner
Product From The Sterling Sales Meeting Presentation On March 23, 2011
17

Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Dec 23, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

ProductFrom The

Sterling Sales Meeting Presentation On March 23, 2011

Page 2: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Out Sourcing / Private Label

Page 3: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Private Label Opportunity

• Electric Unit Heaters• 2-20 ton Commercial Rooftop (Goodman)• 2-10 ton Commercial Split Systems (Goodman)

– 3 ph/460/230v

• PTAC Units (Goodman)• ??

Page 4: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Internally Build Product-------------------------------------

Current Product Enhancements

Page 5: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Hydronic Unit Heaters

See suggestions in the discussion section

Page 6: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Tubular Unit HeatersTubular Centrifugal Fan Unit

Heater

Tubular Duct furnace

Tubular Separated Fan Unit Heater

Tubular Separated Centrifugal Fan Unit Heater

High efficiency Unit heater A

High efficiency Unit heater B

Modify current tubular fan unit to blower. Match QVEB. Must add modulation gas controls

Modulation gas controls for blower, fan and duct furnace

Modify current tubular unit by removing the fan. Must meet a minimum of 30-80 degree rise (90 if possible)Duct flanges to be added on inlet and outlet.

Modify current tubular fan unit to make it separated combustion. Modification of burner box is required. New power venter and pressure switch required.

Modify current tubular blower unit to make it separated combustion. Modification of burner box is required. New power venter and pressure switch required.

Modify current tubular to high efficiency

Design new unit with complete new heat exchanger

Page 7: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Engineered ProductHydronic Packaged Rooftop Unit Heating only, 800MBH input, High efficiency 90%+,

Hydronic coil, Heat Net controls, xxxxx CFM, xxxx TSP,

Packaged Make-Up Air Unit Air conditioning and heating, energy recovery section, high filtration section, 100% outside air, turndown 25% or below, Change Mtr system on standard CFM Units, BAS Interface package - Bacnet, Lon, N2, Modbus, 2" filter frame option (Merv 13) (New ASHRAE/ANSI fan standards coming)

Air handler Unit Additions Add heating coil for split system with Hydronic heatingAdd Condenser Section Optional field installed with AHUCurrent unit modifications /additions

1. Blower spring isolation2. Main control board with better logic3. Evap Cooling Section, Cabinet Designed up to 12,000 CFM, bag filter or 12" final filter, 2" prefilter option

4. Add Condenser Secction to Rail - up to 30 Tons (out source Cond Unit)

5. ME & MS units are short on CFM. Ned to adsd top discharge and top return

Page 8: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Internally Build Product---------------------------------

New Product Development

Page 9: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

New Product Development

• Magic Pak Unit

• New Upflow Gas furnace (150-400k btu) – w/cooling coil

Page 10: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

• Kitchen Systems Make-Up Air Units

• Self Contained 100% OSA -5000 CFM w/ Fixed-plate enthalpic energy exchanger

New Product Development

Page 11: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Misc Project

Find VFD Drive that can handle factory mounted under all conditions

CanFab unit

Flue collars on GG

MS and ME third party label for complete unit

Page 12: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Product Meeting -----------------------------

Discussions Topics

Page 13: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Product Meeting Discussion

• Outsource Electric Unit Heaters• Goodman Cond Units for Space Pak• Energy Recovery Modules

– Calcana & AirXchnage• Hydronic Unit Heaters

– Become at least a me too– Specifier– Unit Mounted Controls– Upgrade Mtrs and junction box– Reznor , Modine & Rettling all becoming a threat

Page 14: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Product Meeting Discussion Topics

• Hydronic Unit Heaters– Production Issues

• Sharp corners and lose fit of meteal• Issue w/ Fan Blades coming off• Issue w/ Vibration

– Upgrade housing for Plastic (polish model)– All engineering done to date has been to take cost out

Page 15: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

Product Meeting Discussion Topics

• Tubular unit Heater– Need tubular QVEB, Duct Furnace– Tubular QVEB nearly done

• Moving to separated combustion model next

– Condensing unit heater bimetal control switch to avoid freezing

– Solenoid valve for power outages to dump condensate

Page 16: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

6 Month Project Goals

Page 17: Product From The Sterling Sales Meeting Presentation On March 23, 2011.

6 Month Project Goals

1. Tubular unit heater with blower (+modulation) - Lab2. TF & TC unit heater with separated combustion - Lab3.1 Tubular Duct Furnace – Lab3.2 High efficiency unit heater - Eng Design 4. High efficiency unit heater – Lab