Top Banner
PREZENTACJA WYNIKÓW ZA 2014 R. 1 September 3th, 2015 H 1 2015 results
16

PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Feb 28, 2019

Download

Documents

trinhkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

PREZENTACJA WYNIKÓW ZA 2014 R.

1September 3th, 2015

H 1 2015 results

Page 2: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Agenda

• About us

• Competitive advantage

• Financial insights

• Market landscape

• Unique selling points

• Property portfolio

‒ Office

‒ Multipurpose

‒ Commercial

‒ Other

2

Page 3: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

About us

What we do:

• We develop and manage real estate. We specialize in complex development and revitalization projects with above-average profit margins

How we do it:

• We invest in our key projects and create comfortable, highest-quality space for our tenants

• We execute our projects comprehensively, employing over 60 specialists from different fields of the real estate business

Why we do it:

• We want to create projects unique in the Polish market, adhering to the principles of sustainable development and meeting the needs of a wide range of tenants

3

Through our „Office Plus” concept we aim to create the most sought-after office space in Poland.

About Capital Park Key events in the first half of 2015

• Since January 2015 we have let 17,529 square metres of office space.

• On August 19th we opened Royal Wilanów, a modern mixed-use project located in the centre of the Wilanów district of Warsaw, again increasing the area of completed projects that generate rental income.

• Capital Park signed an agreement with GTC S.A. concerning free-of-charge lease of land adjacent to the Royal Wilanów building, to develop public amenities in the area, offering a more attractive space for tenants.

• Polskie Sieci Elektroenergetyczne S.A. leased 6,291 squar metres of office space in the Delta Eurocentrum Office Complex.

• A new mall, with a floor area of 3,000 square metres, was added to the portfolio of the Vis à Vis shopping centres, located in Toruń at ul. Szosa Lubicka 111.

Page 4: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

About us

4

76PROPERTIES

258.000 m2

PORTFOLIO AREA

37CITIES ACROSS POLAND

80%OF PROPERTY VALUEIS IN WARSAW

PLN 1.7 bnVALUE OF PROPERTY PORTFOLIO

PLN 2.8 bnTARGET PORTFOLIO VALUE

Currently we are developing two properties in Warsaw with a total area of over 64thousand m2 and a mid sized office property in Krakow. We are also preparing theconstruction of a hotel property in Gdańsk.

Page 5: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

5

Competitive advantages

5

People can now choose where to work and work becomes their life. Tenants need work-friendly spaceand that is what we offer. Thanks to our unique Office Plus concept our properties are unlike any otherand their commercialization continues despite a negative market trend.

FOCUS ON TENANTS' NEEDS

Our solutions include Warsaw's firstconcierge service for tenants, a wide varietyof catering services, a mini SPA, fitnessofferings, a car wash and personalizedinterior arrangement

QUALITY & ARCHITECTURE

It positions our properties above marketstandards and positively impacts thecorporate identity of our tenants

SUSTAINABLE DEVELOPMENT

Thanks to the principles of sustainabledevelopment our properties offer lowermaintenance costs and meet the goals ofour tenants

Page 6: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

6

Key events in the H 1 2015

6

Since January 2015 we have let 17,529 square metres of office space, which proves that ourinnovative Office Plus concept is effective.

6

Percentage leased for selected office projects

Leasd area in H 1 201531th of December 2014

Page 7: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

77

Key events in the H 1 2015The grand opening of the Royal Wilanow

Page 8: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

88

• Construction completed on schedule and within budget

• 37,000 square metres of GLA:• 30,000 square metres of office space GLA,

63% let• 7,000 square metres of retail space GLA, 88%

leased to 14 reputable tenants• Plazas and public space development

8

Royal Wilanów offices, shops and restaurants

Key events in the H 1 2015The grand opening of the Royal Wilanow

Page 9: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Financial insights

9

Selected insights from the profit and loss statement Revenue by segment

Multipurpose

Office

Commercial

Revenue structure by segment

PLN ’000 H1 2015 2014 H1 2014

Lease income 36 131 56 393 22 881

Net operating income (17 930) (30 577) (14 639)

Revaluation of properties (48 112) (60 976) 12 849

Interest cost (17 617) (18 906) (6 467)

Net income (39 033) (63 615) 10 760

Office Multipurpose Commercial Other

propertiesOthers

H 1 2014

H 1 2014

H 1 2014

H 1 2015

H 1 2015

H 1 2015

H 1 2015H 1 2014 2014

Page 10: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Financial insights

10

Increase in property value Capital expenditures split

Increase in completed properties share Stable financial situation

31.12.2014 Capital

expenditures

Acquiring

property

Sale of

property

Revaluation 30.06.2015

Completed Under

construction

In preparation

149mln

Others, 5%

H 1 2015

+ 105%

H 1 2015H 1 2014

Page 11: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Financial insights

11

NAV Increase in portfolio value

Net debt ratio 5-year loan and bond maturity (as of 2/28/2015)

Notes Credit facilities

985 983915

861 8699,41 9,39

8,74

8,17 8,25

7,5

8

8,5

9

9,5

10

400

600

800

1 000

1 200

NAV NAV/akcjęNAV/share

H1 2014 31.12.2014 H1 2015

H1 2014 31.12.2014 H1 2015

Page 12: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Market overview

12

Projected compression of capitalization rates

Decreasing unemployment Upcoming trend reversal

Largest office properties scheduled for completion in 2015

Source: Raport Savillis, Capital Park

Source: Savillis Source: Cushman & Wakefield

North Gate

DEKA

Immobilien

2011

Crown

Square

Invesco

2011

Orange HQ

Qatar

Investment

Authority

2011

Focus

Filtrowa

RREEF

2011

Zebra Tower

Union

Investment

2011

International

Business Centre

DEKAImmobilien

2012

Green

Corner

RREEF

2013

Senator

Union

Investment

2013

Lipowy

Business Park

WP. Carey

2014

Source: Cushman & Wakefield

8%

7%

6%

Page 13: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Office projects

13

EUROCENTRUM BETA, GAMMA EUROCENTRUM DELTA

2 444 m2 GLA

May 2011 completion date

42 337 m2 GLA

June 2014 completion date

27 241 m2 GLA

Q4 2015 scheduled completion

RACŁAWICKA POINT

Project name Project stage CityGLA

(m2, thousands)Parking capacity

Current leasedarea

Book value12/31/2014

(PLN, thousands)Yield

EC Beta, Gamma Completed Warsaw 43 320 76% 411 090 6,70%

EC Alpha Completed Warsaw 15 221 75% 106 291 7,50%

Racławicka Point Completed Warsaw 2 48 100% 32 556 7,00%

EC Delta Under construction Warsaw 27 214 26% 120 661 6,70%

Topos Under construction Krakow 1 - 40% 2 150 7,50%

Piano House In preparation Gdańsk 5 102 - 8 914 7,50%

Total 93 905 681 662

Page 14: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Mixed-use projects

14

37 257 m2 GLA

Q III 2015 scheduled completion

64 656 m2 GLA

Q I 2018 scheduled completion

3 748 m2 GLA

Q III 2007 date of acquisition

ROYAL WILANÓW ARTN SOBIESKIEGO 104

Project name Project stage CityGLA

(m2, thousands)Parking capacity

Current leasedarea

Book value12/31/2014

(PLN, thousands)Yield

Royal Wilanów Office Completed Warsaw 37 925 62% 223 726 7,00%

Royal Wilanów Retail 88%

ArtN In preparation Warsaw 65 470 9% 259 285 6,50%

Sobieskiego 104 Completed Warsaw 4 79 96% 34 779 7,50%

Neptun House In preparation Gdańsk 7 34 81% 19 156 7,50%

suma 113 1 508 536 946

Page 15: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

Commercial projects

15

3 698 m2 GLA

Nov 2013 completion date

5 711 m2 GLA

Dec 2014 completion date

2 890 m2 GLA

Sep 2014 date of acquisition

Vis à Vis Radom Vis à Vis Łódź Vis à Vis Toruń

Project name Project stage CityGLA

(m2, thousands)Parking capacity

Current leased area

Book value12/31/2014

(PLN, thousands)Yield

Projected NOI1

(PLN, thousands)

Projected investment after 12/31/2014(PLN, thousands)

Vis à Vis Radom Completed Radom 4 - 100% 31 678 8,50% 2 693 -

Vis à Vis Łódź Completed Łódź 6 - 93% 38 573 8,00% 3 086 -

Vis à Vis Toruń Completed Toruń 3 - 94% 19 435 8,25% 1 603 -

Pozostałe, w tym zarządzane na zlecenie

Completed Polska 17 - 90% 195 804 16 205 -

suma 29 - 285 490 23 587 0

Page 16: PREZENTACJA WYNIKÓW ZA 2014 R.inwestor.capitalpark.pl/wp-content/uploads/2016/12/H12015.pdf · Royal Wilanów offices, shops and restaurants Key events in the H 1 2015 The grand

1616

Contact

16

www.capitalpark.pl

Joanna Zieliń[email protected]: +48 605 366 001