PRESENTATION ERA MODULE ASSEMBLY PROJECT ERA Brine Concentrator System Energy Resources of Australia (Rio Tinto)
90
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentation ERA

PRESENTATIONERA MODULE ASSEMBLY PROJECT

ERA Brine Concentrator System

Energy Resources of Australia (Rio Tinto)

Page 2: Presentation ERA

OVERVIEW OF THE ERA PROJECT (AUSTRALIA)

Port of Darwin

Page 3: Presentation ERA

PORT OF DISCHARGE---DARWIN, AUSTRALIA

Page 4: Presentation ERA

ERA OWNED BY RIO TINTO PRODUCES DRUMMED URANIUM OXIDE AT ITS RANGER MINE IN AUSTRALIA’S NORTHERN TERRITORY

CLEANING THE LARGE POND / PRODUCING CLEAN DISTILLED WATER

ENERGY RESOURCES OF AUSTRALIA

Page 5: Presentation ERA

ERA – GENERAL ARRANGEMENTS FRONT VIEW

≈ 15 Meters

≈ 25 Meters

Page 6: Presentation ERA

ERA – GENERAL ARRANGEMENTS SIDE VIEW

≈ 8 Meters

≈ 25 Meters

Page 7: Presentation ERA

ERA – GENERAL ARRANGEMENTS TOP VIEW

≈ 50 Meters

Page 8: Presentation ERA

OVERALL WATER TREATMENT PLANT

Page 9: Presentation ERA

BRINE CONCENTRATOR AREA

Page 10: Presentation ERA

BRINE CONCENTRATORS (AL6XN, DUPLEX)

LARGE VAPOR WASHERS(AL6XN, DUPLEX)

LARGE DIAMETER DUCTING (DUPLEX & 316L SS)

Page 11: Presentation ERA

MODULARIZED SKIDS, FULLY PIPED / INSULATED WITH INSTRUMENTATION & CONTROL VALVES

Page 12: Presentation ERA

1) Vapour Washer 3 Units (JF-1517)

2) Tank (in the skid)5 Tanks(JF-1517)

3) Ducting Work 1 Set (JF-1517)

4) Skid Module 1 Set (JF-1543)

Including; Structure, Platform, Handrail , Piping, Duct support, Insulation, Electrical & Instrument

Delivery Condition:CIF at Darwin Port (NT),AustraliaDelivery date:On Sep. 30,2012 for Item 1) and 3) On Dec. 01,2012 for Item 2) and 4)

SCOPE OF WORK

Page 13: Presentation ERA

Unit3Vapour Washer

Unit2Vapour Washer

Unit1Vapour Washer

DUCTING(VWH)Evap to Vapour Body

DUCTING(FHT)Fan to Evap

DUCTING(VWF)Vapour Body to Fan

DUCTING(REC)Recirculation

Tanks in skid

Page 14: Presentation ERA

VAPOUR WASHER 3 UNITS

Page 15: Presentation ERA

DUCTING

Page 16: Presentation ERA

Vent Separator Tank

CIP Tank

Hot Water DayTank

Start-Up Seed&Chem Mix Tank

Distillate Collection Tank

5 TANKS IN MODULE

Page 17: Presentation ERA

Vent Separator Tank

Distillate Collection Tank

Start-Up Seed&Chem Mix Tank

CIP Tank

Hot Water DayTank

Page 18: Presentation ERA

A

B

D

C

F

E

H

G

L

K

J

M

STRUCTURE & FRAME

TOTAL 12 MODULES

Page 19: Presentation ERA

MODULE A

Page 20: Presentation ERA

MODULE B

Page 21: Presentation ERA

MODULE C

Page 22: Presentation ERA

MODULE D

Page 23: Presentation ERA

MODULE E

Page 24: Presentation ERA

MODULE F

Page 25: Presentation ERA

MODULE G

Page 26: Presentation ERA

MODULE H

Page 27: Presentation ERA

MODULE J

Page 28: Presentation ERA

MODULE K

Page 29: Presentation ERA

MODULE L

Page 30: Presentation ERA

MODULE M

Page 31: Presentation ERA

STRUCTURE SHOP FABRICATION AREA

TRACABILITY CONTROL

Page 32: Presentation ERA

ERRECTION STARTED AT STRUCTURE SHOP

Page 33: Presentation ERA

ERRECTION STARTED AT STRUCTURE SHOP

Page 34: Presentation ERA

TOTAL ASSEMBLY AT STRUCTURE SHOP

M

A

K

J

H

G

F

E C

DB

L

Page 35: Presentation ERA

STRUCTURE LAID DOWN IN MODULE SHOP

TOP VIEW

Page 36: Presentation ERA

STRUCTURE LAYED DOWN IN MODULE SHOP

Page 37: Presentation ERA

SAFETY CONTROL

Page 38: Presentation ERA

STRICT INDOCTRINATION

Page 39: Presentation ERA

SAFETY CONTROL

Page 40: Presentation ERA

PIPING

Page 41: Presentation ERA

PIPE RACK

Page 42: Presentation ERA

STORING

Page 43: Presentation ERA

PIPE RACK

Page 44: Presentation ERA

STORING SMALL PARTS NEATLY

Page 45: Presentation ERA

STORING SMALL PARTS

Page 46: Presentation ERA

DUCTING

Page 47: Presentation ERA

DUCTING

Page 48: Presentation ERA

DUCTING

Page 49: Presentation ERA

COLLABORATION OF PIPING E & I INSULATION

Page 50: Presentation ERA

PUMP INSTALLED

Page 51: Presentation ERA

VALVE PUNCH-LISTED

Page 52: Presentation ERA

INSULATING PIPE

Page 53: Presentation ERA

GRATING

Page 54: Presentation ERA

INSTALLING PLATE HEAT EXCHANGERS

Page 55: Presentation ERA

INSTALLING PLATE HEAT EXCHANGERS

Page 56: Presentation ERA

CABLE INSTALLATION

Page 57: Presentation ERA

WORKING ON UPPER MODULE

Page 58: Presentation ERA

SCAFFOLDING

Page 59: Presentation ERA

INSULATING PIPES

Page 60: Presentation ERA

STEAM LINE VALVE ON TOP OF MODULES

Page 61: Presentation ERA

INSULATING VALVE PART

Page 62: Presentation ERA

INSULATING BY MATRESS

Page 63: Presentation ERA

EYE WASHERDRAIN PIPING

Page 64: Presentation ERA

FINALIZING

Page 65: Presentation ERA

PUNCH LISTING

Page 66: Presentation ERA

START PACKING

Page 67: Presentation ERA

BLUE SHEET + NETTING

Page 68: Presentation ERA

PIPE SHUE CLAMP & LASHING

Page 69: Presentation ERA

PIPE SHUE CLAMP & LASHING

Page 70: Presentation ERA

READY FOR TRANSPORT

CENTER OF GRAVITY

TRANSPORTATION BEAM

LIFTING LUG

Page 71: Presentation ERA

TRANSPORTATION TO LCB PORT

Page 72: Presentation ERA

TRANSPORTING VAPOR WASHERS

LIFTING POWER LINE

Page 73: Presentation ERA

TRANSPORTING VAPOR WASHERS

Page 74: Presentation ERA

TRANSPORTING VAPOR WASHERS

Page 75: Presentation ERA

LIFTING AT THE PORT OF THAILAND

Page 76: Presentation ERA

LIFTING AT THE PORT OF THAILAND

Page 77: Presentation ERA

UNDER DECK BREAK BULK

Page 78: Presentation ERA

UNDER DECK BREAK BULK

Page 79: Presentation ERA

TRANSPORTING DUCTING

Page 80: Presentation ERA

TRANSPORTING DUCTING

Page 81: Presentation ERA

UNDER DECK BREAK BULK

Page 82: Presentation ERA

UNDER DECK BREAK BULK

Page 83: Presentation ERA

LASHING INSIDE VESSEL

Page 84: Presentation ERA

RIGGING OPERATION

Page 85: Presentation ERA

LIFTING OPERATION

Page 86: Presentation ERA

UNDER DECK BREAK BULK

Page 87: Presentation ERA

LASHING INSIDE VESSEL

Page 88: Presentation ERA

LASHING INSIDE VESSEL

Page 89: Presentation ERA

CARGO LOADING COMPLETED--SAILING

Page 90: Presentation ERA

DELIVERED TO JOBSITE ON 1ST DEC'12