    1

    Location

    Project Goals

    The Italian Community Center (ICC) is located i

    Third Ward neighborhood of Milwaukee, WI. Current

    site contains the building on the north side with su

    parking lots running to Polk St. to the south. The s

    zoned C9G which allows for a variety of commercia

    residential uses. Consideration has been given to the

    Policy defined in the Third Ward NeighboComprehensive Plan including the concept of cre

    social spaces and restoration of a street grid

    incorporates the Italian Village concept.

    Allow the Italian Community Center to achieve s

    independence from the Italian Conference Cente

    redefine the necessary support spaces.

    Improve and create new presence in the Third W

    that welcomes people to the area for festivals and

    draws people to the ICC.

    Develop a boutique hotel that draws people to

    Italian Conference Center and provides me

    space for functions.

    Create an iconic destination restaurant

    encourages people to explore The Italian Comm

    Center grounds.

    NEW CONSTRUCTION

    HOTELEXISTING

    REMAIN

    Analyze and explore revnue generation streams t

    sustain and continue ICC operations.

  • 8/13/2019 Presentation Brochure.pdf

    3/8

    Demolition

    Hotel Design Services

    Start of Preconstruction

    Lock in Hotel GMPHotel Permitting

    Hotel Notice to Proceed

    Install Tower Crane

    Shell

    ServicesInterior Finishes

    Substantial Completion

    Occupancy & Project Completion

    Substructure

    Hotel

    Site Preparation

    CC Design Services

    CC Permitting

    Start of Preconstruction

    Lock in GMPCC Notice to Proceed

    Building Enclosure

    SubstructureShell

    ServicesInterior FinishesSubstantial Completion

    Occupancy & Project Completion

    Design Build Contract Award Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    June

    July

    Aug

    Sept

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    June

    July

    Aug

    Sept

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    June

    July

    Aug

    Sept

    Oct

    2014 2015 2016

    Sept

    Oct

    CommunityCenter

    chedule

    Sept 10

    Oct 21

    Oct

    Building Enclosure

    Owner Move-In

    Site Work

    Dec 17

    Feb 11

    Feb 18

    Sept 17

    Oct 21

    Feb 25

    June 3

    Oct 22

    Feb 11

    May 25

    Aug 6

  • 8/13/2019 Presentation Brochure.pdf

    4/8

    The Italian Community Center

  • 8/13/2019 Presentation Brochure.pdf

    5/8

    A - Substructure

    B - Shell

    C - Interiors

    D - ServicesE - Equipment and Furnishings

    F - Special Construction

    G - Sitework

    Z - General

    $138,940

    $3,376,348

    $773,325

    $2,250,574

    $75,000

    $93,750

    $209,405

    $478,475Design Build Fee: 5%

    Design Contingency: 7%

    Construction Contingency: 5%

    Community Center - UniFormat Division Summary

    $361,353

    $505,895

    $361,353 Total Cost: $8,624,420 Total Cost/SF: $222.06

    Shell, 39%

    Interiors, 9%

    Services, 26%

    Sitework, 2%

    General, 6%

    Design Build Fee, 4%

    Substructure, 2%Construction Contingency, 4%

    Design Contingency, 6%

    Key Features

    Structural steel beams and joists with cast in place

    concrete on metal deck. Load bearing exterior walls.

    tructural System

    Three highly visible bocce courts with expansive curtain

    walls that offer greater street visibility.

    State of the art demonstration kitchen with seating for anaudience of 25.

    Community Room with seating for 150 people for

    meetings and events.

    Three 700 SF classrooms.

    Clearly defined spaces that are separate from ItalianConference Center operations.

    Cafe for Italian Community Center members that

    serves light meals and quick snacks.

    Administration space for Italian Community Center

    staff and volunteers.

    Mechanical System

    LED lighting fixtures with occupancy sensors

    automatically control lighting in spaces. Extelighting to make the Italian Community Center sta

    out as an iconic building in the Third Ward.

    Electrical System

    Green roof to reduce heat island effect and runoff.

    Sustainability

    Locally sourced brick, flooring, and other low V

    construction materials.Reused materials from existing building.

    Energy efficient lighting and Energy Star Appliance

    Multizone packaged rooftop units with variable

    volume (VAV) units to conserve energy when spacare unoccupied.

    Reclaimed water used for irrigation and toilet flush

    Extensive day lighting and views with autom

    shading.

    Building occupancy control system to reduceenergy consumption when building is unoccupied.

    Special

    Construction, 1%

    Equipment and

    Furnishings, 1%

  • 8/13/2019 Presentation Brochure.pdf

    6/8

    The Italian Hotel and Conference Cent

  • 8/13/2019 Presentation Brochure.pdf

    7/8

    A - Substructure

    B - Shell

    C - Interiors

    D - ServicesE - Equipment and Furnishings

    F - Special Construction

    G - Sitework

    Z - General

    $4,590,913

    $11,797,719

    $8,071,080

    $7,510,247

    $419,800

    $264,000

    $247,621

    $1,991,062Design Build Fee: 5%

    Design Contingency: 7%Construction Contingency: 5%

    Hotel Estimate - UniFormat Division Summary

    $1,503,687

    $2,105,162$1,503,687 Total Cost: $40,004,977 Total Cost/SF: $271.34

    Shell, 29%

    Interiors, 20%

    Services, 19%Eqipment and

    Furnishings, 1%

    SpecialConstruction, 1%

    General, 5%

    Design Build Fee, 4%Substructure, 11%

    Construction Contingency, 4%Design Contingency, 5%

    Key FeaturesWarm and inviting dcor with a uniquely configured floorplate to take full advantage of the incredible architecture

    and view surrounding the hotel.

    Customizable HVAC temperature control in eachguestroom.

    Guestroom electricity is activated when the room's

    key-card is inserted into a switch by the door.

    Energy efficient LED lighting, low flow fixtures.

    Accessible rooms available upon request.

    Variable refrigerant flow (VRF) HVAC system a

    for efficiency and balancing of loads between roEach guestroom and suite has individual contro

    programmability to maximize guest comOccupancy sensors and on demand hot water a

    guest comfort and environmental efficiency.

    Mechanical System

    LED lighting is used in all spaces to conserve e

    and reduce cost over the lifetime of the Guestrooms will have USB charging receptacle

    will use their keycard to activate and control in power and lighting.

    Electrical System

    Green roofs to reduce heat island effect and runo

    Sustainability

    Guestroom lighting and power controlled with

    card.Occupancy sensors throughout building.Locally sourced materials.Maximization of day lighting with curtain wallsprogrammed shading.

    Educational program to increase awareness.

    tructural System

    Composite steel and concrete system. Cast-in-place concrete shear wall building core.

    Clear span required in ballroom to preserve open layout.Limited columns in lobby and restaurant spaces.

    Sitework, 1%

    oom Breakdown6 accessible king bed guest rooms.54 double queen bed guest rooms.30 king bed guest rooms.8 king bed guest suites.

  • 8/13/2019 Presentation Brochure.pdf

    8/8