Top Banner
PELUANG GEOTHERMAL SEBAGAI ANDALAN ENERGI ALTERNATIF DI INDONESIA (DISAMPAIKAN PADA SEMINAR NASIONAL – HMTG UNIVERSITAS GADJAHMADA) YOGYAKARTA, 28 APRIL 2007
32
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentasi seminar hmtg_ugm

PELUANG GEOTHERMAL SEBAGAI ANDALAN ENERGI ALTERNATIF

DI INDONESIA

(DISAMPAIKAN PADA SEMINAR NASIONAL – HMTG UNIVERSITAS GADJAHMADA)

YOGYAKARTA, 28 APRIL 2007

Page 2: Presentasi seminar hmtg_ugm

ENERGI GEOTHERMALKEBIJAKAN ENERGI NASIONALPROGRAM PENGEMBANGAN GEOTHERMALKESIMPULAN

Page 3: Presentasi seminar hmtg_ugm

ENERGI GEOTHERMAL

Page 4: Presentasi seminar hmtg_ugm

CAP

HOT WATER

STEAM

STEAM

HEAT SOURCE

GEOTHERMAL ENERGY

Page 5: Presentasi seminar hmtg_ugm

PENGERTIAN DAN PEMANFAATAN ENERGI GEOTHERMAL

Page 6: Presentasi seminar hmtg_ugm

PENGERTIAN DAN PEMANFAATAN ENERGI GEOTHERMAL

Page 7: Presentasi seminar hmtg_ugm

BISNIS GEOTHERMAL(UNIQUE)

UNCERTAINTY (SITE SPECIFIC)

Kondisi lapangan satu dengan lainnya

- Kualitas uap (kandungan gas & potensi “scaling)

- Kualitas cadangan (dominan uap, dominan air)

Mempengaruhi Uncertainty Cost

NON QUICK YIELDING, TERKAIT RECOVERY OF CAPITALT YANG RELATIF LAMA ~ 7 - 8 TAHUN

Masa pembangunan pra-produksi (eksplorasi & pengembangan) mencapai 4 – 5 tahun

TIDAK ADA KEJUTAN HARGA

Terikat kontrak jangka panjang (perioda 30 tahun)

Ada eskalasi harga sesuai inflasi barang dan jasa sesuai laporan BPS dan Biro Statistik Internasional (USA)

Formulasi harga & eskalasi harga tertuang dalam kontrak

RENEWABLE

Energi geothermal merupakan energi primer non minyak yang bersifat terbarukan. Namun untuk “business arrangement” diperhitungkan waktu (umur) operasi komersial 25 – 30 tahun yang tertuang dalam kontrak.

RAMAH LINGKUNGAN

Potensi emisi gas buangan kecil ~ 0

Potensi limbah B-3 kecil

Lahan pengembangan tidak mengkhawatirkan lingkungan

ONSITE UTILIZATION

Tidak dapat disimpan & ditransport

Page 8: Presentasi seminar hmtg_ugm

KONVERSI ENERGI

KONVERSI ENERGI (PT PLN, pers.com)

1 GWh ~ 260 Ton Minyak (Steam Power Plant)1 GWh ~ 400 Ton Coal Power Plant1 GWh ~ 8.000 MCF Natural Gas

1 CF Gas = 1.030 BTU

FUEL Cost1 kWh ~ 0.28 liter (Minyak) = Rp. 763,84 = 8.3 cents US /kWh1 kWh ~ 0.4 kg (Coal) = 2 cents US / kWh.1 kWh ~ 8 CF (Gas) = 2.8 cents US /kWh.

Asumsi :• Harga Minyak Rp 2.728,--/liter• Harga Batubara 45 US$/ton• Harga Gas 3.5 US$/MMBTU

Potensi gejolak/kenaikan harga tingg, terkaitdengan kecenderungan kenaikan Harga minyakmentah dunia dan pemicuan teknologi dalampenyediaan alternatif minyak

Page 9: Presentasi seminar hmtg_ugm

100 MWINSTALLED CAPACITY

4.250 BOEPD OF OIL

OIL CONSUMPTION ENERGY TO GEOTHERMAL UTILIZATION

OIL CONSUMPTION ENERGY TO OIL CONSUMPTION ENERGY TO GEOTHERMAL UTILIZATION GEOTHERMAL UTILIZATION

100 MWINSTALLEDCAPACITY

864TONNE / DAY

OF COAL

COAL CONSUMPTION TO GEOTHERMAL UTILIZATION

ECONOMICSUBSITITUTION PRICE

TECHNOLOGYTREND OF PRICING DEPENDENCY RELATAED TO INCREASING OIL AND GAS INTERANTIONAL MARKET (UNCERATINTY)

THE INCREMENTAL OIL AND GAS INTERNATIONAL MARKET WHICH IS TRIGERRED TECHNOLOGY IN COAL/BIOFUEL PROCESSING

ENVIRONMENTALINTERNALIZED ENVIROMENTAL COST RELATED TO GAS EMMISION

Page 10: Presentasi seminar hmtg_ugm

LATAR BELAKANG

Page 11: Presentasi seminar hmtg_ugm

UNCERTAINTY REGULATION

LAND USE

AUTONOMY

FISCAL

ENVIRONMENTAL

RESOURCE COMPETITOR

• OIL AND GAS

• COAL

• LARGE UPFRONTINVESTMENT

• HIGH RISK / TECHNOLOGY

REGULATED PRICELEAST COST

REGULATION CERTAINTY

IN

BUSINESS AND FISCAL TO

MEET ECONOMIC

BUSINESS

CRITERIA

RENEWABLE –NON TRANSPORTABLE / ONSITE –

SUSTAINABLE – ENVIRONMENTAL FRIENDLY –

CARBON CREDIT POTENTIAL EARNING

STRATEGIC ? (MULTIPLY EFFECT)

REDUCING OIL IMPORT / C

ONSUMPTION, CREATE

JOB, ECONOMIC TRIGERRING, SECURE NATIONAL

ENERGY, ADDED VALUE OF SOCIAL LIVE AND

ENVIRONMENT

NATIONAL ENERGY POLICY

PP NO. 3/2005 & PERPRES NO. 5/2006

GEOTHERMAL

ENERGY

ELECTRICITY

Page 12: Presentasi seminar hmtg_ugm

Total power generation capacity byType of energy in 2004

35,572984458524,2007,4606,36116,201MW

TotalOther (Renewable)BiomassGeothermalHydroCoalGasOil

Power Plant Capacity by Energy Type

Page 13: Presentasi seminar hmtg_ugm

Oil Production and Domestic Demand For Petroleum Products

0

250

500

750

1000

1250

1500

1750

1970 1974 1978 1982 1986 1990 1994 1998 2002 2006 2010

MM

STB

D

Demand Production

A number of months of net

oil imports were recorded in

2004

2004Production

1.07 MMstbd

Consumption1.0 MMstbd

Source : Chris Newton - IPA

Page 14: Presentasi seminar hmtg_ugm

CRUDE OIL PRODUCTION IN INDONESIA CRUDE OIL PRODUCTION IN INDONESIA (Million Barrel/Day)(Million Barrel/Day)

POD = Plan of Development

Oil productionnatural decline

SUMBER: DESDM

Page 15: Presentasi seminar hmtg_ugm
Page 16: Presentasi seminar hmtg_ugm

Current State and ChallengesIs geothermal expensive energy?

If we consider the fuel export effect and the environmental cost, geothermal energy is not expensive energy for the society

26.714.69.111.58.7(¢/kWh)Total

from table belowdittoditto

(0.38)(0.45)(0.74)

(0.01)(0.34)(0.52)

(0.33)(0.49)(0.98)

(0.00)(0.00)(0.01)

(0.01)(0.00)(0.02)

(¢/kWh)(¢/kWh)(¢/kWh)

(Sulfur dioxide)(Nitrogen oxide)(Carbon dioxide)

1.60.91.80.00.0(¢/kWh)Environmental cost

Oil 50$/BBL,Coal 35 US $ /ton, LNG 8.6U$/MMBTU

8.06.01.8--(¢/kWh)Loss of fuel export opportunity cost

In case of IRR=18%17.17.75.511.58.7(¢/kWh)Selling Price

RemarksOil (Diesel)Natural GasCoalHydroGeothermalItem

‘@ 10$/ton7425199751115(kg/MWh) (*3)Carbon dioxide

‘@ 2,500$/ton (*4)4.002.964.310.000.00(lb/MWh) (*2)Nitrogen oxide

‘@ 700$/ton (*4)12.000.2210.390.000.35(lb/MWh) (*1)Sulfur dioxide

Price of EmissionOil (Diesel)Natural GasCoalHydroGeothermalEmission of Pollutant

*1 A Guide to Geothermal and the Environmental: Geothermal Energy Association USA (2005) Fig.1.6 *2 A Guide to Geothermal and the Environmental: Geothermal Energy Association USA (2005) Fig.1.7 *3 Central Research Institute of Electric Power Industry, Japan CRIEPI Review No. 45,2001 Nov Fig 1.8 *4 US Emission Market 2006, April JICA Geoth.Dev. Masterplan Team, Feb 2007

Page 17: Presentasi seminar hmtg_ugm

EmisiEmisi gas gas berbagaiberbagai pembangkitpembangkitdandan nilainilai ekonomiekonomi carbon creditcarbon creditgeothermalgeothermal

0

200

400

600

800

1000

1200

Batubara M.Bumi Geoth. Nat. Gas

0

50

100

150

Batubara M.Bumi Geoth. Nat. Gas

~30%~50%

100%

Eko

nom

i1 G

W u

ntuk

10 th

n

0%

$300-500 Jt

960

670 500

100CE

R

Emis

ikg

/MW

h

Base Line 728Base Line 728CER (Certified Emission Reduction) ~ US$ 5,2 /ton

Page 18: Presentasi seminar hmtg_ugm

STATISTIK CAPACITY FACTOR PEMBANGKIT LISTRIK(Energi dan Permasalahan Investasi Ketenagalistrikan, B. Hasan – 2002)

BBM MuarakarangBBM TambaklorokPLTG – BBM GilimanukPLTG – BBM Pesanggrahan

PLTGU – BBG GresikPLTGU BBG – BBM MuarakarangPLTGU – BBM Tambaklorok

PEMBANGKIT

3854.90

39

67746064

CF,%

64644444

716838

PLTA SagulingPLTA SutamiPLTA Brantas

PLTU batubara Suralaya 1 – 45 – 7

PLTU Batubara PaitonPLTU Batubara Jawa Power

CF,%PEMBANGKIT

93939492

CF,%PLTP KamojangPLTP DarajatPLTP Wayang WInduPLTP Salak

PEMBANGKIT

(Sumber : “Energi dan Permasalahan Investasi Ketenagalistrikan” oleh B. Hasan)

KHUSUS PLTP INDEK PERFORMACE

• IGA Indek yang dipakai = CF, LF dan AFUntuk Jepang = 75,6 ; 84,2 dan 92,1

Itali = 75,1 ; 89,3 dan 92,3• Standar NERC (North American Electric Releability Council)

adalah (CF = 72,77%, EAT = 73,71%)PLTP di Indonesia harga rata-rata diatas standar tersebut :Salah satu contohPLTP Kamojang rata-rata (Unit 1, 2 dan 3) :CF = 97,1%LF = 95,8%AF = 96,5%EAF = 96,4%

Catatan :CF = Capacity FactorLF = Load FactorAF = Available FactorEAF = Equivaled Malleable Factor

Page 19: Presentasi seminar hmtg_ugm

KEBIJAKAN ENERGI NASIONAL

Page 20: Presentasi seminar hmtg_ugm

TARGET KEBIJAKAN ENERGI NASIONAL

DIVERSIFICATION, EFFICIENCY ENERGY, PRICE POLICY

Secure National Energy Supply

Reduce Import Fuel/Fossil Fuel

Create People Job

Generating / Triggering Local Economic

Added Value / Social – Environment

Page 21: Presentasi seminar hmtg_ugm

KEBIJAKAN BISNIS GEOTHERMAL

Ref. UU No. 27/2003 :

Pasal 9 : Wilayah kerja Pengusahaan Geotehrmal diberikan olehPemerintah Pusat (lintas Propinsi), Gubernur (lintas Kabupaten) danatau Kabupaten.

Pasal 29 g : Pemegang IUP secara berkala melaporakan tertulispelaksanaan RK kepada pemberi IUP (Menteri, Gubernur/Bupati)

Ref. PP No. 3/2005: PasalPasal 2 2 ayatayat 4 :4 :

Penyediaan tenaga listrik untuk kepentingan Umum diprioritaskanmenggunakan sumber energi setempat, wajib mengutamakan sumberenergi terbarukan.

Ref. PerPres No. 5/2006 :

Kebijakan Energi Nasional (Pasal 2) : minyakbumi menjadi kurang dari 20 %, dan panasbumi menjadi 5 % dari energy mix.

Penetapan kebijakan harga (Pasal 3 butir 2 c) kearah harga keekonomiaan.

Harga keekonomiaan merupakan biaya produksi per unit energi termasuk biayalingkungan ditambah biaya margin.

Page 22: Presentasi seminar hmtg_ugm

PROGRAM PENGEMBANGAN GEOTHERMAL

Page 23: Presentasi seminar hmtg_ugm

Pengusahaan geothermal adalah pengusahaan yang padat modal dan ber-resikotinggi, meliputi pengusahaan hulu (eksplorasi dan eksploitasi lapangan) untukkonfirmasi cadangan dan suplai energi (uap) berkesinambungan, serta pengusahaanhilir (konstruksi, operasi PLTP dan distribusi energi listrik) yang merupakan saturangkaian dalam satu ikatan komitmen bisnis.

Didalam industri geothermal, banyak pihak terlibat mulai dari para pengusaha(penjual dan pembeli/pemakai), tenaga ahli (scientists dan engineers) sampai pihakpemerintah, kesemuanya tidak mampu mengelak dari adanya faktor ketidakpastiandalam menetapkan besaran dan karakter cadangan geothermal terkait kelayakanproyek untuk pengembangannya.

EKSPLORASIEKSPLOITASILAPANGAN

FILOSOFI DASAR

U A PKONSTRUKSIOPERASIPLTP

LISTRIK DISTRIBUSI LISTRIK PELANGGAN

Page 24: Presentasi seminar hmtg_ugm

SumateraReserves : 5,837 MWe

Resources : 7,983 MWe

SumateraSumateraReserves : 5,837 Reserves : 5,837 MWeMWe

Resources : 7,983 Resources : 7,983 MWeMWe

Semarang

Medan

Tanjung Karang

Bandung

Manado

Maluku-PapuaReserves : 142 MWe

Resources : 442 MWe

MalukuMaluku--PapuaPapuaReserves : 142 Reserves : 142 MWeMWe

Resources : 442 Resources : 442 MWeMWe

Sulawesi-Kalimantan Reserves : 896 MWe

Resources : 1100 MWe

SulawesiSulawesi--Kalimantan Kalimantan Reserves : 896 Reserves : 896 MWeMWe

Resources : 1100 Resources : 1100 MWeMWe

JawaReserves : 5,300 MWeResources : 3954 MWe

JawaJawaReserves : 5,300 Reserves : 5,300 MWeMWeResources : 3954 Resources : 3954 MWeMWe Bali-NTB - NTT

Reserves : 885 MWeResources : 602 MWe

BaliBali--NTB NTB -- NTTNTTReserves : 885 Reserves : 885 MWeMWe

Resources : 602 Resources : 602 MWeMWe

POTENSI GEOTHERMAL DI INDONESIAPOTENSI GEOTHERMAL DI INDONESIA

807 *3.60513.06014.08027.140INSTALLED, MWESC, MWeRESERVES, MWeRESOURCES, MWeTOTAL, MWe

* PERTAMINA ~ 162 MWTotal kapasitas PLTP terpasang : 807 MW ~ 40.000 SBM/HARI (BOEPD)

Page 25: Presentasi seminar hmtg_ugm

• Potensi Cadangan

Kamojang : 300 MW, Wayang Windu : 400 MWDarajat : 360 MW, Patuha : 250 MW, Salak: 485MW

Sibayak : 40 MW

Lumutbalai : 300 MW

Lahendong : 100 MWTompaso : 100 MW

Dieng : 280 MW

Ulubelu : 300 MW

POTENSI PENGEMBANGAN BISNIS GEOTHERMAL PERTAMINA

Source: Interviews; literature search; Pertamina Corporate Planning

• Sekilas informasi :

– Potensi sumber daya diIndonesia diperkirakan sampai27 GW

– Mempunyai daya saing dengan energi alternatif lain

– Akan tetapi pengembanganlapangan tidak berjalansebagaimana yang diharapkankarena isu kebijakan bisnismaupun fiskal

• Pengembangangeothermal padat modal & padat resiko( 1s/d 2,2 juta US$ /MW)

• PLN masih menjadi single buyer dengan struktur tarifdalam Rp. dan tidakfleksibel terhadap investasigeothermal

• Pengembangan sementaraterhenti terkait ketidakpastian usaha.

Sarulla : 400 MW

4 Area KOB : 645 MW–- Salak (330 MW)–- Darajat (145 MW)–- Wayang WIndu (110 MW)–- Dieng (60MW)

Bedugul : 30 MW

• Kapasitas PLTP Terpasang (Desember 2006)3 AGH Pertamina Operasi Sendiri

– Kamojang (140 MW)– Lahendong (20 MW)– Sibayak (2 MW)

Kotamobagu : 150 MW

Hululais : 200 MW

S. Penuh : 60 MW

Page 26: Presentasi seminar hmtg_ugm

Eksplorasi Pengembangan Komersial

2 tahun 2-3 tahun 25-30 tahun

Page 27: Presentasi seminar hmtg_ugm

HAMBATAN PENGEMBANGAN BISNIS GEOTHERMAL

HAMBATAN TEKNIS :FRACTURED PERMEABILITY

CHEMICAL COSTRAINT ~ PRODUCTION DECLINE RATE

HAZARDS

INVESTASI :

NON QUICK YIELDING (HARGA PEROLEHAN & HARGA JUAL)

TUNTUTAN BISNIS (MARGIN DAN INVESTASI)

KONTRAK JANGKA PANJANG

Page 28: Presentasi seminar hmtg_ugm

KONDISI YANG DIINGINKAN UNTUK TERCAPAINYAKONDISI YANG DIINGINKAN UNTUK TERCAPAINYAPERCEPATAN PENGEMBANGAN GEOTHERMALPERCEPATAN PENGEMBANGAN GEOTHERMAL

JAMINAN INVESTASI

Pengusahaan geothermal bersifat padat modal dan padat teknologi sertaberesiko tinggi, kecenderungan pelaku bisnis akan berpartner untuk“sharing risk”.

Partnership : pendanaan dan teknologi memerlukan jaminan dancenderung lebih “costly”.

MINDSET DALAM PENGEMBANGAN GEOTHERMAL MELIBATKAN LINTAS DEPARTEMENTAL DAN FUNGSI HARUS DALAM PERSEPSI satu“COMMITMENT”, konsisten dan berkesinambungan dalam pelaksanaanpengembangan geothermal sebagai implementasi Kebijakan Diversifikasi.

PRICING : PENGUSAHAAN GEOTHERMAL HARUS MEMENUHI KRITERIA TEKNIS YANG DIDUKUNG DENGAN REGULASI DAN KEBIJAKAN UNTUK DAPAT MEMASUKI PASAR SESUAI ATURAN BISNIS (bench mark), semestinya tidak sekedar berprinsip “least cost” tetapi harus dilakukansecara komprehensif dalam analisa “benefit-loss” dalam pengusahaangeothermal suatu daerah (ketersediaan sumberdaya alam vs kebutuhanenergi/listrik)

Page 29: Presentasi seminar hmtg_ugm

2004 2012 2020

2004 2008 2012 2016 2020

822 MW(produksi

)

2000 MW 3442 MW 4600 MW 6000 MW(target)

1442 MWExisting

WKP

1158 MWExisting

WKP+ New WKP

1400 MWNew WKP

1193 MWExisting

WKP

Geothermal Road - map

(GSDM, 2004; 2005)

Geothermal Road-map by 2025

1000 Mwefor

30 years465 JutaBarrel oil

9000 MW(target)

2025

2008 2016 2025

Page 30: Presentasi seminar hmtg_ugm

KESIMPULAN

Page 31: Presentasi seminar hmtg_ugm

KESIMPULANKESIMPULANKONDISI GEOLOGIS INDONESIA MENDUKUNG TERBENTUKNYA ENERGI

GEOTHERMAL YANG BESAR YANG TERINDIKASI SAMPAI DENGAN 27 GW.

ENERGI GEOTHERMAL DAPAT DIMANFAATKAN SECARA TIDAK LANGSUNG UNTUK PENGGERAK TURBIN PENGHASIL ENERGI LISTRIK YANG MEMPUNYAI KESETARAAN 1 MWh SEBESAR 1,971 BBL MINYAK YANG BERARTI UNTUK PEMANFAATAN SEBESAR 1000 MW SETARA DENGAN SEKITAR 47.300 BOEPD

SEIRING DENGAN NILAI JUAL MINYAK YANG SEMAKIN BESAR DAN CADANGANYANG SEMAKIN MENIPIS SERTA KETERGANTUNGAN ENERGI LISTRIK DARI MINYAK DAN GAS MASIH DIATAS 50 % DARI ENERGY MIX, PEMBERDAYAAN ENERGI ALTERNATIF KHUSUSNYA YANG BERSIFAT TERBARUKAN SEPANTASNYA MENJADI PRIORITAS.

DENGAN ADANYA RATIFIKASI KYOTO PROTOCOL, ENERGI TERBARUKAN YANG AKRAB LINGKUNGAN SESUAI KEBIJAKAN ENERGI NASIONAL, GEOTHERMAL SUDAH DITETAPKAN UNTUK MEMBERIKAN KONTRIBUSI HINGGA 5 % ENERGY MIX

PEMERINTAH MELALUI KANTOR MENTERI ESDM TELAH MENETAPKAN ROAD MAP UNTUK PENGEMBANGAN GEOTHERMAL MENJADI 3000 MW DI TAHUN 2010 DAN 9000 MW DI TAHUN 2025.

Page 32: Presentasi seminar hmtg_ugm