client saves 55% on flowback and initial production Specialized Desanders saved a client, in Ohio, 55% on their monthly cost of turn-in-line and initial production flowback operations. Client now hits maximum production rates within a few days 100% of the time and routinely sets 90-day IP records as a result. desanders.com HIGHLIGHTS 55% Overall Cost Savings 90% Reduction in Total Washout Costs Reduced Manpower by 60% Job Length Reduced by 30% Data-Driven Decisions Max Gas Rate Achieved 100% of the Time Routinely Breaks 90-day IP Records Elimination of ALL Sand-related NPT Reduced Overall Gas Emissions Total Sand Protection of Equipment/Facilities Reliable, Real-Time Sand Production Data Smaller Flowback Spread Footprint No More Sand-Related Well Shut-Ins Pre-SDI Flowback Rig-Up Current Rig-Up Resulting in 55% Cost Savings
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
client saves 55% on flowback and initial productionSpecialized Desanders saved a client, in Ohio, 55% on their monthly cost of turn-in-line and initial production flowback operations. Client now hits maximum production rates within a few days 100% of the time and routinely sets 90-day IP records as a result.
desanders.com
HIGHLIGHTS55% Overall Cost Savings
90% Reduction in Total Washout Costs
Reduced Manpower by 60%
Job Length Reduced by 30%
Data-Driven Decisions
Max Gas Rate Achieved 100% of the Time
Routinely Breaks 90-day IP Records
Elimination of ALL Sand-related NPT
Reduced Overall GasEmissions
Total Sand Protection of Equipment/Facilities
Reliable, Real-Time Sand Production Data
Smaller Flowback Spread Footprint
No More Sand-Related Well Shut-Ins
Pre-SDI Flowback Rig-Up
Current Rig-Up Resulting in 55% Cost Savings
desanders.com
An Ohio operator began implementing model 62020 gravity Desanders to mitigate the e�ects of sand on their flowback operations. Over several step-change improvements, the client has eliminated the need for all other sand control on site, choke manifolds, test separators, 60% of on-site manpower requirement, and all sand-related non-productive time. They have reduced washout charges 90% on average and have shortened the length of the flowback phase by approximately 30% through the leveraging of reliable, real-time, sand production data.
This was accomplished through incremental improvements to the rig-up, production tree configuration, and operational procedure. The following is an outline of the iterative flowback design implementations to reach current e�ciencies:
Because of Specialized Desanders’ ability to stop 99+% of the sand produced from the well, the client can ramp up as quickly as possible to their desired maximum gas rate without risk of washing out flowback equipment, production tree components, or permanent production facilities. With the total elimination of sand-related non-productive time, well productivity is maximized and flowback operations can be streamlined to increase overall cost-e�ciency. Also, because SDI’s Sand Sentry Measurement System provides accurate, real-time, sand production data, the decision can be made to release flowback crews, flowback equipment, and Desanders earlier and with confidence, based on quantitative measures, to reduce the overall turn-in-line costs and minimize the probability of sand-related downtime after the well is turned over to production.