PRE REAC INSPECTION ACTIVITIES. Pre-REAC Activities. Annual Inspection Prior to REAC Coming on Site Day of the Inspection During the Inspection Problem Areas Common EHS Deficiencies Supplemental Guidance Top 20 Deficiencies . ANNUAL INSPECTION. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRE REAC INSPECTION ACTIVITIES

1

PRE REAC INSPECTION PRE REAC INSPECTION ACTIVITIESACTIVITIES

Page 2: PRE REAC INSPECTION ACTIVITIES

Pre-REAC ActivitiesPre-REAC ActivitiesAnnual InspectionAnnual InspectionPrior to REAC Coming on SitePrior to REAC Coming on SiteDay of the InspectionDay of the InspectionDuring the InspectionDuring the InspectionProblem AreasProblem AreasCommon EHS DeficienciesCommon EHS DeficienciesSupplemental GuidanceSupplemental GuidanceTop 20 Deficiencies Top 20 Deficiencies

Page 3: PRE REAC INSPECTION ACTIVITIES

3

ANNUAL INSPECTIONANNUAL INSPECTION►If possible plan annual unit inspection

prior to the REAC inspection date to identify and correct obvious deficiencies

►include the site, building exteriors, building systems, common areas and units.

Page 4: PRE REAC INSPECTION ACTIVITIES

4

ANNUAL INSPECTIONANNUAL INSPECTION►keep in mind that if an inspectable

item exists on your property it must function as designed by the manufacturer.

Page 5: PRE REAC INSPECTION ACTIVITIES

5

Prior to the InspectionPrior to the Inspection

►When the inspector contacts you to schedule the inspection it must be a mutually agreeable time/date. (The inspection should take place during normal business hours of course.)

Page 6: PRE REAC INSPECTION ACTIVITIES

6

Prior to the InspectionPrior to the Inspection

►You should not schedule the maintenance or service of any of the inspectable items the day of the inspection, i.e. elevators

► “Out of Order” due to planned maintenance will be cited for a level 3 deficiency.

Page 7: PRE REAC INSPECTION ACTIVITIES

7

Prior to the InspectionPrior to the Inspection►If work is in progress or have recently

completed work that required the removal of panel covers exposing electrical wiring/connections, outlet/switch plate covers, etc. you will need to ensure that these items have been properly re-installed.

Page 8: PRE REAC INSPECTION ACTIVITIES

8

ON THE DAY OF THE INSPECTION

►Certificates (if applicable) for: Boilers, Fire Alarm, Building Sprinkler System, Elevator Lead Based Paint Report and Resident

Disclosure if the property has a building built prior to 1978.

Page 9: PRE REAC INSPECTION ACTIVITIES

9

ON THE DAY OF THE INSPECTION

►Rent Roll: Should be current for the day of inspection and show all occupied units, vacant units and non-revenue units.

►If the purpose of any of these dwelling units changes to a non-dwelling use you will need to inform the inspector and it must be removed from the unit count. (e.g. Office, Police Substation, etc.)

Page 10: PRE REAC INSPECTION ACTIVITIES

10

ON THE DAY OF THE INSPECTION

►Area Measures: Parking Lots / Driveways / Roads (square footage) and Walkways /

►Steps (square footage)

Page 11: PRE REAC INSPECTION ACTIVITIES

11

ON THE DAY OF THE INSPECTION

►Site map: (If available) This enables the inspector to navigate the property in a more efficient manner.

►Property Line Boundary Lines-to identify PHA property

Page 12: PRE REAC INSPECTION ACTIVITIES

12

DURING the INSPECTION

►Carry a notepad and camera with you during the REAC inspection to document the various findings when appropriate.

Page 13: PRE REAC INSPECTION ACTIVITIES

13

Problem Areas-Electrical:►All electrical boxes, electrical panel

boxes, fuse boxes, disconnect boxes, timer boxes, etc., are subject to inspection by the REAC inspector regardless of the location. These boxes will be inspected even if behind locked doors for any electrical deficiency that exists.

Page 14: PRE REAC INSPECTION ACTIVITIES

14

Electrical:

►All electrical panels and fuse boxes must be made available for inspection whether located inside or outside and secured or unsecured.

Page 15: PRE REAC INSPECTION ACTIVITIES

15

Electrical:►All other electrical boxes, disconnects,

timers, etc. will not be opened by the REAC inspector and no deficiency cited if secured at the time of the inspection.

►A box is considered secured by REAC definition if it can not be opened using only your hands. (No tools are allowed.)

Page 16: PRE REAC INSPECTION ACTIVITIES

16

Problem Areas-Blocked Egress:

►All individual living areas/rooms in a unit and all common area rooms must have 2 independent and unimpeded means of egress (escape) if so designed. The only exception is windows above the 3rd floor that do not serve as a means of access to a designed escape route.

Page 17: PRE REAC INSPECTION ACTIVITIES

17

Blocked Egress:

►In cases where local code differs with this standard; either a letter from a local code official , or a copy of the code should be submitted within the guidelines of the technical review and database adjustment process so that applicable lost points can be restored

Page 18: PRE REAC INSPECTION ACTIVITIES

18

Most Common Exigent Health & Safety

Deficiencies►- Propane, natural, or methane

gas leaks

►- Exposed wires or open electrical panels

►- Water leaks on or near electrical equipment

Page 19: PRE REAC INSPECTION ACTIVITIES

19

Most Common Exigent Health & Safety

Deficiencies

►- Blocked or unusable emergency or fire exits

►- Blocked fire escapes or ladders

Page 20: PRE REAC INSPECTION ACTIVITIES

20

Most Common Exigent Health & Safety

Deficiencies►- Missing or misaligned chimney

for gas-fired water heater or HVAC unit

►- Window security bars preventing exit

Page 21: PRE REAC INSPECTION ACTIVITIES

21

Most Common Exigent Health & Safety

Deficiencies ►- Expired fire extinguishers

►- Inoperative or missing smoke detectors

Page 22: PRE REAC INSPECTION ACTIVITIES

22

SUPPLEMENTAL GUIDANCE:

►The “Compilation Bulletin” compiles all of the changes and the clarifications of the definitions that have taken place, You will need to familiarize yourself with this document:

►Compilation Bulletin URL:►http://www.hud.gov/offices/reac/products/

pass/pass_bulletin.cfm

Page 23: PRE REAC INSPECTION ACTIVITIES

23

SUPPLEMENTAL GUIDANCESUPPLEMENTAL GUIDANCE►The Inspector Notices are clarifications of

the definitions and take priority over the written definitions in the inspection 2.3 software Inspector Notices URL: http://www.hud.gov/offices/reac/products/pass/pass_doc.cfm

► Inspector Business Rules URL: http://www.hud.gov/offices/reac/products/pass/PDFs/i_a_business_rule.pdf

Page 24: PRE REAC INSPECTION ACTIVITIES

Top 20 Deficiencies

1. HVAC – the water heater Pressure Relief Valve discharge tube extends to within 18 inches of the floor;

2. Misaligned Chimney – the vent stack on gas operated water heaters or furnaces are properly aligned;

3. Missing HVAC Covers – there are covers on all baseboard heaters;

4. Access to the Electrical Panel – access to electrical panels is not blocked by furniture or other items;

5. Missing Covers – electrical panels have interior covers (aside from the panel lid box itself) to prevent exposure from the wire connections;

24

Page 25: PRE REAC INSPECTION ACTIVITIES

Top 20 Deficiencies

6. Open Breaker Ports – Open breaker ports are covered;

7. Doors Damaged Seals – the factory-installed seals on Exterior Doors, such as building or unit doors, are in place and undamaged;

8. Doors Damaged Hardware – Exterior door hardware locks or latches properly and Fire Doors function as designed;

9. Security Doors – security doors do not have dual-side key locks;

10. Kitchen – Damaged Stoves/Ovens – stove burners are working;

25

Page 26: PRE REAC INSPECTION ACTIVITIES

Top 20 Deficiencies 11. Plumbing – pipes and faucets are not leaking, and areas around any leaks are cleaned up and repaired;

12. Damaged Sinks/Showers – any hardware problems are repaired, diverters are working, drains have stoppers, Hot or Cold water handles are in place and working;

13. Clothes Dryers - are properly vented to the outside from units or laundry rooms;

14. Storm Water Sewers - are not clogged with trash or leaves;

15. Sanitary Sewer Damaged Covers –caps located in the grass on the exterior of the building that have been damaged by a lawn mower are cleaned out. Replace and mark the areas to prevent further damage; 26

Page 27: PRE REAC INSPECTION ACTIVITIES

Top 20 Deficiencies

16. Trash Chutes – hardware is in place and the chute door closes properly;

17. Trash Receptacles - are not overflowing and are adequate in size for the property;

18. Auxiliary Lighting – the back up lighting works even when the test light does not work;

19. Leaking Domestic Water – there are no leaks in the domestic water supply, including the hose bibs located on the exterior of the building;

20. Switchplate Covers – are not cracked or broken.