City of New Orleans West End Group A Pre-Construction Community Meeting January 29, 2019
22

Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

Jul 20, 2019

Download

Documents

vucong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans

West End Group A

Pre-Construction

Community Meeting

January 29, 2019

Page 2: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 1

• IntroductionsSam Gordon, Office of Neighborhood Engagement

• West End Group A ProjectSara DeBoer, Project Manager

• What to expect during constructionNakeila Polk, Community Outreach Specialist

• Questions

Agenda

Page 3: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 2

Ground Rules

• Presentation will precede public comment.

• Please limit questions to the project area.

• Please fill out a comment card to provide a comment/ask a question.

• Please raise your hand and your comment card will be collected by a staff member.

• There is a two-minute time limit on questions.

• A staff member will hold the microphone for you.

• You may not yield time to another speaker.

Page 4: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 3

Capital Improvement Program Highlights

More than $2.2B worth of DPW / SWB work

• Most comprehensive infrastructure program our region has seen in a generation.

• More than 200 individual projects - every neighborhood will feel a positive impact.

• Multiple Funding Sources: FEMA-funded road / waterline work, FEMA-funded Hazard Mitigation Grant Program (HMGP) projects, HUD-funded National Disaster Resiliency Competition (NDRC) grant projects, SWB-funded Sewer System Evaluation and Rehabilitation Program (SSERP) (sewer consent decree) work and City-funded bond project work.

• Work will create thousands of construction jobs across the city and

maximize economic opportunity for the City’s small and

disadvantaged

Page 5: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 4

Types of CIP Construction – What the colors represent

-Full ReconstructionRepair sewerage, water, and drainage lines, rebuild the

street entirely, and repair sidewalks and curbs.

-Patch Mill/OverlayRepave the asphalt roadway from curb to curb and

repair damaged sidewalks.

-Patch ConcreteRemove damaged portions of the concrete roadway

and replace it with new smooth concrete pavement and repair damaged sidewalks.

Page 6: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 5

Types of CIP Construction – What the colors represent

-Incidental Road RepairsRemove damaged portions of the asphalt roadway

and replace it with new smooth pavement.

-Non-Paving IncidentalsRepair damaged sidewalks, driveway aprons and curbs

within the public right-of-way.

-Other Group ProjectStreet is in the design phase or is planned to be built

in a future project.

Page 7: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 6

Project Limits – West End Group A

Page 8: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

7

West End Group APatch Mill, Overlay and Incidental Road Repairs

Why An Incidental Road Repair Project as opposed to a Full-Depth Reconstruction?

- The City studied several factors prior to determining the type of construction that would be scheduled on any given street including: Citywide Pavement Assessment – conducted in 2015

- West End Group A requires replacement of some water lines.

What FEMA authorized the City to address

Other things to consider- As part of a recent Sewerage and Water Board project, there were

waterlines replaced in the area.

Page 9: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 8

● Design: Atkins, LLC.

● Construction Management

and Administration.

MSMM Engineering

● Construction: Beverly Construction

● Construction Cost: Approximately $5.6 M Project

● Timeline: Project will begin February 2019 and will be completed in summer 2020

West End Group A

Page 10: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

9

Project Limits – West End Group A

Page 11: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 10

Existing conditions on Roy Street.

Pavement Condition Index is Poor.

West End Group A

Page 12: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 11

Future Conditions

Scope of work includes:

• Repaving the asphalt roadway from curb-to-curb;

• Patching the roadway with asphalt or concrete;

• Repairing damaged sidewalks and driveway aprons;

• Installing Americans with Disabilities Act-compliant curb

ramps at intersection; and

• Replacing / repairing damaged underground water, sewer,

and/or drainage lines.

West End Group A

Page 13: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 12

Americans with Disabilities Act-Compliant Curb Ramps

Americans with Disabilities Act (ADA)-compliant curb ramps at sidewalk corners ensure accessibility for people who are visually or physically impaired, using wheelchairs or strollers.

Page 14: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 13

Sidewalks

• Sidewalk panels adjacent to Americans with Disabilities Act (ADA)-compliant ramps will be replaced with new sidewalks.

• New sidewalks and ramps will meet ADA-compliance regulations.

Page 15: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 14

Project Timeline

Milestone Date

Construction Start February 2019

Construction Complete Summer 2020

* Please note that all schedules are subject to change and weather

delays.

Page 16: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 15

Sequence of ActivitiesTentatively work will begin on the north end of the project (Veterans Highway) and move towards Old Hammond Highway. This schedule may change due to planned waterline work throughout the project. Impacts related to changes in sequencing will be communicated to the community by the RoadWork NOLA office.

StagingStaging for this project has yet to be confirmed.

Construction Sequencing -UPDATE

Page 17: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 16

Future Conditions -UPDATE

Repaving on Marshall Foch as part of the

Lakeview North Group A Project

Page 18: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 17

What to Expect During Construction

Temporary construction impacts

• Additional construction equipment

• Limited parking availability

• Sounds

• Dust

Efforts to minimize construction impacts

Construction signage placed around the sites.

Any temporary closures will be communicated in advance.

Construction equipment will not be staged in areas that prohibit residential

access and parking.

Any changes to garbage and US Postal services will be communicated in

advance.

Residents will be informed throughout construction.

Regular work hours are Monday-Friday 7 a.m. to 5:30 p.m.

Permission for occasional weekend work may be granted, if required.

Page 19: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 18

Keeping You Informed

Roadwork.nola.gov

Page 20: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 19

Facebook.com/roadworkNOLA

@roadworkNOLA

We have also joined Next Door!

Construction Hotline: 504.658.ROAD (7623)

@RoadworkNOLA

+ Monthly Newsletter

Stay Connected With Us

Page 21: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 20

Nakeila Polk

Outreach Specialist

504-658-ROAD (7623)

[email protected]

Contact Information

Page 22: Pre-Construction Community Meeting - roadwork.nola.gov · Pre-Construction Community Meeting January 29, 2019. ... construction that would be scheduled on any given street including:

City of New Orleans 21

Questions / Discussion