Feedback Projects Construction Maps Communications Welcome Agenda A. Introduction and Overview 2:30 p.m. B. Project Updates 2:35 p.m. C. Construction Maps for 2018 2:45 p.m. D. Communication Mechanisms: 3:05 p.m. - Tuesday Construction Coordination Meetings - Campus Planning Contact Information - PM Contact Information E. Feedback 3:10 p.m. F. Adjourn 3:30 p.m. State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium C State Street Neighborhood Construction Preview Meeting Page 1 of 19 DRAFT PRELIMINARY AND ADVISORY 04.05.18 ARCHITECTURE, ENGINEERING AND CONSTRUCTION Refer HERE for most up-to-date campus maps.
19

State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

Mar 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

FeedbackProjects Construction Maps CommunicationsWelcome

AgendaA. Introduction and Overview 2:30 p.m.

B. Project Updates 2:35 p.m.

C. Construction Maps for 2018 2:45 p.m.

D. Communication Mechanisms: 3:05 p.m.- Tuesday Construction Coordination Meetings- Campus Planning Contact Information- PM Contact Information

E. Feedback 3:10 p.m.

F. Adjourn 3:30 p.m.

State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 20182:30 - 3:30 p.m.Angell Hall, Auditorium C

State Street Neighborhood Construction Preview Meeting Page 1 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Refer HERE for most up-to-date campus maps.

jenmich
Sticky Note
Unmarked set by jenmich
jenmich
Rectangle
Page 2: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

FeedbackProjects Construction Maps CommunicationsWelcome League/Ingalls

State Street Neighborhood Construction Preview Meeting Page 2 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Welcome Projects

• New William Monroe Trotter Muliticultural Center• LSA 1st Floor Renovation and Addition

Ongoing and Upcoming Central Campus State Street Area Construction Projects

Ongoing Construction Projects

Projects Beginning Summer 2018• Michigan Union Renovation• Central Campus Storm Water In�ltration Project• Michigan News Building Steam Replacement • Kraus Building Renovation and Addition• Michigan League Retail Market• Cooley Memorial Fountain Rehabilitation

Upcoming North University Ave. Area Construction Projects• Dental Building and W.K. Kellogg Foundation Institute Expansion and Renovation• Alexander G. Ruthven Museums Building Renovation and Addition

Page 3: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

Full Project Title (12pt, regular)

State Street Neighborhood Construction Preview Meeting Page 3 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

William Monroe Trotter Multicultural Center

FeedbackProjects Construction Maps CommunicationsWelcome Projects

On-going Construction

Estimated Construction End Date: February 2019

• 20,000 gsf new construction• Replacement spaces from the current facility• Multipurpose room that will be able to accommodate approximately

300 people in both banquet-style seating for conferences and anactive learning con�guration that will accommodate more than 100 students

Page 4: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

Page 1 of XDRAFT PRELIMINARY AND ADVISORY

01.01.18ARCHITECTURE, ENGINEERING AND CONSTRUCTIONFull Project Title (12pt, regular)

State Street Neighborhood Construction Preview Meeting Page 4 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Literature, Science & the Arts 1st Floor Renovation and Addition

FeedbackProjects Construction Maps CommunicationsWelcome Projects

On-going Construction

Estimated Construction End Date: August 2019

• 24,000 gsf renovation and 21,000 gsf addition • Signature space to connect LSA with current and prospective undergraduate students• All relevant student services together in a single vibrant, student focused space that showcases the opportunities that an LSA education o�ers

Page 5: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

Icon 3

State Street Neighborhood Construction Preview Meeting Page 5 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Michigan Union

FeedbackProjects Construction Maps CommunicationsWelcome Projects

Estimated Construction Schedule: Mid-May 2018 through November 2019

• Deep renovation of 250,000 gsf• Improves ADA accessibility throughout the building interior• Expands informal gathering spaces and creates state-of-the-art student organization and student

involvement space• Creates social space on the main

level by enclosing the courtyard

Page 6: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 6 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Central Campus Storm Water In�ltration Project

FeedbackProjects Construction Maps CommunicationsWelcome Projects

• Redirect existing overland and roof top storm water to an underground storm water in�ltration (open-bottom) precast concrete system • Permanently remove up to 100,000 cubic feet (750,000 gallons or 1.75 feet �lling a football �eld) of storm water from the City storm sewer system/Allen Creek watershed during a 100 year 24-hr storm event

Estimated Construction Schedule: Late April 2018 through Fall 2018

Page 7: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 7 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Michigan News & Information

FeedbackProjects Construction Maps CommunicationsWelcome Projects

• Replace, in kind, the direct buried, failing steam, condensate and DHW lines between the main tunneland the building service entry

Estimated Construction Schedule: July through October 2018

Page 8: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 8 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Kraus Building Renovation and Addition Project

FeedbackProjects Construction Maps CommunicationsWelcome Projects

Estimated Construction Schedule: August 2018 through Fall 2020

• Deep renovation of the Kraus building and construction of 62,000 gsf in�ll addition within the existing exterior courtyard in order to accommodate the current and projected future growth needs for the School of Kinesiology.

Page 9: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 9 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Michigan League Retail Market

FeedbackProjects Construction Maps CommunicationsWelcome Projects

Rehabilitate Cooley Memorial Fountain (Ingalls Mall fountain)

• Approximately 6,800 gsf interior renovation of the space currently utilized at Beanster’s, on the �rst �oorat the south end of the League, including the adjacent seating area.

• Market and food service areas will be renovated as well as creating an enhanced entrance into the spacefrom the hallway, and a developing a variety of seating types to meet user needs and improve the overalllook and ambiance of the space.

Estimated Construction Schedule: April through September 2018

• The project will include replacement of the piping, concrete and sump pump repairs, new waterproo�ngof the basin, and restoration of the bronze sculptural components.

Estimated Construction Schedule: May through July 2018

Page 10: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 10 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Dental Building and W.K. Kellogg Foundation Institute Expansion and Renovation

FeedbackProjects Construction Maps CommunicationsWelcome Projects

Estimated Construction Schedule: September 2018 through June 2022

• Renovation of approximately 172,000 gsf and additions totalling 46,600 gsf to improve access forvisitors, patients, students, faculty and sta�.

Page 11: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 11 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

• Renovation of the approximately 150,000 gsf building built in 1928 for relocation of all occupants of Fleming• Construction of a 100,000 gsf addition for active learning-style classroom space

Alexander G. Ruthven Museums Building Renovation and AdditionEstimated Construction Schedule: Fall 2018 through Summer 2021

Page 12: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 12 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

W I L L I A M

M A D I S O N

J E F F E R S O N

K E N N E D Y

M O N R O E

J O H N

CROSS

M O N R O E

S . U N I V E R S I T Y

N . U N I V E R S I T Y

PAC

KA

RD

ST

AT

E

ST

AT

E

TH

AY

ER

DIV

I SI O

N

DI V

I SI O

N

MA

YN

AR

D

TH

OM

PS

ON

TH

OM

PS

ON

TA

PP

AN

OA

KL

AN

D

ThompsonStreet

ParkingStructure

MungerGraduateResidence

Inst. forSocial

Research(ISR)

W16

W3

ClementsLibrary

Angell Hall& Tisch Hall

Angell HallAuditoriums

HavenHall

DIAG

AikensCommons

Kraus

MichiganNews Bldg.

Lawyers’ Club Building &Munger Residences

John P. CookBuilding

HutchinsHall

SouthQuadrangle

WestQuadrangle

MichiganUnion

Helen Newberry

Betsy Barbour

Hatcher - North

MarthaCook

President’sResidence

TappanHall

Hatcher - South

Student ActivitiesBuilding (SAB)

MasonHall

Newberry Hall

LS&ABuilding

Fleming

LipseyStudent

Publications

Cook LegalResearchLibrary

AlumniMemorial(Museum

of Art)

W12 W4

W23

S9

W13

W14

W1

Maynard (City) Parking Structure

P

P

P

P

Do not walk in the street next to construction fences

Anticipated Pedestrian Way�nding Map Early Summer 2018

U-M FOIS | 3/30/18

Symbol Key:

Pedestrian detour route

Construction area U-M / City visitor parking

U-M permit parking

Accessible pedestrian route

Accessible pedestrian entrance remaining open during construction

Construction access gate

PP

May 2018-Dec 2019

MichiganUnion

Sidewalk closed mid-May through mid-June

LS&A

Nov 2017-Aug 2019

Emergency Exit Only

Jul 2017-Feb 2019

May - June 2018Stormwater Project Ph 1

YOU ARE

HERE

Trotter Multicultural

Center

Refer HERE for most up-to-date campus maps.

Page 13: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 13 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

W I L L I A M

M A D I S O N

J E F F E R S O N

K E N N E D Y

M O N R O E

J O H N

CROSS

M O N R O E

S . U N I V E R S I T Y

N . U N I V E R S I T Y

PAC

KA

RD

ST

AT

E

ST

AT

E

TH

AY

ER

DIV

I SI O

N

DI V

I SI O

N

MA

YN

AR

D

TH

OM

PS

ON

TH

OM

PS

ON

TA

PP

AN

OA

KL

AN

D

ThompsonStreet

ParkingStructure

MungerGraduateResidence

Inst. forSocial

Research(ISR)

W16

W3

ClementsLibrary

Angell Hall& Tisch Hall

Angell HallAuditoriums

HavenHall

DIAG

AikensCommons

Kraus

MichiganNews Bldg.

Lawyers’ Club Building &Munger Residences

John P. CookBuilding

HutchinsHall

SouthQuadrangle

WestQuadrangle

MichiganUnion

Helen Newberry

Betsy Barbour

Hatcher - North

MarthaCook

President’sResidence

TappanHall

Hatcher - South

Student ActivitiesBuilding (SAB)

MasonHall

Newberry Hall

LS&ABuilding

Fleming

LipseyStudent

Publications

Cook LegalResearchLibrary

AlumniMemorial(Museum

of Art)

W12 W4

W23

S9

W13

W14

W1

Maynard (City) Parking Structure

P

P

P

P

Do not walk in the street next to construction fences

Anticipated Pedestrian Way�nding Map Midsummer 2018

U-M FOIS | 3/30/18

Symbol Key:

Pedestrian detour route

Construction area U-M / City visitor parking

U-M permit parking

Service / delivery tra�c detour route

Accessible pedestrian route

Accessible pedestrian entrance remaining open during construction

Construction access gate

PP

MichiganUnion

May 2018-Dec 2019

LS&ANov 2017-Aug 2019

Emergency Exit Only

Trotter Multicultural

Center

Jul 2017-Feb 2019

Jul - Aug 2018

Kraus

Aug 2018-Nov 2020

June- Mid July 2018

Stormwater Project Ph 2

YOU ARE

HERE

Refer HERE for most up-to-date campus maps.

Page 14: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 14 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

W I L L I A M

M A D I S O N

J E F F E R S O N

K E N N E D Y

M O N R O E

J O H N

CROSS

M O N R O E

S . U N I V E R S I T Y

N . U N I V E R S I T Y

PAC

KA

RD

ST

AT

E

ST

AT

E

TH

AY

ER

DIV

I SI O

N

DI V

I SI O

N

MA

YN

AR

D

TH

OM

PS

ON

TH

OM

PS

ON

TA

PP

AN

OA

KL

AN

D

ThompsonStreet

ParkingStructure

MungerGraduateResidence

Inst. forSocial

Research(ISR)

W16

W3

ClementsLibrary

Angell Hall& Tisch Hall

Angell HallAuditoriums

HavenHall

DIAG

AikensCommons

Kraus

MichiganNews Bldg.

Lawyers’ Club Building &Munger Residences

John P. CookBuilding

HutchinsHall

SouthQuadrangle

WestQuadrangle

MichiganUnion

Helen Newberry

Betsy Barbour

Hatcher - North

MarthaCook

President’sResidence

TappanHall

Hatcher - South

Student ActivitiesBuilding (SAB)

MasonHall

Newberry Hall

LS&ABuilding

Fleming

LipseyStudent

Publications

Cook LegalResearchLibrary

AlumniMemorial(Museum

of Art)

W12 W4

W23

S9

W13

W14

W1

Maynard (City) Parking Structure

P

P

P

P

MichiganUnion

May 2018-Dec 2019

LS&ANov 2017-Aug 2019

Emergency Exit Only

Trotter Multicultural

Center

Jul 2017-Feb 2019

Jul - Aug 2018

Kraus

Aug 2018-Nov 2020

Mid July - Sept 2018

Stormwater Project Ph 3

YOU ARE

HERE

Do not walk in the street next to construction fences

Anticipated Pedestrian Way�nding Map Late Summer 2018

U-M FOIS | 3/30/18

Symbol Key:

Construction area U-M / City visitor parking

U-M permit parking

Service / delivery tra�c detour route

Pedestrian detour route

Accessible pedestrian route

Accessible pedestrian entrance remaining open during construction

Construction access gate

PP

Refer HERE for most up-to-date campus maps.

Page 15: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 15 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

W I L L I A M

M A D I S O N

J E F F E R S O N

K E N N E D Y

M O N R O E

J O H N

CROSS

M O N R O E

S . U N I V E R S I T Y

N . U N I V E R S I T Y

PAC

KA

RD

ST

AT

E

ST

AT

E

TH

AY

ER

DIV

I SI O

N

DI V

I SI O

N

MA

YN

AR

D

TH

OM

PS

ON

TH

OM

PS

ON

TA

PP

AN

OA

KL

AN

D

ThompsonStreet

ParkingStructure

MungerGraduateResidence

Inst. forSocial

Research(ISR)

W16

W3

ClementsLibrary

Angell Hall& Tisch Hall

Angell HallAuditoriums

HavenHall

DIAG

AikensCommons

Kraus

MichiganNews Bldg.

Lawyers’ Club Building &Munger Residences

John P. CookBuilding

HutchinsHall

SouthQuadrangle

WestQuadrangle

MichiganUnion

Helen Newberry

Betsy Barbour

Hatcher - North

MarthaCook

President’sResidence

TappanHall

Hatcher - South

Student ActivitiesBuilding (SAB)

MasonHall

Newberry Hall

LS&ABuilding

Fleming

LipseyStudent

Publications

Cook LegalResearchLibrary

AlumniMemorial(Museum

of Art)

W12 W4

W23

S9

W13

W14

W1

Maynard (City) Parking Structure

P

P

P

P

MichiganUnion

May 2018-Dec 2019

LS&ANov 2017-Aug 2019

Emergency Exit Only

Trotter Multicultural

Center

Jul 2017-Feb 2019

Kraus

Aug 2018-Nov 2020

Mid July - Sept 2018

Stormwater Project Ph 3

YOU ARE

HERE

Do not walk in the street next to construction fences

Anticipated Pedestrian Way�nding Map Fall 2018

U-M FOIS | 3/30/18

Symbol Key:

Construction area U-M / City visitor parking

U-M permit parking

Service / delivery tra�c detour route

Pedestrian detour route

Accessible pedestrian route

Accessible pedestrian entrance remaining open during construction

Construction access gate

PP

Refer HERE for most up-to-date campus maps.

Page 16: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 16 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

W I L L I A M

M A D I S O N

J E F F E R S O N

K E N N E D Y

M O N R O E

J O H N

CROSS

M O N R O E

S . U N I V E R S I T Y

N . U N I V E R S I T Y

PAC

KA

RD

ST

AT

E

ST

AT

E

TH

AY

ER

DIV

I SI O

N

DI V

I SI O

N

MA

YN

AR

D

TH

OM

PS

ON

TH

OM

PS

ON

TA

PP

AN

OA

KL

AN

D

ThompsonStreet

ParkingStructure

MungerGraduateResidence

Inst. forSocial

Research(ISR)

W16

W3

ClementsLibrary

Angell Hall& Tisch Hall

Angell HallAuditoriums

HavenHall

DIAG

AikensCommons

Kraus

MichiganNews Bldg.

Lawyers’ Club Building &Munger Residences

John P. CookBuilding

HutchinsHall

SouthQuadrangle

WestQuadrangle

MichiganUnion

Helen Newberry

Betsy Barbour

Hatcher - North

MarthaCook

President’sResidence

TappanHall

Hatcher - South

Student ActivitiesBuilding (SAB)

MasonHall

Newberry Hall

LS&ABuilding

Fleming

LipseyStudent

Publications

Cook LegalResearchLibrary

AlumniMemorial(Museum

of Art)

W12 W4

W23

S9

W13

W14

W1

Maynard (City) Parking Structure

P

P

P

P

Do not walk in the street next to construction fences

Anticipated Pedestrian Way�nding Map Early Summer 2018

U-M FOIS | 3/30/18

Symbol Key:

Pedestrian detour route

Construction area U-M / City visitor parking

U-M permit parking

Accessible pedestrian route

Accessible pedestrian entrance remaining open during construction

Construction access gate

PP

May 2018-Dec 2019

MichiganUnion

Sidewalk closed mid-May through mid-June

LS&A

Nov 2017-Aug 2019

Emergency Exit Only

Jul 2017-Feb 2019

May - June 2018Stormwater Project Ph 1

YOU ARE

HERE

Trotter Multicultural

Center

F, E

C

O

A, P

E

A

G

F

F, EPedestrian access sign location and direction

Pedestrian way�nding map location

Michigan Union services relocated to:

Fleming Administration Building:Student Life Associate Vice President

Pierpont Commons (North Campus):Campus InformationCenter for Campus InvolvementUniversity Unions Administration

Trotter Multicultural Center (on Washtenaw):Multi-Ethnic Student Affairs (MESA)Spectrum CenterTrotter Administration

Michigan League:Campus InformationCenter for Campus InvolvementMichigan Debate Program

Student Organization Account Services (SOAS)Student Organization Resource Center (SORC)University Activities Center

Baits I/Eaton House (North Campus):Conference & Event ServicesStudent Life Auxiliary MarketingStudent Life Tech Services

North Quad:Central Student Government

West Quad - Cambridge:Sexual Assault Prevention & Awareness Center (SAPAC)

https://uunions.umich.edu/reunion

Tappan Street Auxiliary Building:Counseling & Psychological Services (CAPS)Dean of StudentsFraternity & Sorority Life

For more information, please visit:

North Campus1.

2.

3.

4.

5.

6.

7.

8.

1

7

6 2

34

8

5

ElbelBuilding

M A D I S O N

M O N R O E

H U R O N

E . W A S H I N G T O N A V E .

S . U N I V E R S I T Y

N . U N I V E R S I T Y

H I L L

PA

CK

AR

D

ST

AT

E

FL

ET

CH

ER

DIV

I SI O

N

TH

OM

PS

ON

E.

UN

IVE

RS

ITY

TA

PP

AN

CH

UR

CH

WA

SH

TE

NA

W

WA

S HT E N

AW

S . U N I V E R S I T Y

D I A G

UNIONUNION

BO

NI S

TE

EL

F U L L E R

D U F F I E L D

H U B B A R D

MU

RF

IN

B A I T S

Refer HERE for most up-to-date campus maps.

Page 17: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 17 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

Summer 2018

Refer HERE for most up-to-date campus maps.

Page 18: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 18 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

FeedbackProjects Construction Maps CommunicationsWelcome Projects

Summer 2018 Summer 2018

Refer HERE for most up-to-date campus maps.

Page 19: State Street Projects Pre-Construction Internal ... · State Street Projects Pre-Construction Internal Neighborhood Meeting Friday, April 6, 2018 2:30 - 3:30 p.m. Angell Hall, Auditorium

State Street Neighborhood Construction Preview Meeting Page 19 of 19DRAFT PRELIMINARY AND ADVISORY

04.05.18ARCHITECTURE, ENGINEERING AND CONSTRUCTION

Communication Mechanisms

FeedbackProjects Construction Maps CommunicationsWelcome Projects

• Trotter Muliticultural Center, Michigan Union Renovation - Matt Fuller (mbfuller, 323-5973)• LSA 1st Floor Renovation and Addition, Biological Sciences Building - Bryan Valachek (valachek, 936-8277)• Central Campus Storm Water In�ltration Project - Andrew Smith (andrewws, 647-1314)• Michigan News Steam Replacement, Cooley Fountain Rehabilitation - Tom Walterhouse (trwalt, 763-5565)• Kraus Building Renovation and Addition - Eric Smith (ejsmyth, 972-9437)• Michigan League Retail Market, Power Center Dock Repairs - Paul Doepfer (pdoepfer, 891-6478)• Dental and Kellogg Institute Expansion and Renovation - Ken Silverman (kensilv, 936-7356)• Alexander G. Ruthven Museums Building Renovation and Addition - Mike Marenghi (marenghi, 777-2355)

Tuesday Construction Coordination Meetings at AEC

Project Manager Contact Information (764-9289)

Larry Bowman (bowmania, 936-6690)

• For more information contact:Sven Sawin, Assistant Campus [email protected]

Sue Gott, Campus Planner [email protected]