-
GSPublisherEngine 0.0.100.100
30
1,0010
1,3010
2,25
30
10
2,80
30
6,30
30
2,70
30
2,70
0,30
4,40
30
9,55
8,35
1,65
1,35
90
90
2,15
21,35
1,60
4,00
0,00
+0,45
+0,10
+0,45
Kitchen
2
4,30 m
granite
Passage
2
1,60 m
granite
Passage
2
Living room
granite
18,94 m
2
1,49 mgranite
Pantry
2
Dining room
granite
12,15 m2
Room
parquet
10,15 m2
granite
7,54 m2
granite
Bathroom
granite
5,28 m2
Room
parquet
12,32 m2
Terrace
granite
22,46 m2
Bathroom
3,84 m2
2,63 m 2
Garage
Toilet
1,65 m
31,02 m
A
A
granite
granite
granite
2
3,80
2,40
Entrance
Z s o l t K a d a r - p o r t f o l i o
-
GSPublisherEngine 0.0.100.100
650
600
900
1616
1660
025
600
2530
025
600
16
1264
800
786
600
2182
2207
16 16 600 600 16 16
600 1337 16 16 1000 400 650600 5.82 2082
4000
600 768 1264 768 600
2.64
186
16 600 25 600 25 300 25 600 16
2333
6715
072
090
655
767
2400
1566 6002166
2207
150
720
4051
990
476
910
519
904
7624
00
AA
BB
elevation A
elevation B
C C
D D
2016 (Mconcept Ltd)Kitchen, Residential House, Hornsey, London
N8
-
GSPublisherEngine 0.0.100.100
600 1447 1353 6004000
150
720
4051
990
467
910
519
904
6724
00
600 784 1232 784 6004000
150
2183
7624
00
150
720
4051
990
476
910
519
904
7624
00
150
2183
7624
00
35
50
23
35 65
23
front door
carcase
'L' shapehandle strip
for base unit
'C' shapehandle strip
for base unit
handle stripfor wall unit
worktop
drawer front panel
carcase
1
2
3
1
2
3
elevation C
elevation D
-
GSPublisherEngine 0.0.100.100
photos about Office for British American Tobacco, Budapest 2014
(GMB Studio Ltd)
-
GSPublisherEngine 0.0.100.100
2014 (University of Pcs)
Dissertation of Master Degree: this project was for atemporary
home and rehabilitation facility for homelesspeople in Budapest.The
building was to be located in a less affluent
Budapestneighbourhood. The development is overlooking
otherresidential units and street access so it was necessary
todevelop a friendly atmosphere and colourful facade. Thefunctional
requirements included specific areas fordaytime recreation, short
term accommodation and longterm living. The design concept was to
provide occupantswith safe refuge and stable accomodation needs
forimmediate and long term.
Master Degree in Architecture at University of Pecs
-
GSPublisherEngine 0.0.100.100
High-end residental home, Budars, Hungary 2013 (Freelance
project)
Freelance Project: this wasa subcontracting projectfor a
prominent localArchitect. I was tasked withcompleting survey
plansand design communicationwith the client along withfinal
delivery of thecomplete planningapplication package. Thehouse was
built in May of2013.www.istvanbarsony.com
-
GSPublisherEngine 0.0.100.100
Kiss Zoltn2476, Pzmnd Szabadsg utca 14.
Dsa Nikoletta1118, Budapest Menedkes u. 1.
D2 lph. 2/11
Felels tervez:
2011. Augusztus 31.
Tervlapcm:
E-2
Lptk: M = 1:100
Dtum:
Fldszinti alaprajz
Tervlapszm:
ptett:
pts helye:
Csaldihz ptsi engedlyezsi terveptsi munka:
Budars,Bnysz utca 7/1
HRSZ:2394/1
ptsz munkatrs: Wenczel Attilaokl.eptszmrnk, E2 13-1207
Statikus tervez:
Gpsz tervez:
Pavlics Gyrgypletgpsz vezet tervez G-T-Tell 01-8618
fszt p.v. (0,00) = +177,8 mBFutcai csatorna fedlap =+178
mBF=fszt p.v. +0,20
Petrs Gyuln Gbory Erzsbettartszerkezeti tervez T-T
01-9062energetikai szakrt ENt-Sz 01-9062
Brsony Istvnokl. ptszmrnk /2 01-0229
1135, Budapest Mr u. 16.Tel.: 00-36-30-339-84-71
1,45
2,402,10
90pm
1,70
1,8045
2,402,00
pm60
1,8045
2,00
2,40
2,40
1,10
2,402,20
2,00
2,40
pm0,00
1,00
2,40
2,10
1,00
702,10
1,641,00
1,641,00
752,10
1,001,62
9,25 10,66 3,00
5,22
13,25
6,46
5,31
13,25
6,55
9,29 10,66 3,00
30 3,95 30 5,50 30
30 3,95 30 4,20 10 1,20 30
30 3,95 30 5,50 30
1,07 2,48 70 1,07 1,50 3,53
30 1,50 10 2,35 30 5,50 30
3,38 87 3,05 3,05
3,75
301,50
101,90
2,67
302,43
3,75
302,50
103,57
302,43
2,02
1,73
742,11
2,85
2,33
1,17
305,55
201,76
104,74
30
305,55
206,60
30
4,12
3,15
5,68
4,25 6,10
3,75
6,77
2,43
4,25 6,10
-0,02
+0,10
+0,36
+ 0,30
+ 0,50
- 0,30
- 0,90
-0,02
-0,02
-0,02
-0,02
-0,30
-0,30
-0,02
+ 0,90
+ 1,00
0,00
-0,25
+0,47+0,49
-0,05
-0,07
kandall
KZMVEK KUKATROL
beptettborht
MEGLV KERTSFAL MAX MAGASSG CSATLAKOZ TEREPSZINT + 210 CM
frisslevegbevezets
K1 Schiedel
uni plus 20
1,20
4,50
tolajttolajt3,101,40
meglv gymlcsfk
meglv gymlcsfk
ptsi hely hatra
ptsi hely hatra
ptsi hely hatra
ptsi hely hatra
gyeprcs
kule kavics
telekhatr
telekhatr
telekhatr
telekhatr
telekhatr telekhatr
buk
meglv szomszd tmfal
harmnika ajt
buk
b-ny
J KERTS SZAKASZ
folyka
2,5 %
fix
fix buk
harm
nika ajt
eredeti terepsk
30/25vb. pillr
25/25vb. pillr
25/25vb. pillr
30/25vb. pillr
25/25vb. pillr
J KERTSFALMAX MAGASSG CSATLAKOZ TEREPSZINT + 210 CM
meglv szomszd tmfal
eredeti terepmag.
eredeti terepmag.
eredeti terepmag.
eredeti terepmag.
esvz
ejtcs
esvz
ejtcs
esvz
ejtcs
Konyhasvdpadl8,38 m2
Elszobakburkolat6,41 m2
Nappali-tkezsvdpadl39,12 m2
Kzleked
parketta
5,24 m
2
Terasz-2kburkolat31,46 m2
Terasz-1kburkolat5,99 m2
BB
A A
pm60 45
1,80
pm60 45
1,80
pm60 45
1,80
pm60
1,8045
H
2,40
5,00
90/155
Garzsmgyanta31,77 m2
Wckburkolat2,25 m2
Kamrakermia2,23 m2
1. Elszoba 6,41 m2 kburkolat2. Zuhany-WC 2,25 m2 kburkolat3.
Konyha 8,38 m2 svdpadl4. Kamra 2,23 m2 kermia5. Kzleked 5,24 m2
svdpadl6. Nappali-tkez 39,12 m2 svdpadl7. GArzs 31,77 m2 mgyanta
sszesen 95,40 m2
8. Terasz 1. 5,99 m29. Terasz 2. 31,46 m2
JELMAGYARZAT:
Falazblokk
Vasbeton szerkezet
Hszigetels
szak
Kburkolat
existing trees
planning area
ex
isting
tree
s
plan
ning
area
folding door
fixe
dbo
ttom
hinge
d
30/25r.c. coloumn
Living - dining roomparquet
Kitchenparquet
25/25r.c. column
25/25r.c. column
30/25r.c. column
bottom andside hinged
bottom hingedbottom hinged fixed
foldi
ng
door
Terrace - 2stone
Garageplastic
25/25r.c. column
Terrace - 1stone
soil pipe
planning areasurface channel
origi
nal g
roun
d lev
el
lawn
origi
nal g
roun
d lev
el
sliding door sliding door
Waste storage main pipes
boundary
bou
ndar
y
boundary
bou
ndar
y
boundary
bou
ndar
y
exis
ting r
etaini
ng w
all
exis
ting r
etaini
ng w
all
plan
ning
area
Storage ceramics
ventilation
gra
vel
fireplace
L E G E N D :
r.c. structure
stock brick
thermal insulation
stone
north
new boundary wallnew boundary wall
origi
nal g
roun
d lev
el
origi
nal g
roun
d lev
el
soil pipe
built-inwine cooler
S t a
i r s
parq
uet
Entrancestone Toilet stone
F/F
-
GSPublisherEngine 0.0.100.100
Kiss Zoltn2476, Pzmnd Szabadsg utca 14.
Dsa Nikoletta1118, Budapest Menedkes u. 1.
D2 lph. 2/11
Felels tervez:
2011. Augusztus 31.
Tervlapcm:
E-3
Lptk: M = 1:100
Dtum:
Emeleti alaprajz
Tervlapszm:
ptett:
pts helye:
Csaldihz ptsi engedlyezsi terveptsi munka:
Budars,Bnysz utca 7/1
HRSZ:2394/1
ptsz munkatrs: Wenczel Attilaokl.eptszmrnk, E2 13-1207
Statikus tervez:
Gpsz tervez:
Pavlics Gyrgypletgpsz vezet tervez G-T-Tell 01-8618
fszt p.v. (0,00) = +177,8 mBFutcai csatorna fedlap =+178
mBF=fszt p.v. +0,20
Petrs Gyuln Gbory Erzsbettartszerkezeti tervez T-T
01-9062energetikai szakrt ENt-Sz 01-9062
Brsony Istvnokl. ptszmrnk /2 01-0229
1135, Budapest Mr u. 16.Tel.: 00-36-30-339-84-71
902,10 90
2,10
pm30
1,80
1,80
pm30
451,80
pm30
451,80
pm30
1,80
45
pm30
1,80
45
pm30
1,5045
pm0,00
3545
pm30
1,80
1,80
pm30
1,8045
pm30
1,8045
902,10
2,10
90
2,1075
2,1075
SZ
10,66
13,25
3,75
6,77
2,43
10,66
4,25 30 3,50 10 1,90 30
30 4,79 6 2,90 10 1,90 30
30 3,95 30 5,50 30
2,10 2,15 1,75 2,42 90 1,03
30 4,15 10 2,85 10 2,55 30
1,35 90 2,00 52 3,35 90 1,33
3,75
301,50
101,90
102,57
302,43
5290
2,33
2,85
2,38
9157
1,07
9053
303,00
104,15
102,40
102,50
30
305,25
101,90
105,00
30
4,57
9090
6,58
30 2,80 3,45 10 3,40 30
13,25
303,45
306,17
302,13
30
3012,35
30
4,25 30 2,85 10 2,55 30
4,25 6,10
30 3,95 30 5,50 30
4,25 6,10
+3,15
+2,82
+2,82
FEL
LVILG
T
fa pergola
fa pergola
K1 Schiedeluni plus 20
K2 80/125
tetkibv
25/25vb. pillr
25/25vb. pillr
Kzlekedparketta6,56 m2
Frdkburkolat6,23 m2
Hlszobaparketta12,31 m2
Hlszobaparketta14,96 m2
Hztartsi/gpszeti h.
kporceln
7,65 m
2
Hlszobaparketta15,90 m2
Gardrbparketta4,56 m2
Frdkburkolat4,75 m2
Lpcstr
faburkolat
5,32 m
2
Trol / Ve
ndgszob
akporceln
12,51 m
2
BB
A A
pm30
1,8090
pm30
1,8090
pm30
1,80
90
pm30
1,80
45
pm30
1,80
45
pm0,00 45
1,80
pm0,00 45
1,80
pm0,00 45
1,80
2,10
75 2,10
90
M
105/200
1. Kzleked 6,56 m2 parketta2. Lpcstr 5,32 m2 parketta3.
Gyermek-hl 12,31 m2 parketta4. Gyermek-hl 14,96 m2 parketta5. Frd
6,23 m2 kburkolat6. Hlszoba 15,90 m2 parketta7. Gardrb 4,56 m2
parketta8. Frd 4,75 m2 kburkolat9. Vendgszoba/Trol 12,51 m2
kporceln10. Gpszeti helyisg 7,65 m2 kporceln sszesen 90,75 m2
szak
JELMAGYARZAT:
Falazblokk
Vasbeton szerkezet
Hszigetels
Kburkolat
Bedroom parquet Walk-in closet
parquet
25/25r.c. column
Bedroom parquet
Corridorparquet
Bedroom parquet
Boile
r roo
mce
rami
cs
Stor
age /
Gues
t roo
mskyli
ght w
indow
S t a
i r s
parq
uet
Showerceramics c
eram
ics
Showerceramics
25/25r.c. column
L E G E N D :
r.c. structure
stock brick
thermal insulation
stone
north
Bedroom parquet
-
GSPublisherEngine 0.0.100.100
Kiss Zoltn2476, Pzmnd Szabadsg utca 14.
Dsa Nikoletta1118, Budapest Menedkes u. 1.
D2 lph. 2/11
Felels tervez:
2011. Augusztus 31.
Tervlapcm:
E-4
Lptk: M = 1:100
Dtum:
Metszetek
Tervlapszm:
ptett:
pts helye:
Csaldihz ptsi engedlyezsi terveptsi munka:
Budars,Bnysz utca 7/1
HRSZ:2394/1
ptsz munkatrs: Wenczel Attilaokl.eptszmrnk, E2 13-1207
Statikus tervez:
Gpsz tervez:
Pavlics Gyrgypletgpsz vezet tervez G-T-Tell 01-8618
fszt p.v. (0,00) = +177,8 mBFutcai csatorna fedlap =+178
mBF=fszt p.v. +0,20
Petrs Gyuln Gbory Erzsbettartszerkezeti tervez T-T
01-9062energetikai szakrt ENt-Sz 01-9062
Brsony Istvnokl. ptszmrnk /2 01-0229
1135, Budapest Mr u. 16.Tel.: 00-36-30-339-84-71
60 2,16 60 6,69 60
5615
1219
2,80
2015
3,24
0,00
+2,80
+3,15
-0,60
+5,25+5,48
+7,04
+7,99
-0,03
+0,47
+5,41+5,63
+7,99
+0,49+0,60
+2,40
3,15
3,72
+5,06 +5,15
+6,87
2,10
1,20
+0,97
+7,28
3,00
3,00 6,25
20
20
60
60
TELE
KHAT
R
+3,15emelet
0,00fldszint
trolvendgszoba
konyha kamra
kzleked
Lpcstr
drain
K1 Schiedeluni plus 20napko
llektor
szomszd telekmeglv terepvonalm
eglv tmfalkerts
P1P2
P5P4
EREDETITEREPVONAL
PTS
I HEL
Y HA
TRA
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
EREDETI
TEREPVONAL
TERVEZETT
TEREPVONALszomszd
telekmeglv terepvonal
EREDETITEREPVONAL
16 30 9,75 30 15
16 30 2,75 10 3,40 10 3,40 30 15
60 5,20 60 6,21 60
5615
1219
2,80
2015
2,80
0,00
+2,80
+3,15
+5,95
-0,02
+7,99
-0,250,00
+2,40
+3,45
+5,25
3,15
2,80
-0,30
+2,67
+2,82
+7,99
0,00
+2,40
-1,02-0,31
-0,19
+2,80
+3,00
5,0026
1,57 4,92
+0,10
+3,15emelet
0,00fldszint
hlszoba
konyha
kzleked
garzs nappali tkez
hlszoba
rednykapu
P3 P2
P4 P4 P4
fa pergola
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
PTS
I HEL
Y HA
TRA
TELE
KHAT
R
EREDETITEREPVONAL
TERVEZETTTEREPVONAL
EREDETITEREPVONALTERVEZETTTEREPVONAL
fix fellvilgtbiztonsgi veggel
Acl utcakzt
meglvterepvonal
szomszdtelek
meglvterepvonal
15 30 5,55 20 6,60 30 15
15 30 5,25 10 1,90 10 5,00 30 15
P2ragasztott svdpadl 2.2 cmpadlkiegyenlt 0.2 cmsimtott
aljzatbeton 6.5 cmPE flia 0.01 cmAustrotherm lpsll hszigetels 10.0
cm2 rtg. GV-4 bitumenes szigetel lemez 0.8 cmvasalt aljzatbeton
8x150x150 mm-es hlvasalssal 12.0 cmtmrtett kavicsgy 15.0
cmtalaj
RTEGTERVEK:P1Gresslap burkolat + flexibilis ragaszt 1.6
cmpadlkiegyenlt 0.3 cmsimtott aljzatbeton 7.0 cmPE flia 0.01
cmAustrotherm lpsll hszigetels 10.0 cm2 rtg. GV-4 bitumenes
szigetel lemez 0.8 cmvasalt aljzatbeton 8x150x150 mm-es hlvasalssal
12.0 cmtmrtett kavicsgy 15.0 cmtalaj
P4szalagparketta + habflia altt 1.9 cmsimtott aljzatbeton 6.0
cmPE flia 0.01 cmAustrotherm lpsll hszigetels 7.0 cmmonolit
vasbeton fdm 20.0 cmgipszes bels vakolat 1.0 cmglettels + fests 0.3
cm
F1glettels + fests 0.3 cmgipszes bels vakolat 1.0 cmPorotherm 30
HS falazat 30.0 cmcementes alapvakolat 1.0 cmlbazati szigetels 0.8
cmAUSTROTHERM expert hszgetels 12.0 cmvegftyol kasirozott drain
lemez 2.0 cmkavics szivrg rteg 30.0 cm
F2glettels + fests 0.3 cmgipszes bels vakolat 1.0 cmPorotherm 30
HS falazat 30.0 cmragasztott 15.0 cm vtg. ROCKWOOL hszigetel tbla
15.5 cmnemesvakolat 0.5 cm
T1CREATON DOMINO kermiacserpteltett fa cserplcezs 5x3 cm 3.0
cmteltett fa ellenlc 5x5 cm 5.0 cmalfesztett creaton uno
szigetels10/20 szarufa, kzte Rockwool hszigetels 15 cm 20.0
cmellenlc 5x5 cm kzte Rockwool hszigetels 5 cm 5.0 cmPE flia 0.01
cmhtkrs aluflia 0.01 cm2 rtg. RIGIPS RF tzgtl gipszkarton 3.0
cmglettels + fests 0.2 cm
P3mgyanta 0.3 cmsimtott aljzatbeton 8.5 cmPE flia 0.01
cmAustrotherm lpsll hszigetels 10.0 cm2 rtg. GV-4 bitumenes
szigetel lemez 0.8 cmvasalt aljzatbeton 8x150x150 mm-es hlvasalssal
12.0 cmtmrtett kavicsgy 15.0 cmtalaj
P5Gresslap burkolat + flexibilis ragaszt 1.6 cmpadlkiegyenlt 0.3
cmsimtott aljzatbeton 7.0 cmPE flia 0.01 cmAustrotherm lpsll
hszigetels 7.0 cmmonolit vasbeton fdm 20.0 cmgipszes bels vakolat
1.0 cmglettels + fests 0.3 cm
F3glettels + fests 0.3 cmgipszes bels vakolat 1.0 cmPorotherm 30
HS falazat 30.0 cmragasztott 12.0 cm vtg.Austrotherm grafit
hszigetels 12.5 cmragsztott kburkolat 3.5 cm
A-A metszet
B-B metszet
JELMAGYARZAT:
Falazblokk
Vasbeton szerkezet
Hszigetels
Kburkolat
bou
ndar
y
p
lannin
g ar
ea
p
lannin
g ar
ea
bou
ndar
y
StorageGuest room
Stairs
Corridor
kitchen
original ground level
original ground level
original ground level
proposal ground level
next plot existing ground level existing ground levelground
floor
existing ground levelnext plot
exist
ing re
tainin
g wall
1st floor
solar collecto
r
bou
ndar
y
p
lannin
g ar
ea
p
lannin
g ar
ea
bou
ndar
y
Bedroom
Storage
Section A
Section B
skylight window(toughened glass)
Corridor Bedroom
Kitchen Living - Dining roomGarage
1st floor
ground floor
original ground level ground level
proposal original ground level
ground level proposal
existing ground level
rolling shutterchasing
-
GSPublisherEngine 0.0.100.100
Kiss Zoltn2476, Pzmnd Szabadsg utca 14.
Dsa Nikoletta1118, Budapest Menedkes u. 1.
D2 lph. 2/11
Felels tervez:
2011. Augusztus 31.
Tervlapcm:
E-6
Lptk: M = 1:100
Dtum:
Homlokzatok II.
Tervlapszm:
ptett:
pts helye:
Csaldihz ptsi engedlyezsi terveptsi munka:
Budars,Bnysz utca 7/1
HRSZ:2394/1
ptsz munkatrs: Wenczel Attilaokl.eptszmrnk, E2 13-1207
Statikus tervez:
Gpsz tervez:
Pavlics Gyrgypletgpsz vezet tervez G-T-Tell 01-8618
fszt p.v. (0,00) = +177,8 mBFutcai csatorna fedlap =+178
mBF=fszt p.v. +0,20
Petrs Gyuln Gbory Erzsbettartszerkezeti tervez T-T
01-9062energetikai szakrt ENt-Sz 01-9062
Brsony Istvnokl. ptszmrnk /2 01-0229
1135, Budapest Mr u. 16.Tel.: 00-36-30-339-84-71
-0,02
+2,67
+2,82
+5,48
+7,04
+7,99
0,00
+2,40
+3,45
+5,25
+5,64
+7,99
0,00
+2,40
+3,45
+5,25
+7,28
+7,7520
20
fa pergola
natr tlgyfa fa nylszrk
eltolhat natr tlgyfa sznzsalus rnykol
elpatinzott vm zink fallefeds
nemesvakolatRAL 1015
rdestett fellet natr kburkolatvilsgosbarna sznben elpatinzott vm
zink burkolat
TELE
KHAT
R
+3,15emelet
0,00fldszint
K1 Schiedeluni plus 20
K2 80/125
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
szomszd telekmeglv terepvonal
meglv tmfalkerts
EREDETITEREPVONAL
TERVEZETTTEREPVONALszomszd
telek meglv terepvonal
EREDETITEREPVONAL
+0,60
+2,40
+3,45
+5,25
-0,30-0,02
+2,67
+2,82
+5,63
+7,99
-0,02
+0,70
+5,63
+7,99
0,00
+2,40
+3,45
+5,25
fa pergola
fa nylszrknatr tlgyfa sznben
eltolhat zsalus rnykolnatr tlgyfa szn
elpatinzottvm zink fallefeds
nemesvakolatRAL 1015
elpatinzottvm zink ereszcsatorna
palaszrke szn kermia cserpfeds rdestett fellet natr
kburkolatvilsgosbarna sznben
+3,15emelet
0,00fldszint
napkollektor
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
PTS
I HEL
Y HA
TRA
TELE
KHAT
R
EREDETITEREPVONALTERVEZETTTEREPVONAL
szomszdtelek
meglv terepvonal
szomszdtelek
meglvterepvonal
EREDETITEREPVONAL
szakkeleti homlokzat
Dlkeleti homlokzat
Homlokzaton megjelen anyagok s sznek:
Vakolt fal: trtfehr szn nemesvakolat (RAL 1015)Kburkolat:
rdestett fellet natr kburkolat vilgosbarna sznbenKmnytest:
elpatinzot vm zink burkolatNylszrk: natr szn tlgyfa fa
nylszrkEreszcsatorna: elpatinzott vm zink ereszcsatornaTetfeds:
palaszrke szn Creaton kermiacserp
kburkolat
talaj
JELMAGYARZAT:Creaton dominopalaszrke kermiacserp
nemes vakolat (RAL1015)
bou
ndar
y
p
lannin
g ar
ea
bou
ndar
y
p
lannin
g ar
ea
bou
ndar
y
p
lannin
g ar
ea
p
lannin
g ar
ea
bou
ndar
y
Southeast Elevation
Northeast Elevation
grey interlocking tiles stone cladding, rough surfacelight
brown
downpipe, zinc
plasterRAL 1015
original ground level
ground floor proposal ground level
next plot
ground level existing
doorscolour: natur oak
1st floor
sliding shading panelcolour: natur oak
solar collector
originalground level
next plot
existing ground level
stone cladding, rough surfacelight brown zinc coating
plasterRAL 1015
1st floor
ground floor
exist
ing re
tainin
g wall
original ground level
existing ground levelnext plot
pergola
doorscolour: natur oak
pergola
existing ground levelnext plot original
ground level
proposal ground level
sheet zinc cladding
sheet zinc cladding
sliding shading panelcolour: natur oak
-
GSPublisherEngine 0.0.100.100
Kiss Zoltn2476, Pzmnd Szabadsg utca 14.
Dsa Nikoletta1118, Budapest Menedkes u. 1.
D2 lph. 2/11
Felels tervez:
2011. Augusztus 31.
Tervlapcm:
E-5
Lptk: M = 1:100
Dtum:
Homlokzatok I.
Tervlapszm:
ptett:
pts helye:
Csaldihz ptsi engedlyezsi terveptsi munka:
Budars,Bnysz utca 7/1
HRSZ:2394/1
ptsz munkatrs: Wenczel Attilaokl.eptszmrnk, E2 13-1207
Statikus tervez:
Gpsz tervez:
Pavlics Gyrgypletgpsz vezet tervez G-T-Tell 01-8618
fszt p.v. (0,00) = +177,8 mBFutcai csatorna fedlap =+178
mBF=fszt p.v. +0,20
Petrs Gyuln Gbory Erzsbettartszerkezeti tervez T-T
01-9062energetikai szakrt ENt-Sz 01-9062
Brsony Istvnokl. ptszmrnk /2 01-0229
1135, Budapest Mr u. 16.Tel.: 00-36-30-339-84-71
-0,30-0,02
+2,67
+2,82
+5,48
+7,04
+7,93
0,00
+2,40
+3,45
+5,25
+0,47+0,47
+5,64
+7,99
+3,45
+5,25
+7,28
+7,75
20 20
fa pergola
natr tlgyfa fa nylszrk
eltolhat natr tlgyfa sznzsalus rnykol
elpatinzott vm zink fallefeds
nemesvakolatRAL 1015
rdestett fellet natr kburkolatvilsgosbarna sznbenelpatinzott vm
zink burkolat
TELE
KHAT
R
+3,15emelet
0,00fldszint
K1 Schiedeluni plus 20
K2 80/125
PTS
I HEL
Y HA
TRA
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
szomszd telekmeglv terepvonal m
eglv tmfalkerts
EREDETITEREPVONALTERVEZETTTEREPVONAL szomszd
telekmeglv terepvonal
EREDETITEREPVONAL
+0,60
+2,40
+3,15
+4,95
+0,46
+2,67
+2,82
+5,63
+7,99
-0,02
+5,63
+7,99
fa pergola
kandall szellz
fa nylszrknatr tlgyfa sznben
eltolhat zsalus rnykolnatr tlgyfa szn
elpatinzottvm zink fallefeds
nemesvakolatRAL 1015
elpatinzott vm zink burkolat
elpatinzottvm zink ereszcsatorna
palaszrke szn kermia cserpfeds
+3,15emelet
0,00fldszint
K1 Schiedeluni plus 20
K2 80/125
tetkibv
klma
TELE
KHAT
R
PTS
I HEL
Y HA
TRA
PTS
I HEL
Y HA
TRA
TELE
KHAT
R
EREDETITEREPVONAL
TERVEZETTTEREPVONAL
szomszdtelek
meglvterepvonal
EREDETITEREPVONAL
TERVEZETTTEREPVONAL
kmnysepr jrda
fix fellvilgtbiztonsgi veggel
Acl utca
meglvterepvonal
Dlnyugati homlokzat
szaknyugati homlokzat
kburkolat
talaj
nemes vakolat (RAL1015)
JELMAGYARZAT:Creaton dominopalaszrke kermiacserp
Homlokzaton megjelen anyagok s sznek:
Vakolt fal: trtfehr szn nemesvakolat (RAL 1015)Kburkolat:
rdestett fellet natr kburkolat vilgosbarna sznbenKmnytest:
elpatinzot vm zink burkolatNylszrk: natr szn tlgyfa fa
nylszrkEreszcsatorna: elpatinzott vm zink ereszcsatornaTetfeds:
palaszrke szn Creaton kermiacserp
Southwest Elevation
Northwest Elevation
bou
ndar
y
bou
ndar
y b
ound
ary
bou
ndar
y
p
lannin
g ar
ea
p
lannin
g ar
ea
p
lannin
g ar
ea
p
lannin
g ar
ea
plasterRAL 1015
grey interlocking tiles zinc coating
skylight window(toughened glass)
climate
originalground level
next plot
existing ground level
proposalground level
originalground level
proposalground level next plot
existing ground level
ground floor
1st floor
pergolawindowscolour: natur oak
sliding shading panelcolour: natur oak
downpipe, zinc
sheet zinc cladding
zinc coating stone cladding, rough surfacelight brown
ventillation for fireplace
plasterRAL 1015
exist
ing re
tainin
g wall
originalground level
original ground level proposal ground level
existing ground level next plot
doorscolour: natur oak
pergola
sliding shading panelcolour: natur oak
sheet zinc cladding
ground floor
1st floor
next plot existing ground level
-
GSPublisherEngine 0.0.100.100
-
GSPublisherEngine 0.0.100.100
ground floor first floor
2011 (University of Pcs)
After 8 years of valuable workexperience I decided to
worktowards gaining a Masters Degree inacrhitecture an MSc. In
2014, whilstworking for Budars Local Council Igraduated from the
University of Pcswith my MSc. This is my conceptdesign on the
subject of "residentialhomes". My task was to design ahigh-end
residential home for amiddle aged wealthy couple who likewide
interior spaces. I planned thehigh-end residential home with
anemphasis on comfort, space andsecurity.
High-end residental home, Pecs, Hungary
-
GSPublisherEngine 0.0.100.100
New Residential house, Vigh St. Budapest, Hungary 2 mansard+4
storey+2 basement
I started to working with XXLArchitect Ltd in August of 2008.
AtXXL I worked mainly on public andresidential buildings.This
project is the first that Imanaged on my own. I organisedand
attended project meetings withthe investor and engaged
withstructural, mechanical, electrical andfire service engineers to
ensuresuitability and compliance. As theproject manager, I had to
workclosely with my architectural andengineering colleagues to
deliverexecution design documentation anddetail drawings which
included build-ups, roofing, metal, railing, stairs,stone works and
fenestrationschedules.This is one of the projects that I ammost
proud of.The overall project cost was app.47M
GBPwww.xxlarchitect.hu
2008 (XXL Architect Ltd)
-
GSPublisherEngine 0.0.100.100
H
H
H
H
H
H
OFFICE ZONE HOTEL ZONE
I started working on thisproject in it's early stageonly. It is
a dual functionalbuilding. The north wing isan office building, the
southwing is a hotel. My task wasin concept drawings and
3Dvisualizations in severalvariations.www.xxlarchitect.hu
ROBERT Office Building and Hotel, Budapest, Hungary 2009 (XXL
Architect Ltd)
linen
hajdu
road
robert karoly avenue
kitchen storage
office
48,43 m2
teakonyha5,04 m
storage4,83 m
eltr4,18 m 47,02 m
eltr16,92 m2
entr.6,65 m2
meeting10,76 m2
corridor14,91 m2
kitchen8,76 m2
8,22 m2
37,63 m25,92 m2
7,01 m2
34,57 m245,30 m2
eltr
37,87 m2
kitchen7,79 m2
entrance6,42 m
server8,66 m2
27,80 m2
31,06 m2
storage9,31 m2
kitchen7,41 m2
storage6,84 m2 5,06 m2
63,18 m2
meeting
irattr8,25 m2
26,58 m2
electr.9,28 m2 13,13 m2
49,27 m29,13 m12,76 m235,66 m2
12,94 m2
16,81 m22kitchenstorageoffice
office
office
office
office
office
storagestorage
officeoffice office office
office
storage storage
stairs
-
GSPublisherEngine 0.0.100.100
1st VERSION 2nd VERSION
3rd VERSION
-
GSPublisherEngine 0.0.100.100
2009 (XXL Architect Ltd)
XXL Architect Ltd were commissionedto work on several car
showrooms forGeneral Motors.This particular project is for an
Opel-Chevrolet dealership in Perm, Russia. Iwas tasked to create a
functionalspace plan with 3D visualization.On this project I was
working as asubcontract architect to the consultantarchitect of
General Motors.www.xxlarchitect.hu
General Motors, Opel-Chevrolet car showroom, Perm, Russia
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
201
ALL CONSTRUCTIONS SHALL BE IN ACCORDANCEWITH THESE PLANS.
- - T
SECTION A
S H E E T
KONSTRUMA Mrnki Iroda Ltd. 1078 Budapest, Murnyi u. 1. II.em.
7-8G E N E R A L P L A N N E R S / A R C H I T E C T U R E
P R O J E C T
G E N E R A L N O T E S
ID:Title:
Type:
Planners:
Date:
Investor:
North:
Note:
Executive planner:
Managing Director: Dr. Olh M ZoltnTel.: +36-1-413-38-81
Fax:+36-1-413-38-90Web: www.konstruma.hu E-mail:
[email protected]
P L A N N E R S
Project:
Printed: 17 October 2007
CORNEL HOTEL
Budapest,VII. Wesselnyi u. 4.Site:
34227Address:
CONSTRUCTION DOCUMENTS
0566WESS KKT
Office manager:
Structure:
Mechanics:
Electricity:denburger Mrnki Iroda Ltd.Dezs Hensler (ST 1-08
0272)Imre Ivanits
Klmn s TrsaZsolt KlmnKSZ-G-1 01 6782
Somogyi Ltd.Gbor Somogyi (SZV-01-0264)
CORNEL HOTEL
0,00 = ground floor
4 October 2007
Dr. Olh M. Zoltn 1 01-3029/05Imre Sebestyn
Judit Viezner, gnes Darnyi,Zsolt Kdr, Zsolt Szab, gnes
Pozsr,Zsfia Anna Horvth, Imre Ivanits
EPI
EPI-2011:50
Interior:Artonic Ltd.Csaba Orbn
Scale:
Templeview Hotel Ltd.1036 Budapest Bcsi t 52.I.1.
3.38
622.
2065
351,
4515
3.18
15
-4.00
-3.20
0.00
+2.85
+3.20
+5.40
+6.00
+6.35
2.85
352.
0080
951.
85
5.80 15 1.20 96 4.09 20 1.18 13 1.40 20 28 16 1.08 13 1.23
2020
16 1.70 13 1.44 2020
20 1.60 13 1.66 61 3.68 50 6.96 45
6.02 1.15 1.01 2.84 5 1.20 20 1.20 10 1.41 2020
16 1.12 13 1.27 2020
16 1.64 13 1.51 2020
20 1.45 10 1.85 15 4.64 10 6.85 45
0.00
+2.85
+3.20
+5.40
+6.00
2.85
352.
2060
-3.80
0.00
+2.20
+2.85
+3.20
+5.40
+6.00
0.00
+2.20
+2.85
+3.20
+5.40
+6.00
183
5 2
2.40
4535
2.20
60
2.85
352.
8035
1.05 6.07 1.05 4.03 20 1.32 10 2.90 10 95 15 5.60 15 2.36 95
351.
903.
504.
40
2.40
4528
72.
755
2510
0.00
+2.20
+2.85
+3.20
+5.40
+6.00
0.00
+2.40
+2.85
+3.20
+5.40
+6.00
-0.30
+5.61
+7.25
4.00
3.20
3.15
5218
3 7
5218 3
52
60
305.
2437
1.64
-1.90
+1.60
-3.80
-3.20
parapet(0,75 hrs)
foiled glass new r.c. slab existing r.c. slabnew r.c. slab new
r.c. slabexisting r.c. slab
liftsee on lift plan
existing "I" beams
existing "I" beams
fire stop cladding(1,5 hrs)
fire stop cladding(1,5 hrs)
fire stop cladding(1,5 hrs)
fire stop cladding(1,5 hrs)
fire stop cladding(1,5 hrs)
fire stop cladding(1,5 hrs)
new r.c. slab new r.c. slab
brick lintel 38 cm2 lyr plasterboard box with
thermal insulation
Ground Floor
Basement
1st Floor
2nd floor
Ground Floor
Basement
1st Floor
2nd Floor
VENT
ILATI
ONCH
ANNE
L
Room
Entrance
Corridor
Lobby
StairsEntrance Shower Eltr Shower Shower
Storage Corridor
Eltr Frd EltrFrd Frd Eltr
4.
1.
2.
3.
2.5.
1.
5.
4.
jonnan kialaktott vb lpcsld. lpcsterv
5.3.
Corridor
1.
next
build
ing
Corridor
Electrical roomBoiler room
Ladies' toilet
Disab.ToiletCorridor
not planning area
6.6.
Mechanicalarea Mechanicalarea
VENT
ILATI
ONCH
ANNE
L
Ladies' toilet
not planning area
Entrance
-4.15
-3.80
-1.20
-0.30
0.00
+2.20
+2.85
+3.20
+5.40
+6.00
2.60
585
302.
8535
2.20
60
422.
2065
352.
2060
302.
2065
352.
2060
302.
2065
352.
2060
2.85
2015
2.75
526
92.
2065
352.
2060
353.
203.
15
2.60
9030
2.20
6535
2.20
60
15 5.00 15
2.94
15
2740
563.
09
10 1.17 1.30 1.30 1.32 10
1625
2525
30 30 30 30
1.51
+22.58
+24.41
+31.78
2.33
Elasticacoustical insulant
Acousticalwall, plasterboard
R.C. joist
PADLSTR Loft
tetre val feljuts biztostott,kmnyseprjrda van a tetn
VENTILLATION
existing wall
released wall
new brick wall
new r.c. structure
new partitional wall
LEGEND :
existing r.c. slab
GSPublisherEngine 0.0.100.100
102
ALL CONSTRUCTIONS SHALL BE IN ACCORDANCEWITH THESE PLANS.
- - T
GROUND FLOOR PLAN
S H E E T
KONSTRUMA Mrnki Iroda Ltd. 1078 Budapest, Murnyi u. 1. II.em.
7-8G E N E R A L P L A N N E R S / A R C H I T E C T U R E
P R O J E C T
G E N E R A L N O T E S
ID:Title:
Type:
Planners:
Date:
Investor:
North:
Note:
Executive planner:
Managing Director: Dr. Olh M ZoltnTel.: +36-1-413-38-81
Fax:+36-1-413-38-90Web: www.konstruma.hu E-mail:
[email protected]
P L A N N E R S
Project:
Printed: 17 October 2007
CORNEL HOTEL
Budapest,VII. Wesselnyi u. 4.Site:
34227Address:
CONSTRUCTION DOCUMENTS
0566WESS KKT
Office manager:
Structure:
Mechanics:
Electricity:denburger Mrnki Iroda Ltd.Dezs Hensler (ST 1-08
0272)Imre Ivanits
Klmn s TrsaZsolt KlmnKSZ-G-1 01 6782
Somogyi Ltd.Gbor Somogyi (SZV-01-0264)
CORNEL HOTEL
0,00 = ground floor
4 October 2007
Dr. Olh M. Zoltn 1 01-3029/05Imre Sebestyn
Judit Viezner, gnes Darnyi,Zsolt Kdr, Zsolt Szab, gnes
Pozsr,Zsfia Anna Horvth, Imre Ivanits
EPI
EPI-1021:50
Interior:Artonic Ltd.Csaba Orbn
Scale:
Templeview Hotel Ltd.1036 Budapest Bcsi t 52.I.1.
240210
B23x
21251125
B13
T30 100
2125B13
T30
2125
100
0,00
-0,32
-0,15
+1,50
0,00
-0,25
+3,20
+0,00
-0,15
+0,00
0,00
+1,60
-0,16
+0,00
-0,30
-0,16
2.3
emergency exit
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
emergency exit
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
C
D D
B A
C
B A
RECEPTION -BAR
Service lift
E
E
B24
2125
100
B13
T30
2125
100B13
T30
2125
100
B06752125
B171125
2125
B20875
2125
L4
210
180
B16
75212
5
B1675
2125
B16
212575
B17
1125
2125
B1675
2125
B06752125
B06752125
B25
100212
5
L3
90
210
B06752125
B21
100212
5
B06752125
B0675
2125
B16
2125
75
B16
2125
75
B1675
2125
B1675
2125
B16
212575
B06
212575
B25
100212
5
B16
212575
B20x
875
2125
B0675
2125B06
212575
B16
212575
B09
875
2125
B22
T30
2125
875
B211002125
B06
212575
B22875
2125
B25 2125100
B29
T=30
875
2125
B23
1125
2125
B27x
2125112,5
B14
T30
1002125
B14
T30
1002125
B14
T30
2125
100
B14
T30
1002125
H05
pm 1
10
165300
H27
240130
H04
pm 110
165
130
H04
pm 110
165
130
H04
pm 110
165
130
H06
pm 110
165
210
H06
pm 110
165
210
270120
140270
180
75
H11
2,85
+40+
(200
)26
5
H11
2,85
+40+
(200
)26
5
H14/b
285+
40+2
0026
5
H14/a
285+
40+2
0026
5
H13
285+
40+2
0021
5
H13
285+
40+2
0021
5
H13
285+
40+2
0021
5
H12
285+
40+2
0026
5
H20
285+
40+(
200)
325
H10
pm110
120
105
H15/b
285+
40+2
0026
5
H15/a
285+
40+2
0026
5
H04
pm 110
130
165
H24
pm 1
10
165135
H04
pm 110
130
165
H04
pm 110
130
165
H04
pm 110
130
165
H04
pm 110
130
165
H04
pm 110
130
165
H04
pm 110
130
165
120
270
H16265
285+40+200
H11265
2,85+40+(200)
H17/a
190285+40+(200)
H17/a
190285+40+(200)
H17/b
190285+40+(200)
H17/a
190285+40+(200)
H18350
285+40+(200)
H21190
285+40+(200)
H24
pm 1
10
165135
H03
270140
B27
T30
2125
112,
5
B14
T30
2125
100
H08
pm 110
105190
H09
pm 110
55105
L3
21090
B14
T30
2125
100
B14
T30
2125
100 10
862.
6715
1.20
151.
1015
1.81
155
2.91
515
53.
4615
53.
7961
3.67
611.
5110
1.99
3889
2.503.68 10
85 8.28 90
81 16.11 14.46
81 16.11 81 5.30 1.12 6.28 95
1.82
512
5
80 3.41125 1.90
945 1.205 15 80 104.03 64
3.0752.88 1.20
154.925
1.055
1.20
3.50 155 3.435 155 3.60 155 3.14 155 5.14 10
3.43
125
811.
3110
1.52
155
1.78
1.00 8.13 90 1.49 125 2.015 195 20 195 1.21 125 1.315155
3.835 195 20 195 1.39 125 1.38 30 1.33 125 1.20 195 20
1.955
2.0112
1.275
2.455
121.22
52.50
512
1.851.96
382.15
1.4315
2.6010
1.555
1.2020
1.10
125
1.845
1.705
125
1.635
155
1.6612
51.28
1.8110
101.22
101.17
101.02
101.67
10
1.755 10 1.825
4.93
1.85 3.08
108575
2.30
1.40
26
10 20 195 1.265 38
1.02
1568
15
1.49 125 2.015 155 1.645 125 1.315 155 1.51 35 2.19 155 1.61 125
1.38 30 1.33 125 1.595 80 1.465 20 1.20
2.09 125
125
9015
70
10857515
125
1.265
195
2015
51.63
512
51.51
519
5
125
1.81
1.4510
2010
75
1.18
1.90125
3.89
1.16
1.20
1557
44
15 51 1538 4.97 81
1.215
6815
9012
5
10 20 15 1.175 38
101.
535
195
15
101.
555
195
1.85
125
1.73
81 2.09 125 1.2981 2.215 1.29
4.13
1
3.43
2.05
5
1.20 15 925 10
85 2.47 20 3.59 20 1.82 90 3.625 155 3.085 155 1.51 35 2.37 155
2.935 30 3.05 35
1.805125
1057
1580
155
9015
715
15
1.95
2.80
1.29 15
1.02
582
5
1.4378
2.041.49
1.04
59 54
195 205
1.025 3.905
108575
58
58
195
2019
5
1.445
125
101.41
519
520
155
581.
275
581.
37
551.
30
1.63
50
108575
6060
551.
28
551.
30
5065
55
195 205
735
1.22
2.755
1.14
65
1,20
2.81
5
1.03581.
465
3.61 5.595 3.76 4.79 4.95 3.28 3.30 4.92 4.53 4.53 5.69
3.205
2.285 2.65 2.945 2.65 815 3.235 1.85 2.65 2.55 2.15 1.13 2.15
1.15 2.15 2.52 2.65 1.88 2.65 1.88 2.65 3.04 2.65 1.8895 9.58 81
3.425 965 11.815 38 3.48 38 4.50 38 4.87 38 4.97 64 4.635
95 9.58 81 3.425 965 8.05 12 3.645 38 3.48 38 4.50 38 4.87 38
4.97 64 4.635
20.44 11.105 14.395 6.215
52.16
7.26
7.26
7.26
3.045
5.133.32
3.044.48
4.423.13
3.795
3.25
1.722.65
2.851.90
1.421.90
1.141.90
1.783.50
1.721.90
1.231.90
1.522.65
1.925
16.875
38
15.615
6013
5
4.9710
1.6710
3.6010
2.6015
3.5838
3.8112
3.7312
3.7312
3.985
6013
5
6.535
27.07
33.605
4.9710
1.6710
3.6010
2.6015
3.5838
3.8112
3.7312
3.7312
3.985
6013
5
1.05 2.035 3.25 1.71 10.08 3.05 3.00 2.91 3.03 2.95 1.13
40 1.30 1.385 3.25 1.11 1.20 8.83 1.30 1.75 1.30 1.70 1.30 1.61
1.30 1.73 1.30 1.65 1.30 48465 1.17 1.45 3.25 1.11 1.20 8.895 1.17
1.88 1.17 1.83 1.17 1.74 1.17 1.86 1.17 1.78 1.17 545
95 6.50 80 2.28 81 3.39 85 2.47 20 3.59 20 1.82 90 8.53 35 5.46
30 3.05 8095 6.50 80 2.28 81 3.39 85 2.47 20 3.59 20 1.82 90 3.625
155 3.085 155 1.51 35 2.37 155 2.935 30 3.05 80
7.45 80 3.09 3.25 27.8642.45
3.26
2.27
54.
875
4.44
51.
685
241.
401.
011.
221.
055
1.22
2.76
53.
012.
285
1.30
1.03
5
241.
4094
51.
5077
51.
352.
303.
412.
285
1.30
1.03
5
16.5
4
2.77 4.05 3.25 2.90 2.90 851.785 1.97 2.08 1.97 1.68 1.17 1.73
1.17 1.73 1.17 265
1.72 2.10 1.95 2.10 1.55 1.30 1.60 1.30 1.345 1.56 2016.72
95 9.58 81 3.425 965 8.05 12 3.645 38 3.48 38 4.50 38 4.87 38
4.97 64 4.105
10 20 195 1.28 10
965 3.225 10 1.675 10 2.95 12
1068
151.
20
102.
03
975
6.25
96
975
3.94
2.31
12 1.885 10 1.66 38 2.235 10 1.145 38 1.34 10 3.06 38 3.245 10
1.525 38
3.05
101.
7515
1568
15
551.
30
3.05
101.
7515
10 1.145 38 79 15 40 10
3.05
101.
7515
1568
15
3.07
101.
7315
1.15
4.90
15
1.15
4.90
15
1.15
4.90
15
1.15
4.90
15
964.
7585
963.
0020
1.55
585
1.65 5.26 1.845 5.575 1.93 1.025 10 2.85 75 1.20
9668
1599
512
5
1.95
2.80
1.09
1.21
51.
051.
0535
961.
9512
5
961.
9212
5
151.
2096
6815
962.
045
2.70
585
961.
855
2.90
85
15 17.285 1064 17
1.62
2.27
1520
3744
2.045
2.05
1.15
1.80
1.145
4.095
6.60 10
3.895
10
10
1.02 5
1.05
3.835
1.775
1.84
62 1.28 60
67 1.21
95 2.5010 1.78 10
1.80 955
1.32
49 1.57 1.37
10 4.375
2.01 10 9753.08
5
2.05
935
3.614.85
6.301.50
2.381.50
10
10
21.08
101.12
955.34
3.632.58
1.8551.365
7661
5
20 195 1.695 125
125 1.545 195 20 195 1.515 125
125 1.46 195 21
1.525 125 1.79 155 1.705 125 1.775 155 3.14 155 1.825 801.535
1.90 155 1.83 1.775 155 3.14 155
1.14
548
125
1.61
5
9015
685
4.55
4.56
125 1.855 80
1.17
548
5
5.085
2.055
97
2.09
2.455
2.39
12.48
81
4.49
151.20
70
151.20
70
2.11 951.20 15
205
195
1.455
102.01
121.27
510
1.5319
520
195
235
121.12
510
2.505
121.85
1020
195
1.465
3840
519
51.45
101.43
621.33
5
4.93
3.905
621.83
512
605
62
3.905
1.025 3.905
1.025 3.905
108575
621.53
3852
1.44
8111
.96
85
815.
285
655
3.00
513
.62
1.09
6.75
85 1.70 2.27 2.49 1.82
1.70
1.35
1.70
85
incoming fresh air
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m ceramic claddingup to 2,20 m
ceramic tilesup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
Fire
plug
Fireplug
F 11-3Shower
ceramic floor2.83 m2
F 12-2Entrance
fitted carpet3.94 m2
F 12-3Shower
ceramic floor2.90 m2
F04Waste Storage
ceramic floor2.17 m2
F 21-2Entrance
fitted carpet2.58 m2
F 13-2Entrance
fitted carpet3.54 m2
F23Corridor
fitted carpet20.74 m2
F10Corridor
fitted carpet25.30 m2
F01Entrancegres floor5.62 m2
F 36Storage
ceramic floor1.79 m2
F02Hall
gres floor80.53 m2
F14Corridor
fitted carpet17.25 m2
F 11-2Entrance
fitted carpet2.27 m2
F03Lobby
gres floor34.42 m2
F 19-3Shower
ceramic tiles2.84 m2
F 13-3Shower
ceramic floor2.82 m2
F 19-2Entrance
fitted carpet2.20 m2
F 26-1Disabled Room
fitted carpet11.39 m2
F 11-1Room
fitted carpet9.82 m2
F 12-1Room
fitted carpet11.28 m2
F 13-1Room
fitted carpet13.59 m2
F 27-3Shower
ceramic floor2.64 m2
F 22-1Room
fitted carpet12.01 m2 F 21-1
Roomfitted carpet
8.54 m2
F 20-1Room
fitted carpet8.95 m2
F 24-1Room
fitted carpet8.83 m2
F 28-1Room
fitted carpet10.16 m2
F 20-3Shower
ceramic tiles2.87 m2
F 25-3Shower
ceramic floor2.91 m2 F 24-3
Showerceramic floor
2.43 m2
F 27-1Room
fitted carpet8.64 m2
F 32-1Shop
ceramic floor15.49 m2
F 30-1Shop
ceramic floor20.47 m2
F 32-2Toilet
ceramic floor2.58 m2
F 29-2Toilet
ceramic floor2.15 m2
F 25-2Entrance
fitted carpet3.74 m2
F05Service
ceramic floor9.68 m2
F 25-1Room
fitted carpet7.97 m2
F 28-3Shower
ceramic floor3.68 m2
F09Waste stoageceramic floor
2.30 m2
F 28-2Entrance
fitted carpet3.93 m2 F 27-2Entrance
fitted carpet3.48 m2
F 22-2Entrance
fitted carpet2.60 m2
F 21-3Shower
ceramic tiles2.79 m2
F 19-1Room
fitted carpet12.40 m2
F 33-1Shop
ceramic floor48.29 m2
F 33-2Toilet
ceramic floor3.08 m2
F 20-2Entrance
fitted carpet3.57 m2
F17Linen
ceramic floor4.82 m2
F 41Stairs and Lift
gres floor16.81 m2
F18Corridor
fitted carpet19.37 m2
F 39Office
fitted carpet13.19 m2
F 37-1Shop
ceramic floor16.60 m2
F 35-1Shop
ceramic floor18.16 m2
F 34-2Toilet
ceramic floor1.23 m2
F 35-2Toilet
ceramic floor1.24 m2
F 36-2Toilet
ceramic floor1.25 m2
F 37-2Toilet
ceramic floor1.30 m2
F 34-1Shop
ceramic floor16.18 m2
F 36-1Shop
ceramic floor17.91 m2
F 38-2Toilet
ceramic floor1.24 m2
F 38-1Shop
ceramic floor18.67 m2
F15Cleaning storage
ceramic floor5.79 m2
F 43Smoking Room
ceramic floor5.04 m2
F42Disabled Toilet
ceramic floor3.85 m2
F08Corridor
ceramic floor5.16 m2
F 40Storage
ceramic floor5.52 m2
F 26-3Disabled Shower
ceramic tiles4.28 m2
F34Relaxing
ceramic floor2.49 m2
F 31-2Toilet
ceramic floor1.78 m2
F 30-2Toilet
ceramic floor1.74 m2
F 31-1Shop
ceramic floor15.63 m2
F 29-1Shop
ceramic floor21.98 m2
F 24-2Entrance
fitted carpet2.46 m2
F16Service
ceramic floor7.20 m2
F 22-3Shower
ceramic floor3.40 m2
F 26-2Entrance
fitted carpet3.79 m2
existing wall
released wall
new brick wall
new r.c. structure
LEGEND :
existing r.c. slab
new partitional wall
Hotel CORNER refurbishment, Wesselenyi St., Budapest, Hungary
2007 (Konstruma Ltd)
At Konstruma Ltd, I was working asa member of a team of
20architects. At that time I learnt towork collectively within a
teamenvironment.My first project at Konstruma wason a period hotel
refurbishment.The period building is more than100 years old. The
project was achange of use from sublet officespace to a premium
hotel withparticular attention being paid tothe interior of the
basement andthe ground and first floors. Toachieve our design aims
we had tomake structural changes to thebuilding.My task was
surveying on site,creating execution designdocumentation and
detailpackages.The project overall cost of theproject was app. 14M
GBPwww.konstruma.hu
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
-0,25
+0,00
0,00
+1,60
-0,30
emergency exit
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
ceramic claddingup to 2,20 m
RECEPTION -BAR
Service lift
E B16
75212
5
B17
1125
2125
B25
100212
5
B21
100212
5
B25
100212
5
B16
212575
87212
B22
T30
2125
875
B211002125
B22875
2125
B25 2125100
B23
1125
2125
B14
T30
1002125
T30
2125
100
H04
pm 110
130
165
H16265
285+40+200
H17/b
190285+40+(200)
H21190
285+40+(200)
H24
pm 1
10
165135
H03
270140
862.
6715
1.20
151.
1015
1.81
155
2.91
515
5
2.503.68 10
80 3.41125 1.90
945 1.205 15 80 104.03 64
1.055
1.201.33 12
5 1.20 195 20
152.60
10
1.555
1.2020
1.10
155
1.6612
51.28
1.8110
101.22
101.17
101.02
101.67
10
1.755 10 1.825
4.93
1.85 3.08
2.30
1.40
26
1.33 125 1.595 80 1.465 20 1.20
125
1.265
195
2015
5
1.4510
2010
75
1.18
1.90125
1.215
6815
9012
5
3.05 35
101.41
519
520
155
581.
275
5065
55
2.755
1.14
65
1,20
2.81
5
1.03
4.9710
1.6710
3.6010
2.6015
1.13
1.30 481.17 545
3.05 803.05 80
3.26
2.27
5
241.
401.
011.
221.
055
241.
4094
51.
5077
5
3.835
1.775
1.84
62 1.28 60
67 1.21
95 2.5010 1.78 10
1.80 955
1.32
49 1.57 1.37
10 4.375
2.01 10 9753.08
5
2.05
935
3.61
10
ceramic tilesup to 2,20 m
ceramic claddingup to 2,20 m
F 11-3Shower
ceramic floor2.83 m2
3.94 m
F04Waste Storage
ceramic floor2.17 m2
F 36Storage
ceramic floor1.79 m2
F02Hall
gres floor80.53 m2
F 11-2Entrance
fitted carpet2.27 m2
F 11-1Room
fitted carpet9.82 m2
F 24-1Room
fitted carpet8.83 m2
F 24-3Shower
ceramic floor2.43 m2
F05Service
ceramic floor9.68 m2
F09Waste stoageceramic floor
2.30 m2
F 41Stairs and Lift
gres floor16.81 m2
F 39Office
fitted carpet13.19 m2
F 43Smoking Room
ceramic floor5.04 m2
F42Disabled Toilet
ceramic floor3.85 m2
F08Corridor
ceramic floor5.16 m2
F 40Storage
ceramic floor5.52 m2
F 24-2Entrance
fitted carpet2.46 m2
proposed ground floor plan scale 1:50@A3
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
-4.00
-3.20
0.00
+2.85
+3.20
+5.40
+6.00
+6.35
2.85
352.
0080
951.
855.80 15 1.20 96 4.09 20 1.185 125 1.405 195
275155 1.08
6.02 1.15 1.01 2.84 5 1.20 20 1.20 10 1.415 19520
155 1.12
0.00
+2.85
+3.20
+5.40
+6.00
2.85
352.
2060
183
5 2
2.40
4535
2.20
60
2.85
352.
8035
1.05 6.07 1.05 4.025 20 1.32 10 2.90
351.
903.
505
4.40
2.40
4528
72.
755
255
95
0.00
+2.40
+2.85
+3.20
+5.40
+6.00
-0.30
+5.61
4.00
3.20
3.15
5218 3
52
60
305.
2437
1.64
-1.90
+1.60
-3.80
parapet(0,75 hrs)
foiled glass new r.c. slab
liftsee: lift plan
existing "I" beams
existing "I" beams
fire stop cladding(1,5 hrs)
fire stop cladding(1,5 hrs)
new r.c. slab
brick lintel38 cm
2 lyr plasterboard box withthermal insulation
Ground Floor
Basement
1st Floor
2nd floor
Room
Entrance
Corridor
Lobby
StairsEntrance
2.
3. 5.new stairs, reinforced concretesee: stairs plan
1.
Corridor
Disab.ToiletCorridor
not planning area
6.
Mechanicalarea
Ladies' toilet
Entrance
-4.15
-3.80
-1.20
-0.30
0.00
+2.20
+2.85
+3.20
+5.40
+6.00
2.60
585
302.
8535
2.20
60
proposed section A scale 1:50@A3
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
30
35 15 485
210
3
1215
3
1515
60
1530
15
125 75
62
42
25
ADDITIONAL WALL
TIMBER SKIRTING3x3 cm
FIXED WING
DISMANTLED PARAPET
GRILLE FORVENTILATION WELL
FROST-PROOFLIMESTONE STAIRS
80/145
80/150
80/70
fldszint
2 cm floor tile + adhesive4 cm cement screed
2 cm parafoam insulation6 cm concrete slab
existing fillingexisting arch
GSPublisherEngine 0.0.100.100
3
1515
175 35
30
2 3015
3015
1530
15
228
123
123
166
24
2FROST-PROOFLIMESTONE STAIRS
DISMANTLED PARAPET
OPENING WING
80/70
80/145
80/150
2 cm floor tile + adhesive4 cm cement screed
2 cm parafoam insulation6 cm concrete slab
existing fillingexisting archground floor
detials scale 1:10@A3
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
912
7538
25
6537
529
319
75
575
3325 1075
DOUBLE GLAZING (4-16-4 MM)
6,5 CM x 15 CMREVEAL
PLASTERBOARDCOATING
BEAD 3x10 CM
PELMETPB.PROFIL CD 60x27PB.PROFIL CD 60x27PB.PROFIL CD 60x27
PLASTERBOARDCOATING
PLASTERBOARD FIXED TOTHE EXISTING STRUCTURE
BEAD
PB.P
ROFI
L CD
60x2
7
L40x40x2 METAL FRAME OF ANGLE
Aereco EHAweather board
with acoustical protectionAereco EHA 755 AIR VENTILATION
90/80
90/80
ROOM
265 525 49
375 15 5 44
MEGLV ZRFDM
38 CM BRICK ARCH
GSPublisherEngine 0.0.100.100
10 15 16
328
8
1120
159
531
775
WOODEN MOULDING
DISMANDLED WALL SECTION
SHUTTER CASING
Aereco EHA 755 AIR VENTILLATION
Aereco EHAweather board
with acoustical protection
DISMANDLED WALL SECTION
DOUBLE GLAZING (4-16-4 MM)
190/80
80/110
1ST FLOOR
'HERAKLITH'THERMAL INSULATIONIN FRONT OF THE SLAB
detials scale 1:10@A3
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
625 26
72 85 14
36
285
432
5
6125
2030
7523
20
24
4 2R 4
TIMBER SKIRTING3x3 cm
DISMANTLED PARAPETSTONE STATUE
1 COAT WATERPROOFING
SHEET STEEL CLADDINGWEATHER BOARD2x3,5 cm
STON
EWOR
K
80/80 STEEL BRACKET
STON
EWOR
K
'HERAKLITH' THERMAL INSULATION
RECT
ANGU
LAR
HOLL
OW S
ECTI
ON16
0x80
MM
SQAR
E HO
LLOW
SEC
TION
100x
100 M
M
ENTRANCE HORISONTAL ENCLOSURE
TIMBER SKIRTING3x3 cm
'HERAKLITH'THERMAL ISULATION
DISMANTLED STRUCTURE
MAIN ENTRANCE OPENING WING
20/20 STONE FRAME
4 CM FLUTED SHEET STRUCTURE
90/80
190/80
30/220
6275
STEEL FIXING OF CANOPY
20/20
GSPublisherEngine 0.0.100.100
2,65
65 2,51 65
2,65
925
2815
49
1,30 27 81
2 2,61 2
9 1,35 9
2 5 1,53 5 9 5 89 5 2
9 71 9
PARAPET WALLTH=0,75 hrs
PARAPET WALLTH=0,75 hrs
80/9080/90
80/9080/90
80/9080/90
130/40
50/90
40/9080/90
80/90
detials scale 1:10@A3
-
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
-0.30+0.04
+0.75
+3.54
+6.17
+7,23
+9,54
+10.74
+11,60
+13,94
+15,90
+18,24
+19.29
+20,15
+22,51
+24,50
+31,68
+32,72
-0.30+0.04
+0.75
+6.17
+7,23
+9,54
+10.74
+11,60
+13,94
+15,90
+18,24
+19.29
+20,15
+22,51
+24,50
+31,68
+32,72
-0.30+0.04
+0.75
+6.17
+7,23
+9,54
+10.74
+11,60
+13,94
+15,90
+18,24
+19.29
+20,15
+22,51
+24,50
+31,68
+32,72
-0.30+0.04
+0.75
+6.17
+7,23
+9,54
+10.74
+11,60
+13,94
+15,90
+18,24
+19.29
+20,15
+22,51
+24,50
+31,68
+32,72
-0.30+0.04
+0.75
+6.17
+7,23
+9,54
+10.74
+11,60
+13,94
+15,90
+18,24
+19.29
+20,15
+22,51
+24,50
+31,68
+32,72
K4
L8
K4K4K4
K4K4K4K5K5
L8 L8 L8 L8L8 L8
S H O P
1.
2.
3.
4.
5.
6.
7.
H19 H16 H21H17/b H17/a
H18
H17/aH17/a H11
S H O P S H O P S H O P S H O P S H O P
GSPublisherEngine 0.0.100.100
+3.51
-0.32
+5.20
+5.82
-0.300.00
+0.75
-0.30
+0.75
+5.24
-0.32
0.00
+6.13
+7,23
+9,54
+10.71
+11,60
+13,94
+15,90
+18,24
+19.26
+20,15
+22,51
+24,50
+31,68
+32,72
-0.32
0.00
+6.13
+7,23
+9,54
+10.71
+11,60
+13,94
+15,90
+18,24
+19.26
+20,15
+22,51
+24,50
+31,68
+32,72
K5K5K4K4 K4 K4 K4 K4 K4 K4 K4 K2 K2
K3
K1
K3
K1
K4
L8 L8L8 L8 L8 L8 L8 L8 L8 L8 L8
2.
3.
1.
4.
5.
6.
7.S H O P
6.
2.
3.
1.
H14/aH14/b H19H11H11H13H13H13
H20
H15/bH19
H15/a H12
S H O P S H O P S H O P S H O P
proposed elevations scale 1:200@A3
-
GSPublisherEngine 0.0.100.100
Whilst at Konstruma Ltd, I also workedon several Tesco
hypermarket projects.I was tasked with tender delivery,execution of
design documentation(various detail drawings) along with
fireprotection documentation. To executedelivery of this
documentation packageit was necessary to cooperate andengage with
structural, mechanical andelectrical engineers so I was
heavilyinvolved in project meetings with theseprofessional
colleagues.The overall project cost was app.
54MGBPwww.konstruma.hu
2007 (Konstruma Ltd)TESCO Hipermarket, Sifok, Hungary
-
GSPublisherEngine 0.0.100.100
2004 (Novak Office)
This is a 4 storey residentialdevelopment with mansard roofwith
the building located close tocentre of Szeged in Hungary.My
specific role was in the draftingand delivery of the
completedplanning application package.At this time I was learning
thefundamentals of architecture whilstworking under a supervision
andguidance of a senior architect.The overall project cost
fordelivery was app. 27M GBP
Residential House (4 storey + 1 mansard), Szeged, Hajnoczy St.,
Hungary
-
GSPublisherEngine 0.0.100.100
30
1,0010
1,3010
2,25
30
10
2,80
30
6,30
30
2,70
30
2,70
0,30
4,40
30
9,55
8,35
1,65
1,35
90
90
2,15
21,35
1,60
4,00
0,00
+0,45
+0,10
+0,45
Kitchen
2
4,30 m
granite
Passage
2
1,60 m
granite
Passage
2
Living room
granite
18,94 m
2
1,49 mgranite
Pantry
2
Dining room
granite
12,15 m2
Room
parquet
10,15 m2
granite
7,54 m2
granite
Bathroom
granite
5,28 m2
Room
parquet
12,32 m2
Terrace
granite
22,46 m2
Bathroom
3,84 m2
2,63 m 2
Garage
Toilet
1,65 m
31,02 m
A
A
granite
granite
granite
2
3,80
2,40
EntranceCONFIDENTIALITY: Please be aware that theprojects shown
in this portfolio are confidential innature and are not to be used
or shown to any thirdparty. The project information contained in
thisdocument are for illustrative purposes only, they arenot
complete examples and present a snap-shot ofmy knowledge and
experience in architecture only.