Sommer 2008Workshop WISH
The workshop is organized by the Accademia di Architettura di Mendrisio, by the professor Mar-tino Pedrozzi and his assistant Max Otto Krausbeck. Only 5 stu-dents from Mendrisio and 5 from the university of the guest city are involved for a 5 weeks intensive workshop.The issue of the workshop is making an analysis on cities all over the world between 1 and 3 million inhabitants, in coun-tries with growing economies. It is exstimated that nearly 70% of the world population lives in this kind of cities, the most of them are unknown to mass media. The problem of social appartaments is typical of this kind of cities: the demand is quite high but is not given to it the right attention, and the design is poor quality.
Amman is the capital of Jordan, a caotic and overcrowded city, like all the cities in middle east, with a latest history, as its development started from XX sec. To increase the problems of Amman, a mas-sive immigration from neighbor-ing countries, like Palestine/Isra-el, Iraq, Saudi Arabia, and even Afghanistan is to add. In the last three years King Abdullah II pro-vided to build 500.000 new ac-comodations for low incoming person. But the realization is in huge late and without any control
My site is in Ein-al-Basha, in the north suburbs of Amman, close to the highway to Syria and to the biggest palestinian refugee camp of Jordan, al-Barqa. The site is long and narrow, along a new street that will serve two new residential quarters, one already in construction. The sorround is massively affected by the so-called sprawl.
The settlements are spontaneus, like islands in the landscape, and then somehow and without any previous urban strategy joined toghether.
My proposal is to merge all the small parcels along the main street into a bigger parcel, in-creasing the number of apparta-mentents and designing a proper public space. Building along the main street is giving a strong identity to the site, and it will be able to be read after years. I developed small units, with au-tonomous construction, in which there are 2 appartaments, each with its own private access. The types are 1/2/3 bedrooms, flat or duplex. The ground floor is thought as a soft elements that interacts with the slope: here there is the space for shops, small workshop, garage ect.
The units are set as a „greca“, that define two kind of spaces, one more generous to the street, with public and semiprivate gar-dens and one more domestic to the future quarters. Each apar-tament has double facing, to ensure natural ventilation. The concept for the internal orga-nization of appartaments, is to have service blocks and an open space living room, that diagonals perspectives to seems bigger, and is also easily divisible if it is needed. The bed rooms have same square meters, to give the freedom to the inhabitants to chose how to live their house.The complex looks shaped and not rigid: in this way is given the possibility to transform it, adding floors or volumes, without loos-ing the main idea of the design. The existing intersections are more defined, giving a hierarchy readable by people.
SITE FOTO
Architektin bei Bosshard Vaquer Architekten, Caruso St.John Architects EUROPAALLEE BAUFELD E, Zürich, 2009-2010
(Projektleiterin Irene Leuthold)Bauprojekt
Baueingabe/BaubewilligungDetailstudie
L
W/T
W/T
L
W/TL
W/T
L
WM/T
L
LWM/T
LWM/T
L
WM/T
RH.10: var.
RH.10: var
RH.10: var.
RH.10: var.
0.0m2
2.48m
E10/E09.OAP4.01Entree
BF: 9.6m2
LRH.10:
Bad
0.00m2
2.48m
E10/E09.OAP4.02BF: 4.1m2
LRH.10:
37.2/33.2m2
3.0m/3.8m
E10/E09.OAP4.03
Essen/Kochen/Wohnen
BF:FF10/9:
K
50.5m2
K
LRH.10:
K
K
FF: 0.0m2BF:
Loggia
10.7m2E10/E09.OAP4.04
Zimmer
11.0/12.3m2
3.0m
E10/E09.OAP4.05BF: 13.2m2
LRH.10:
FF10/9:
12.3/10.0m2
3.00m
E10/E09.OAP4.07Zimmer
BF: 17.5m2
LRH.10:FF10/9:
FF10/9:
FF10/9:
FF10/9:
Reduit
0.00m2
2.48m
E10/E09.OAP4.09BF: 4.0m2
LRH.10:FF10/9:
0.0m2
2.48m
E10/E09.OAP4.08Ankleide
BF: 9.3m2
LRH.10:FF10/9:
E10/E09.WA1.02Reduit
BF: 3.7m2
FF: 0.0m2
+34.06mFB.10:RB.10:
Wohnungstyp AE10/E09.WA13.5 Zimmer 116.9m2BF:
+33.94m
0.0m2FF:9.4m2BF:
LoggiaE10/E09.WA1.04
0.0m2FF:8.5m2BF:
EntreeE10/E09.WA1.01
28.5m2FF:54.1m2BF:
Essen/Kochen/Wohnen
E10/E09.WA1.03
5.1m2FF:13.7m2BF:
ZimmerE10/E09.WA1.05
8.0m2FF:16.7m2BF:
ZimmerE10/E09.WA1.08
0.0m2FF:12.6m2BF:
Bad (BG)E10/E09.WA1.09
0.0m2FF:3.4m2BF:
BadE10/E09.WA1.06
0.0m2FF:23.4m2BF:
0.0m2FF:16.2m2BF:
EntreeE10/E09.WA2.01
8.0m2FF:16.4m2BF:
ZimmerE10/E09.WA2.04
3.6m2FF:13.4m2BF:
ZimmerE10/E09.WA2.05
5.6m2FF:13.5m2BF:
ZimmerE10/E09.WA2.06
0.0m2FF:11.5m2BF:
LoggiaE10/E09.WA2.08
0.0m2FF:12.2m2BF:
Bad (BG)E10/E09.WA2.02
0.00m2FF:3.3m2BF:
BadE10/E09.WC2.10
0.0m2FF:3.8m2BF:
ReduitE10/E09.WA2.09
E10/E09.WA3.01Entree
BF: 15.0m2
FF: 0.0m2
E10/E09.WA3.03Reduit
BF: 3.4m2
FF: 0.0m2E10/E09.WA3.05Loggia
BF: 12.5m2
FF: 0.0m2
E10/E09.WA3.06Zimmer
BF: 13.3m2
FF: 8.0m2
E10/E09.WA3.07Zimmer
BF: 15.8m2
FF: 3.6m2
E10/E09.WA3.10Bad (BG)
BF: 9.8m2
FF: 0.0m2
E10/E09.WA3.09Zimmer
BF: 17.1m2
FF: 5.6m2
E10/E09.WA4.01Entree
BF: 9.2m2
FF: 0.0m2
E10/E09.WA4.02Bad
BF: 3.8m2
FF: 0.0m2
E10/E09.WA4.03Zimmer
BF: 13.3m2
FF: 6.0m2
E10/E09.WA4.06Bad (BG)
BF: 11.4m2
FF: 4.6m2
E10/E09.WA4.05Loggia
BF: 9.5m2
FF: 0.0m2
E10/E09.WA4.07Zimmer
BF: 16.8m2
FF: 8.3m2
2.53m3.00m LRH:RH:+31.06mFB.09:+30.94mRB.09:
Wohnungstyp AE10/E09.WA24.5 Zimmer BF: 135.2m2
2.53m3.00m LRH:RH:
Wohnungstyp AE10/E09.WA34.5 Zimmer BF: 131.8m2
2.53m3.00m LRH:RH:
Wohnungstyp AE10/E09.WA43.5 Zimmer BF: 112.4m2
2.53m3.00m LRH:RH:
RB.10: +33.94m FB.10: +34.06m+31.06mFB.09:+30.94mRB.09:
RB.10: +33.94m FB.10: +34.06m+31.06mFB.09:+30.94mRB.09:
RB.10: +33.94m FB.10: +34.06m+31.06mFB.09:+30.94mRB.09:
Essen/Kochen/Wohnen
BF:FF: 26.7m2
E10/E09.WA2.0749.2m2
Essen/Kochen/Wohnen
BF:FF: 17.7m2
E10/E09.WA3.0447.4m2
E10/E09.WA3.08Ankleide
BF: 6.1m2
FF: 0.0m2
E10/E09.WA3.02Bad
BF: 3.7m2
FF: 0.0m2
AnkleideE10/E09.WA2.03BF: 6.1m2
FF: 0.0m2
Essen/Kochen/Wohnen
BF:FF: 28.3m2
E10/E09.WA4.0446.3m2
E10/E09.WA4.09Reduit
BF: 3.4m2
FF: 0.0m2
AnkleideE10/E09.WA1.07BF: 4.2m2
FF: 0.0m2
AnkleideE10/E09.WA4.08BF: 8.2m2
FF: 0.0m2
+34.56mFB.10:RB.10:
Wohnungstyp APE10/E09.OAP13.5 Zimmer +129.4m2BF:
+34.44m
0.0m2FF:10.8m2BF:
Loggia
Wohnungstyp AP
3.5 Zimmer BF: +120.8m2
E10/E09.SO.8
Wohnungstyp AP
3.5 Zimmer BF: +120.9m2
Wohnungstyp AP
3.5 Zimmer BF: +120.2m2
E10/E09.SO.7
E10/E09.SO.11
RH.09: 3.03m3.15m LRH.09:
+31.06m+30.94mRB.09: FB.09:
+34.56m
E10/E09.OAP2
FB.10:+34.44mRB.10:
RH.09: 3.03m3.15m LRH.09:
+31.06m+30.94mRB.09: FB.09:
+34.56m
E10/E09.OAP3
FB.10:+34.44mRB.10:
RH.09: 3.03m3.15m LRH.09:
+31.06m+30.94mRB.09: FB.09:
+34.56m
E10/E09.OAP4
FB.10:+34.44mRB.10:
RH.09: 3.03m3.15m LRH.09:
+31.06m+30.94mRB.09: FB.09:
0.0m2FF:30.8m2BF:
Vorraum Kern WOE10/E09.012
E10/E09.SW.8
E10/E09.SW.5
E10/
E09.
SW.9
E10/E09.SW.10
E10/E09.SW.6
E10/
E09.
SW.7
Zimmer
40.4/36m2
E10/E09.OAP1.06
Essen/Kochen/Wohnen
BF:E10/E09.OAP1.05
51.6m2
3.0m/3.8mLRH.10:
15.7/14m2
3.00m
E10/E09.OAP1.04Zimmer
BF: 20.2m2
LRH.10:0.0m2
E10/E09.OAP1.02Bad BG
BF:FF10/9:
13.0m2
LRH.10:
0.0m2
E10/E09.OAP1.03Ankleide
BF: 6.5m2
LRH.10:
0.0m2
2.48m
E10/E09.OAP1.01Entree
BF: 15.5m2
LRH.10:
8.0/7.1m2
3.0m
E10/E09.OAP1.07BF: 15.8m2
LRH.10:
Bad
0.00m2
E10/E09.OAP1.08BF: 3.3m2
LRH.10:
Reduit
0.00m2
E10/E09.OAP1.09BF: 3.5m2
LRH.10:
0.0m2
2.48m
E10/E09.OAP2.01Entree
BF: 9.1m2
LRH.10:
Reduit
0.00m2
2.48m
E10/E09.OAP2.03BF: 3.4m2
LRH.10:
37.7/33.7m2
3.0m/3.8m
E10/E09.OAP2.04
Essen/Kochen/Wohnen
BF: 51.2m2
LRH.10:
Zimmer
8.9/9.9m2
3.0m
E10/E09.OAP2.06BF: 14.2m2
LRH.10:
FF: 0.0m2BF:
Loggia
8.6m2
0.0m2
2.48m
E10/E09.OAP2.09Ankleide
BF: 5.1m2
LRH.10:
0.0m2
2.48m
E10/E09.OAP2.08Bad BG
BF: 16.8m2
LRH.10:
8.7/7.8m2
3.00m
E10/E09.OAP2.07Zimmer
BF: 17.0m2
LRH.10:
E10/E09.OAP2.05
0.0m2
2.48m
E10/E09.OAP3.01Entree
BF: 10.9m2
LRH.10:
Reduit
0.00m2
2.48m
E10/E09.OAP3.02BF: 4.4m2
LRH.10:
39/34.8m2
3.0m/3.8m
E10/E09.OAP3.04
Essen/Kochen/Wohnen
BF:FF10/9:
51.7m2
LRH.10:
FF: 0.0m2BF:
Loggia
10.0m2E10/E09.OAP3.05
0.0m2
2.48m
E10/E09.OAP3.09Ankleide
BF: 6.5m2
LRH.10:
7.8/7.0m2
3.00m
E10/E09.OAP3.08Zimmer
BF: 16.0m2
LRH.10:
Zimmer
7.8/7.0m2
3.0m
E10/E09.OAP3.06BF: 13.6m2
LRH.10:FF10/9:
FF10/9:
FF10/9:
FF10/9: FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
FF10/9:
KK
K
LRH.10: var.
var.LRH.10:
LRH.10: var
LRH.10: var.
Schindler 54001000kg _ 13 P
Schindler 5400630kg _ 8 P
E10/E09.004Treppe B/A Kern WW
BF:FF:
9.4m20.0m2
E10/E09.LW.2 F
0.0m23.2m2
FF:BF:
Schleuse Kern WWE10/E09.005
E10/E09.LW.1
0.0m29.4m2
FF:BF:
Treppe A/B Kern WWE10/E09.003
0.0m23.2m2
FF:BF:
Schleuse Kern WWE10/E09.002
E10/
E09.
SW.0
2
E10/
E09.
SW.0
4
WLP
WLP
Schindler 54001000kg _ 13 P
Schindler 5400630kg _ 8 P
E10/E09.LO.4 F
0.0m29.4m2
FF:BF:
Treppe B/A Kern WOE10/E09.015
0.0m23.2m2
FF:BF:
Schleuse Kern WOE10/E09.016
E10/E09.LO.3
E10/
E09.
SO.0
4
0.0m23.2m2
FF:BF:
Schleuse Kern WOE10/E09.013
0.0m29.4m2
FF:BF:
Treppe A/B Kern WOE10/E09.014
E10/
E09.
SO.0
2
Vorraum Kern WWE10/E09.001
2.48m
2.48m
2.48m
F
F
6.8/6.0m2
3.00m
E10/E09.OAP4.06Bad BG
BF: 12.0m2
LRH.10:FF10/9:
E10/E09.SO.6
E10/E09.SO.9
E10/E09.SO.10
Bad
0.00m2
2.48m
E10/E09.OAP2.02BF: 4.0m2
LRH.10:
Bad
0.00m2
2.48m
E10/E09.OAP3.03BF: 3.2m2
LRH.10:
3.4/3.0m2
2.48/3.00m
E10/E09.OAP3.07Bad BG
BF: 14.6m2
LRH.10:FF10/9:
FF10/9:
Mein Verantwortungsbereich umfasste den Entwurf und die Planung der Wohnungen bis hin zum Mst. 1:100, sowie die zugehörige Detailplanung im Mst. 1:20, 1:10 bis hin zu handgezeichneten Details im Mst. 1:1. Diese Detailierung-sarbeit betraf die Bereiche der Loggien, der Badezimmer, der Küchen sowie die Innenseite im Fassadenaufbau.Ausschliesslich war ich bei der Dachterrasse-Gestaltung en-gagiert.
Von August 2009 bis April 2010 war ich als Architektin im Büro Bosshard Vaquer Ar-chitekten tätig. Während dieser Zeit wurde ich damit betraut, innerhalb des zuständigen Projektteams die Baubewilligu-ngsplanung sowie die Baupro-jektphase am Projekt ‘Eu-ropaallee Baufeld E’ in Zürich zum Abschluss zu bringen.
BAUPROJEKT 05 OBERGESCHOSS 1:100 VERKLEINERT
BAUPROJEKT 09-10 OBERGESCHOSS 1:100 VERKLEINERT
E12.WAP1.07E12.WAP2.02
Spie
gels
chrä
nke
100c
mx5
0cm
polie
rte
Mar
mor
plat
ten
bis
OK
205.
0
Spie
gel�
äche
Gip
spla
tte,
zw
eim
al m
iner
alis
ch g
estr
iche
n
Nat
urst
ein
mit
eing
elas
sene
r Bad
ewan
ne
Wan
nenr
andt
herm
osta
t A
xor
Uno
2
Telle
rkop
fbra
use
240m
m A
xor U
no 2
und
Han
dbra
useg
arni
tur A
xor U
no 2
Bode
nabl
auf S
chec
o
Seife
nnis
che
Wan
dklo
sett
Cat
alan
o Ze
ro V
S55
Papi
erha
lter L
ogis
Chr
om
Unt
erpu
tzth
erm
osta
t Axo
r Uno
Nat
urst
ein
mit
eing
elas
sene
n La
vabo
s
polie
rte
Mar
mor
plat
ten
20m
mbi
s O
K 10
5cm
Han
dtuc
hrad
iato
r Zeh
nder
polie
rte
Mar
mor
plat
ten
bis
OK
246.
0
BAUPROJEKT BADEZIMMER TYP “LANDSCAPE” 1:10 VERKLEINERT
Architektin bei Martin Spühler AG, BERGTROTTE OSTERFINGEN, Kanton Schaffausen, 2010-2012
Wettberwerb 1°PreisVorprojekt
BauprojektBaueingabe/Baubewilligung
Ausführungsphase (Projektleiterin Fani Kevrekidou)
Wettbewerb
Wein, Brot und Käse - welch eine poetische Aufgabe für Architekten. Der grossräu-mige Rebberg mit der wun-derbaren Bergtrotte aus dem 16. Jahrhundert führt zu ei-nem grossen Respekt vor diesem Ort.
Die Idee, hier ein Zentrum für den lokalen Wein mit den entsprechenden Eventräu-men zu realisieren, bedeutet eine Verdoppelung der beste-henden Bergtrotte. Um diese als Solitär erhalten zu können und da der Wein auch viel mit Kellerlagerung zu tun hat, fügten wir die erfordelichen Räume unteridisch hinter der Trotte an.
Als sichtbares und erlebbares
neues Element setzen wir auf der Giebelseite der Trotte ein-en Platz ein: zusammen mit der alten Presse bildet dieser das Zentrum der Gesamtan-lage. Hier können Aussenan-lässe mit direkter Beziehung zum Beizli wie auch die An-lieferung von Eventmobilien stattfinden.
Der kompakte rückwärtige Neubau in einer Sichtbet-onkonstruktion entspricht den neuesten energetischen und ökologischen An-forderungen. Im Zirkulations-bereich zwischen Alt- und Neubau entsteht eine Klima-pufferzone.
Martin Spühler
WETTBEWERB, EUROPAALLEE BAUFELD B, ZürichARGE mit Marcello Nasso und Emil Münge
2° Jurytag, letze 12 Projekte
Städtebau
Die 40m hohe Frontscheibe des Gebäudes zum Le Corbusier Platz bildet mit seiner schlank-en Silhouette das Portal in die Europaallee und entwickelt sich mit seinen beiden seitlichen Auskragungen zum Kopf des Gesamtvolumens. Zurückhal-tend aber doch Imperativ lädt das keilförmige Gesamtvolumen in die Europaallee ein. Durch die kontextuelle Übernahme der Traufhöhen des gegenüberlie-gen den Gebäudes, vervollstän-digt das Projekt die Europaallee. Die städtebauliche Verbindung mit den weiteren auf das Per-ron weisende Bauten wird durch den L-förmige Aufbau des Geb-äudes hergestellt.
Architektur
Die aus dem Städtebau re-sultierende Keilform bildet, mit seinen beiden Auskra-gungen, zusammen mit dem Gebäudekopf und dem L-för-migen Aufbau, verschiedene Grundrissatmosphären. Im in-nern des Volumens kommen die Erschliessungsschächte, Funktionschächte und einzelne Nebennutzflächen in drei Mit-telkerne zusammen. Diese drei Mittelkerne unterteilen den Grundriss. Es entsteht eine Allee - und Perronseite, beziehungs-weise eine Front und eine Rück-
seite. Im Erdgeschoss führen drei grössere Öffnungen über die Europaallee zu den Atrien der einzelnen Erschliessungss-chächte. Sämtliche weiteren Flächen im Erdgeschoss und im ersten Obergeschoss sind als Gewerbe, Retail und Gas-troflächen ausgebildet. In den oberen Geschossen sind die an der Fassade liegenden Flächen, als flexible Büroflächen nutzbar. Einzelne grössere Sitzungszim-mer befinden sich innerhalb der Mittelkernzone.
Gebäudehülle
Der Gebäudekörper ist sehr kom-pakt gehalten und erreicht dank einer disziplinierten Ausbildung der Gebäudehülle und wenigen Rücksprüngen ein sehr gutes Oberflächen-Verhältnis. Dank ei-nem optimierten Fensteranteil von ca. 50% an der Fassadenfläche, kann mit sinnvollen Dämmstärken der Minergie P-Standard erreicht werden.
Fensteröffnungen
Alle Büros werden durchwegs über genügend grosse Fensteröff-nungen mit der erneuerbaren En-ergie Tageslicht versorgt. Als ther-mische Speichermasse können die zugänglichen Betondecken aktiviert werden. Der sommerliche Wärmeschutz wird gewährleistet durch aussen liegende Rafflamel-lenstoren, einer variablen und nutzungsabhängigen Beschattung der Tageslicht-Nutzung. Das Ver-bundschutzglas im Aussenbereich zusammen mit der dreifachver-glasung im Innenbereich der Fen-steröffnung gewährleistet sowohl auf Perronseite, als auch auf der Europaalleeseite den notwendigen Schutz vor Lärmimmissionen.
Architektin bei Guignard Saner Architekten, Zürich, 2012-2013WETTBEWERB, WOHNUNGS UND GESCHÄFTSÜBERBAUUNG
MIGROS KREUZPLATZ, ZÜRICH2° Platz
Situation
Die gestellte Wettbewerbsa-ufgabe bietet die interessante Möglichkeit die städtebauliche Situation am Kreuzplatz zu klären. Der Ort ist von sehr un-terschiedlichen Bebauungmus-tern geprägt. Vollständige und fragmentierte Blockrandbebau-ungen stehen im Kontrast zu Villen des Englischviertel oder zu den dörflich anmutenden Kompositionen in Richtung Seefeld. Die verschiedenen Parzellen der Migros wider-spiegeln diese Unterschiede der Massstäblichkeit sehr gut. Die grosse Herausforderung des Wettbewerbs besteht da-rin, die durch das spezielle Raumprogramm der Migros
gegebene Volumenverteilung in die sehr unterschiedlichen Massstäblichkeiten einzubi-eten. Die zweifach geknick-te Hauptfassade schliesst an den Bestand an, übernimmt die Höhe der Arkade und führt das bestehende Vordach als markantes Element weiter. Als Abschluss der Arkadenfassade formuliert die Stirnfassade einen volumetrischen Akzent zur Zollikerstrasse. Die Volum-etrie treppt sich dann in vier Schritten zur Wagnerstrasse hin ab. Mit Gebäudeeinschnit-ten ab dem 2.Obergeschoss versuchen wir auf die unter-schiedliche Kornung zu ant-worten.
Materialisierung und Konstruktion
Abgesehen von den vorhan-denen, konstruktiven Bauteilen des Altbaus bestehen die tra-genden Bauteilen der Migros und Büronutzung des Neubaus in der Fassadenebene und im Inneren aus einem Stützen-raster und aus aussteifende Treppenkernen. Der Raster orientert sich an den gängi-gen Achmassen für Büro- und Gewerbebauten. Die tragenden Stützen sind aus vorfabriezier-ten Elementen gedacht, die aussteifenden Kerne aus Ort-beton. Im Bereich der Wohn-nutzung werden die inneren Stützen durch Backsteinwände ersetzt. Die Materialisierung der Fassade im Bereich des Hauptsraster besteht aus sand-gestrahlten hinterlüfteten Beto-nelemente. Die zwischen dem Hauptraster
vorgeschlagenen kleinformati-gen Platten sind aus derselben Betonmischung gefertig jedoch geschliffen. Diese geschliffenen Kuststeinplatten sind leicht aus der Ebene des Hauptrasters zurückversetzt. An den rück-wärtigen Fassaden wird der Hauptraster unterbrochen, wodurch leichte Irritationen im sonst rigiden Rasters erzeugt werden. Die Fenster der Migros und Gewerbenutzung sind aus eloxiertem Aluminium gefertigt. In den Verkaufsgeschossen können die Fenster von Innen emaliert werden, um das Tag-eslicht auszusperren. Im Bere-ich der Wohnungen schlagen wir Holzmetallfesnter aus elox-iertem Aluminium vor. Die tex-tilen Stoffstoren verleihen dem Haus eine einladende Auss-trahlung.
Architektin bei Boltshauser Architekten, Zürich, 2013-2015GLC FORSCHUGSGEBÄUDE ETH, ZÜRICH
BauprojektphaseBaueingabe
Ausschreibungsphase
Option Fragment Bestand, Foto Georg Aerni
Hofbodenbelag und Erdgeschoss ETA Gebäude mit Option Fragment, 1:100