PORTFOLIO Alexandre BOMPARD Civil Engineer Specialty Architecture
Mar 24, 2016
PORTFOLIO
Alexandre
BOMPARD
Civil Engineer
Specialty Architecture
T R A I N I N G
2010 – 2012 : Saint Luc School of Architecture, Specialty « Building, Development & Architecture »
2007 – 2012 : HEI (High School of Engineering), Specialty « Building, Development & Architecture »
2010 – 2011 : HEI Co-Design, Workshop
W O R K I N G E X P E R I E N C E S
Mai 2012 – November 2012: Assistant Architect – GHD Consulting/ Beijing, China
October 2011 – December 2011: Intern Engineer – Lafarge Cement / Paris (75)
June 2011 – October 2011: Assistant Architect – Carré d’A / Marcq en Barœul (59)
July 2009 – August 2009 : Worker – Chantiers de l’Atlantique / Saint Nazaire (44)
2006 – 2009 : Salt worker – Marais Salants de la Presqu’ile Guérandaise / Guérande (44)
S K I L L S
Languages English(Read, written, speak) Chinese (speak beginner) German (Read, written, speak beginner)
2D AutoCAD, ArchiCAD
3D Sketchup, Rhino, ArchiCAD, Revit Architecture, Maya, 3DS max, AutoCAD
Treatment of images Photoshop CS5, Lumion, 3DS max, InDesign
Office Word, PowerPoint, Excel
C O M P L E M E N T S
Boating Boat license – Spi Ouest France 2010 – Maintenance & restoration – Sailing
Automobile Driving license – 4L Trophy 2009, Ranking120/1050
Auto mechanics(motor & body), preparing « rally »
Arts Trumpet, Bombard, Bagpipes– Orchestra, Military Harmony, Solos, Band
Photography – Drawing
Association Association « Chti’Breizh » (Equipage Spi Ouest France 2010) – President
Association « Les Cheiches Blancs » (Equipage 4L Trophy 2009) – Treasurer, Pilot
Association « Orchestre Intermezzo » (Orchestra HEI) – Vice-president, Treasurer
Scouting (scout & Leader) BAFA (Camp councelor)
Member of the Order of Malta – Private tuition
9. Space / Structure School Project 4
th year
8. Rehabilitation Restaurant Carré d’A
7. Urban Planning Carré d’A
6. Train Station School Project 5
th year
5. Profile of Street Analysis School Project 5
th year
4. Japanese House GHD Consulting
3. Extension of University Campus GHD Consulting
1. Yalong Bay Water Park GHD Consulting
2. Sanya Wetland Park GHD Consulting
Located on the island of Hainan, the project aims to restore the
seal to the site. The creation of the Water Park allows vacationers
to enjoy the climate and idyllic landscapes.
The land becomes a particular issue and the position of the
different buildings and their function is crucial.
Restaurants, museums and shops are the main functions of the
building in this area.
5 1
管理与出入口
Management And Entrance
日间活动区域划分
Daytime Zoning
交通流线
Traffic Organization
娱乐设施
Recreational Facility
夜间区域划分
Night Zoning
建筑面积
Building Area S ANYA WATER PARK 三 亚 亚 龙湾滨海风景区概念规划
J u l y - O c t o b e r 2 0 1 2 : G H D C o n s u l t i n g
P r o j e c t M a n a g e r : M . L i Y i j u n
W A T E R P A R K E N T R A N C E
水上乐园入口平面图
S C E N I C E N T R A N C E A R E A
景区入口区—
1
With an abstract form consists of three peaks, the bridge is a
transition between the park and the mountains.
Consists of a reinforced concrete base and steel structure,
the overall design of the building is simple, modern and with
variations to clear the view. Coexistence is practical and
ornamental.
T H E S H A N H A I B R I D G E
山海连接桥——方案三
P E A K D I S T R I C T
山顶区平面图
S C E N I C T I M E S E N T R A N C E
景区次入口平面图
1
O C É A N O G R A P H I C M U S E U M
声 光 电 海洋博物馆
1
M A I N R E S T A U R A N T
核 心 综 合 体 建 筑
1
A week’s project for the realization of the wetland park essentially
consists of a central building multifunctional : ticket office,
restaurant, shop ...
Urban planning through a system of the architectural promenade
allows you to integrate into the background and the user to take
the time to stop and watch.
The ecology and conservation of the site were the key points of
the design.
5 2
功能分区
Planning Zone
陆路交通分析
Traffic Analysis
水路交通系分析
Water Traffic Analysis
建筑与动线分析
Architecture and Route Analysis
景观系统分析
Landscape Analysis
水系分析
Water Analysis
排水工程规划图
Waste Water Design
电力工程规划图
Electric Design
水上消防艇通道规划图
Outdoor Emergency Design
WETL AND PARK
三 亚 亚 龙湾湿地公园景观设计
S e p t e m b e r 2 0 1 2 : G H D C o n s u l t i n g
P r o j e c t M a n a g e r : M . L i u
T O U R I S T C E N T R E
游客服务中心
2
S K Y P A T H
空中廊道
2
W A V E W A L L
波浪墙
2
F E A T U R E D P E R G O L A
景观廊架
2
EX TENS I ON C AMPUS 5 3
General Plan
Traffic Analysis
Landscape Analysis
J u n e – J u l y 2 0 1 2 : G H D C o n s u l t i n g
P r o j e c t M a n a g e r : M . S o n g H A O
Located in the east of Beijing, this campus of the University
requires an extension to accommodate a larger number of
students enrolled.
Over 40,000 m² of floor space, the building has mainly classes,
amphitheaters and library.
Positioned at the entrance to the campus, it becomes the new
symbol of the site.
总平面图
交通分析图
景观分析图
T E A C H I N G B U I L D I N G T E A C H I N G B U I L D I N G , L I B R A R Y B U I L D I N G P L A N
教学楼一、图书馆建筑平面图 教学楼
3
JAPANES E H OUS E 4
J u n e 2 0 1 2 : G H D C o n s u l t i n g
P r o j e c t M a n a g e r : Y i j u n Y U
With 350 m² area, this house is designed to be integrated into a
global urban planning.
The distribution on 3 different levels is related to the topography.
Using topography, the garden demonstrates a willingness and
geometric art.
The particular use of “Feng Shui” related to Asian traditions gives
this home a sacred space amid the new building.
5
S TREAT ANALYS I S
B i n o m i a l – S e m e s t e r 3
T e a t c h e r : D e n i s O U A I L L A R B O U R O U
In this project, it is to study the different types of roads
identifiable in the city of Tournai, Belgium. These make up the
urban fabric and organize the distribution network of the city. By
analyzing the plans and maps of the city, three types of roads
have been classified :
- The extra-urban roads such as country roads and highways,
- The suburban roads integrating distribution of residential
areas,
- Urban roads which are divided into several subtypes (city
center, main roads, edges of dock).
Profile #1 : Extra-urban roads
« chaussée de Willemeau »
Profile #2 : Suburban roads
« Résidence du Vert Mont »
Profile #3 : Urban roads
« Rue des sœurs noires »
The downtown
or the old Tournai
Profile #3 : Urban roads
« Boulevard Léopold »
The main axes
Profile #3 : Urban roads
« Quai de Luchet d’Antoing »
Dock side
TRA I N S TAT I ON 6
M o n o m i a l – S e m e s t e r 3
T e a t c h e r : D e n i s O U A I L L A R B O U R O U
In the context of improving the deserted space of the train station
in Froyennes, the final project of the School of Architecture in
Tournai is focused on several elements:
- Partial coverage of platforms,
- The design of the public space surrounding,
- The creation of a car park and bus stop,
- The creation of trade and the ticket office.
Understanding of the structure and material savings are the two
essential elements for achieving coverage platforms.
URBAN PL ANNI NG
O c t o b e r 2 0 1 1 : A g e n c e C a r r é d ’ A
T u t o r : A r c h i t e c t J e a n - L o u i s M U N C H
7
Plots & potential access
Traffic Analysis
Network and connections Analysis
The study of this development permits from documents such as
the PLU (Local Urbanism) to capture the best strict rules for
Creating subdivision.
The provision of housing is put into compliance but also for the
sake of comfort (lighting, audio, security) as well as an economic
concern (plot size, areas, networks ...).
Unused land, the parcels in “Villeneuve d'Ascq” bode financial
resources interesting.
A major problem on the ground is the lack of access by road. It is
therefore essential to create an exchange or redemption of a
portion of land available, vacant ...
Total Area: 9 885 m²
Building Floor Area: 1 977 m²
A C C E S S « R É S I D E N C E D E L’ E T R I L L E »
7
A C C E S S « R U E D U M A R E C H A L J O F F R E »
Total Area : 10 252 m²
Building Floor Area: 2 050.50 m²
7
P R O P O S A L S
7
This restaurant in the center of Marcq-en-Barœul occupies a plot
slender and narrow, the construction is limited to a FAR 0.4. The
building consists of a pancake restaurant with a capacity of 50
people on the ground floor and housing on the 1st and 2nd floor.
The courtyard can expand the dining area as well as separate
technical elements.
The rehabilitation of this building allows its standards PMR
(Disabled people) and fire while keeping its integration
of protected area.
8 RES TAURANT
J u n e - S e p t e m b e r 2 0 1 1 : A g e n c e C a r r é d ’ A
T u t o r : A r c h i t e c t J e a n - L o u i s M U N C H
E X I S T I N G & P R O P O S A L M A S T E R P L A N E X I S T I N G & P R O P O S A L S E C T I O N
8
E X I S T I N G F A Ç A D E S P R O P O S A L F A Ç A D E S
8
A C C E S S I B I L I T Y & S E C U R I T Y P L A N
8
The creation of an area is due to a variation of volume.
Linking green spaces and walls, the association of elements
create a reflection instead to take shape.
The structure target looks and confines all around this central
element.
The goal is to create consistency between intensions and
materialization of ideas.
4 cubes assembled developed complex form where the study of
tensile and compression is essential for the stability of the
building.
9
T e a m o f 3 p e o p l e – S e m e s t e r 1
T e a c h e r : A n n e C r o g a e r t
S PAC E_S TRUC TURE
T R A V E L / P H O T O G R A P H Y
Portfolio 2012
Alexandre BOMPARD
49 bd de mer 44740 Batz sur Mer
+33 (0) 619540892