Portfolio A. MOUSA – Sr. Architect Page 1/5 SAN STEFANO – GRAND PLAZA FOUR SEASONS HOTEL – EGYPT SQUARE ENGINEERING FIRM DEC 2004: NOV 2007 SITE ARCHITECT – Q.S PROJECT SAN STEFANO COMPLEX Consists Of A Five Star Four Seasons Hotel, 1100 Luxury Residential Units, A Shopping Mall, 10 Movie Theatres, Executive Office Spaces, Garage Holding 2200 Vehicles. The Complex Has Its Own Private Beach And Yacht Marina. CLIENT SAN STEFANO FOR REAL STATE. . CONSULTANT DAR AL HANDASAH. PROJECT MANAGER LANG INTERNATIONAL. PROJECT VALUE 335,000,000 U$D DEC 2004 TO MAY 2005 MAIN CONTRACTOR ALEXANDRIA CONSTC CO. (A.C.C) POSTION SITE ENGINEER. - Supervision on the Interior Finishing Works (Masonery, Plaster, Water Proofing, Tiles, Flase Ceiling, …etc) JUNE 2005 TO NOV 2007 MAIN CONTRACTOR SQUARE ENGINEERING FIRM. POSTION TECH. ENGINEER & Q.S - Prepare All Architecture Shop Drawing and Details. - Preparing Full-Organized Document (AutoCad Sketches & Excel Sheets) For The Project Monthly Payment and The Sub Contractor's Payments and Project's B.O.Q. - STAGE 1: The Finishing of The Retail Mall and The Multiplex Cenimas. - STAGE 2: The Finishing of the Luxury Flats of Tower 5&10 (266 Apartments). - STAGE 3: The Finishing of The Four Seasons Hotel’s Health Club
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Portfolio A. MOUSA – Sr. Architect Page 1/5
SAN STEFANO – GRAND PLAZA
FOUR SEASONS HOTEL – EGYPT SQUARE ENGINEERING FIRM
DEC 2004: NOV 2007 SITE ARCHITECT – Q.S
PROJECT SAN STEFANO COMPLEX Consists Of
A Five Star Four Seasons Hotel, 1100
Luxury Residential Units, A Shopping
Mall, 10 Movie Theatres, Executive
Office Spaces, Garage Holding 2200
Vehicles. The Complex Has Its Own
Private Beach And Yacht Marina.
CLIENT SAN STEFANO FOR REAL STATE.
.
CONSULTANT DAR AL HANDASAH.
PROJECT MANAGER LANG INTERNATIONAL.
PROJECT VALUE 335,000,000 U$D
DEC 2004 TO MAY 2005
MAIN CONTRACTOR
ALEXANDRIA CONSTC CO. (A.C.C)
POSTION
SITE ENGINEER.
- Supervision on the Interior Finishing
Works (Masonery, Plaster, Water
Proofing, Tiles, Flase Ceiling, …etc)
JUNE 2005 TO NOV 2007
MAIN CONTRACTOR
SQUARE ENGINEERING FIRM.
POSTION
TECH. ENGINEER & Q.S
- Prepare All Architecture Shop
Drawing and Details.
- Preparing Full-Organized
Document (AutoCad Sketches &
Excel Sheets) For The Project
Monthly Payment and The Sub
Contractor's Payments and
Project's B.O.Q.
- STAGE 1: The Finishing of The
Retail Mall and The Multiplex
Cenimas.
- STAGE 2: The Finishing of the
Luxury Flats of Tower 5&10 (266
Apartments).
- STAGE 3: The Finishing of The
Four Seasons Hotel’s Health Club
Portfolio A. MOUSA – Sr. Architect Page 2/5
SEBA TOWER
DOWNTOWN – ABU DHABI COMMODORE CONTRACTING CO.
DEC 2007: MAY 2011 Jr. ARCHITECT – TECH. OFFICE
PROJECT Consider One Of The Heighest and
Land Mark Towers In Abu Dhabi.
Tower Comprises Of: 51 Multiuses Floors
( 9 Podium Floors, 3 Basements, 13
Office Floors, 25 Residential Floors, 3
Technical Floors, SPA And Recreation
Floor).
CLIENT H.H SHIKH HIMDAN BIN ZAID AL NAHIAN
.
CONSULTANT G.A ARCHITECTURE & ENGINEERS.
PROJECT MANAGER MORGANTI GROUP INC.
PROJECT VALUE 172,000,000 U$D
MAIN CONTRACTOR
COMMODORE CONTRACTING CO. LLC
POSTION
JR ARCHITECT.
- ARCH SHOP DRAWING & DETAILS.
- PROJECT COORDINATOR.
- PROJECT HANDING OVER.
Portfolio A. MOUSA – Sr. Architect Page 3/5
LEAF TOWER
REEM ISLAND – ABU DHABI COMMODORE CONTRACTING CO.
JUNE 2011: AUG 2013 TECHNICAL OFFICE ENGINEER.
SAN STEFANO – GRAND FOUR SEASONS HOTEL PROJECT An Iconic Tower. Build on Area Of
20,000m2, Overlooking The Sea.
Tower Comprises Of: 60 Multiuses Floors
(8 Parking Floors Accommodates 4,600
Car Lot, 22 Floors Of Luxury Apartments
Office Spaces, 4 Technical Floors, (396
UNITS), 24 Floors Of Grade-A Health
Club, Variety Of Restaurants And
Retails.
CLIENT 3AM PROPERTY INVESTMENT CO. LLC.
CONSULTANT ETAN CONSULT ARCH & URBAN DESIGN
PROJECT VALUE 272,000,000 U$D
MAIN CONTRACTOR
COMMODORE CONTRACTING CO. LLC
POSTION
ARCHITECT & TECHNICAL ENGINEER.
- ARCH SHOP DRAWING & DETAILS.
- PROJECT COORDINATOR.
- ENGINEERING WORKS &
SUBMITTALS.
- Reviews And Evaluates
Subcontractors Offers &
Submissions.
Portfolio A. MOUSA – Sr. Architect Page 4/5
CAPITAL BAY TOWERS
BUSINESS BAY – DUBAI COMMODORE CONTRACTING CO.
AUG 2013: MARCH 2014 SENIOR TECHNICAL ENGINEER.
PROJECT Mixed Use Service Apartment.
Towers Comprises Of: Two Towers
Spectacular 18-Storey Mixed Use
Luxury Service Apartments, Retail
Shops, Swimming Pool & Landscaping
And Health Club.
CLIENT DAMAC PROPERTIES.
CONSULTANT E.C.C.E ENGINEERING CONSORTIUM
CONSULTING ENGINEERS.
PROJECT VALUE 25,000,000 U$D
CONTRACT FINISHING ONLY
MAIN CONTRACTOR
COMMODORE CONTRACTING CO. LLC
POSTION
SENIOR TECHNICAL ENGINEER.
- ARCH SHOP DRAWING & DETAILS.
- PROJECT COORDINATOR.
- ENGINEERING WORKS &
SUBMITTALS.
- Reviews And Evaluates Sub-
contractors Offers &
Submissions. - PROJECT HANDING OVER.
Portfolio A. MOUSA – Sr. Architect Page 5/5
THE KITE RESIDENCES
REEM ISLAND – ABU DHABI TASAMEEM STX CONSTRUCTION.
APRIL 2014: PRESENT Sr. ARCHITECT – Sr. TECH. ENGR