DRAWING INDEX PROJECT DESCRIPTION TITLE VICINITY MAP LOCATION MAP Clemson University Starbucks Coffee Company ARCHITECTS PROJECT NO. 0816.01 This project is a renovation and refurbishment of an existing student union gaming lounge space, to be replaced with a Starbucks Brand retail food service venue. The extents of the work includes demolition of existing partitions, ceilings, flooring, furniture and interior wall finishes and construction of new partitions, millwork, ceilings and installation of new finishes and equipment as shown on A/E drawings. MEP systems will be modified as required and shown on A/E construction drawings. The project is located on the first floor of the Harcombe University Center. TRUE PROJECT dwg no. project no. drawn checked project date kenneth w. tipton, jr., aia bryon m. hume, aia darrin l. badon, aia daniel m. zito, aia 449 westmoreland drive baton rouge, louisiana 70806 ph 225.387.0101 fax 225.387.0104 www.tipton-associates.com revisions Clemson University, SC Student Center 113 Union Drive Clemson, SC 29634 8/3/2012 5:20:57 PM G-000 0816.01 DK JP 05-25-2012 Starbucks Coffee Company COVER McKnight Smith Ward Griffin Engineers, Inc. 4223 South Blvd. Charlotte, NC 28209 704-527-2112 X156 mswg.com MEP HARCOMBE DINNING HALL CLEMSON UNIVERSITY General G-000 COVER G-001 General Information G-002 Scope of Work Plan Demolition D-100 Demolition Plan D-200 Demolition Ceiling Plan Architectural A-112 Floor Plan A-113 Penetration Plan A-114 FF and E Plan A-115 Casework Plan A-116 Reflected Ceiling Plan A-117 Floor Finish Plan A-119 Wall Finish Plan A-201 Exterior Elevations A-211 Interior Elevations A-212 Interior Elevations A-501 Partition Types and Wall Details A-502 Ceiling Details A-503 Custom Seating Details A-504 Casework Details A-505 Casework Details A-506 Light Fixture Details A-601 Schedules A-602 Schedules A-801 Enlarged Electrical Plans A-802 Enlarged Plumbing Plans Mechanical M-100 Mechanical Demo Plan M-101 Mechanical Floor Plan M-201 Mechanical Schedules and Details Plumbing P-101 Plumbing Plan P-201 Schedules and Details Electrical E-100 Symbols and Schedules E-101 Symbols and Schedules E-201 Floor Plan - Lighting E-301 Floor Plan - Power E-401 Power Riser Diagram no. description date
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
DRAWING INDEX
PROJECT DESCRIPTION
TITLE
VICINITY MAP LOCATION MAP
Clemson UniversityStarbucks Coffee Company
ARCHITECTS PROJECT NO. 0816.01
This project is a renovation and refurbishment of an existing student union gaming lounge space, to be replaced with a Starbucks Brandretail food service venue. The extents of the work includes demolition of existing partitions, ceilings, flooring, furniture and interior wallfinishes and construction of new partitions, millwork, ceilings and installation of new finishes and equipment as shown on A/E drawings.MEP systems will be modified as required and shown on A/E construction drawings. The project is located on the first floor of the HarcombeUniversity Center.
TRUE
PROJECTdwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
1. All work shall be performed in strict compliance with local, county, state, and federal codesand ordinances.
2. General Contractor shall verify the location of all utilities.
3. General Contractor to verify all dimensions, including clearances required by other trades,and notify Starbucks Development Manager of any discrepancies prior to proceeding with thework. All dimensions are to the face of the finished surface unless noted otherwise. Alldimensions to be taken from designated datum point. Do not scale drawings.
4. General Contractor shall patch and repair all existing walls, floors, ceilings, or othersurfaces identified to remain that may become damaged during the course of the work.
5. The General Contractor is responsible for obtaining permits for fire protection, plumbing,mechanical, and electrical systems prior to installation of such systems.
6. Responsibility for supply and delivery of materials and equipment is identified in thedrawing schedule sheets under the column labeled "Responsibility".
7. For the purpose of the documents, to “install”, shall mean to provide all fasteners,miscellaneous hardware, blocking, electrical connections, plumbing connections, and otheritems required for a complete and operation installation, unless otherwise noted.
8. All item substitutions must be approved by the Starbucks Design Manager.
9. Refer to item cutsheets for additional information.
JURISDICTION CLEMSON UNIVERSITY HARCOMBE UNIVERSITY CENTERPICKENS COUNTYCLEMSON, SC
SOUTH CAROLINA DEPARTMENT OF LABOR, LICENSING, AND REGULATIONSYNERGY BUSINESS PARK; KINGSTREE BUILDING110 CENTERVIEW DR.COLUMBIA, SC 29210803.896.4300
CODE CRITERIA AS SET FORTH IS APPLICABLE AS ADOPTED AND/OR AMENDED BY NOTED JURISDICTION
APPLICABLE CODES
BUILDING CODE INTERNATIONAL BUILDING CODE 2009EXISTING CODE INTERNATIONAL EXISTING BUILDING CODE 2009
MECHANICAL CODE INTERNATIONAL MECHANICAL CODE 2009ELECTRICAL CODE NATIONAL ELECTRIC CODE 2009PLUMBING CODE INTERNATIONAL PLUMBING CODE 2009
GAS CODE INTERNATIONAL GAS CODE 2009FIRE CODE INTERNATIONAL FIRE CODE 2009ENERGY CODE COMMERCIAL ENERGY CODE
LIFE SAFETY CODE NFPA 101 LIFE SAFETY CODE 2009
ACCESSIBILITY CODE ADA ACCESSIBILITY GUIDELINES 1994
Harcombe Univeristy Center
1 (Plaza Deck Above)
1975
II-A Renovations to existing
1-HR
No
22,269 sf
3,096 sf14 % Total plate renovation
A-2
3,096 sf / 15 = 206
CODE CRITERIA
SITE:
TOTAL FLOORS:
BUILT:
CONSTRUCTION TYPE:
FIRE RATINGS:
SPRINKLERS:
TOTAL SF:
SCOPE OF WORK:
OCCUPANCY TYPE:
OCCUPANCY LOAD:
STARBUCKSLOCATION
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
9:59
PM
D-100
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
Demolition Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Scale: 1/4" = 1'-0"1 Demolition Plan - 1st Floor N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
Wall Legend - Demo Plan
no. description date
Armstrong is not licensed to provide professional architecture or engineering design services.
compliance with all Legal Requirements.advised to consult with a duly licensed architect or engineer in the particular locale of the installation to assure
the drawings for a particular installation or their fitness for a particular purpose.Armstrong does not warrant, and assumes no liability for the accuracy or completeness of
applicable for a particular installation.local building codes, laws, statutes, ordinances, rules and regulations (Legal Requirements) that may be
They are not a substitute for an architect's or engineer's plan and do not reflect the unique requirements ofThese drawings show typical conditions in which the Armstrong product depicted is installed.
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:2
0:31
PM
D-200
0816.01
Author
Checker
05-25-2012
Starbucks Coffee Company
Demolition Ceiling Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Scale: 1/4" = 1'-0"1 Demolition Ceiling Plan - 1st Floor N
0 2' 4' 8'
Scale: 1/4" = 1'-0"
RCP Demo Legend
no. description date
Floor Plan NotesA. General Contractor to verify all dimensions and notifyStarbucks Construction Manager of any discrepancies prior toconstruction. All dimensions to be taken from designateddatum point.
B. If existing exterior entrance threshold exceeds requiredAmerican’s with Disability Act (ADA) maximum allowable1/2" bevel or 1/4" step (total change of not more than 1/2"),remove and replace with accessible threshold. Raisedthresholds and floor level changes at accessible doorways tobe beveled with a slope no greater than 1:12.
C. General Contractor to provide fire treated wood studblocking, or equivalent to support any wall attachment and/orsignage.
D. All doors to provide 32” (900mm) minimum clear openingwhen opened to 90 degree position unless otherwise noted.
E. Verify all existing doors, hardware and frames meetStarbucks and/or code requirements.
F. Install 1/4" glass-mat water resistant backing board onbackbar wall per specification.
Sheet Notes1. Align both sides. Frame into existing wall.
2. New storefront to match existing storefront.
3. RE: X0055 / A-505
4. RE: X0021 / A-503
5. RE: X0024 / A-503
6. Tube steel wall support, RE: 5 / A-501
Existing Column
New Partial Height Wall
New Full Height Wall
Existing Wall
9' -
7 3/
4"
2' -
6 1/
2"
9' -
8"
14' - 1 1/2"
2' - 0 1/4"
7' -
0"6'
- 0"
7' -
0"2'
- 7
1/2"
CafeSeating
Workroom
Women'sRestroom
Men'sRestroom
1
4' -
7"16
' - 2
1/2
"
12' - 6 1/4" 1' - 7"
3' - 6" 18' - 2 1/2" 31' - 10"
2' - 0"
2' -
0"
9' -
7 3/
4"
9' -
4 3/
4"
13' - 7"
2' -
2 3/
4"2'
- 7
1/2"
2
2
4
5
Bar
1' -
7 1/
16"
12' -
8 3
/16"
6' - 4 3/16"
NIC NIC
A-5014
2
6
5
3
4
2 1
Existing Door to Remain;New removeable centermullion, new hinges, newclosers.
Existing Door to Remain
6
7
7
7
1
2
3
1
2
3
4
4
1
1
Glazing:T = Tempered
Frame:AL = Aluminum StorefrontHM4 = Hollow Metal No Rabbet
Construction:SC = Solid CoreWD = Wood
Door Legend:
Door Hardware Set No. 4 Workroom Door, @ BackbarCount Item Description Manufacturer Finish1 Easy Swing Hardware Eliason Door Packaged with Hardware Eliason Black Powder Coat
Door Hardware Set No. 5 Gate @ BackbarCount Item Description Manufacturer Finish1 SCP - Gate (hardware only) Easy-swing hinges & gate post Eliason Black Powder Coat
Type A
TT
Type B Type C
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
6:23
PM
A-112
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
Floor Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Wall Legend - Floor Plan
Scale: 1/4" = 1'-0"1 Floor Plan N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
Door Schedule
Design ID Count Description Width Height Finish Door TypeConstruction
TypeHardware
Group Frame Type Frame Material Responsibility CommentsGlazed Doors & Entrances
1 1 Aluminum - Double Storefront metal Frame 6' - 0" 7' - 11 1/2" Black A AL Existing Door to Remain; New removeablecenter mullion, new hinges, new closers.
2 1 Aluminum - Double Storefront metal Frame 5' - 11 1/2" 7' - 11 1/2" A AL Existing Door to Remain3 1 Aluminum - Double Storefront metal Frame 6' - 0" 7' - 11 1/2" A AL
Interior Doors4 1 Door - Single Impact Double Acting - 36in
915mm3' - 0" 7' - 2" WD0019 B SC 4 HM4 N/A GC
5 1 1" Thick Wood Gate - Single ImpactDouble Acting
3' - 0" 2' - 6" WD0019 C SC 5 N/A N/A GC Gate post system provided by Eliason. Customwood gate with planking finish per caseworkFinish Schedule. WD0019. Supplied byCasework Vendor
6 1 Door - Double Flush - 28in 710mm 2' - 4" 7' - 0" Paint Paint to match surrounding walls7 3 Door - Single Flush - 36in 915mm 3' - 0" 7' - 0" Paint Paint to match surrounding walls; 1" clear
undercut at restrooms
Door Type Legend
no. description date
Penetration Plan NotesA. All stub-up dimensions are relative to finished wall locations(shown as outlines on this plan). Refer to Construction Plan forwall placement.
B. Floor Sink: Refer to cut sheets for component specificationsand cutout requirements.
C. Waste Line Penetrations: Refer to Plumbing Plans forindividual line specifications.
D. Stub-up Penetrations: Refer to Plumbing Plans for individualstub-up specifications.
E. Toilet Floor Penetration: Refer to cut sheets for stub-uplocation relative to finished wall.
F. Penetration to be located on centerline of wall or as requiredper conditions.
G. Trenching outline for guideline use only. General Contractorto coordinate with specific trades and site conditions todetermine actual layout.
All conduitstub upsto be withinthis boundary
Dimensiondatum point
CWF stub up
CW stub up
0' - 7"
0' -
3"
Eq.Eq
.
HW stub up
All conduitstub upsto be withinthis boundary
Dimension datum point
Eq.
3/4" LAN conduitto POS / safe
3/4" isolated groundpower conduit
3/4" LAN conduit tomanager's station3/4" isolated groundpower conduit
1' - 9"
0' -
3"
Eq. All conduitstub upsto be withinthis boundary
Dimension datum point
Eq.
3/4" power conduitto electrical panel
1/2" phone to managersdesk
1/2" data to managersdesk
0' -
3"
1' - 6"
Eq.
3/4" power tofoodcase
3/4" power future
1/2" security tomanagers desk
Floor sink set flush with top finish floor
Caulk Joint
Existing concrete floor
No-Hub connection
3" Tail Piece
Grind concrete floor to drain
Slope downward to drainSlope
8' - 10 3/4" 5' - 10 1/4" 1' - 8"
A-1134
A-1133
A-1132
A-1132
A-1135 A-113
5
A-1135
A-1135
A-1135
10294
10294
10294
1' -
2 1/
2"
5' -
7 3/
4"11
' - 7
1/2
"
CafeSeating
WorkroomWomen'sRestroom
Men'sRestroom
34' - 8 1/2"
32' - 10" 10' - 9 3/4"
7' -
11 1
/2"
4 11/16" 6 1/8"
1029410294
Bar
4 1/
4"
5"
NIC NIC
8' -
3 3/
4"
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Scale: 1/4" = 1'-0"1 Penetration Plan N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
no. description date
FF and E Plan NotesA. General Contractor to schedule with local refrigerationContractor to conduct initial food case start-up and testing. Forapproved Contractor, contact vendor.
B. The space is served by the municipal water and sewersystem unless otherwise noted.
C. All equipment and installation will meet National SanitationFoundation standards or equivalent.
D. Equipment units shall contain no exposed threads,embellishments or overhanging edges that serve as places foraccumulation of dust, dirt and debris.
E. Warming oven(s) shown for permitting purposes. Installationat store opening to be verified by Starbucks ConstructionRepresentative.
F. Each hand washing sink will have a single service towel andsoap dispenser, and all hand sinks to have a combination faucetor premixing faucet.
G. See sheet I-601 for schedules.
Sheet Notes1. See elevations for distribution of cup dispensers
2. Place fire extinguisher in workroom per fire inspector.
3 POS equipment specs & installation by licensee. Verifyequipment provided with licensee.
(8)(8)(6) 12303
X003312184
(6)(6)(6)
X0003(12)
X00101218412303 (2)
X00101218412303 (2)
X0008X0003 (4)
X00101218412303 (3)
(4)X0008X0003 X0003(10)
X0010
12303 (2)(2)(2)
(3)
X00101218412303
X0010121841230312184
X00101218412303
X0008X0003 (4)
11901
X0004 (3) (8)(8)(8)
X0001X0004
X0033 (8)(8)(8)
Workroom
CafeSeating
Women'sRestroom
Men'sRestroom
105971323810917 (2)
(2)
(2)
12694108551009110396
10153108741021511003
(4)(4)
(6)(6)
12618
10473
1034412508
1050510215
10527(2)
2
1
312023
11115
10797(2)(2)
(3)
X0006
X0005
X0002(2)
(2)
X0006(2)
X0002X0032
(2)
(3)
X00331218412303
(2)
10818 1081810818
12193X0011
X0011
1
11061(4)
1051312149(2)
1051312149(2)
1051312149(2)
1051312149(2)
1051312149(2)
1051312149(2)
1051312149(2)
X0009
X0009
1240712480
1058110597
1097710947
10501
1010210475
108551009110396
10495
10305
1054910152
1072410314
1091710452
10439 (2)11055 (2)107881075711737
10452
(2)
10967 11083
(2)
108551009110396
(2)
1022211070
1071910447
104161046210462
10416
10995
10698
10922
X00331218412303
1007610005
(4)
1216012149(2)
X00101218412303 (2)
NIC NIC
10838
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
6:52
PM
A-114
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
FF and E Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Scale: 1/4" = 1'-0"1 Furniture, Fixtures and Equipment Plan N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
no. description date
Casework Plan NotesA. General Contractor to notify Starbucks ConstructionManager immediately if a discrepancy exists betweencasework shop drawings, site dimensions, casework plan oractual casework fixtures. All dimensions to be taken fromdesignated datum point.
B. Starbucks Construction Manager to coordinate andschedule casework delivery date. General Contractor toconfirm casework delivery date with casework manufacturer 4weeks and 1 week prior to scheduled date of delivery.
C. Starbucks contracts directly with casework vendor tosupply casework listed in casework schedule, unlessotherwise noted.
D. Refer to casework installation manual provided bycasework vendor for complete installation instructions.
E. All casework base units shall be set on 1/4" (6mm) non-absorbent plastic shims provided by casework vendor.
F. See Wall Finish Plan for location, tagging, and finishschedules of applied wall treatments.
G. Install oven stainless steel countertop and base cabinet with1/2" (10mm) gap between adjacent countertops.
H. See Reflected Ceiling Plan for casework soffit locations.
J. See Schedule sheets for schedules
Sheet Notes1. Do not caulk trash rings to countertops.
Indicates Stainless Steel
Indicates Chair RailDesign ID: X0025
Indicates Wall PlankingDesign ID: X0027
Indicates Wall PlankingDesign ID: X0028
A
B
C
A-1152
12802
11155
X0029
(2)
11900
11915
11930
11971
11971
11972
11973
11993
1200712082
1209112100 (3)
X0017
1191212103
X0018
12128
X0023
01-01
ADD
MODIFIED
BRW 01-02
ESP 10-02
X0021(2)
(4)
X0022
CafeSeating
WorkroomWomen'sRestroom
Men'sRestroom
MO
DIF
IED
CBS
07-
01 X0030
12474
X0016
A
AA
A
A
AA
A
9' -
3 3/
4"
C C
B B
X0045 (3)
X0046
1193311942 11945
1209612080X0048
X00491208012098120141197112096
X0056
MODIFIED
POS 18-01
X0024
MODIFIED
BRW 07-02
3' -
0 5/
8"3'
- 0"
3' -
4"
X0047
MOD.
SCL 03-01 X0044X0053X0020
X0055
X0051
X0043X0054
X0052
13287
11994X0050
12775
WRM 02-01
(2)
10' - 0"
10"
12127
X0031
11957
1
1
NIC
A
NICA-504
7Sim
1197711977 11977 11977
11902
11977 11977
1284512845
12816 12816
(Below)
11959
0' - 3 1/4"
12845
1197712816 12816
11977 11977 X0034
3 1/4"12' - 6 3/8"
12845
11956
12845
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
6:59
PM
A-115
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
Casework Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Casework Plan Legend
Scale: 1/4" = 1'-0"1 Casework Plan
N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
Scale: 1/4" = 1'-0"2 Upper Casework Plan
no. description date
Reflected Ceiling Plan NotesA. If required by local code, General Contractor to provide semi-recessed sprinkler heads with polished chrome escutcheonscentered in Acoustical Ceiling Tile. If pendant heads arerequired in gypsum soffit over frontbar, conceal supply pipingwithin soffit. General Contractor to submit sprinkler layout toStarbucks' Construction Manager for approval prior toinstallation.
B. General Contractor to provide and locate sprinklers per localcodes. Contact Starbucks Construction Manager if design intentis affected.
C. Where acoustical ceiling meets wall, provide angle wallmolding for reveal. Match ceiling grid color when applicable.
D. Leave (10) additional retail ceiling tiles, to match retail ceilingpaint color, above the workroom ceiling at manager's desk forfuture use.
E. Provide grommet at all ceiling penetrations for fixtures orsupports.
F. Heating, Ventilating, and Air Conditioning (HVAC) shown fordesign intent only. Contact project manager if changed.
G. Diffusers and returns at backbar in Acoustical Ceiling Tile tobe centered in tile, painted to match adjacent finishes, typical.
H. Paint all HVAC ducts, HVAC diffusers, recessed speakersand light trim rings the same color as ceiling or soffit. Typicalthroughout retail portion of store.
I. Paint substitutions are not allowed. Use Starbucks' nationalaccount "color code" when ordering paints. See sheet I-602 forschedules.
J. Existing and new structure, ceiling, duct, conduit, piping, etc.to be painted out black in all locations visible to below. Anyequipment which may be affected by paint to be coordinatedwith architect and MEP and protected as necessary.
Sheet Notes1. Align
2. Not Used.
3. Paint ceiling prior to wood planking installation.
4. GC to paint recessed trim to match adjacent surfaces.
5. 2' x 2' Access panel in drywall. Coordinate location withMEP prior to fabrication.
6. 2' x 4' Access panel. Coordinate location with MEP anddetails with Architect prior to fabrication.
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
7:13
PM
A-116
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
Reflected Ceiling Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Scale: 1/4" = 1'-0"1 Reflected Ceiling Plan N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
no. description date
Floor Finish Plan NotesA. Starbucks to supply retail floor tile and tile base. GeneralContractor to install. General Contractor to supply workroom tileand base and install. General Contractor to supply and installmortar, adhesive, and grout. General Contractor to inspect alltiles and reject damaged or substandard tiles prior toinstallation.
B. All tile and slate to be installed per Tile Council of Americastandards.
C. All flooring and base material to be installed according toStarbucks specifications.
D. Cabinet bases to be set after tile installation.
E. Align tile transitions on whole tiles as shown.
F. For carpet installation, refer to manufacturers' installationinstructions.
Sheet Notes1. Not Used.
2. Floor sink/floor drain location.
3. GC to infill score cuts in concrete with grout to matchconcrete.
Concrete Floor8'x8' score cut pattern
Tile Base - Black - 6x12Design ID: 11403A
Walk-Off MatDesign ID: 11158
Tile Base - Black - Cut to 6x2 per specsMatch Design ID: 11403B
CafeSeating
WorkroomWomen'sRestroom
Men'sRestroom
Tile - Base - Black -6x12in - 11403
Concrete Stain - DarkBrown
Concrete Stain - DarkBrown
A
AA
A
A
A A
A
B
AA
A
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
B B B
A
2 2
22
2
Tile - Base - Black -6x12in - 11403
Tile - Base - Black -6x12in - 11403
Tile - Base - Black -6x12in - 11403
Concrete Stain - DarkBrown
Tile - Base - Black -6x12in - 11403
Concrete Stain - DarkBrown
6' - 2"
11158Walk off Mat
AA
Bar
B
A
A
AA
A
11289
11289
11289
3
A-501
1
A-501
2
A-504
2
A-501
A
NIC NIC
BB
A
BB
AA
B
A
AA
A
A
A
A
A
A
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
7:40
PM
A-117
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
Floor Finish Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Floor Legend
Scale: 1/4" = 1'-0"1 Floor Finish Plan N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
no. description date
Wall Finish Plan NotesA. Workroom to be finished per local code requirements.
B. Install clear corner guards as indicated. Mount at 6”(150mm) AFF. Back-paint with corresponding wall color.Adhere with clear silicone adhesive and #6 stainless steel ovalhead screws 3” (75mm) from ends, 12” (305mm) on center.Offset screws on either side by 1/2" (10mm) vertically. Cutcorner guards to fit below chair rail at applicable locations. Donot install corner guards above chair rail.
C. Install metal corner guards as indicated. Mount at 6”(150mm) AFF. Affix with #6 stainless steel oval head screws 3”(75mm) from ends, 12” (305mm) on center offset screws oneither side by 1/2" (10mm) vertically. To be installed in back ofhouse only.
D. Change of paint color allowed at inside corners only.
E. Refer to Interior Elevations for graphics locations.
F. Refer to Casework Finish Schedule for additional information
G. General Contractor to provide and install workroom wallfinishes.
Indicates full height backbar wall tileDesign ID: 12320
Indicates full height FRPDesign ID: 11428
A
B
Indicates Leather WainscotDesign ID: X0063C
Indicates Leather WainscotDesign ID: X0064D
Full Height Wall TileDesign ID: T00001E
A-201
1
A-211
5
A-211
1
3
2
A-211
7
A-212
3
6
A
A
AA A
B
B
B
B
CafeSeating
Workroom
Women'sRestroom
Men'sRestroom
4 5
4
A-211
8
A-212 2
A-211 8Sim
A
A-2012
Bar
CC
C
CC
C
C
C
C
C
C
C
D
NIC
C
NIC
E
E
E
E
E
E
E
E
E
E
C
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Clemson University, SCStudent Center113 Union DriveClemson, SC 29634
8/3/
2012
5:1
8:01
PM
A-119
0816.01
DK
JP
05-25-2012
Starbucks Coffee Company
Wall Finish Plan
McKnight Smith Ward Griffin Engineers, Inc.4223 South Blvd.Charlotte, NC 28209704-527-2112 X156mswg.com
MEP
Wall Treatment Key
Scale: 1/4" = 1'-0"1 Wall Finish Plan N 0 2' 4' 8'
Scale: 1/4" = 1'-0"
no. description date
Exterior Elevation NotesA. General Contractor to coordinate and schedule signageinstallation with the Signage Contractor providing a minimumscheduling notice of 4 weeks and shall confirm installationschedule with Signage Contractor 1 week prior to scheduleddate of installation. Starbucks Construction Manager toprovide General Contractor with Signage Contractor contactinformation.
B. General Contractor shall coordinate with ElectricalContractor to furnish and install electrical circuits including allconduit, wire, connections, and breaker at panel boardnecessary to serve Signage.
C. General Contractor to provide fire treated wood blocking, orequivalent to support Signage.
D. Signage Contractor shall verify size and location of any andall allowable monument or pole signage with landlord andprovide shop drawing(s) prior to fabrication to StarbucksDesigner for approval.
E. Signage Contractor to install signage in compliance withlocal codes ad obtain permit and landlord approval.
F. Signage Contractor to supply shop drawings to StarbucksConstruction Manager and to the General Contractor asneeded. General Contractor to notify Starbucks ConstructionManager immediately if shop drawings or installation is inconflict with Starbucks architectural drawings.
G. General Contractor to clean, patch and repair existingexterior as required.
H. See Schedule sheets for schedules
Sheet Notes1. Provide 3" high, 3/4" stroke width, acrylic store addresslettering in approved contrasting color, on or above storefrontdoor or in location approved by local AHJ standards.
1
4' -
10"
13181
STUDENT UNIONDISPLAY BOARD
13181 4' -
10"
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Sheet Notes1. Attach menu hinge to top of cabinet to allow access tocabinet shelves behind, typical.
2. Apply FRP to all sides of chase interior behind cubbie.
3. Cup dispener(s) mounting order from left to right:- Grande Venti- Grande Venti- Tall Hot- Short Hot
4. Backbar wall tile runs behind warming station.
5. Paint wall prior to installing wood planking and/orplywood panels.
6. GC to add outlets to front "kick plate" centered at eachtable.
A. Change of paint color allowed at inside corners only.
B. Refer to manufacturers' instructions shipped with artworkfor installation instructions and spacing.
C. Install wall cabinets before backbar wall tile. Run backbarwall tile to underside of wall cabinets, not behind cabinets.
D. Paint substitutions are not allowed. Use Starbucks'national account "color code" when ordering paints.
E. Paint finishes shall be applied as follows, unless otherwisenoted;
- All wood and metal surfaces shall be paintedSemigloss, or equal.- All accent and trim paint to be Semigloss, or equal.- All wall and ceiling paints to be Eggshell, or equal.
F. See Schedule sheets for schedules
CBS 07-01
MODIFIED
12860 12976
3
11
4
BRW 05-02
MODIFIED
Tile - Mottled DarkBrown - 2x8in - 12320
Tile - Base - Black -6x12in - 11403
Tile - Base - Black -6x12in - 11403
Tile - Mottled DarkBrown - 2x8in - 12320
01-01
ADD
BRW 05-02
MODIFIEDWRM 02-01
P552-ES
X0064
3' -
4 1/
2"
X0025
Tile - Mottled DarkBrown - 2x8in - 12320 ?
Open
Tile - Base - Black -6x12in - 11403
P546-SG
NEW FOODCASE MODIFIED POS 18-01 ESP 10-02
Open
Tile - Base - Black -6x12in - 11403
Open
SCL 03-01
MOD
P546-SG
5' -
3"
NEW FOODCASEMODIFIED POS 18-01ESP 10-02
OpenOpen
3
SCL 03-01
MOD
Wood Planking - 1x6 -10'-0" Bd cut to fit
9' - 7 3/4"
P552-ES
X0027
5
Open
Tile - Base - Black -6x12in - 11403
Tile - Base - Black -6x12in - 11403
P546-SG
X0064
SW6272
EQEQEQEQ X0038 X0039 X0040 X0041
4' - 6" 4' - 6" 4' - 6" 4' - 6"
3' -
6"
3' -
6"
3' -
6"
3' -
6"
6' -
0"
6
4A-502
P546-SG
Tile - Base - Black -6x12in - 11403
New Gate
P552-ES
Tile - Base - Black -6x12in - 11403
X0025
X0063
3' -
0"
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
5. Paint wall/ceiling prior to installing wood planking.
6. GC to add outlets to front "kick plate" centered at eachtable
A. Change of paint color allowed at inside corners only.
B. Refer to manufacturers' instructions shipped with artworkfor installation instructions and spacing.
C. Install wall cabinets before backbar wall tile. Run backbarwall tile to underside of wall cabinets, not behind cabinets.
D. Paint substitutions are not allowed. Use Starbucks'national account "color code" when ordering paints.
E. Paint finishes shall be applied as follows, unless otherwisenoted;
- All wood and metal surfaces shall be paintedSemigloss, or equal.- All accent and trim paint to be Semigloss, or equal.- All wall and ceiling paints to be Eggshell, or equal.
F. See Schedule sheets for schedules
SW6272
X0036 X0035 X0037
4' -
0"
3' - 0" 6' - 0" 3' - 0"
4' -
0"
4' -
0"
5' -
8" 8' -
0"
6
EQ EQ EQ
P552-ES
Wood Planking - 1x6 -10'-0" Bd cut to fit
P552-ES5
X0025
13181
X0063 X0063
4' -
10"
Tile - Base - Black -6x12in - 11403
Tile - Base - Black -6x12in - 11403
Wood Planking - 1x6 -10'-0" Bd cut to fit
X0027
X0025
X0025
3' -
0"
P552-ES 5
X0042
13' - 6"
6
X0063
X0063
7' -
6"
6' -
8"
Wood Planking - 1x6 -10'-0" Bd cut to fit
X0027
P552-ES5
P546-SG
OPEN
Tile - Base - Black -6x12in - 11403
3' -
0 3/
4"
6
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
Unistrut P1000 w/ 5/8" threaded rodsupport to structure above
Carriage bolt thru unistrut
7' -
0"
BOTTOM OF PANEL8'-0" A.F.F.
3/4" Thick Lamlite Panelwith Walnut veneer
Existing mechanical ductbeyond
Box beam supports at 16" O.C.attached to thread rod
Suspended light fixtureRE: 3/A-506
5 13/16" Extruded Aluminumtrim panel
5/8" Gyp board ceiling
MIN
6"
4"1'
- 0"
6' - 8" AFF
8' - 0" AFF
Existing mechanical duct
Existing hard ceiling to remain
Box beam framing to span existing ceiling
Thread rod from box beam toexisting structural deck above
3 1/2" metal stud framingsystem with studs at 16" O.C.in each direction; frame toavoid fixtures; box beams asnecessary to span belowexisting hard ceiling to remain
5/8" All thread rod with steelanchor plate at each box beam
10501 1 Fire Extinguisher LCFood Service - Appliances & Equipment
10102 1 Ice - Bin 590lb SB10344 1 Ice - Bin Drop In 95lb SB10452 4 Brewer Warming Stand SB10473 1 Fridge Undercounter 2 Door - 48in SB10475 1 Ice - Machine 1109lb Air Cooled Side Vent SB10495 1 Brewer Dual SB10527 1 Ice - Bin Drop In 45lb SB10724 1 Grinder Grindmaster SB10797 1 Pastry Case with Self Serve - 66in -
BronzeSB
10917 4 Brewer Server SB10967 1 Freezer Reach In 2 Door - 51in SB11083 1 Fridge Reach In 2 Door - 51x35in SB12407 1 Oven TurboChef Next Generation SB12480 1 Fridge 1 Door with Countertop - 29in - SST SB12508 2 Blender Quiet Model On Counter SB12618 1 Fridge Undercounter 1 Door with Shelf -
Other Equipment10091 2 Cup Dispenser Tall Hot Vertical SB10314 1 Scale Digital with Adjustable Display
MountSB
10396 2 Cup Dispenser Short Hot Vertical SB10439 2 Cup Dispenser Grande Venti Hot
HorizontalSB
10757 1 Cup Dispenser Tall Cold Horizontal SB10788 1 Cup Dispenser Tall Hot Horizontal SB10855 4 Cup Dispenser Grande Venti Hot Vertical SB10947 1 Soap Dispenser Wall Mounted SB11055 2 Cup Dispenser Grande Venti Cold
HorizontalSB
11737 1 Cup Dispenser Short Hot Horizontal SBParts Bins
10305 1 Trash Drop Ring Liner Square - Black SB11061 4 Trash Drop Ring Round SB
Shelving10222 1 Wire Shelf Grid at Sink SB10416 9 Workroom Wire Shelving SB10462 9 Workroom Wire Shelving Posts SB10698 1 Mop Rack with 3 Holders SB10838 1 Rolling Wire Cart for 3 Comp Sink SB
Note: All responsibilities to be confirmed withStarbucks DM prior to ordering / construction
Responsibility Legend - Licensed StoresFC Provided by Starbucks - Installed by Fixture ContractorGC Provided by General Contractor - Installed by General ContractorLC Provided by Licensee - Installed by General ContractorSB Provided by Starbucks - Installed by General Contractor
*All custom furniture itpens to be provided by Icon Modern Contact:[email protected]: 312-560-2067Unless otherwise noted.
Data Device ScheduleDesign ID Count Description Responsibility Comments
Public Address & Music Systems10005 1 Music System SB10017 7 Speaker Surface Mounted - (Designer
Specify) White or BlackSBSB
10076 1 Amplifier SB
no. description date
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia
11959 1 Fit Kit - Upper Cubby - Variable to 9in230mm
FC
11971 3 Cabinet - Sink or Ice Bin - 15in FC11972 1 Cabinet - Espresso with Cup Dispenser -
24inFC
11973 1 Condiment Cart Island Base - 59in FC See casework finish schedule11977 9 Cabinet - Upper Cubby - 24x16x21in
610x405x535mmFC See casework finish schedule
11993 1 Espresso Inline Sneeze Guard for 126in FC11994 1 POS Double Server Shroud - 30in 760mm FC See casework finish schedule12007 1 Cabinet - Sink - 24in FC12014 1 Cabinet - Door with Blocking - 15in 380mm FC12080 2 Cabinet - 15in 380mm FC12082 1 Cabinet - CBS Ice Bin - LH - 24in FC12091 1 Countertop - Handoff Rounded Stone - RH
- 30x33inFC See casework finish schedule
12096 2 Cabinet - with Drawer - 15in 380mm FC12098 1 Cabinet - Brew Grind - 24in 610mm FC12100 3 Espresso Countertop Support Leg
StainlessFC
12127 1 Cabinet - POS with Cup Dispenser Panel -30in 760mm
FC
12816 4 French Cleat - Variable 12in to 96in FC 20' -5" Total Length12816 1 French Cleat - Variable to 96in 2440mm FC Designer To Verify Quantity. Provide
Overall Length Required12845 5 Soffit - Light Valance - 96x2in FC 23'-3" Total Length12845 1 Soffit - Light Valance - 96x2in 2440x50mm FC Designer To Verify Quantity. Provide
Overall Length Required13287 1 Countertop - POS Double Server Solid
Surface - 30in 760mmFC See casework finish schedule
X0016 1 Custom Queue - 10" x 7'-0" SB Top Cap - See CW finish scheduleX0020 1 Custom Scale Toe Kick Corner - 15in
380mmFC Based on Design ID 11970
X0029 1 Custom Countertop - CBS Shared RinseSink and Ice Bin L Shape Solid Surface -LH - 84x67in
FC See Casework Finish Schedule
X0031 1 Custom Sit Here Sneeze Guard FC Based on Design ID 11993X0034 1 Fit Kit - Custom Upper Cubby End Piece -
3 1/8"FC Based on Design ID 11959, See casework
finish scheduleX0043 1 Custom POS Toe Kick Corner FC Based on Design ID 11916, See casework
finish scheduleX0044 1 Custom Countertop - Scale Stone - 15in
based on 11992FC Based on Design ID 11992, See casework
finish scheduleX0052 1 Countertop - POS Double Server Stone FC Based on Design ID 12788, See casework
finish scheduleX0056 1 Custom Cabinet - Scale - 15in FC Based on Design ID 11985, See casework
finish scheduleFixed Casework
11912 1 Panel - Espresso Inline - RH - 126in FC See Casework Finish Schedule11957 1 Panel - Cup Dispenser FC12103 1 Diewall - Inline Handoff Support - RH FC12128 1 Diewall - Espresso Inline - RH - 126in FC12775 1 Panel - POS Double Server - 30in 760mm FC12802 1 Diewall - Espresso Inline Top Cap - RH -
126inFC See casework finish schedule
X0017 1 Panel - CBS - RH - 126in FC See Casework Finish ScheduleX0018 1 Diewall - CBS - RH - 126in FCX0030 1 Diewall - Sit-Here Top Cap - RH - 126in FC See casework finish scheduleX0046 1 Custom Partial Wall Cap FC See Casework Finish ScheduleX0047 1 Custom Partial Wall Cap FC See Casework Finish ScheduleX0053 1 Panel - Scale - 16in 405mm FC Based on Design ID 11907, See casework
finish scheduleX0054 2 Panel - POS - 45in based on 11951 FC See Casework Finish ScheduleX0055 1 Panel - Partial Height Wall FC Based on Design ID 11907, See casework
X0021 2 Custom U-Shape Settee FC based on 12844 - Moore + Giles - Leather;Brighton in "Spice" - Refer to CaseworkFinish Schedule and details 1/I-502,2/I-502, and 3/I-502
X0022 1 Banquette - with Thick Seat FC based on 12844 - Moore + Giles - LeatherSeat; Brighton in "Chocolate"; Back:Maharam; Pattern: Crush 464780, in "001Feather" - Refer to Casework FinishSchedule and details 1/I-502, 2/I-502, and3/I-502
X0023 1 Custom High Banquette FC based on 12844 - Moore + Giles - LeatherSeat; Brighton in "Chocolate"; Back:Maharam; Pattern: Crush 464780, in "001Feather" - Refer to Casework FinishSchedule and details 1/I-502, 2/I-502, and3/I-502
X0024 4 Custom L-Shape Settee FC based on 12844 - Moore + Giles - Leather;Brighton in "Spice" - Refer to CaseworkFinish Schedule and details 1/I-502,2/I-502, and 3/I-502
Furniture & AccessoriesX0045 3 Coat Hook 2 Prong FC Rejuvenation Cast Iron Double Hook Item
# C0189 from rejuvenation.com888-401-1900
Finish - Ceiling TreatmentDesign ID Area Description Responsibility Comments
X0015 1091 SF Wood Planking - 1x4 - 16'-0" Bd cut to fit FC 16' Boards cut to fit; see casework finishschedule
Finish - Floor TreatmentDesign ID Area Description Responsibility Comments
11158 19 SF Walk off Mat GC11289 3399 SF Concrete Stain - Dark Brown GC GC to infill score cuts with grout to match
24 SW use CP-1 Primer; NCS - S5010 Y10R ;Akzo Nobel - 20YY 24/177
P546-SG SW - Library Pewter 20 GC SW use CP-1 PrimerP551-ES SW - Wool Skein 64 GC SW use CP-1 PrimerP551-SG SW - Wool Skein 64 GC SW use CP-1 PrimerP552-ES SW - Mega Greige 20 GC SW use CP-1 PrimerSW6272 SW6272 Plum Brown Accent Walls 7 GC SW use CP-1 Primer
Note: All responsibilities to be confirmed withStarbucks DM prior to ordering / construction
Responsibility Legend - Licensed StoresFC Provided by Starbucks - Installed by Fixture ContractorGC Provided by General Contractor - Installed by General ContractorLC Provided by Licensee - Installed by General ContractorSB Provided by Starbucks - Installed by General Contractor
Receptacle and Data junction box forCup Labeler at 26" (660mm) AFF
Receptacles for Espresso Machinesat 26" (660mm) AFF
Countertop (above)
Plan View
Electrical Components
Box base (below)
Receptacle for Coffee Warmer at 18"(460mm) AFF
Double duplex receptacle at 18" (460mm)AFF
18"x3" (460mmx75mm) stub-uppenetration area. Supply Power,Data, and Phone conduits for POS,and Power conduit for Pastry Case.See Electrical Design Plan for finallocation
Juntion box for Phone at 18"(460mm) AFF
Box base
Dedicated POS duplex receptacle at18" (460mm) AFF
Data Junction Box at 18" (460mm) AFF
Double duplex receptacle at 18" (460mm)AFF
1' - 10 1/4" 1' - 10" 2' - 6"
Dedicated POS duplex receptacle at18" (460mm) AFF
Countertop (above)
Plan View
Electrical Components
Receptacle for Warming Ovenat 26" (660mm) AFF
Double duplex receptacle for Refrigeratorand Cup Labeler at 26" (660mm) AFF
Data Junction Box for CupLabeler at 26" (660mm) AFF
0' - 9 3/4"0' - 6 1/4"
Clear
2' - 6"
dwg no.
project no.
drawn
checked
project date
kenneth w. tipton, jr., aiabryon m. hume, aiadarrin l. badon, aiadaniel m. zito, aia