PLANILLA DE METRADOS (ACERO EN ESCALERA)
DESCRIPCION Ø 1/4" 3/8" 1/2" 5/8" 3/4" 1"
ESCALERATramo I
1/2" 1.93 4 1 7.72
1/2" 4.07 4 1 16.28
1/2" 4.25 4 1 17.00
1/2" 1.49 4 1 5.96
1/2" 0.91 4 1 3.65
3/8" 0.97 24 1 23.28
Tramo II
1/2" 1.87 4 1 7.48
1/2" 3.76 4 1 15.04
1/2" 3.12 4 1 12.48
1/2" 1.09 4 1 4.36
3/8" 0.96 18 1 17.28
DENSIDAD LINEAL DEL ACERO TOTAL (m) 0.00 40.56 90.0 0.00 0.00 0.00
LONG. DE
BARRA
# BARRA X
ELEMENT.
# ELEMENT. IGUALES (C/PISO)
PLANILLA DE METRADOS (ACERO EN ESCALERA)
DESCRIPCION Ø 1/4" 3/8" 1/2" 5/8" 3/4" 1"LONG.
DE BARRA
# BARRA X
ELEMENT.
# ELEMENT. IGUALES (C/PISO)
3/8 " 0.58 kg/ml TOTAL (Kg) 0.00 23.52 91.8 0.00 0.00 0.001/2 " 1.02 kg/ml TOTAL Ø (Kg) = 115.30 KG
PLANILLA DE METRADOS (VIGAS)
DESCRIPCION Ø 1/4" 3/8" 1/2" 5/8" 3/4" 1"
VIGAS
V.B (.15 X .20)
Entre ejes D-C y 3-4,D-C y 7-8Acero Negativo
5/8" 2.80 2 2 3 33.60
Acero Positivo
5/8" 2.80 2 2 3 33.60
estrivos 3/8" 0.90 22 2 3 118.80
Eje D tramo 3-7Acero Negativo
12.255/8" 12.65 2 1 3 75.90
Acero Positivo
5/8" 12.65 2 1 3 75.9012.25
estrivos 3/8" 0.90 91 1 3 245.70
Entre ejes 1' y 1 tramo A-CAcero Negativo
5/8" 7.25 2 1 3 43.50
Acero Positivo
5/8" 7.25 2 1 3 43.50
estrivos 3/8" 0.90 50 2 3 270.00
V-101 (.25 X .50)
LONG. DE
BARRA
# BARRA X ELEM.
# ELEM. IGUA LES
# DE PISO
S
Ejes 1 ,2 ,3 ,7 y 8Acero Negativo
5/8" 7.65 2 5 3 229.50
5/8" 6.95 2 5 3 208.50
Acero Positivo
5/8" 7.65 2 5 3 229.50
5/8" 1.90 2 5 3 57.005/8" 1.95 2 5 3 58.50
estrivos 1/2" 1.75 49 5 3 1286.25
Ejes 4 ,5 y 6Acero Negativo
5/8" 5.35 2 3 3 96.30
5/8" 4.65 2 3 3 83.70
Acero Positivo
5/8" 5.35 2 3 3 96.30
5/8" 1.90 2 3 3 34.205/8" 1.20 2 3 3 21.60
estrivos 1/2" 1.75 11 3 3 173.25
Eje B tramo 1'- 7Acero Negativo
18.155/8" 18.95 2 1 3 113.70
17.45
5/8" 17.85 2 1 3 107.10
Acero Positivo18.15
5/8" 18.95 2 1 3 113.70
17.45
5/8" 17.85 2 1 3 107.10
estrivos 1/2" 1.75 136 5 3 3570.00
Ejes 7 y 8 (4to piso)Acero Negativo
5/8" 7.65 2 2 1 30.60
5/8" 6.95 2 2 1 27.80
Acero Positivo
5/8" 7.65 2 2 1 30.60
5/8" 1.90 2 2 1 7.605/8" 1.95 2 2 1 7.80
estrivos 1/2" 1.75 49 2 1 171.50
Eje B tramo 1'-1 (4to piso)Acero Negativo
5/8" 1.40 2 1 1 2.80
5/8" 0.70 2 1 1 1.40
Acero Positivo
5/8" 1.40 2 1 1 2.80
5/8" 0.70 2 1 1 1.40
estrivos 1/2" 1.75 5 1 1 8.75
V-102 (.25 X .20)
Eje A tramo 1'- 8Acero Negativo
20.755/8" 21.55 2 1 3 129.30
Acero Positivo
5/8" 21.55 2 1 3 129.3020.75
estrivos 3/8" 1.10 159 1 3 524.70
eje C tramo 1'- 3Acero Negativo
5/8" 6.50 2 1 3 39.00
Acero Positivo
5/8" 6.50 2 1 3 39.00
estrivos 3/8" 1.10 49 1 3 161.70
eje C tramo 7- 8Acero Negativo
5/8" 3.50 2 1 3 21.00
Acero Positivo
5/8" 3.50 2 1 3 21.00
estrivos 3/8" 1.10 23 1 3 75.90
eje A tramo 7- 8 (4to piso)Acero Negativo
5/8" 3.50 2 1 1 7.00
Acero Positivo
5/8" 3.50 2 1 1 7.00
estrivos 3/8" 1.10 23 1 1 25.30
V-103 (.15 X .20)
eje C tramo 3- 4Acero Negativo
1/2" 1.85 2 1 3 11.10
Acero Positivo
1/2" 1.85 2 1 3 11.10
estrivos 3/8" 0.90 10 1 3 27.00
eje C tramo 6 - 7Acero Negativo
1/2" 1.45 2 1 3 8.70
Acero Positivo
1/2" 1.45 2 1 3 8.70
estrivos 3/8" 0.90 6 1 3 16.20
eje D tramo 7 - 8Acero Negativo
1/2" 3.50 2 1 3 21.00
Acero Positivo
1/2" 3.50 2 1 3 21.00
estrivos 3/8" 0.90 23 1 3 62.10
eje D y C tramo 7 - 8 (4to piso)Acero Negativo
1/2" 3.50 2 4 1 28.00
Acero Positivo
1/2" 3.50 2 4 1 28.00
estrivos 3/8" 0.90 23 4 1 82.80
Entre ejes D-C y ejes 7-8 (4to piso)Acero Negativo