PetroChina International Iraq FZE Iraq Branch شركة بترو ش ا اينا نترناشيونال م.م.ح العراق فرعTenders Announcement Tenders by: PetroChina International Iraq FZE Iraq Branch (PetroChina), Operator at Halfaya Oil Field (about 35km southeast of Amarah city) in Iraq, PetroChina is assigned the operator in the consortium, alongside partners TOTAL E&P Iraq PETRONAS Carigali Sdn. Bhd. and the State Partner South Oil Company to develop Halfaya Oil field under contract (DPSC) with Missan Oil Company. The Announced Tenders are listed below: Tender No. Tender Title HFY-PUR/HFO0517-0504 Purchase of Spare Parts and Materials for Electric System and Air Conditioners. 1 From 8:00 am on 15 th May 2014 to 03:00 pm on 17 th June 2014. Bidding collection period USD 100.00 Bid Collection fee [email protected]Contact Email HFY-PUR/PD0460-0447 Purchase of Spare heat Exchangers for CPF1. 2 From 8:00 am on 15 th May 2014 to 12:00 pm on 15 th June 2014. Bidding collection period USD 100.00 Bid Collection fee [email protected]Contact Email HFY-CON/F&C0540-0564 Provision and Installation of Furniture for Iraqi Security Forces (ISF) Camps and Check Points. 3 From 8:00 am on 15 th May 2014 to 12:00 pm on 11 th June 2014. Bidding collection period USD 100.00 Bid Collection fee [email protected]Contact Email HFY-PUR/SEC0503-0490 Purchase of 18,000 m of Razor Wire. 4 From 8:00 am on 15 th May 2014 to 12:00 pm on 11 th June 2014. Bidding collection period USD 100.00 Bid Collection fee [email protected]Contact Email 2. Qualifications and documents required for ITB package request: 2.1) Filled ITB Package Request Form. 2.2) ITB request fees receipt. 2.3) Copy of Certificate of Incorporation. 2.4) Copy of Certificate of Contracting/Trade. 2.5) Original Power of Attorney to whom ITB package مناقصاتن عن إعشركة( العراقنترناشيونال م.م.ح فرع امعلنة : شركة بتروشاينا الجهة ال يبعد الذي( حلفاية نفط المشروع حقل المنفذة ل) بتروشاينا53 لجنوب كم لا لتكون شركة بتروشاينيرت، وقد اخت في العراق)لعمارة مدينة ا الشرقي من الحكوميع شركائها شركة توتال وشركة بتروناس وشريكهمبة المنفذ م بمثاد الموقع معحت العقه ت المذكور أع شركة نفط الجنوب لتنفيذ المشروعفط ميسان . شركة نلمناقص ا ات المراد ان عا مدرجة أدناه: عنهلمناقصةوان ا عنلمناقصة رقم ا1 ز تجه قطعار غ ومىاد ل لىظاملكهربائ افاث ومك الهىاء. HFY-PUR/HFO0517-0504 ءاثلعطام ا فترة است مهلساعت ا0000 صباحا مهىم51 ار آ4052 وت لغالساعت ا03000 ءا مسا مهىم51 حز ر ان4052 رسىم ا لمشاركت بالمىاقصت00 5 ك امرر دولكترود ا البر و[email protected]2 ز تجه مبادلاري حر لمحطتلمعالجت ات المركزولى ا. HFY-PUR/PD0460-0447 ءاثلعطام ا فترة است مهلساعت ا0000 صباحا مهىم51 ار آ4052 وت لغالساعت ا54000 ءا مسا مهىم51 ران حز4052 رسىم ا لمشاركت بالمىاقصت00 5 ك امرر دولكترود ا البر و[email protected]3 مخيماتاث في تجهيز وتنصيب أثط التفتيشية ونقامن العراق قوات ا. HFY-CON/F&C0540-0564 ءاثلعطام ا فترة است مهلساعت ا0000 صباحا مهىم51 ار آ4052 وت لغالساعت ا54000 ءا مسا مهىم55 ران حز4052 رسىم ا لمشاركت بالمىاقصت00 5 ك امرر دولكترود ا البر و[email protected]4 تجهيز000111 شائكةك متر أس. HFY-PUR/SEC0503-0490 ءاثلعطام ا فترة است مهلساعت ا0000 صباحا مهىم51 ار آ4052 وت لغالساعت ا54000 ءا مسا مهىم55 ران حز4052 رسىم ا لمشاركت بالمىاقصت00 5 ك امرر دولكترود ا البر و[email protected]4 . 0مشاركت بالمىاقصتلىبت لمطلئق اللىثاث و ا المؤه2 - 1 شاركحرج طهة انذػىج نهاهيء إست ي) نؼطاء.تمذيى ا ت2 - 2 ك. لثم انثو رسىو انطهة ي وصم است) 2 - 3 يس انشركح. شهادج تأسسخح ي ) 2 - 4 نتؼالذدج ا شهاسخح ي ) / ارج. انتج2 - 5 نؼطاءو كراسح اأستخىل تب تخىيم نهشخص ان كتا) و يجة أ
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PetroChina International Iraq FZE Iraq Branch
فرع العراق نترناشيونال م.م.حاينا اششركة بترو
Tenders Announcement Tenders by: PetroChina International Iraq FZE Iraq
Branch (PetroChina), Operator at Halfaya Oil Field
(about 35km southeast of Amarah city) in Iraq,
PetroChina is assigned the operator in the consortium,
alongside partners TOTAL E&P Iraq PETRONAS
Carigali Sdn. Bhd. and the State Partner South Oil
Company to develop Halfaya Oil field under contract
Internet City, Dubai, United Arab Emirates the Republic of Iraq
Instructions:
1. It is Bidder’s obligation to submit its bid proposal at PetroChina’s office by the Closing Date before 4:00pm local
time in Dubai, or 3:00pm local time in Iraq, addressing to Tender Secretary.
2. Original Offer shall be signed properly and stamped with a company seal.
3. All bids proposal shall be submitted as follows in a separate sealed packages:
A. One (1) Original Technical Proposal
B. One (1) Copy Technical Proposal + One CD (PDF + Word/Excel)
C. Two (2) Original Commercial Proposals
D. Two (2) Copy Commercial + One CD (PDF + Word/Excel)
E. One (1) Original Bid Bond
F. One (1) Copy of Bidder’s Corporate Documentation and Authorization
Note:Electronic copy of technical and commercial bids should be prepared and sealed inside bid envelopes.
4. Technical Clarification(s) shall be electronically transmitted to the concerned OIC directly at given E-mail address
before the closing date.
5. Enquiry name and enquiry number shall be clearly indicated on your bid proposal envelope.
6. Bid Bond: To be submitted in the seal envelope, along with the Commercial Proposal; in amounting to 1% of
Proposed offer Value; failure of submission such bid bond may result in bid proposal being invalid. (Please refer
to Appendix B(ii)- Form of Bid Bond)
7. Bank Guarantee is five percent (5%) or retention money of equivalent amount till end of warranty period.
8. Bid proposal shall be submitted either by Courier or by hand in a sealed envelope.
9. Your bid must be in English language.
Notes: Each sealed envelope of the Bid Package must be marked with a company stamp on each seal and on each
corner.
PetroChina International Iraq FZE Iraq Branch
Enquiry Title: Purchase of Spare Parts and Materials for Electric System
and Air Conditioners
Enquiry No.: HFY-PUR/HFO0517-0504
Date : 15th
May 2014
MR No. : 10002451
SAP No: 63000324
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 3 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
(In Supplier’s Letterhead)
APPENDIX A– CIF UMM QASR PORT, IRAQ
COMMERCIAL OFFER
Enquiry No.: HFY-PUR/HFO0517-0504
Enquiry Name: Purchase of Spare Parts and Materials for Electric System and Air
Conditioners
Project End User Location : PetroChina Halfaya Base Camp, Amarah, Iraq
Vendor Name:
Phone:
Fax:
Email:
Attention:
1. Materials for Electricity System
No. Name Type Unit Qty
Unit Price for CIF
Umm Qasr Port
(USD)
Subtotal for CIF
Umm Qasr Port
(USD)
1 AC contactor 3TF4122-OX EA 20
2 AC contactor
CJ20-100 EA 10 CJT1-40 EA 10 CJX2-0910 EA 10
3 Thermal relay 3UA5040-1G4-63A EA 10
4 Timer relay OMRONH3BBA EA 10
! NOTE: Alternative P/N or Model Number is NOT acceptable unless justification is provided.
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 4 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
5 Pushbutton switch EA 10
6 Level controller NK-XII EA 10 ssr-04 EA 10
7 Pressure Switch PSG-2 EA 20
8 Exhaust Fan EA 200
9 Insect Killer 20W, 200tubes Set 100
10 Fluorescence Lamp 1*36W Set 100
11 Double Fluorescence Lamp 2*36W Set 100
12 Ball Ceiling Lamp 36W Set 50
13 Emergency lamp EA 20
14 ballast
36W EA 100 20W EA 100 15W EA 100
15 Transformer NG400 Z EA 100
16 Transformer NaHJ250 EA 50
17 Starter 4-60W EA 200 4-22W EA 500
18 Fluorescence tube
36W EA 200 18W EA 200 15WJM-6 EA 300
19 Bulb Light
40W EA 100 60W EA 500 100W EA 500
20 Street Lamp
400W EA 200 250W EA 200 120W EA 200 500W EA 200 1000W EA 200
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 5 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
21 Breaker
ABB NF250-CS EA 10 ABB NF100-CS EA 20 ABB NF80-CS EA 20 ABB SACES1-32 EA 20 ABB-63 3P EA 100 ABB-63 2P EA 100 ABB-63 1P EA 100 ABB-32 2P EA 100 ABB-32 1P EA 100 ABB-25 3P EA 100 ABB-25 2P EA 100 ABB-25 1P EA 100 ABB-16 2P EA 100 ABB-16 1P EA 100
22 Leakage protection
ABB-32 4P EA 100 ABB-32 3P EA 100 ABB-32 2P EA 100 ABB-25 4P EA 100 ABB-25 3P EA 100 ABB-25 2P EA 100
23 Socket
75#,75*125 EA 40 86#, 86×86 EA 40
24 Water Heater Switch EA 100 25
Socket 7380-18 EA 200 MGT460 EA 200
26 Switch
86# EA 100
27 socket Base 86# EA 200
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 6 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
28 Plug
10A EA 200 16A EA 200 13A British EA 200 15A British EA 200
29 Cuprum Wire
1.5 ㎜² M 1000 2.5 ㎜² m 1000 4 ㎜² m 1000 6 ㎜² m 1000
30 cable
4×4 ㎜² m 600 4×6 ㎜² m 500 4×10 ㎜² m 300 4×16 ㎜² m 300
31 Copper Clip
1.5 ㎜² EA 100 2.5 ㎜ EA 100 4 ㎜² EA 100 6 ㎜² EA 100 10 ㎜² EA 100 16 ㎜² EA 100 25 ㎜² EA 50 32 ㎜² EA 50 50 ㎜² EA 50 70 ㎜² EA 50 95 ㎜² EA 50 120 ㎜² EA 50
32 Copper cannula
4 ㎜² EA 50
6 ㎜² EA 50 10 ㎜² EA 50
16 ㎜² EA 50
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 7 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
25 ㎜² EA 50
32 ㎜² EA 50 50 ㎜² EA 50 70 ㎜² EA 50 95 ㎜² EA 50 120 ㎜² EA 50
No. Description Specification Qty Unit Photos Unit Price
(USD)
Subtotal
(USD)
1 Kerry compressor
2JS324D3Ab07 20
EA
2JS438D3FE02 20
EA
2 LG compressor
QJ330PAA 2P 50 EA
SHY33MC4-E 2P 50 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 8 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
3 Aux compressor
2GQP442PAE 3P 20 EA
2GQP464PAA 3P 20 EA
4 Capacitor
35U 100 EA
4UF 100 EA
45+5 100 EA
50+5 100 EA
2.5UF 100 EA
55+5 100 EA
70UF 100 EA
5 Copper pipe
Φ6 50m
m
Φ8 50m m
Φ10 50m m
Φ12 50m m
Φ14 50m m
Φ16 50m m
Φ19 50m m
6 Insulation tube
Φ12 50m m
Φ19 50m m
7 Copper welding rod 50kg
kg
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 9 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
8 Fan shaft
Kerry 50
EA
LG 50 EA
9 R404A
Freon
F22 20 EA
F12 20 EA
10 Freon R134A 1 EA
11 Four-way valve SHF-7(SHF-7-
34U-PG) 50 EA
12 AC contactor 220V 3100Y 20U
6777C 50 EA
13 Control panel
Kerry 50 EA
LG 1865KS-
H2665 SA2 3P 50 EA
14 Freezer control device 50 EA
15 Wrap bandage 100 pieces for 1
box 5 boxes
Box
16 Vacuum pump 141 1
EA
17 Tool box 1 EA
18 Oxygen gas cylinder 2 EA
19 Acetylene gas cylinder 2 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 10 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
20 Oxygen meter 2 EA
21 Acetylene meter 2 EA
22 Welding gun 5 EA
23 Oxygen/acetylene high
voltage tube 200m
m
24 gas cylinder valve 10
EA
25 Pipe cutter 4 EA
26 pipe expander 2 EA
27 Sealing clamp 2 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 11 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
28 Bipitch Table fluoridation With forcing pipe 5 EA
29 hydraulic drill With 60# drill bit 1
EA
30 Electric drill 5
EA
31 Chargeable/portable
electric drill 5
EA
32 Alloy steel hole opener Φ60 10
EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 12 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
33 8’-10’-12’ adjustable
spanner
6 (2 for
each type)
EA
34 Box spanner 1
EA
35 Open spanner 2
EA
36 Hex wrench 2
EA
37 Screw driver Slot type and
cross type
10 (5 for
each type)
EA
38 Nipper pliers 2
EA
39 Diagonal pliers 2
EA
40 Cutting nippers 2
EA
41 Plier current meter Minor type 2 EA
42 Magneto-ohmmeter 2 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 13 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
43 Multi-tester 9208 2
EA
44 Chlorine leak detector 2
EA
45 Reserve machine
2P 10
EA
LG3P 10
EA
LG2P 10
EA
46 Electric iron 35W 5
EA
47 Tin wire 20 coil Coil
Total in USD (CIF UMM QASR PORT, IRAQ)
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 14 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
3. Spares for OCC building York Central Air Conditioning System
No. Description Model Qty Remark Unit Price
(USD)
Subtotal
(USD)
1 HS (high voltage switch) 3
2 LS (low voltage switch) 3
3 EXV 6
4 transformer 344243 5
11V
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 15 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
5 4 WAY valve 5
6 heat by pass valve 5
7 Oil return valve 5
8 Oil balanced valve 5
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 16 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
9 Compressor solenoid valve 264198 5
10 Protector in fan motor 5
11 Outer engine blower motor 692799 5
12 outer engine sail 533106 10
13 digital compressor 721534 2
14 fixed frequency Compressor 420814 2
15 outer engine panel 685030 5
16 liquid crystal wire controller 879190 5
17 inner engine blower motor 2
18 inner engine sail 2
19 temperature-sensing head 5K 344242 10 5k
20 temperature-sensing head 10K 344090 10 10k
21 temperature-sensing head 50K 525360 10 50k
22 Mouth for Freon filling 3
For York A/C
23 R410a 10
24 electrohydraulic lifter 1 First floor repair lamp, about
10meter high;
25 folding standing ladder 2 about 4.5 meter high;
Total in USD (CIF UMM QASR PORT, IRAQ)
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 17 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
SUMMARY BREAKDOWN
S# Type Total in USD
1. Materials for Electricity System
2. Materials for Air Conditioners
3. Spares for OCC building York Central
Air Conditioning System
GRAND TOTAL in USD (CIF UMM QASR PORT, IRAQ)
Notes:
(1) The cost of the containers for the goods shall be included in the estimated cost which describe under below condition:
a. Container shall be free from detention charges for a period of 30 days after arrival to Umm Qasr Port, Republic of Iraq.
b. PetroChina will be responsible to return back of this container to port.
(2) COMPANY shall have the right to perform manufacturer inspection whenever COMPANY thinks it is necessary.
(3) Commercial Offer for CIF delivery shall be submitted in a separate sealed envelope.
VENDOR PROPOSED PETROCHINA REQUIREMENT
Payment Terms Expected Payment Terms
Payment will be made within forty five (45) days from receipt of correct and undisputed invoice (including all supporting documents) from Supplier. 100% against delivery order (goods arrived and received as manifest in the final BL at Umm Qasr Port, Republic of Iraq)
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
4 Capacitor
35U 100 EA
4UF 100 EA
12 weeks
after issuance
of PO
45+5 100 EA
50+5 100 EA
2.5UF 100 EA
55+5 100 EA
70UF 100 EA
5 Copper pipe
Φ6 50m
m
Φ8 50m m
Φ10 50m m
Φ12 50m m
Φ14 50m m
Φ16 50m m
Φ19 50m m
6 Insulation tube
Φ12 50m m
Φ19 50m m
7 Copper welding rod 50kg
kg
8 Fan shaft
Kerry 50
EA
LG 50 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 24 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
9 R404A
Freon
F22 20 EA 12 weeks
after issuance
of PO
F12 20 EA
10 Freon R134A 1 EA
11 Four-way valve SHF-7(SHF-7-34U-PG) 50 EA
12 AC contactor 220V 3100Y 20U 6777C 50 EA
13 Control panel
Kerry 50 EA
LG 1865KS-H2665 SA2 3P 50 EA
14 Freezer control device 50
EA
15 Wrap bandage 100 pieces for 1 box 5 boxes
Box
16 Vacuum pump 141 1
EA
17 Tool box 1 EA
18 Oxygen gas cylinder 2 EA
19 Acetylene gas cylinder 2 EA
20 Oxygen meter 2 EA
21 Acetylene meter 2 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 25 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
22 Welding gun 5 EA 12 weeks
after issuance
of PO
23 Oxygen/acetylene high voltage
tube 200m
m
24 gas cylinder valve 10
EA
25 Pipe cutter 4 EA
12 weeks
after issuance
of PO
26 pipe expander 2 EA
12 weeks
after issuance
of PO
27 Sealing clamp 2 EA
12 weeks
after issuance
of PO
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 26 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
28 Bipitch Table fluoridation With forcing pipe 5 EA
12 weeks
after issuance
of PO
29 hydraulic drill With 60# drill bit 1
EA
12 weeks
after issuance
of PO
30 Electric drill 5 EA
12 weeks
after issuance
of PO
31 Chargeable/portable electric drill 5 EA
32 Alloy steel hole opener Φ60 10 EA
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 27 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
33 8’-10’-12’ adjustable
spanner
6 (2 for
each
type)
EA
12 weeks
after issuance
of PO
34 Box spanner 1 EA
35 Open spanner 2 EA
36 Hex wrench 2 EA
37 Screw driver Slot type and cross type
10 (5 for
each
type)
EA
38 Nipper pliers 2 EA
39 Diagonal pliers 2 EA
40 Cutting nippers 2 EA
41 Plier current meter Minor type 2 EA
12 weeks
after issuance
of PO
42 Magneto-ohmmeter 2 EA
12 weeks
after issuance
of PO
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 28 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
43 Multi-tester 9208 2 EA
12 weeks
after issuance
of PO
44 Chlorine leak detector 2 EA
45 Reserve machine
2P 10 EA
LG3P 10 EA
LG2P 10
EA
46 Electric iron 35W 5
EA
47 Tin wire 20 coil Coil
12 weeks
after issuance
of PO
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 29 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
3. Spares for OCC building York Central Air Conditioning System
No. Description Model Qty /UOM Remark
Expected Delivery
( CIF Umm Qasr
Port)
Bidder’s
Proposed
Delivery
1 HS (high voltage switch) 3 , EA
12 weeks after
issuance of PO
2 LS (low voltage switch) 3, EA
12 weeks after
issuance of PO
3 EXV 6, EA
12 weeks after
issuance of PO
4 Transformer, 11V 344243 5, EA
12 weeks after
issuance of PO
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 30 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
5 4 WAY valve 5 , EA
12 weeks after
issuance of PO
6 heat by pass valve 5 , EA
12 weeks after
issuance of PO
7 Oil return valve 5 , EA
12 weeks after
issuance of PO
8 Oil balanced valve 5, EA
12 weeks after
issuance of PO
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 31 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
9 Compressor solenoid valve 264198 5 , EA
12 weeks after
issuance of PO
10 Protector in fan motor 5, EA
12 weeks after
issuance of PO
11 Outer engine blower motor 692799 5, EA
12 outer engine sail 533106 10, EA
13 digital compressor 721534 2, EA
14 fixed frequency Compressor 420814 2, EA
15 outer engine panel 685030 5, EA
16 liquid crystal wire controller 879190 5, EA
17 inner engine blower motor 2, EA
18 inner engine sail 2, EA
19 temperature-sensing head 5K 344242 10, EA 5k
20 temperature-sensing head 10K 344090 10, EA 10k
21 temperature-sensing head 50K 525360 10, EA 50k
22 Mouth for Freon filling 3, EA
For York A/C
23 R410a 10 , EA
12 weeks after
issuance of PO
24 electrohydraulic lifter 1, EA First floor repair lamp, about
10meter high;
25 folding standing ladder 2 , EA about 4.5 meter high;
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 32 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX B (II)
BIDDER’S CORPORATE DOCUMENTATION AND AUTHORIZATION
BIDDER’S CORPORATE DOCUMENTATION AND AUTHORIZATION
Bidder shall submit in a separate and clearly marked envelop the appropriate documentation to evidence its legal existence. I f
documents are not originally in the English language, they have to be translated into English by a certified public translato r.
Documents to be provided shall be as indicated below:
1. Local Iraqi Companies (registered/incorporated in Iraq pursuant to Iraqi Companies Law) .
(a) Certificate of Incorporation and/or Business License,
(b) Memorandum of Association,
(c) Company ID,
(d) Power of Attorney.
Except for the Power of Attorney that shall be submitted in original and duly notarized by a Public Notary; all documents may
be submitted in copies with the original seal of the issuing authority stamped on them. As the case maybe, B idder may present
such documents in original to allow PetroChina verify compliance with applicable regulations.
2. UAE Companies (registered/incorporated in the UAE or in a UAE Free Zone) .
(a) Certificate of Incorporation and/or Business License (DED Trade License),
(b) Memorandum of Association and membership in Chamber of Commerce,
(c) Power of Attorney
Except for the Power of Attorney that shall be submitted in original and duly notarized by a Public Notary; all documents may
be submitted in copies with the original seal of the issuing authority stamped on them. As the case maybe, Bidder may present
such documents in original to allow PetroChina verify compliance with applicable regulations. Companies incorporated in a
Free Zone shall comply with such local requirements, as they may be applicable.
PetroChina International Iraq FZE Iraq Branch
Enquiry No. : HFY-PUR/HFO0517-0504 Page 33 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
3. Companies incorporated/registered outside Iraq and/or the UAE (Branches of Foreign Companies) .
(a) Certificate of Registration in the country of origin,
(b) Memorandum of Association in the country of origin,
(c) Power of Attorney,
(d) Registration of an Office Branch in Iraq (Domiciliation); only if activities are to be performed in Iraq.
Documents under (a), (b) and (c) above have to be submitted in original hard copy, notarized by Public Notary an d
legalized/authenticated by the correspondent Iraqi diplomatic representation in the country of origin. Concerning the
Registration of the Office Branch in Iraq, under (d), it may be submitted in a copy with the original seal of the issuing aut hority
stamped on it.
4. Same requirements, as mentioned above, shall be complied by Bidder’s Parent Company if a parent company guarantee is
requested; as well as, by each member of a joint venture, consortium or partnership, if the offer is jointly submitted.
5. All documents shall be valid and in force, documents with their validity expired shall not be accepted.
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 34 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX C
TERMS AND CONDITIONS
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 35 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX A
TERMS & CONDITIONS 1) DELIVERY, INSPECTION AND ACCEPTANCE (a) Unless expressly agreed otherwise in writing, all Goods must be delivered at the designated Delivery Point within Twelve (12) weeks from the date of PO issuance. The Goods shall be delivered based on CIF Umm Qasr Port, Republic of Iraqand include all the duties, taxes, and other fees required by as per the applicable laws.
2) LIQUIDATED DAMAGES If delivery of the Goods is not completed by the Delivery Schedule as indicated in Section (1) above,
Supplier shall pay PetroChina up to 10% of the Purchase Order as Liquidated Damages. The
Liquidated Damages shall accrue on a daily basis until Supplier shall have delivered the Goods in
accordance with the requirements of the Purchase Order. Both PetroChina and Supplier agree that
such Liquidated Damages represent a genuine and reasonable pre-estimate of the losses likely to be
suffered by PetroChina in the event of any delay in the delivery of Goods as specified in the Purchase
Order. Liquidated Damages shall be calculated as per following formula: Purchase Order value/
Delivery Period x 10%= Liquidated Damages per day.
Note: Company reserves the right to exercise its rights and opportunities pursuant to this Section 2 at
its discretion. The exercise or non-exercise by Company and/or its authorized representative of such
rights and opportunities shall not relieve or discharge Supplier of liability for any of its duties,
obligations and responsibilities under this Contract.
3) PRICE The Price for the Goods shall be as set out in the PO Signature Page, contained in the invoice(s) to be provided by Supplier; all charges, costs, expenses, fees, taxes, customs, excise duties, corporate tax or income tax shall be included in the Price set out therein. All prices are fixed, no Price increase or additional charges shall be permitted without PetroChina’s prior written consent. The Price shall be the maximum value of Goods that will be paid under this PO. 4) INVOICING AND PAYMENT (a) Unless otherwise expressly provided for herein, Supplier shall invoice PetroChina for Goods delivered and accepted. Bidder’s invoice shall be submitted as one (1) original invoice together with sufficient original supporting documentation to permit verification thereof by PetroChina. All invoices shall include the reference of this PO and the description of Goods supplied, as indicated in the Signature Page. All invoices shall be prepared in Supplier’s official letterhead and signed by Supplier’s authorized representative. Invoices shall be addressed to:
PetroChina International Iraq FZE Iraq Branch C/o PetroChina Halfaya FZ-LLC Finance and Accounting Department The Greens, Building No.1 (CNPC Building), 8
th Floor, Office 822
P. O. Box 500486, Dubai, United Arab Emirates
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 36 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
(b) Notwithstanding anything else contained herein, invoices shall be rendered to and paid by PetroChina in United States Dollars by wire transfer to the following bank account of the Bidder: Name of Bank : Name of Account : Account Number : SWIFT CODE : Provided that Supplier may specify different bank account details to Petrochina in writing from time to time; provided, further, that any such change in bank account details shall be effective only five (5) Business Days’ after PetroChina has acknowledged receipt thereof. (c) Payment of invoices shall be subject to withholding as required by any applicable tax laws in the Republic of Iraq. (d) Payment of undisputed invoices shall be remitted within forty five (45) days after proof of delivery was duly submitted thereof to PetroChina. If the forty fifth (45) day falls on a Friday, a Saturday or an official public holiday in the Republic of Iraq or the United Arab Emirates, the next working day shall be deemed to be the due date for remittance. 5) TERMINATION (a) PetroChina may terminate all or part of this PO, even before the delivery of the Goods at the Delivery Point, in the event of Supplier (i) fails to comply with any express or implied provisions of this PO, (ii) incurs in insolvency, involuntary bankruptcy, or receivership, (iii) makes an assi gnment of this PO for the benefit of creditors, (iv) has taken steps to liquidate or voluntarily wind up its operations, or (v) is wound up by the courts. Upon such termination: (i) PetroChina shall be relieved of all further obligations under this PO except the obligation to pay Bidder for Goods delivered and accepted prior to the effective date of such termination; and, (ii) Supplier shall be liable to PetroChina for all reasonable costs incurred as a consequence of such termination.
6) WARRANTY PERIOD Bidder shall warrant the Goods against any defects for a period of twelve (12) months from the date of acceptance of the Goods. Such acceptance shall be advised within 14 days of receiving of goods at PetroChina Base camp, Iraq. Any defective Goods shall either be replaced or repaired to the satisfaction of PetroChina. It is agreed that the replaced or repaired Goods shall be re -warranted for a further period of six (6) months from the date of replacement or repair.
7) ASSIGNMENT Supplier shall not assign any of his rights and obligations under this PO without obtaining PetroChina prior written approval
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 37 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
8) GOVERNING LAW AND DISPUTE RESOLUTION
I. This PO shall be governed under the English laws(without reference to its rules as to conflict of laws) and excluding and excluding Contracts (Third party Rights) Act 1999.
II. The Parties agree to negotiate in good faith to resolve any Legal Dispute that may arise first by negotiations between representatives of each Party who have authority to settle the controversy. When a Party believes there is a Legal Dispute relating to this Agreement, the Party will give the other Party written notice of the Legal Dispute. The authorized representatives of the Parties shall meet at a mutually acceptable time and place within thirty (30) days after the date of the notice to exchange relevant information and to attempt to resolve the Legal Dispute. The authorized representatives of the Parties shall be entitled to representation by legal counsel at the negotiations. All negotiations shall be confidential and shall be treated as compromise and settlement negotiations. Notwithstanding the above provisions, if either Party deems that time is of the essence in resolving the Legal Dispute, it may initiate arbitration and seek an expedited formation of the tribunal, seek interim measures, if appropriate, and then comply with the requirements for negotiations as long as they are fully completed before the commencement of the final hearing on the merits in the arbitration proceeding. A “Legal Dispute” means any dispute, controversy or claim, of any and every kind or type, whether based on contract, tort, statute, regulations or otherwise, arising out of, connected with, or relating in any way to this Agreement or the obligations of the Parties, including any dispute as to the existence, validity, construction, interpretation, negotiation, performance, non-performance, breach, termination or enforceability of this Agreement.
III. If the Legal Dispute has not been resolved within sixty (60) days after the date of the notice of the Legal Dispute, or if the Party receiving such notice fails or refuses to meet within such time period, either Party may initiate arbitration proceedings. The arbitration shall be conducted in accordance with the Hong Kong International Arbitration Centre Rules as in effect on the date of commencement of the arbitration proceeding (the “HKIAC Rules”). The arbitration shall be conducted and finally settled by three arbitrators. All Legal Disputes shall be settled through final and binding arbitration, it being the intention of the Parties that this is a broad form arbitration agreement designed to encompass all possible Legal Disputes between the Parties relating to the transactions that are the subject of this Agreement.
IV. The arbitration process referred to in the preceding paragraph shall take place in Hong Kong, shall be administered by the Hong Kong International Arbitration Centre and shall be conducted in the English language, with appropriate arrangements made for the translation of any oral testimony.
V. The Party in whose favor the Legal Dispute is resolved may request the enforcement of the arbitration award before any court of competent jurisdiction if the other Party does not comply with what is resolved.
VI. Each Party agrees that service of process in any action, suit or proceeding referred to in this Section 34 shall be deemed in every respect effective service of process upon it if sent to it at the address specified in Section 24 for notice purposes pursuant to the provisions of this Agreement. The arbitrators shall apply principles of legal privileges, such as those involving the confidentiality of communications between a lawyer and a client. The arbitrators shall render any monetary award in U.S. dollars, with pre-award and post-award interest calculated at an agreed interest rate thereon and are authorized to award costs and attorney’s fees or allocate them between the Parties.
VII. Each of the Parties, together with any members of their Groups, as relevant, shall appoint one arbitrator, within thirty (30) days of receipt of notice of the commencement of the arbitration, and the two arbitrators so appointed shall select the presiding arbitrator within thirty (30) days of their nomination. If either Party does not appoint an arbitrator as specified in the immediately preceding sentence or if the party-appointed arbitrators fail to agree on the presiding arbitrator within thirty
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 38 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
(30) days of their nomination, then the Hong Kong International Arbitration Centre shall appoint such arbitrator.
VIII. A majority of the arbitrators may grant interim measures including injunctions, attachments and conservation orders in appropriate circumstances, which measures the Parties agree may be immediately enforced by the arbitrators or by court order. Hearings on requests for interim measures may be held in person, by telephone or by video conference, and requests for relief, responses, briefs or memorials may be sent to, and orders or awards received from, the arbitrators by facsimile or other similar means which include a confirmation of delivery. Notwithstanding the requirements for negotiation between the Parties, prior to the constitution of the arbitration tribunal and thereafter as necessary to enforce the arbitrators’ rulings or in the absence of the jurisdiction of the arbitrators to rule on interim measures in a given jurisdiction, either Party may apply to a court for interim measures, and the Parties agree that seeking and obtaining such measures shall not waive the right to arbitration.
IX. If a Legal Dispute occurs or if arbitration proceedings regarding such Legal Dispute have been initiated, the Parties shall continue to exercise their rights and fulfill their obligations under this Agreement with respect to all other matters unrelated to such Legal Dispute.
9) INSURANCE
a) Supplier, at its sole expense, shall carry with solvent and reputable insurance carriers insurance coverage of the types and in the minimum amounts stated in Appendix C at all times during the term of this Agreement. Any and all deductibles shall be assumed by and shall be for the account of Supplier.
b) Prior to providing any Goods, Supplier or its Affiliates engaged in providing the Goods shall furnish COMPANY certificates, on a form acceptable to COMPANY, signed by authorized representatives of the insurance companies providing the coverage, evidencing all coverage’s, extensions and limits required to be carried by Supplier or such Affiliates under the provisions of this Agreement. Upon request, COMPANY shall have the right to examine or inspect the originals or certified copies of such insurance policies in the offices of Supplier or such Affiliates during normal business hours.
c) Supplier shall cause COMPANY and COMPANY Group to be included as additional insured and to be covered by all insurances set forth in Appendix C with respect to the operations conducted under this Agreement and shall cause the insurers thereof to waive all expressed or implied rights of subrogation against COMPANY and COMPANY Group. Supplier shall further cause the Comprehensive General Third Party Liability Insurance to contain a “severability-of-interests” (cross-liability) clause providing that in the event of one insured Party incurring liability to any of the other insured Parties, the insurance shall apply for the benefit of the Party against whom a claim is or may be made in the same manner as if separate policies had been issued to insure each Party.
d) All premiums, deductibles, exceptions and exclusions applicable to the foregoing insurances shall be for the account of and be paid by Supplier. Any breach of conditions and/or warranties contained in such policies of insurances shall also be for the account of Supplier.
e) Upon request by COMPANY, Supplier shall furnish COMPANY with certified copies of policies of insurance as set forth in Appendix B accompanied by certified copies of official receipts evidencing full payment of premiums thereof. No insurance shall be canceled or materially discharged during the term of this Agreement without COMPANY’s prior written consent. Policies and/or extension certificates or documents shall be furnished to COMPANY as and when requested by COMPANY.
f) Supplier shall be responsible for, and liable to, and shall release, indemnify, defend and hold COMPANY and COMPANY Group harmless from and against any and all Claims or liability for loss
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 39 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
or damage arising out of any failure to obtain or maintain such insurances specified by this Agreement or out of any act or omission which invalidates such insurances
g) Should Supplier at any time neglect or refuse to provide or renew any insurance required herein, or should any insurance be canceled, COMPANY shall have the right to procure such insurance and, in such event, any sum so paid by COMPANY shall immediately become due and payable to COMPANY by Supplier. COMPANY shall be entitled to deduct such sums from any monies due or which may become due to Supplier under this Agreement in addition to any other remedies COMPANY may have.
h) Supplier shall notify COMPANY immediately upon receipt of any notice of Claims, incidents or demands or of any situation which may give rise to such Claims or demands being made with respect to this Agreement under the said policies. Written notice of any accident shall be given not later than two (2) Business Days after the occurrence of the accident. However, for serious accidents (including death or serious injuries) Supplier shall advise COMPANY immediately and provide written confirmation within two (2) Business Days.
i) The insurance coverage amounts required to be obtained by Supplier pursuant to this Agreement shall be the minimum and not the maximum limits of liability. Supplier may provide other insurance coverage or higher limits of coverage. COMPANY will bear no financial liability attributable to deficient insurance coverage by Supplier.
j) Without COMPANY’s prior written consent, Supplier shall not be allowed to self-insure for one or more of the risks as to which coverage is required pursuant to this Agreement.
k) Supplier shall not begin to provide the Goods until all the insurances and; if applicable, COMPANY’s written consent for self-insurance, required by this Section 11 and set forth in Appendix C is in force.
l) Nothing in this Section 11 shall serve in any way to limit or waive Supplier’s responsibility under this Agreement.
10) BANK GUARANTEE
Supplier shall provide a bank guarantee of five percent (5%) from the purchase order value for
a period of twelve (12) months from the delivery date.
OR
Five percent (5%) of Supplier’s invoice (s) to be withheld for twelve (12) months if Supplier fails
to provide the Bank Guarantee.
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 40 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX B (i)
FORM OF BANK GUARANTEE
To: PetroChina International Iraq FZE Iraq Branch
PetroChina Halfaya Base Camp Kahla’a
Missan Governorate, Republic of Iraq c/o PetroChina Halfaya FZ-LLC Department of Contract, procurement and Logistics Dubai Internet City, Building No. 10, Fourth Floor Dubai, United Arab Emirates
This Bank Guarantee is made on [insert date] and issued by [insert name of bank] (the “Guarantor”), having its registered address at [insert address] in favor of PetroChina International Iraq FZE Iraq Branch (the “Company”), a company duly domiciled in the Republic of Iraq, pursuant the contract No. [insert number of contract] for Purchase of Spare Parts and Materials for Electric System and Air Conditioners Agreement (the “Agreement”), dated [insert effective date contract], executed by and between Company and [insert name of Contractor (the “Contractor”).
1. Since Contractor has agreed to perform the mentioned [insert work and/or services] in accordance with the Agreement, and at the request of Contractor, The Guarantor hereby irrevocably and unconditionally guarantee the sum of [insert amount in letters] [insert amount in numbers] in favour of Company, that being the amount of financial guarantee required for the Agreement. Guarantor assumes its obligation as primary obligor and not as surety only, guaranteeing the due and punctual performance and observance by Contractor of the terms and conditions of the Agreement and amendments thereof which may subsequently be duly executed by Contractor and the due payment and discharge of all moneys whatsoever which may from time to time fall due to be paid by Contractor to Company or any third party under or pursuant to the Agreement. The sum shall, at the option of Company, be drawable and shall become payable by Guarantor immediately on first demand by Company without proof or conditions and notwithstanding any contestation or protest by Contractor or any other third party. Company may demand all or part of the guaranteed amount. Any part of the guaranteed amount which is undrawn may be drawn by Company in a subsequent demand or demands.
2. Guarantor, irrespective of the validity and legal effects of the Agreement and waiving all rights of objection and defense arising therefrom, undertake to pay any sum or sums not exceeding the above-mentioned maximum amount. This Guarantee will be only reduced by each payment made by Guarantor to Company as a result of a claim.
3. This Guarantee is a separate, additional, continuing and primary obligation of Guarantor and not an accesory to the Agreement. The Gurantee shall be continuing and shall extend to the ultimate balance of the liabilities, regardless of any intermediate payment in whole or in part or performance in part and irrespective of the exercise, variation, renewal, waiver, release or enforcement of any rights or remedies against Contractor.
4. The Guarantor shall not be discharged or released from this guarantee by any agreement made between Contractor and Company with or without the consent of the Guarantor unless such agreement expressly and explicitly provides for such release. Additionally, the Guarantor shall not be discharged or released from this guarantee by any alteration in the obligations undertaken by Contractor or by any forbearance whether as to payment, time, performances or otherwise, or by any change in name or constitution of Company or Contractor.
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 41 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
5. Guarantor warrants that this Guarantee constitutes its legally binding obligations enforceable in accordance with its terms and does not conflict with any law, regulation or instrument binding on or relating to the Guarantor and that this Guarantee is within its powers, has been duly authorized by it and all acts, conditions and things required to have been done, fulfilled and performed by it in order to ensure its proper authorization and issue of this Guarantee and to ensure that its obligations under this Guarantee are legal, valid and binding on it and to ensure that this Guarantee is admisible in evidence under the Applicaale Laws, have been done, fulfilled and performed.
6. All sums payable under this Guarantee shall be paid in full without set-off or counter-claim and free and clear of and without deduction of or withholding for or on account of any present or future taxes, duties or other charges.
7. This guarantee is a continuing security and accordingly shall remain valid until three (3) months after expiry of warranty period.
8. The Guarantor agrees that this guarantee is given regardless of whether or not the sum outstanding is occasioned by loss, damages, costs, and expenses or otherwise incurred by Company and whether or not the sum outstanding is recoverable by legal action or arbitration.
9. This Bank Guarantee shall be Governed by the Laws of England and Wales (without reference to its rules as to conflicts of law), excluding the Contracts (Rights of Third Parties) Act 1999. Any dispute arising out of its terms and conditions, interpretation, validity or enforceability will be subject to the Hong Kong International Arbitration Centre Administered Arbitration Rules, in force as of the date of commencement of the arbitration procedings, under the procedure and proceeding established in the Agreement. Arbitration venue shall be Hong Kong a special administrative region of People’s Republic of China.
IN WITNESS whereof this guarantee has been duly executed by Guarantor the ________day of _________ for and on behalf of ___________________ for (Name of Bank)
Name: (Authorized Signature)
Designation:
Banker’s Seal:
Address:
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 42 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX B (ii)
FORM OF BID BOND
Date: [●]
To: PetroChina International Iraq FZE Iraq Branch
c/o: Department of Contract, Procurement and Logistics
Dubai Internet City, Building No. 10, Four Floor
Dubai, United Arab Emirates
Re: Bid Bond
We, [name of bank] (the “Bank”), hereby issue in favour of PetroChina International Iraq FZE Iraq
Branch (the “COMPANY”) our bid bond number [●], in the aggregate maximum amount of [●]
(hereinafter referred to as the “Bid Bond”) on behalf of [insert name of Vendor] in connection with its
bid for Tender No. HFY-PUR/HFO0517-0504.
We unconditionally and irrevocably undertake to pay to COMPANY, without deduction or set -off of any
kind, the above-mentioned amount upon our receipt of a payment demand (a “Payment Demand”) and
without COMPANY having to substantiate its demand. Partial drawings and multiple presentations are
permitted hereunder; provided, however, that the aggregate amount of such drawings shall not e xceed
the amount set forth in this Bid Bond. Payment under this Bid Bond shall be made by wire transfer of
immediately available funds to the account specified in the Payment Demand.
All correspondence and any drawings under this Bid Bond are to be directed to our office at [●] (the
“Payment Office”), attention: [●] and shall mention this Bid Bond number [●]. Our customer inquiry
number is [●]. Our facsimile number is [●].
Drawings under this Bid Bond may be by presentation of paper documents or by facs imile or other
electronic communication received at our office stated above. If we receive your complying Payment
Demand at or prior to 11:00 a.m., local time in the location of the Payment Office on any banking day,
we will honour the Payment Demand and make payment by 2:00 p.m., local time in the location of the
Payment Office on the first banking day after the day on which such Payment Demand is received. If
we receive your complying Payment Demand after 11:00 a.m., local time in the location of the Paym ent
Office on any banking day, we will honour the drawing and make payment by 2:00 p.m., local time in
the location of the Payment Office on the second banking day after the day on which such Payment
Demand is received. If a Payment Demand does not comply with the terms and conditions of this Bid
Bond, we will give notice of dishonour within one banking day after the banking day on which such
drawing is received.
All drawings under this Bid Bond must be made on or before _______ [insert the ninetieth day
following Bid Closing Date].
Upon the Expiry Date, this Bid Bond shall become null and void, whether returned to the Bank for
cancellation or not and any claim or statement received after the Expiry Date shall be ineffective and
not accepted; provided, however, that any claim or demand received by us prior to the Expiry Date in
accordance with its terms shall not be affected.
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 43 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
This Bid Bond shall be construed and interpreted according to and governed by the laws of England
and Wales (without reference to its rules as to conflicts of laws), excluding the Contracts (Rights of
Third Parties) Act 1999. Any dispute, including any question regarding existence, validity or termination
of this Bid Bond shall be finally and exclusively settled in accordance with the Hong Kong International
Arbitration Centre Administered Arbitration Rules (the “HKIAC Rules”), in force as of the date of this Bid
Bond. The arbitration proceedings shall be held in London, England, the United Kingdom, adminstered
by the London Court of International Arbitration, and in the English language. This provision shall not
restrict the parties from reaching any subsequent agreement in the event of a failure of the procedure
under the HKIAC Rules.
[name of issuing bank],
By:
……………………..
[insert name and title]
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 44 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX C
INSURANCE
Supplier shall carry and maintain in full force for the duration of the Agreement, at a minimum, the following insurance with companies satisfactory to COMPANY:
a. Workers’ compensation and Occupational Disease Insurance in accordance with the Applicable Law requirements of the jurisdiction in which the Goods are to be manufactured and/or procured, the jurisdiction in which Supplier’s personnel reside and the jurisdiction in which Supplier is domiciled, covering all liabilities owed for compensation and other benefits under the relevant Workers’ Compensation laws of each such jurisdiction.
b. Personal Accident Insurance or similar statutory social insurance, as required by Applicable Laws and which may be applicable and/or accidental death or dismemberment insurance, covering all Supplier’s personnel engaged in the manufacture and/or purchase and supply of the Goods. The Employer’s Liability Policy shall provide an indemnity based on the statutory limit for any one occurrence.
c. In the event that Supplier provides any automobiles in association with its purchase and supply of the Goods, Motor (Automobile) Insurance covering owned, non-owned, hired, operated or licensed automobiles by Supplier providing unlimited coverage for injury or death and a minimum limit of One Hundred and Fifty Thousand United States dollars (U. S. $ 150,000.00), per occurrence for property damage.
d. Transportation insurance covering the Equipments, materials, bulk materials and supplies provided by Supplier at and from ports and/or places anywhere in the world to arrival at the Site, direct shipment or via ports and/or places in any order, including transits to or from and while at the premises of forwarders, packers, consolidators, haulers, warehousemen and other bailees, via any route, including risks in customs and temporary storage as required;
e. Any other insurances which may be relevant and/or which may be required by any Laws to which the Supplier and its Subcontractors are subject to.
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 45 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX D
SHIPPING DOCUMENTS INSTRUCTIONS
AND REQUIREMENTS FOR GOOD DELIVERY
UNDER CIF TERMS AND CONDITION
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 46 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
APPENDIX D
SHIPPING DOCUMENTS INSTRUCTIONS
1. Consignee
Missan Oil Company / PetroChina International Iraq FZE Iraq Branch, PetroChinaHalfaya Base Camp, Kahla’a, Missan Governorate, Iraq Contact: Mr. Khalid., Mobile: 00964 7811 648 840, [email protected] Mr. Haitham., Mobile: 07817125366, [email protected] Note: the consignee information shall be the same to the one in following shipping documents: PO, COO, CI, PL and BL/AWB.
2. Notify Party
PetroChina International Iraq FZE Iraq Branch, PetroChinaHalfaya Base Camp, Kahla’a, Missan Governorate, Iraq Contact: Mr. Khalid., Mobile: 00964 7811 648 840, [email protected] Mr. Haitham., Mobile: 07817125366, [email protected] Note: the Notify Party information shall be the same to the one in following shipping documents: PO, COO, CI, PL and BL/AWB.
3. Supplier Name
The supplier name shall be the same on the following shipping documents: PO, CI and PL.
4. Quantities
a) The Quantity of each item in the CI shall be identical with the Quantity of the same item in the PL;
consequently the total Quantity in the CI and PL shall be identical as well.
b) If only one shipment under the PO, total Quantity in the CI & PL shall not exceed the Quantity in the
PO, otherwise multi-shipment under the same PO, total item Quantity of all shipments shall not
exceed the Quantity in the effected PO.
c) The Quantity in the CI and PL shall match with the shipped Quantity stated in the BL/AWB.
d) The total Quantity shall be mentioned in the CI and PL.
e) In case the quantity of materials mentioned in the COO, it shall match with quantity in the C.I and
P.L
5. Page Number
All shipping documents shall have the page number, especially the documents consist of more than
one page, and e.g. the preferred number format is “Page 1 of 20”.
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
Note : Contractor, should mention the PO number on every partial or final shipment documents along with the (Partial Shipment
Number or Batch Number) to eliminate the confusion of multiple shipments documents mix up together, Each shipment to be
identify separately for example :-
PO # XXXXXX
Partial Shipment (batch) No 2
If possible mention CI # XXXXXX on every document.
Every documents of each shipment should contain this basic information (CI, PL, CoO, MIC, TPIC, BL AWB)
The Item mention as spares for two years or any other item should be link to purchase order Item Number in CI , PL, CoO,
MIC, TPIC, BL /AWB. Items should be identify able with PO item Number
Example:;
1. Test plugs Rubber seals - QTY 20, Ref: (Part of Two years Spares) PO item No 8.
All the others major equipment description should match with PO Item number in PL, CI, MIC, TPIC, BL/AWB. Should be
identical to Purchase order.
Any miss match of description will result in rejection of shipment and the delayed of shipment and demurrage cost will be on
contractorresponsibility
General Requirements
1. Submission of all required shipping documents is solely under Supplier’s responsibility.
2. All the shipping documents must be reviewed and approved by PetroChina before issuance. Draft
documents shall be sent to PetroChina at least one (1) month prior to shipment.
3. It is Suppliers’ responsibility to have all required documents (after legalization if required) received
by PetroChina 4 weeks before the vessel’s arrival to Umm Qasr Port.
4. All shipping documents shall be submitted to PetroChina at:
CPL Department, PetroChina (Halfaya)
Address : Office No. A 402, Fourth Floor, Building No. 10, DIC, Dubai, UAE
Subj. : Shipping Documents with invoice #:XXXXX under PO #: XXXXXXX
Attn. : Purchasing Assistant
Tel : +971 04 440414
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 49 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
Summary of Shipping Documents Instruction
No. Documents Type No. of
copy Remark Notes
1
Certificate
of origin
(CoO)
Original 3
Must be
legalized by
commercial
attaché of Iraqi
Embassy in
the country of
origin or
supplier’s
country origin.
Must be reviewed and approved by PetroChina before final issuance. One (1) of three
(3) must be legalized. Number & date of invoice must be mentioned in the CoO.
Note : (Stating detailed cargo description and the quantity in the CoO is NOT
recommended by PetroChina based on our previous experience since unnecessary
information will increase the probability of error and furthermore it will be difficult to
amend the CI i.e. add/remove if needed. PetroChina recommendation is just to add the
CI No. and Date to the CoO without detail cargo description. A simple and brief
description like PPE, Generator, casing , tubing, wellhead with accessories etc. without
adding the Qty or the weight and the detail cargo description).
2
Commercial
Invoice +
Arabic
translation.
Original 4
Must be
legalized by
commercial
attaché of Iraqi
Embassy in
the country of
origin or
supplier’s
country origin.
Must be reviewed and approved by PetroChina before final issuance. To be translated
into Arabic. One (1) of four (4) must be legalized.
Note: Only the cargo description should be translated in such away which describes
the function and appearance of the imported cargo which make it understandable for
customs inspector. Please avoid to use the technical terms and do not translate the
Item specification codes like “L80”. Arabic and English translation must be combined in
the same page )
3 Packing List Original 3
Must be reviewed and approved by PetroChina before final issuance. To be translated
into Arabic. .
Note: Only the cargo description should be translated in such away which describes
the function and appearance of the imported cargo which make it understandable for
customs inspector. Please avoid to use the technical terms and do not translate the
Item specification codes like “L80”. Arabic and English translation must be combined in
the same page )
4 Contract/
Agreement/Copy 1
Please ensure the PO is acknowledged by supplier.
PetroChina International Iraq FZE Iraq Branch
Enquiry No.: HFY-PUR/HFO0517-0504 Page 50 of 50
Purchase of Spare Parts and Materials for Electric System and Air Conditioners
No. Documents Type No. of
copy Remark Notes
PO
5
The 3rd
Party
Inspection
Report
Original 1
Must be reviewed and approved by PetroChina before final issuance. TPI must be
issued by approved TPI firms. The TPI report is complete report by TPI contain all
testing result.
6
Manufactur
er
Inspection
Certificate
Copy 1
Must be reviewed and approved by PetroChina before final issuance.
7
Manufactur
er
Declaration
Original 1
If supplier is not manufacturer, a letter from Manufacturer is required, indicating the
goods supplied by supplier are manufactured in accordance with API or other
applicable standards.
8 Insurance
Certificate Original 1
Must be reviewed and approved by PetroChina before final issuance.
Final one shall be received by PetroChina within 5 calendar days after shipment.
9 Bill of
Lading Original 3
Must be reviewed and approved by PetroChina before final issuance.
3 originals BL plus 3 copies should be with PetroChina within 5 calendar days after
shipment. Any delay for this, Supplier shall be responsible for.
Note: Instruction: All legalized COO and CI must come from the same country. Example Scenario:
Supplier : ABC
Goods origin : Casing from USA
Document needed to be legalized:
1. CI from USA and legalized from USA (normal as per previous arrangement) 2. COO issued by chambers of commerce in USA and legalized byIraqi embassy in USA.