Top Banner
 PERKIRAAN BIAYA PEMBUKAAN LAHAN PER HEKTAR 0 (Rupiah) HARGA SATUAN JUMLAH BIAYA HARGA SATUAN JUMLAH BIAYA 1. Lahan Bekas Hutan : Survey dan Blocking (Manual) 3 Peralatan, Bahan dll (PO) Babat - Imas (Manual) 10 o Excavator 6 JK 250,000 1,500,000 250000 1,500,000 Tebang 8 o Chainsaw 15 JK 10,000 150,000 10000 150,000 Stacking 13 o Alat Bantu 1 Ls 15,000 15,000 15000 15,000 Rumpuk 10 o Herbisida 3 Lt 30,000 90,000 30000 90,000 Pemberantasan Lalang 4 Sub Jumlah 1,755,000 1,755,000 Upah (PK) Sub Jumlah 48 o Tanaga Harian 48 HK 18,000 864,000 18000 864,000 o Mandor 4 HK 21,600 86,400 21600 86,400 Sub Jumlah 950,400 950,400 Jumlah 2,705,400 2,705,400 2. Lalang Sheet : Babat - Imas (Manual) 4 Peralatan, Bahan dll Tebang 2 o Herbisida 7 Lt 30,000 210,000 30000 210,000 Semprot Lalang 4 o Alat Bantu 1 Ls 5,000 5,000 5000 5,000 Koreksi Semprot Lalang 1 o Air & Transportasi 1 Ls 6,250 6,250 9765.625 9,766 Lain-lain 1 Sub Jumlah 221,250 224,766 Upah Sub Jumlah 12 o Tanaga Harian 12 HK 18,000 216,000 18000 216,000 o Mandor 0.5 HK 21,600 10,800 21600 10,800 Sub Jumlah 226,800 226,800 Jumlah 448,050 451,566 Rata-rata : o Lahan Bekas Hutan 80 % 2,705,400 2,164,320 2705400 2,164,320 o Lahan Lalang 20 % 448,050 89,610 451565.625 90,313 Jumlah 2,253,930 2,254,633 Jumlah Dibulatkan 2,254,000 2,255,000 PEKERJAAN HK URIAN VOLUME INTI PLASMA
22

Perhitungan Land Clearing Lahan SAWIT

Oct 09, 2015

Download

Documents

Wildan Kurnia

Hitungan LC
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • PERKIRAAN BIAYA PEMBUKAAN LAHAN PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    1. Lahan Bekas Hutan :Survey dan Blocking (Manual) 3 Peralatan, Bahan dll (PO)Babat - Imas (Manual) 10 o Excavator 6 JK 250,000 1,500,000 250000 1,500,000Tebang 8 o Chainsaw 15 JK 10,000 150,000 10000 150,000Stacking 13 o Alat Bantu 1 Ls 15,000 15,000 15000 15,000Rumpuk 10 o Herbisida 3 Lt 30,000 90,000 30000 90,000Pemberantasan Lalang 4 Sub Jumlah 1,755,000 1,755,000

    Upah (PK)Sub Jumlah 48 o Tanaga Harian 48 HK 18,000 864,000 18000 864,000

    o Mandor 4 HK 21,600 86,400 21600 86,400Sub Jumlah 950,400 950,400Jumlah 2,705,400 2,705,400

    2. Lalang Sheet :Babat - Imas (Manual) 4 Peralatan, Bahan dllTebang 2 o Herbisida 7 Lt 30,000 210,000 30000 210,000Semprot Lalang 4 o Alat Bantu 1 Ls 5,000 5,000 5000 5,000Koreksi Semprot Lalang 1 o Air & Transportasi 1 Ls 6,250 6,250 9765.625 9,766Lain-lain 1 Sub Jumlah 221,250 224,766

    UpahSub Jumlah 12 o Tanaga Harian 12 HK 18,000 216,000 18000 216,000

    o Mandor 0.5 HK 21,600 10,800 21600 10,800Sub Jumlah 226,800 226,800Jumlah 448,050 451,566Rata-rata :o Lahan Bekas Hutan 80 % 2,705,400 2,164,320 2705400 2,164,320o Lahan Lalang 20 % 448,050 89,610 451565.625 90,313Jumlah 2,253,930 2,254,633Jumlah Dibulatkan 2,254,000 2,255,000

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

  • LAMPIRAN V.2

    < MENU PERKIRAAN BIAYA PEMBIBITAN (SETARA SATU HEKTAR MAIN NURSERY)0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    PRE NURSERYPersiapan Bedeng 8 Peralatan, Bahan dllPeteduh 4 o Kecambah 16,000 biji 2,250 36,000,000 2250 36,000,000Pengumpulan Tanah 10 o Bahan Peteduh 1 Ls 50,000 50,000 50000 50,000Persiapan & Penyaringan Tanah 10 o Polybag 25 x 14 x 0,1 16,000 lembar 55 880,000 55 880,000Pengisian Polybag 85 o NPK 15.15.5.4 375 Kg 2,250 843,750 1700 637,500Penanaman Kecambah 16 o Pestisida 1 Lt 35,000 35,000 35000 35,000Penyiangan 17 o Alat Bantu 1 Ls 40,000 40,000 40000 40,000Merumput 40 o Transportasi 1 Ls 400,000 400,000 400000 400,000Seleksi 8 Sub Jumlah 38,248,750 38,042,500Penjaga 12Pemberantasan hama penyakit 8 UpahPemupukan 40 o Tanaga Harian 288 HK 18,000 5,184,000 18000 5,184,000Saluran Drainase 15 o Mandor 14 HK 21,600 302,400 21600 302,400Lain-lain 15 Sub Jumlah 5,486,400 5,486,400

    Sub Jumlah 288 Jumlah 43,735,150 43,528,900

    < MENU LAMPIRAN V.2. (LANJUTAN)PERKIRAAN BIAYA PEMBIBITAN PER HEKTAR

    0(Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    MAIN NURSERYPersiapan tempat 69 Peralatan, Bahan dllPenggalian & pengangkutan tanah 168 o Polybag 50 x 40 x 0,2 14,000 lembar 565 7,910,000 565 7,910,000Pengayakan tanah 64 o NPK 12.12.17.2 3,010 Kg 2,250 6,772,500 1700 5,117,000Penempatan Polybag 127 o Kieserite 665 Kg 1,400 931,000 1400 931,000Pengisian kantong 140 o Pestisida 1 lt 35,000 35,000 35000 35,000Pengajiran 12 o Alat Bantu 1 Ls 90,000 90,000 90000 90,000Pemeliharaan jalan & saluran 30 o Transportasi 1 Ls 25,000 25,000 39062.5 39,063Pemindahan 140 Sub Jumlah 15,763,500 14,122,063 Pemeliharaan tanah 80

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

  • Pemberantasan hama penyakit 20 UpahPemupukan 80 o Tanaga Harian 1,440 HK 18,000 25,920,000 18000 25,920,000Penyiraman 360 o Mandor 72 HK 21,600 1,555,200 21600 1,555,200Pengangkutan & seleksi 80 Sub Jumlah 27,475,200 27,475,200 Sensus & seleksi 20 Penjaga 40 Jumlah 43,238,700 41,597,263 Lain-lain 10 Sub Jumlah 1,440 PENYEDIAAN BIBIT (Setara 1 Ha Tanam)Pembukaan Lahan 1 Ha 2,253,930 2,253,930 2,254,633 2,254,633Persiapan Lahan o Dozer 15 JK 300,000 4,500,000 300000 4,500,000

    o Grader 15 JK 200,000 3,000,000 200000 3,000,000Pre Nursery 1 Ls 43,735,150 43,735,150 43735150 43,735,150Main Nursery 1 Ls 43,238,700 43,238,700 43238700 43,238,700Beban investasi penyiraman 1 Ls 3,500,000 3,500,000 3500000 3,500,000

    Jumlah 100,227,780 100,228,483Bibit Siap Salur 11,440 11,440Nilai per Pokok Bibit 8,761 8,761Nilai Pembibitan Setara 1 Ha Tanam 1,252,847 1,252,856Jumlah Dibulatkan 1,253,000 1,253,000

    LAMPIRAN V.

    < MENU PERKIRAAN BIAYA PENANAMAN LCC PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Tanam LCC 8 Peralatan, Bahan dllPemeliharaaan LCC 15 o Benih LCCMemupuk LCC 4 PJ 2 Kg 23,650 47,300 23650 47,300Lain-lain 2 CM 4 Kg 4,720 18,880 4720 18,880

    CP 4 Kg 3,650 14,600 3650 14,600Sub Jumlah 29 o RP 357.143 Kg 900 321,429 900 321,429

    o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 15,500 15,500 15500 15,500Sub Jumlah 422,709 422,709

    Upaho Tenaga Harian 29 HK 18,000 522,000 18000 522,000o Mandor 2 HK 21,600 43,200 21600 43,200

    Sub Jumlah 565,200 565,200

    Jumlah 987,909 987,909

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • Jumlah Dibulatkan 988,000 988,000

    LAMPIRAN V.3

    < MENU PERKIRAAN BIAYA PENANAMAN KELAPA SAWIT (TBM-0) PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Mengukur dan Pancang 6 Peralatan, Bahan dllMelubang 2 o Excavator 1.2 JK 250,000 300,000 250000 300000Memupuk Lubang Tanam 1 o PupukPenanaman 11 Urea 47.6 Kg 1,450 69,020 1150 54,740Rawat TBM-0 RP 68 Kg 900 61,200 900 61,200o Pemupukan 2 MOP 20.4 Kg 1,800 36,720 1800 36,720o Dongkel Anak Kayu 1 Kieserite 13.6 Kg 1,400 19,040 1400 19,040o Piringan 5 Borat 0 Kg 5,025 0 5025 0o Gawangan Maual 6 CuSO4 0 Kg 4,570 0 4570 0Lain-lain 2 ZnSO4 0 Kg 2,550 0 2550 0

    Dolomit 0 Kg 250 0 250 0Sub Jumlah 36 o Herbisida 0.125 Lt 30,000 3,750 30000 3,750

    o Rodentisida 1 Kg 14,650 14,650 14650 14,650o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 19,000 19,000 29687.5 29,688Sub Jumlah 528,380 524,788Upaho Tanaga Harian 36 HK 18,000 648,000 18000 648,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 691,200 691,200Jumlah 1,219,580 1,215,988

    Jumlah Dibulatkan 1,220,000 1,216,000

    LAMPIRAN V.4

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-1 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemupukan 6 Peralatan, Bahan dllPiringan Manual 22.5 o Pupuk

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

    INTI PLASMAURIAN VOLUMEPEKERJAAN HK

  • Gawangan Manual 21 Urea 136 Kg 1,450 197,200 1150 156,400Dongkel Anak Kayu 3 RP 170 Kg 900 153,000 900 153,000Kontrol Lalang 9 MOP 115.6 Kg 1,800 208,080 1800 208,080Konsolidasi (Pembumbunan) 6 Kieserite 81.6 Kg 1,400 114,240 1400 114,240Pemeliharaan Parit 3 Borat 2.72 Kg 5,025 13,668 5025 13,668Lain-lain 2 CuSO4 0 Kg 4,570 0 4570 0

    ZnSO4 0 Kg 2,550 0 2550 0 Dolomit 0 Kg 250 0 250 0o Herbisida 0.125 Lt 30,000 3,750 30000 3,750o Insektisida 0.5 Lt 35,000 17,500 35000 17,500

    Sub Jumlah 72.5 o Rodentisida 3 Kg 14,650 43,950 14650 43,950o Titi Panen 1.2 Unit 120,000 144,000 120000 144,000o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 37,750 37,750 58984.375 58,984Sub Jumlah 938,138 918,572Upaho Tanaga Harian 72.5 HK 18,000 1,305,000 18000 1,305,000o Mandor 3 HK 21,600 64,800 21600 64,800Sub Jumlah 1,369,800 1,369,800Lain-laino Sisip Kelapa Sawit 5 % 1,220,000 61,000 1,216,000 60,800Sub Jumlah 61,000 60,800Pemeliharaan Jalan 1 Ls 226,000 226,000 226,000 226,000Jumlah 2,594,938 2,575,172

    Jumlah Dibulatkan 2,595,000 2,575,000

    LAMPIRAN V.5

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-2 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemupukan 7 Peralatan, Bahan dllPiringan Manual 24 o PupukGawangan Manual 16 Urea 204 Kg 1,450 295,800 1150 234,600Dongkel Anak Kayu 4 RP 136 Kg 900 122,400 900 122,400Kontrol Lalang 9 MOP 238 Kg 1,800 428,400 1800 428,400Konsolidasi (Pembumbunan) 6 Kieserite 204 Kg 1,400 285,600 1400 285,600Pemeliharaan Parit 3 Borat 10.88 Kg 5,025 54,672 5025 54,672Pemangkasan & Kastrasi 6 CuSO4 0 Kg 4,570 0 4570 0Lain-lain 2 ZnSO4 0 Kg 2,550 0 2550 0

    Dolomit 0 Kg 250 0 250 0o Herbisida 0.125 Lt 30,000 3,750 30000 3,750

    Sub Jumlah 77 o Insektisida 0.5 Lt 35,000 17,500 35000 17,500

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • o Rodentisida 3 Kg 14,650 43,950 14650 43,950o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 40,000 40,000 62500 62,500Sub Jumlah 1,297,072 1,258,372Upaho Tanaga Harian 77 HK 18,000 1,386,000 18000 1,386,000o Mandor 3 HK 21,600 64,800 21600 64,800Sub Jumlah 1,450,800 1,450,800Pemeliharaan Jalan 1 Ls 226,000 226,000 226,000 226,000Jumlah 2,973,872 2,935,172

    Jumlah Dibulatkan 2,974,000 2,935,000

    LAMPIRAN V.6

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-3 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemupukan 8 Peralatan, Bahan dllPiringan Manual 20 o PupukGawangan Manual 16 Urea 204 Kg 1,450 295,800 1150 234,600Dongkel Anak Kayu 4 RP 136 Kg 900 122,400 900 122,400Kontrol Lalang 6 MOP 238 Kg 1,800 428,400 1800 428,400Konsolidasi (Pembumbunan) 6 Kieserite 204 Kg 1,400 285,600 1400 285,600Pemeliharaan Parit 3 Borat 0 Kg 5,025 0 5025 0Pemangkasan & Kastrasi 4 CuSO4 0 Kg 4,570 0 4570 0Pembuatan TPH 2 ZnSO4 0 Kg 2,550 0 2550 0Lain-lain 4 Dolomit 0 Kg 250 0 250 0

    o Herbisida 0.125 Lt 30,000 3,750 30000 3,750Sub Jumlah 73 o Insektisida 0.5 Lt 35,000 17,500 35000 17,500

    o Rodentisida 3 Kg 14,650 43,950 14650 43,950o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 37,500 37,500 58593.75 58,594Sub Jumlah 1,239,900 1,199,794Upaho Tanaga Harian 73 HK 18,000 1,314,000 18000 1,314,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 1,357,200 1,357,200Jumlah 2,597,100 2,556,994

    Jumlah Dibulatkan 2,597,000 2,557,000

    LAMPIRAN V.7

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TM-1 DAN TM-2 PER HEKTAR

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • 0(Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemeliharaan Parit 3 Peralatan, Bahan dllKonsolidasi (Pembumbunan) 6 o PupukCircles & Path Manual 6 Urea 408.0 Kg 1,450 591,600 1150 469,200Circles & Path Chemical 4 RP 204.0 Kg 900 183,600 900 183,600Rawat LCC 0 MOP 340.0 Kg 1,800 612,000 1800 612,000Pemupukan 6 Kieserite 136.0 Kg 1,400 190,400 1400 190,400Sensus Produksi 1 Borat 13.6 Kg 5,025 68,340 5025 68,340Deteksi & Pengendalian HPT 2 CuSO4 - Kg 4,570 0 4570 0Rawat TPH 0.5 ZnSO4 - Kg 2,550 0 2550 0Pruning Kastrasi 3 Dolomit - Kg 250 0 250 0LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750

    o Rodentisida 0.5 Kg 14,650 7,325 14650 7,325Sub Jumlah 34 o Alat Bantu 1 Ls 10,000 10,000 10000 10,000

    o Transportasi 1 Ls 18,000 18,000 28125 28,125Sub Jumlah 1,693,765 1,581,490 Upaho Tanaga Harian 34 HK 18,000 612,000 18000 612,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 655,200 655,200 Pemeliharaan Jalan 226,000 226,000 Jumlah 2,574,965 2,462,690

    Jumlah Dibulatkan 2,575,000 2,463,000

    LAMPIRAN V.8

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TM-3 S/D TM-9 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemeliharaan Parit 3 Peralatan, Bahan dllKonsolidasi (Pembumbunan) 6 o PupukCircles & Path Manual 7 Urea 442.0 Kg 1,450 640,900 1150 508,300Circles & Path Chemical 4 RP 204.0 Kg 900 183,600 900 183,600Rawat LCC 0 MOP 408.0 Kg 1,800 734,400 1800 734,400Pemupukan 6 Kieserite 204.0 Kg 1,400 285,600 1400 285,600Sensus Produksi 1 Borat 0.0 Kg 5,025 0 5025 0

    PEKERJAAN HK

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

    URIAN VOLUMEINTI PLASMA

  • Deteksi & Pengendalian HPT 2 CuSO4 0.0 Kg 4,570 0 4570 0Rawat TPH 0.5 ZnSO4 0.0 Kg 2,550 0 2550 0Pruning Kastrasi 5 Dolomit 0.0 Kg 250 0 250 0LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750

    o Rodentisida 1 Kg 14,650 14,650 14650 14,650Sub Jumlah 37 o Alat Bantu 1 Ls 10,000 10,000 10000 10,000

    o Transportasi 1 Ls 19,500 19,500 30468.75 30,469Sub Jumlah 1,901,150 1,779,519Upaho Tanaga Harian 37 HK 18,000 666,000 18000 666,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 709,200 709,200 Pemeliharaan Jalan 226,000 226,000 Jumlah 2,836,350 2,714,719

    Jumlah Dibulatkan 2,836,000 2,715,000

    LAMPIRAN V.9

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TM-10 S/D TM-22 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemeliharaan Parit 3 Peralatan, Bahan dllKonsolidasi (Pembumbunan) 6 o PupukCircles & Path Manual 6 Urea 408.0 Kg 1,450 591,600 1150 469,200Circles & Path Chemical 4 RP 136.0 Kg 900 122,400 900 122,400Rawat LCC 0 MOP 408.0 Kg 1,800 734,400 1800 734,400Pemupukan 6 Kieserite 408.0 Kg 1,400 571,200 1400 571,200Sensus Produksi 1 Borat 0.0 Kg 5,025 0 5025 0Deteksi & Pengendalian HPT 2 CuSO4 0.0 Kg 4,570 0 4570 0Rawat TPH 0.5 ZnSO4 0.0 Kg 2,550 0 2550 0Pruning Kastrasi 6 Dolomit 0.0 Kg 250 0 250 0LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750

    o Rodentisida 1 Kg 14,650 14,650 14650 14,650Sub Jumlah 37 o Alat Bantu 1 Kg 10,000 10,000 10000 10,000

    o Transportasi 1 Ls 19,500 19,500 30468.75 30,469Sub Jumlah 2,076,250 1,964,819Upaho Tanaga Harian 37 HK 18,000 666,000 18000 666,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 709,200 709,200 Pemeliharaan Jalan 226,000 226,000

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • Jumlah 3,011,450 2,900,019

    Jumlah Dibulatkan 3,011,000 2,900,000

    LAMPIRAN V.10

    < MENU PERKIRAAN BIAYA PEMBUATAN JALAN PER KILOMETER0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    JALAN UTAMA / PRODUKSIPengupasan & Pembersihan 7.5 Peralatan, Bahan dllDaerah Milik Jalan, ROW 9 m o Dozer 36 JK 300,000 10,800,000 300000 10,800,000Membentuk Badan Jalan o Grader 5 JK 200,000 1,000,000 200000 1,000,000(Galian dengan Excavator) o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000Pembuatan Parit Samping o Laterit 144 M3 43,750 6,300,000 43750 6,300,000Penyiapan Tanah Dasar (5 m) 20.0 o Alat Bantu 1 Ls 50,000 50,000 50000 50,000(Pembentukan dengan Grader, Sub Jumlah 19,900,000 19,900,000dan dipadatkan dengan UpahVibrator Roller) o Tanaga Harian 30 HK 18,000 540,000 18000 540,000Membentuk Badan Jalan 62.5 o Mandor 2 HK 21,600 43,200 21600 43,200dengan Timbunan Sub Jumlah 583,200 583,200(Material dihampar dan Dipadatkan) Jumlah 20,483,200 20,483,200

    Jumlah Dibulatkan 20,483,000 20,483,000Sub Jumlah 60.0 JALAN KOLEKSIPengupasan & Pembersihan 5.0 Peralatan, Bahan dllDaerah Milik Jalan, ROW 7 m o Dozer 24 JK 250,000 6,000,000 250000 6,000,000Membentuk Badan Jalan o Grader 3.3 JK 200,000 660,000 200000 660,000(Galian dengan Excavator) o Vibrator Roller 6.7 JK 175,000 1,172,500 175000 1,172,500Pembuatan Parit Samping o Laterit 96 M3 43,750 4,200,000 43750 4,200,000Penyiapan Tanah Dasar (5 m) o Alat Bantu 1 Ls 50,000 50,000 50000 50,000(Pembentukan dengan Grader, Sub Jumlah 12,082,500 12,082,500dan dipadatkan dengan 16.0 UpahVibrator Roller) o Tanaga Harian 20 HK 18,000 360,000 18000 360,000Membentuk Badan Jalan o Mandor 1 HK 21,600 21,600 21600 21,600dengan Timbunan 50.0 Sub Jumlah 381,600 381,600(Material dihampar dan Dipadatkan) Jumlah 12,464,100 12,464,100

    Jumlah Dibulatkan 12,464,000 12,464,000Sub Jumlah 6.0 LAMPIRAN V.11

    < MENU PERKIRAAN BIAYA PENINGKATAN JALAN PER KILOMETERPROYEKSI BIAYA PEMELIHARAAN TANAMAN MENGHASILKAN - INTI

    (Rupiah)

    INTI PLASMA

    INTI PLASMA

    PEKERJAAN HK URIAN VOLUME

  • HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    JALAN UTAMA / PRODUKSIPenyiapan Tanah Dasar 2 Peralatan, Bahan dllPerkerasan Jalan 5 o Grader 5 JK 200,000 1,000,000 200000 1,000,000(Material dihampar, disiram o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000dan dipadatkan minimum o Laterit 180 M3 43,750 7,875,000 43750 7,875,0008 kali lintasan) o Alat Bantu 1 Ls 25,000 25,000 25000 25,000

    Sub Jumlah 10,650,000 10,650,000Sub Jumlah 40 Upah

    o Tanaga Harian 20 HK 18,000 360,000 18000 360,000o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 381,600 381,600Jumlah 11,031,600 11,031,600Jumlah Dibulatkan 11,032,000 11,032,000

    JALAN KOLEKSIPenyiapan Tanah Dasar 2 Peralatan, Bahan dllPerkerasan Jalan 5 o Grader 3.3 JK 200,000 666,667 200000 666,667(Material dihampar, disiram o Vibrator Roller 3 JK 175,000 525,000 175000 525,000dan dipadatkan minimum o Laterit 120 M3 43,750 5,250,000 43750 5,250,0008 kali lintasan) o Alat Bantu 1 Ls 25,000 25,000 25000 25,000

    Sub Jumlah 6,466,667 6,466,667Sub Jumlah 6 Upah

    o Tanaga Harian 13 HK 18,000 234,000 18000 234,000o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 241,400 255,600Jumlah 6,708,067 6,722,267Jumlah Dibulatkan 6,708,000 6,722,000

    LAMPIRAN V.12

    < MENU PERKIRAAN BIAYA PEMELIHARAAN JALAN PER KILOMETER; PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    JALAN UTAMA / PRODUKSIPenyiapan Tanah Dasar 1 Peralatan, Bahan dllPerkerasan Jalan 2 o Grader 5 JK 200,000 1,000,000 200000 1,000,000

    o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000Sub Jumlah 6 o Laterit 60 M3 43,750 2,625,000 43750 2,625,000

    o Alat Bantu 1 Ls 5,000 5,000 5000 5,000Sub Jumlah 5,380,000 5,380,000Upaho Tanaga Harian 20 HK 18,000 360,000 18000 360,000

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

    URIAN VOLUMEPEKERJAAN HK

  • o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 381,600 381,600Jumlah 5,761,600 5,761,600Jalan Produksi per Hektar 12.0 M 5,762 69,139 5,762 69,139Dibulatkan 69,000 69,000

    JALAN KOLEKSIPenyiapan Tanah Dasar 1 Peralatan, Bahan dllPerkerasan Jalan 2 o Grader 5.0 JK 200,000 1,000,000 200000 1,000,000

    o Vibrator Roller 10.0 JK 175,000 1,750,000 175000 1,750,000Sub Jumlah 6 o Laterit 40 M3 43,750 1,750,000 43750 1,750,000

    o Alat Bantu 1 Ls 5,000 5,000 5000 5,000Sub Jumlah 4,505,000 4,505,000Upaho Tanaga Harian 13 HK 18,000 234,000 18000 234,000o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 255,600 255,600Jumlah 4,760,600 4,760,600Jalan Koleksi per Hektar 33.0 M 4,761 157,100 4,761 157,100Dibulatkan 157,000 157,000

  • 00000

    0000

    00

    3515.6253515.625

    000

    3515.625

    0703.125703.125

    1000

  • 000

    -206250000

    -206250

    000

    -206250

    0-1655500

    000

    14062.5-1641437.5

  • 000

    -1641437.5

    703.12500000

    703.1250

    0.0614628.7890625

    0

    0000000

    00

    0

    0

  • 0-142800000000000

    10687.5-3592.5

    000

    -3592.5

    -4000

  • -40800000000000000

    21234.375-19565.625

    000

    -200-200

    0-19765.625

    -20000

    -61200000000000

  • 00

    22500-38700

    0000

    -38700

    -39000

    -6120000000000000

    21093.75-40106.25

    000

    -40106.25

    -40000

  • -12240000000000000

    10125-112275

    0000

    -112275

    -112000

    -1326000000

  • 0000000

    10968.75-121631.25

    0000

    -121631.25

    -121000

    -12240000000000000

    10968.75-111431.25

    0000

  • -111431.25

    -111000

    000000

    00000

    0000000000000

  • 00000

    0

  • 00000

    00000

    000000