TABEL PERENCANAAN TULANGAN BALOK PEMBANGUNAN MALL NIAS SUMATERA BARAT No Lantai Type Balok B1 300 x 600 Momen Tulangan Lentur Gaya Geser Tula Tumpuan Lapangan 1 Lt.1 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 2 Lt.2 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 3 Lt.3 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 4 Lt.4 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 Type Balok B1 Atap 250 x 400 5 Atap 154.230 63.527 22 6.00 5.00 4.00 5.00 4.00 83.069 82.773 13 2.00 No Lantai Type Balok B2 250 x 500 Momen Tulangan Lentur Gaya Geser Tula Tumpuan Lapangan 1 Lt.1 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 2 Lt.2 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 3 Lt.3 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 4 Lt.4 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 Type Balok B2 Atap 200 x 350 5 Atap 72.929 60.952 19 6.00 4.00 4.00 5.00 4.00 53.861 53.319 13 1 Tm ; 2 Lp M.Tum (kN/m) M.Lap (kN/m) Diameter Tulangan (Ø), mm Susut (buah) V.Tum (kN/m) V.Lap (kN/m) Diameter Tulangan (Ø), mm Sengkang (kaki) Desak (buah) Tarik (buah) Desak (buah) Tarik (buah) M.Tum (kN/m) M.Lap (kN/m) Diameter Tulangan (Ø), mm Susut (buah) V.Tum (kN/m) V.Lap (kN/m) Diameter Tulangan (Ø), mm Sengkang (kaki) Desak (buah) Tarik (buah) Desak (buah) Tarik (buah)
199

Perhitungan Balok

Dec 23, 2015

Download

Documents

Pandhu Thok

ini adalah analisa perhitungan kebutuhan tulangan pada balok
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Perhitungan Balok

TABEL PERENCANAAN TULANGAN BALOKPEMBANGUNAN MALL NIAS

SUMATERA BARAT

No Lantai

Type Balok B1 300 x 600Momen Tulangan Lentur Gaya Geser Tulangan Geser

Tumpuan Lapangan Tumpuan Lapangan

1 Lt.1 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 100.00 135.002 Lt.2 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 100.00 135.003 Lt.3 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 100.00 135.004 Lt.4 412.068 249.456 22 8.00 5.00 4.00 5.00 4.00 178.817 175.496 13 2.00 100.00 135.00

Type Balok B1 Atap 250 x 4005 Atap 154.230 63.527 22 6.00 5.00 4.00 5.00 4.00 83.069 82.773 13 2.00 70.00 80.00

No Lantai

Type Balok B2 250 x 500Momen Tulangan Lentur Gaya Geser Tulangan Geser

Tumpuan Lapangan Tumpuan Lapangan

1 Lt.1 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 50.00 80.002 Lt.2 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 50.00 80.003 Lt.3 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 50.00 80.004 Lt.4 210.612 184.835 22 6.00 4.00 4.00 5.00 4.00 153.547 153.357 13 2.00 50.00 80.00

Type Balok B2 Atap 200 x 3505 Atap 72.929 60.952 19 6.00 4.00 4.00 5.00 4.00 53.861 53.319 13 1 Tm ; 2 Lp 50.00 80.00

M.Tum (kN/m)

M.Lap (kN/m)

Diameter Tulangan (Ø), mm

Susut (buah)

V.Tum (kN/m)

V.Lap (kN/m)

Diameter Tulangan (Ø), mm

Sengkang (kaki)Desak

(buah)Tarik (buah)

Desak (buah)

Tarik (buah)

Jarak Sengkang (s), mm

Jarak Sengkang (s), mm

M.Tum (kN/m)

M.Lap (kN/m)

Diameter Tulangan (Ø), mm

Susut (buah)

V.Tum (kN/m)

V.Lap (kN/m)

Diameter Tulangan (Ø), mm

Sengkang (kaki)Desak

(buah)Tarik (buah)

Desak (buah)

Tarik (buah)

Jarak Sengkang (s), mm

Jarak Sengkang (s), mm

Page 2: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

C PERENCANAAN SLOOFI BALOK IKAT (SLOOF) S1

= 2430.33 kN

= 860 kNm

= 7.00 m

= 7.00 m

My =1,60 x 0,65

= 8601.04

= 826.923077 kNm

=

= x My =+ +

=0.1429

x 826.92310.1429 + 0.1429

= 0.500 x 826.9231= 413.4615 kNm

= 1x

10= 0.1 x 2430.33= 243.033 kN

Dimensi SloofDimensi rencana :

b = 300 mm `h = 600 mm

Ag = 180000f'c = 22.5 Mpa

< 0,1 x Ag x f'c243.033 < 0.1 x 180000 x 22.5243.033 < 405.000 kN

Pukolom

Melantai 1

Lka

Lki

Melantai 1

Msloof ki Msloof ka

Msloof 1/Lki 1/Lka

1/Lki 1/Lka 1/Lka 1/Lki

Psloof kiPukolom K1

mm2

Psloof

Jika Psloof > 0,1.Ag.f'c maka htungan tulangan sloof menggunakan perhitungan kolom penulangan 2 muka.

Jika Psloof < 0,1.Ag.f'c maka htungan tulangan sloof menggunakan perhitungan balok (tulangan tumpuan).

Page 3: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

II HITUNGAN TULANGAN SLOOFInput Data Sloof

= 300 mmf'c = 22.5 Mpafy = 370 Mpa

= 0.85φ = 0.8ε = 0.003Es = 200000

Data Momen Sloof

= 413.462 KNm

1 Dihitung Berdasarkan Perhitungan Tulangan Tumpuan BalokRasio Tulangan (ρ)

= x600

fy 600 + fy

= x600

370 600 + 370= 0.0272

== 0.75 x 0.0272= 0.0204

ρ == 0.5 x 0.0272= 0.0136

m=

fy0.85 x f'c

=370

0.85 x 22.5= 19.3464

= ρ x f'c x (1-(0.5 x ρ x m))= 0.0135 x 22.5 x (1-(0.5 x 0.0135 x 19.3464))= 4.3668

=Mu/φ

=4.3668

= 118352398.598 mm

bsloof

β1

Msloof

ρb 0.85 x β1 x f'c

0.85x0.03x22.5

ρmax 0.75 x ρb

0.5 x ρb

Koefisien Perlawanan (R1)

R1

bd2

R1

413.462 X 106/0.8

Page 4: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

=b

=118352398.598

300

= 628.0987

Luas tarik effektif beton (SNI 03-2847-2002)

Pusat berat tulangan baja desak : d' = 69 mmPusat berat tulangan baja tarik : z = 71.5 mm

== 699.5987 mm

Skema penampang (SNI 03-2847-2002)

Jadi, ukuran balok berdasarkan hitungan adalah :b = 300 mm

= 699.5987 mmSyarat

Diambil :

= 600 mm

dperlu bd2

mm2

hperlu dperlu + z

hperlu

hpakai < hperlu

hpakai

Page 5: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

Tinggi efektif desak :

= h - z= 528.50 mm

Tinggi efektif tarik :

= h - d'= 531 mm

a Tulangan Desakγ = 0.50

== 0.5 x 4.3668= 2.1834239

=

== 182.95712 KNm

=Mu

=413.462

- 182.95710.8

= 333.8698 KNmLuas tulangan perlu (As')

As' =fy x (d-d')

=333.8698

370 x (528.5-69)

= 1963.7668

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.2608 50.240

10 78.50013 132.66516 200.96019 283.38522 379.94025 490.625

Coba tulangan D19 dengan AsØ=283.385 mm², maka :Jumlah tulangan perlu :

n =As'

ddesak

dtarik

R2 γ x R1

M1 R2 x b x d2

2.1834239 x 300 x (528.52)

M2M1

M2

mm2

AsØ (mm2)

Page 6: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

n =

=1963.7668

283.385= 6.9297 tulangan, ambil 7 tulangan

=

= 1983.70

b Tulangan Tarik

= γ x ρ= 0.5 x 0.0136= 0.0068

As =

=

= 3040.9868

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.2608 50.240

10 78.50013 132.66516 200.96019 283.38522 379.94025 490.625

Coba tulangan D19 dengan AsØ=283.385 mm², maka :Jumlah tulangan perlu :n = As'

AsØ= 3040.9868

283.385= 8.0039 tulangan, ambil 11 tulangan

=

= 3117.235

AsØ

Dipakai 7D19

Luas tulangan perlu (As'perlu)

As'ada n x AsØ

mm2

ρbaru

Luas tulangan perlu (Asperlu)

(ρbaru x b x d) + As'

(0.0068 x 300 x 528.5) + 1963.7668

mm2

AsØ (mm2)

Dipakai 11D19

Luas tulangan perlu (Asperlu)

Asada n x AsØ

mm2

Page 7: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

Kontrol Momen Tersediac Kontrol Momen Tersedia

= 1983.695

= 3117.235

Cc = 0.85 x f'c x a x b a = 0.85c= 4876.875 c

Cs = As' x εc x Es x c - d'

c= 1190217 x c - 69

cTs = As x fy

= 1153376.95

Cc+ Cs -Ts = 0

4877 c + 1190217 x c - 69 - 1153376.95 = 0

c

4877 36840.05 c - -82124973 = 0

7.55 c -16839.6715 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= -7.5540 ± 67415.7492

= -7.5540 ± 259.64542

= 126.046 mm

= -133.60 mm

= 126.046 mmfs' = c - d' x εc x Es

c= 271.548 Mpa

= fs'= 271.548 Mpa

a = 0.85 x c

As'ada mm2

Asada mm2

c2

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

< 400 Mpa…….Ok!

fs'pakai

Page 8: Perhitungan Balok

Tugas Besar

Perancangan Bangunan Teknik Sipil FST-UTY

= 107.139 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 539.462 KNm

== 431.570 KNm > Mu = 413.462 KNm Aman!

=b x d

= 0.0125

=b x d

= 0.0197

= 0.0071

= 0.0204

0.0071 < 0.0204 Aman!

Mg- Mn-

0.8Mg- 0.8 x Mg-

ρ'ada Asp'

ρada Asp

ρada-ρ'ada

ρmax

syarat ρada-ρ'ada < ρmax

Page 9: Perhitungan Balok

TABEL PERENCANAAN TULANGAN BALOKPEMBANGUNAN MALL NIAS

SUMATERA BARAT

No Lantai

Type Balok B1 300 x 600Momen Tulangan Lentur

Tumpuan Lapangan

1 Lt.1 412.068 249.456 22 5.00 8.00 4.00 5.002 Lt.2 412.068 249.456 22 5.00 8.00 4.00 5.003 Lt.3 412.068 249.456 22 5.00 8.00 4.00 5.004 Lt.4 412.068 249.456 22 5.00 8.00 4.00 5.00

Type Balok B1 Atap 250 x 4005 Atap 154.230 63.527 22 4.00 6.00 4.00 5.00

M.Tum (kN/m)

M.Lap (kN/m)

Diameter Tulangan (Ø), mm

Desak (buah)

Tarik (buah)

Desak (buah)

Tarik (buah)

Page 10: Perhitungan Balok

TABEL PERENCANAAN TULANGAN BALOKPEMBANGUNAN MALL NIAS

SUMATERA BARAT

Type Balok B1 300 x 600Tulangan Lentur Gaya Geser Tulangan Geser

Tumpuan Lapangan

Jarak Sengkang (s), mm Jarak Sengkang (s), mm

4.00 178.817 175.496 13 2.00 100.00 135.004.00 178.817 175.496 13 2.00 100.00 135.004.00 178.817 175.496 13 2.00 100.00 135.004.00 178.817 175.496 13 2.00 100.00 135.00

Type Balok B1 Atap 250 x 4004.00 83.069 82.773 13 2.00 70.00 80.00

Susut (buah)

V.Tum (kN/m)

V.Lap (kN/m)

Diameter Tulangan (Ø), mm

Sengkang (kaki)

Page 11: Perhitungan Balok

D PERENCANAAN PONDASI `

Data Perencanaan PondasiPu = 168359 Kgf'c = 22.5 Mpa

qc = 200SF = 10Bk = 60 cmHk = 60 cmHp = 60 cmds = 7.095 cmd = 52.905 cm

I DIMENSI PONDASIRumus Dasar :

σ =PA

Maka :

A =P x SF

qc

=(168359) x 10

200

=1683590

200

= 8417.95

Bp = A

= 8417.95

= 91.7494 cmDigunakan dimensi Pondasi :Bp = 250 cmLp = 250 cm

II CEK GAYA GESER SATU ARAH

=Bp

-Bk

- d x Hk2 2

=250

-60

- 52.9 x 602 2

= 2525.7

Vu = xqcSF

= 2525.7 x20010

Kg/cm2

cm2

A1

cm2

A1

Page 12: Perhitungan Balok

= 50514 Kg= 505.14 kN

Vn =Vuφ

=5050.6

= 842 kN

Vc=

1 f'c x b x d6

=1 25 x 2500 x 329.056

= 1045626.873 N= 1045.627 kN

Syarat : Vn < Vc842 < 1045.6269 kN Aman!

III CEK GAYA GESER DUA ARAHApabila Hk > Bk :bc = Hk

BkApabila Hk = Bk = 1

bo = (Bk + d) x 2 + (Bp + d) x 2= (60 + 32.905) x 2 + (250 + 32.905) x 2= 451.620 cm= 45162 mm

Vu =qc

(Bp x Hp) - (Bk+d) x (Hk+d)SF

=200

(275 x 275) - (60+52.905) x (60+52.905)10

= 1237252.461 Kg= 1237.252 kN

Vn =Vuφ

=1237.252

0.6= 2062.087435 kN

= 1 +bc

2 f'c x bo x d2

= 1 +1

2 25 x 45162 x 529.052

= ### N

Vc1

Page 13: Perhitungan Balok

= 340002.7259 kN

= 4 f'c x bo x d

= 4 25 x 250 x 32.905

= 453336967.86 N= 453336.96786 kN

Vc = 340002.726 kN

Syarat :Vn < Vc2062.087 < 340002.73 kN Aman!

IV PERHITUNGAN TULANGAN

X = Bp - Bk2 2

= 250 - 602 2

= 95 cm

P = X x Hp (qc/SF)= 108 x 60 (200/10)= 114000 Kg= 1140 kN

Mu = P x 0.5X= 1290 x (0.5 x 1.08)= 542 kN/m

Mn = Muφ

= 542 0.8

= 676.875 kN/m

Mn = C x ZMn = 0.85 x f'c x b x a (d-a/2)

676875000 = 0.85 x 22.5 x 1000 a 529 - a2

Vc2

Diantara Vc1 dan Vc2 diambil nilai yang paling kecil :

Page 14: Perhitungan Balok

676875000 = 19125 a 529 - a2

676875000 = 10118081.25 a -9562.5

Didapat persamaan :

1 -1058.10 a + 70784.314 = 0

Gunakan Rumus ABC :

a = b ± - 4ac2a

= 1058.10 ± 836438.3552

= 1058.10 ± 914.57002

= 986.335 mm

= 71.765 mm

= 71.765 mm

fy = 400 MpaMaka :T = CAs.fy = 0.85 x f'c x b x aAs.400 = 0.85 x 22.5 x 1000 x 71.765As = 1372505.258

400

= 3431.26

Jarak tulangan pokok :D = 22 mm

= 379.940

s = AØ x 1000As

= 379.940 x 10003431.26

= 111 mm ≈ 100 mm

Syarat :s ≤ 2 h

100 ≤ 2 x 600100 ≤ 1200 mm

a2

a2

b2

c1

c2

Dari hitungan gunakan nilai c2

mm2

AØ mm2

Page 15: Perhitungan Balok

Jarak tulangan susut :Menggunakan tulangan polosD = 16 mm

= 200.960

Asst = 0.002 x b x h= 0.002 x 1000 x 600= 1200

s = AØ x 1000100

= 200.960 x 10001200.00

= 167 mm ≈ 150 mm

Digunakan :Jarak (s) tulangan pokok : D22-100Jarak (s) tulangan susut : D16-150

AØ mm2

Page 16: Perhitungan Balok

PERENCANAAN BALOK 1

A PERENCANAAN BALOK 1I TULANGAN LENTUR BALOK

Input Data Balokb 300 mmf'c 22.5 Mpa Data Momen Balok B1 dari SAP2000

fy 370 Mpa = 268.948 KNm

0.85 = 221.876 KNmφ 0.8ε 0.003

Es 200000

1 Tulangan TumpuanRasio Tulangan (ρ)

=x

600fy 600 + fy

=x

600370 600 + 370

= 0.0272

= ρ == 0,75 x 0,0272 = 0,5 x 0,0272 = 0.0204 = 0.0136

m = fy0,85 x f'c

= 3700,85 x 25

= 19.3464

= ρ x fy x (1-(0,5 x ρ x m))= 0.0136 x 370 x (1-(0,5 x 0,0136 x 19,3464))= 4.3668

Mu TumB1

β1 Mu LapB1

ρb 0,85 x β1 x f'c

0,85 x 0,85 x 22,5

ρmax 0,75 x ρb 0,5 x ρb

Koefisien Perlawanan (R1)

R1

Page 17: Perhitungan Balok

= Mu/φ

=4.3668

= 76985736.126 mm

=b

= 76985736.126300

= 506.5759

Luas tarik effektif beton (SNI 03-2847-2002) Skema penampang (SNI 03-2847-2002)

Pusat berat tulangan baja desak : d' = 50 mmPusat berat tulangan baja tarik : z = 109 mm

== 615.5759 mm

Jadi, ukuran balok berdasarkan hitungan adalah :b = 300 mm

= 615.5759 mm

bd2

R1

268,948 x106/0.8

dperlu bd2

mm2

hperlu dperlu + z

hperlu

Page 18: Perhitungan Balok

Syarat

Diambil :

= 600 mm

Tinggi efektif desak : Tinggi efektif tarik :

= h - z = h - d'= 491 mm = 550.5 mm

a Tulangan Desakγ = 0.5

== 0.5 x 4,3668= 2.1834

= Mu -

= φ

= = 268.948 - 157.9146= 157.914609 KNm 0.8

= 178.3 KNm

Luas tulangan perlu (As')

As' =fy x (d-d')

= 178270391.27489370 x (491-50)

= 1091.31Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D19 dengan AsØ=283,385 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.500 AsØ13 132.665 = 1091.3116 200.960 379.94019 283.385 = 3.8510 tulangan, ambil 4 tulangan22 379.94025 490.625

hpakai < hperlu

hpakai

ddesak dtarik

R2 γ x R1

M2 M1

M1 R2 x b x d2

2,1834 x 300 x (4912)

M2

mm2

AsØ (mm2)

Page 19: Perhitungan Balok

=

= 1133.54

b Tulangan Tarik

= γ x ρ= 0.5 x 0.0135= 0.0068

As =

=

= 2092.092Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D19 dengan AsØ=283,385 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.500 AsØ13 132.665 = 2092.09216 200.960 283.38519 283.385 = 7.3825 tulangan, ambil 8 tulangan22 379.94025 490.625

=

= 2267.080

Dipakai 4D19

Luas tulangan perlu (As'perlu)

As'ada n x AsØ

mm2

ρbaru

Luas tulangan perlu (Asperlu)

(ρbaru x b x d) + As'

(0.0068 x 300 x 550,5) + 1091,31

mm2

AsØ (mm2)

Dipakai 8D19

Luas tulangan perlu (Asperlu)

Asada n x AsØ

mm2

Page 20: Perhitungan Balok

c

= 1133.540

= 2267.080

Cc = 0.85 x f'c x a x b a = 0.85c= 4876.875 c

Cs = As' x εc x Es x c - d'

c= 680124

x c - 40

cTs = As x fy

= 838819.6

Cc+ Cs -Ts = 04876.875 c + 680124

x c - 40 - 838819.6 = 0

c

4876.875 -158695.6 c - -33666138 = 0

-32.5404 c -6903.2194 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 32.5404 ± 28671.7572

= 32.5404 ± 169.32742

= 100.934 mm

= -68.393 mm

= 100.93 mmfs' = c - d' x εc x Es

c= 100,93 - 50 x 0.003 x 200000

100.93= 305.748 Mpa < 370 Mpa Ok!

= fs'= 305.748 Mpa

a = 0.85 x c= 0.85 x 100,93= 85.794 mm

Kontrol Momen Tersedia1

Kontrol Momen Tersedia Mg-

As'ada mm2

Asada mm2

c2

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Page 21: Perhitungan Balok

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 373.589 KNm

= 0.8 x 373,589= 298.871 KNm > Mu = 268.948 KNm Aman!

=b x d

= 2267.080300 x 491

= 0.0077

= = 0.0077

b x d = 0.0204

= 1133.540300 x 491 0.0077 < 0.0204 Aman!

= 0.0154

d

= 1133.540

= 2267.080d' = 50 mmz = 109 mm

= 550.50 mm

Cc = 0.85 x f'c x a x b a = 0.85c= 4876.875 c

Cs= As' x εc x Es x

c - zc

= 1360248 x c - 59c

Ts = As x fy= 566,77 x 370= 419409.8

Cc+ Cs -Ts = 04876.875 c + 1360248 x c - 59 - 419409.8 = 0

c

4876.875 940838.2 c -148267032 = 0

192.9183 c -30402.0571 = 0

Mg- Mn-

0.8Mg-

ρ'ada Asada'

ρada Asada ρada-ρ'ada

ρmax

syarat ρada-ρ'ada < ρmax

Kontrol Momen Tersedia Mg+2

As'ada mm2

Asada mm2

dtarik

c2 +

c2 +

Page 22: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= -192.9183 ± 158825.6802

= -192.9183 ± 398.52942

= 102.806 mm

= -295.724 mm

= 102.81 mmfs' = c - d' x εc x Es

c= 102,81 - 50 x 0.003 x 200000

102.81= 311.11 Mpa < 370 Mpa Ok!

= fs'= 311.105 Mpa

a = 0.85 x c= 0.85 x 102,81= 87.385 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 607.454 KNm

= 0.8 x 607,454= 485.963 KNm

2Mu Lap = 221.876 KNm m = fy

0.85 x f'c

= = 370= 0.0204 0.85 x 22,5

= 19.3464

b = 300 mmh = 600 mm

= h - z= 491 mm

=x d

=x 491

= 303.7113402062 mm

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg+ Mn-

0.8Mg+

Tulangan Lapangan Balok3

ρmax 0.75 x ρb

ddesak

cb εc x Esεc x Es x fy

0.003 x 2000000.003 x 200000 x 370

Page 23: Perhitungan Balok

=== 193.62 mm

Mu = 0.85 x f'c x a x b x (d - a/2)φ

277.3446 = 5737.50 a x (491 - a/2)

277.3446 = 2817112.5 a -2868.75Didapat persamaan :

2868.75 -2817112.5 a 277344625 = 0

-982 a 96677.865 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

a = b ± - 4ac2a

= 982 ± 577612.542

= 982 ± 760.0082

= 871.004 mm

= 110.996 mm

= 110.996 mmTulangan yang dignakan yaitu Tulangan sebelah

Cc = Ts0.85 x f'c x a x b = As x fy0.85 x 22,5x 83,860 x 300 = As x 370636838.8324 = As 370

As = 1721.186

amax 0.75 x β x cb

0.75 x 0.8 x 303,7113402

a2

a2

a2

b2

a1

a2

Dari hitungan gunakan nilai a2 < amax = 193,62 mm

mm2

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar.

Page 24: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.50013 132.665 = 1721.18616 200.960 283.38519 283.385 = 6.0737 tulangan, ambil 7 tulangan22 379.940

25 490.625

= 1983.695

Kontrol momen tersediaCc = Ts

0.85 x f'c x a x b =Maka :

a =0.85 x f'c x b

= 127.925 mmMn = 0.85 x f'c x a x b x (d - a/2)

= 313.431659 KNm

= 250.745327 KNm > Mu = 221.876 KNm Aman!

AsØ (mm2) Coba tulangan D19 dengan AsØ= 283,385 mm², maka :

AsØ

Dipakai 7D19

Luas tulangan perlu (Asada)

Asada mm2

Asada x fy

Asada x fy

φMn

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar. Ukuran balok pada perencanaan tulangan lapangan mengikuti ukuran balok padaperencanaan tulangan tumpuan. diameter tulangan yang digunakan harus sama dengan diameter pada tulangan tumpuan.

Page 25: Perhitungan Balok

Jumlah maksimum tulangan dalam satu barisb - d'

=251

= 5.693 ≈ 6 buah tulangan25 + D 44

Tulangan Susutfy = 370 Mpa

Tabel. Luas minimum tulangan susut (pasal 9.12)Mutu Baja (fy) Asst

0,0020.b.h > 0,0014.b.hBJTD-40 0,0018.b.h > 0,0014.b.h

≥BJTD-41 0,0018.b.h (400/fy) > 0,0014.b.h

Asst D10 =

= 324Diameter tulangan rencana :

Luas satu tulangan

Ø (mm) Jumlah tulangan susut :6 28.260 n = Asst D10

8 50.24010 78.500 = 32413 132.665 78.50016 200.960 = 4.1274 tulangan, ambil 4 tulangan19 283.385

22 379.940

25 490.625 = 314.000

Momen Kapasitas Balok

Tarik

=

=

= 283.385

== 8 x 283,385

= 2267.080

Desak

=

=

= 283.385

== 4x 283,385

≤BJTD-30

0.0018 x b x hbalok

mm2

Coba tulangan D10 dengan AsØ=78.50 mm², maka :

AsØ (mm2)

AsØ

Dipakai 4D10

Luas tulangan perlu (Aspakai)

Aspakai mm2

Momen kapasitas negatif (Mpr- )5

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

Asada n x AsØ

mm2

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

As'ada n x AsØ

Page 26: Perhitungan Balok

= 1133.540 mm2

Page 27: Perhitungan Balok

Skema penampang dalam keadaan lentur batas (SNI 03-2847-2002)

Cc = 0.85 x f'c x a x b= 4876.875 c

Cs =As' x εc x Es x

c - d'c

=680124.00 x

c - 40c

Ts = As x 1.25fy= 1048524.5

Cc+ Cs -Ts = 0

4876.875 c + 680124x c - 40

- 1048524.5 = 0c

4876.875 -368400.5 c -33666138 = 0

-75.5403 c -6903.2194 = 0

c2

c2

Page 28: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

c = 75.5403 ± 33319.2112

= 75.5403 ± 182.53552

= 129.038 mm

= -53.498 mm

= 129.038 mmfs' = c - d'

x εc x Esc

= 129,038 - 50x 0.003 x 200000

129.038= 369.8351 Mpa < 370 MPa Ok!

= fs'= 369.835 Mpa

a = 0.85 x c= 0.85 x 129,038= 109.682 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 459.562 KNm

= 367.650 KNm > Mu = 268.948 KNm Aman!

Tarik

=

=

= 283.385

== 4 x 283,385

= 1133.540Desak

=

=

= 283.385

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR-

0,8MPR-

Momen kapasitas positif (Mpr+ )

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

As'ada n x AsØ

mm2

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

Page 29: Perhitungan Balok

== 8 x 283,385

= 2267.080Cc = 0.85 x f'c x a x b

= 4876.875 c

Cs = As' x εc x Es x c - d'

c

= 170031 x c - 40

cTs = As x 1,25fy

= 1133,54 x 1,25(370)= 524262.25

Cc+ Cs -Ts = 0

4876.875 c + 170031 x c - 40

- 524262.25 = 0c

4876.875 -354231.25 c -18533379 = 0

-72.6349 c -3800.2571 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 72.6349 ± 20476.8552

= 72.6349 ± 143.09742

= 107.866 mm

= -35.231 mm

= 107.866 mmfs' = c - d' x εc x Es

c= 107,866 - 50 x 0.003 x 200000

107.866= 324.659 MPa < 370 MPa Ok!

= fs'= 324.659 MPa

a = 0.85 x c= 0.85 x 107,866= 91.686 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 311.568 KNm

= 249.255 KNm

Asada n x AsØ

mm2

c2+

c2 -

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR+

0,8MPR+

Page 30: Perhitungan Balok

II TULANGAN GESER BALOKInput Data Balok

459.562 kNm =

311.568 kNm = 7,00 - 0,60f'c 22.5 Mpa = 6.40 mfy 370 MPab 300 mm Data Geser Balok B1 dari SAP2000

h 600 mm = 205.416 kN

541 mm = -205.416 kN

7.00 m

0.60 mPerhitungan1 Gaya geser akibat beban gempa

Ve = (Mpr -) + (Mpr +) Ve = 120.4892 kNLnetto

= 459.562 + 311.568 A B

6.4= 120.489166 kN

2 Gaya geser akibat beban gravitasi 205.416 kN

= 205.416 kN Vg

= -205.416 kNA B

205.416 kN

3 Menghitung gaya geser ultimate (Vu)Vu = Ve + Vg Vu= 325.91 kN

= 325.905 kN

y = 255.48

x = 2h-84.927 kN

x = 1200 mm

MPR - Lnetto LB1- Lkolom

MPR+

Vmax B1

ddesak Vmin B1

LB1

Lkolom

Vmax B1

Vmin B1

Page 31: Perhitungan Balok

a. Daerah dalam sendi plastisVc = 1/6 x f'c x b x d

= 1/6 x 22,5 x 300 x 541= 128.31 kN

Cek Jika Ve > 0,5 Vu Vc = 0120.4892 > 162.952583 Vc = 0

Vs = Vu- Vc

= 325.905- 0

0.75= 434.540221 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 300 x 541= 513.24 kNm

Syarat Vs< Kontrol434.5402 < 513.24

Jarak Begel (Sengkang)Jml. kaki = 2

= 10 mm

=

=

= 78.50

S =Vs

= 2 x 370 x 541 x 78,50434540.221461566

= 31426690434540.221

= 72.3217 mm ≈ 70 mm

0.25d = 135 mm8db = 152 mm24ds = 240 mm300 mm

digunakan P10 - 70b. Daerah luar sendi plastis

Vc = 1/6 x f'c x b x d= 1/6 x 22,5 x 300 x 541= 128 N

Cek Jika Ve > 0,5 Vu Vc = 0

φgeser

…Ok!

Dtulangan

AP10 0.25 x π x D2

0.25 x 3.4 x 102

mm2

Jml kaki x fy x d x AP10

Smax Daerah dalam sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

Page 32: Perhitungan Balok

120.4892 > 162.952583 Vc = 0

Page 33: Perhitungan Balok

Vs = y - Vc0.75

= 255.48 - 00.75

= 340.64 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 300 x 541= 513.237664 Nmm

Syarat Vs< Kontrol340.64 < 513.24

Jarak Begel (Sengakang)Jml. kaki = 2

= 10 mm

=

= 78.5

S =Vs

= 2 x 370 x 541 x 78,5340640.00

= 31426690340640.00

= 92.258 mm ≈ 90 mm

0.5d = 271 mm600 mm

digunakan P10 - 90

Jadi hasil dari perhitungan diatas didapat hasil sebagai berikut :Tul. TumpuanDesak 4D19Tarik 8D19Tul Lapangan7D19Tul. Susut4D10Tul. Geserdalam sendi plastis P10 - 70Luar sendi plastis P10 - 90

…Ok!

Dtulangan

AP13 0.25 x π x D2

mm2

Jml kaki x fy x d x AP13

Syarat Smax daerah luar sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

Page 34: Perhitungan Balok

PERENCANAAN BALOK 2

A PERENCANAAN BALOKI TULANGAN LENTUR BALOK

Input Data Balokb 250 mmf'c 22.5 Mpa Data Momen Balok dari SAP2000

fy 370 Mpa = 163.132 KNm

0.85 = 155.3512 KNmφ 0.8ε 0.003

Es 200000

1 Tulangan TumpuanRasio Tulangan (ρ)

=x

600fy 600 + fy

=x

600370 600 + 370

= 0.0272

= ρ == 0,75 x 0,0272 = 0,5 x 0,0272 = 0.0204 = 0.0136

m=

fy0,85 x f'c

=370

0,85 x 22,5= 19.3464

= ρ x fy x (1-(0,5 x ρ x m))= 0.0136 x 370 x (1-(0,5 x 0,0136 x 19,3464))= 4.3668

= Mu/φ

=4.3668

= 46696153.553 mm

=b

= 46696153.553300

= 432.1859

Mu TumB2

β1 Mu LapB2

ρb 0,85 x β1 x f'c

0,85 x 0,85 x 22,5

ρmax 0,75 x ρb 0,5 x ρb

Koefisien Perlawanan (R1)

R1

bd2

R1

163,132 x106/0.8

dperlu bd2

mm2

Page 35: Perhitungan Balok

Luas tarik effektif beton (SNI 03-2847-2002) Skema penampang (SNI 03-2847-2002)

Pusat berat tulangan baja desak : d' = 40 mmPusat berat tulangan baja tarik : z = 59 mm

== 491.1859 mm

Jadi, ukuran balok berdasarkan hitungan adalah :b = 250 mm

= 491.1859 mm

Syarat

Diambil :

= 500 mm

Tinggi efektif desak : Tinggi efektif tarik :

= h - z = h - d'= 441 mm = 460.5 mm

a Tulangan Desakγ = 0.5

== 0.5 x 4,3668= 2.1834

= = Mu -

= φ= 106.158618 KNm = 163.132 - 106.1586

0.8

= 97.7564 KNm

Luas tulangan perlu (As')

As' =fy x (d-d')

= 97756381.7366102370 x (441-40)

= 658.05

hperlu dperlu + z

hperlu

hpakai < hperlu

hpakai

ddesak dtarik

R2 γ x R1

M1 R2 x b x d2 M2 M1

2,1834x 250 x (4412)

M2

mm2

Page 36: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D19 dengan AsØ=283,385 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'10 78.500 AsØ13 132.665 = 658.0516 200.960 283.38519 283.385 = 2.3221 tulangan, ambil 2 tulangan22 379.94025 490.625

=

= 566.77

b Tulangan Tarik

= γ x ρ= 0.5 x 0.0136= 0.0068

As =

=

= 1407.109Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D19 dengan AsØ=283,385 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.24010 78.500 n = As'13 132.665 AsØ16 200.960 = 1407.10919 283.385 283.38522 379.940 = 4.9654 tulangan, ambil 5 tulangan25 490.625

=

= 1416.925

c

= 566.770

= 1416.925

Cc = 0.85 x f'c x a x b a = 0.85c= 4064.0625 c

AsØ (mm2)

Dipakai 2D19

Luas tulangan perlu (As'perlu)

As'ada n x AsØ

mm2

ρbaru

Luas tulangan perlu (Asperlu)

(ρbaru x b x d) + As'

(0.0068 x 250 x 441) + 658,05

mm2

AsØ (mm2)

Dipakai 5D19

Luas tulangan perlu (Asperlu)

Asada n x AsØ

mm2

Kontrol Momen Tersedia1

Kontrol Momen Tersedia Mg-

As'ada mm2

Asada mm2

Page 37: Perhitungan Balok

Cs = As' x εc x Es x c - d'

c= 340062

x c - 40

cTs = As x fy

= 524262.25

Cc+ Cs -Ts = 04064.0625 c + 340062

x c - 40 - 524262.25 = 0

c

4064.0625 -184200.25 c - -13432449 = 0

-45.3242 c -3305.1778 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 45.3242 ± 15274.9912

= 45.3242 ± 123.59202

= 84.458 mm

= -39.134 mm

= 84.46 mm

fs' = c - d' x εc x Esc

= 89,91 - 40 x 0.003 x 20000084.46

= 319.387 Mpa < 370 Mpa Ok!

= fs'= 319.387 Mpa

a = 0.85 x c= 0.85 x 89,91= 71.789 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 211.729 KNm

= 0.8 x 316,067= 169.383 KNm > Mu = 163.132 KNm Aman!

=b x d

= 1416.925250 x 441

= 0.0051

= = 0.0077

b x d = 0.0204= 566.770

c2

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg- Mn-

0.8Mg-

ρ'ada Asada'

ρada Asada ρada-ρ'ada

ρmax

Page 38: Perhitungan Balok

250 x 441= 0.0129 0.0077 < 0.0204 Aman!

syarat ρada-ρ'ada < ρmax

Page 39: Perhitungan Balok

d

= 566.770

= 1416.925d' = 40 mmz = 59 mm

= 460.50 mm

Cc = 0.85 x f'c x a x b a = 0.85c= 4064.0625 c

Cs= As' x εc x Es x

c - zc

= 850155 x c - 59c

Ts = As x fy= 566,77 x 370= 209704.9

Cc+ Cs -Ts = 04064.0625 c + 850155 x c - 59 - 209704.9 = 0

c

4064.0625 640450.1 c -50159145 = 0

157.5886 c -12342.1195 = 0Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= -157.5886 ± 74202.6592

= -157.5886 ± 272.40162

= 57.407 mm

= -214.995 mm

= 57.41 mmfs' = c - d' x εc x Es

c= 55,64 - 40 x 0.003 x 200000

55.64= 187.15 Mpa < 370 Mpa Ok!

= fs'= 187.155 Mpa

a = 0.85 x c= 0.85 x 57,407= 48.796 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 213.387 KNm

= 0.8 x 213,387= 170.709 KNm

Kontrol Momen Tersedia Mg+2

As'ada mm2

Asada mm2

dtarik

c2 +

c2 +

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg+ Mn-

0.8Mg+

Page 40: Perhitungan Balok

2Mu Lap = 155.3512 KNm m

=fy

0.85 x f'c

==

370= 0.0204 0.85 x 22,5

= 19.3464

b = 250 mmh = 500 mm

= h - z= 441 mm

=x d

=x 441

= 272.783505 mm

=== 173.90 mm

Mu = 0.85 x f'c x a x b x (d - a/2)φ

194.189 = 4781.25 a x (441 - a/2)

194.189 = 2108531.25 a -2390.63Didapat persamaan :

2390.63 -2108531.25 a 194189000 = 0

-882 a 81229.386 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

a = b ± - 4ac2a

= 882 ± 453006.45752

= 882 ± 673.0582

= 777.529 mm

= 104.471 mm

= 104.471 mmTulangan yang dignakan yaitu Tulangan sebelah

Cc = Ts0.85 x f'c x a x b = As x fy0.85 x 22,5x 104,471x 250 = As x 370

Tulangan Lapangan Balok3

ρmax 0.75 x ρb

ddesak

cb εc x Esεc x Es x fy

0.003 x 2000000.003 x 200000 x 370

amax 0.75 x β x cb

0.75 x 0.8 x 272,7835052

a2

a2

a2

b2

a1

a2

Dari hitungan gunakan nilai a2 < amax = 193,62 mm

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar.

Page 41: Perhitungan Balok

499503.0589 = As 370

As = 1350.008 mm2

Page 42: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan perlu :8 50.240 n

=As'

10 78.50013 132.665

=1350.008

16 200.960 283.38519 283.385 = 4.7639 tulangan, ambil 5 tulangan22 379.940

25 490.625

= 1416.925

Kontrol momen tersediaCc = Ts

0.85 x f'c x a x b =Maka :

a =0.85 x f'c x b

= 109.650 mmMn = 0.85 x f'c x a x b x (d - a/2)

= 202.4570738 KNm

= 161.965659 KNm > Mu = 155.351 KNm Aman!

Jumlah maksimum tulangan dalam satu barisb - d'

=211

= 4.784 ≈ 5 buah tulangan25 + D 44

Tulangan Susutfy = 370 Mpa

Tabel. Luas minimum tulangan susut (pasal 9.12)Mutu Baja (fy) Asst

0,0020.b.h > 0,0014.b.hBJTD-40 0,0018.b.h > 0,0014.b.h

≥BJTD-41 0,0018.b.h (400/fy) > 0,0014.b.h

Asst D10 =

= 225

AsØ (mm2) Coba tulangan D19 dengan AsØ= 283,385 mm², maka :

AsØ

Dipakai 5D19

Luas tulangan perlu (Asada)

Asada mm2

Asada x fy

Asada x fy

φMn

≤BJTD-30

0.0018 x b x hbalok

mm2

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar. Ukuran balok pada perencanaan tulangan lapangan mengikuti ukuran balok padaperencanaan tulangan tumpuan. diameter tulangan yang digunakan harus sama dengan diameter pada tulangan tumpuan.

Page 43: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan susut :8 50.240 n = Asst D10

10 78.50013 132.665 = 22516 200.960 78.50019 283.385 = 2.8662 tulangan, ambil 3 tulangan22 379.94025 490.625

= 235.500

Momen Kapasitas Balok

Tarik

=

=

= 283.385

== 5 x 379.940

= 1416.925

Desak

=

=

= 283.385

== 2 x 379.940

= 566.770

Skema penampang dalam keadaan lentur batas (SNI 03-2847-2002)

Cc = 0.85 x f'c x a x b= 4064.0625 c

Cs =As' x εc x Es x

c - d'c

= 340062.00 x c - 40c

Ts = As x 1.25fy= 655327.8125

Cc+ Cs -Ts = 04064.0625 c + 340062 x c - 40 - 655327.8125 = 0

c

4064.0625 -315265.8125 c -13432449 = 0

AsØ (mm2) Coba tulangan D10 dengan AsØ=78.50 mm², maka :

AsØ

Dipakai 3D10

Luas tulangan perlu (Aspakai)

Aspakai mm2

Momen kapasitas negatif (Mpr- )5

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

Asada n x AsØ

mm2

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

As'ada n x AsØ

mm2

c2

Page 44: Perhitungan Balok

-77.5741 c -3305.1778 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

c = 77.5741 ± 19238.4452

= 77.5741 ± 138.70272

= 108.138 mm

= -30.564 mm

= 108.138 mmfs' = c - d' x εc x Es

c= 34,887 - 40 x 0.003 x 200000

108.138= 380.8364 Mpa < 400 MPa Ok!

= fs'= 380.836 Mpa

a = 0.85 x c= 0.85 x 770,038= 91.918 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 260.276 KNm

= 208.220 KNm > Mu = 163.132 KNm Aman!

Tarik

=

=

= 283.385

== 2 x 379.940

= 566.770Desak

=

=

= 379.940

== 5x 379.940

= 1899.700Cc = 0.85 x f'c x a x b

= 4064.0625 c

Cs =As' x εc x Es x

c - d'c

= 227964x

c - 40

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR-

0,8MPR-

Momen kapasitas positif (Mpr+ )

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

As'ada n x AsØ

mm2

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

Asada n x AsØ

mm2

Page 45: Perhitungan Balok

x c

Ts = As x 1,25fy= 566,77 x 1,25(400)= 262131.125

Cc+ Cs -Ts = 04064.0625 c + 227964 x c - 40 - 262131.125 = 0

c

4064.0625 -34167.125 c -13449876 = 0

-8.4071 c -3309.4658 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 8.4071 ± 13308.5432

= 8.4071 ± 115.36272

= 61.885 mm

= -53.478 mm

= 61.885 mmfs' = c - d' x εc x Es

c= 154.942 - 55 x 0.003 x 200000

61.885= 27.970 MPa < 400 MPa Ok!

= fs'= 27.970 MPa

a = 0.85 x c= 0.85 x 61,885= 52.602 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 113.677 KNm

= 90.941 KNm

c2+

c2 -

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR+

0,8MPR+

Page 46: Perhitungan Balok

II TULANGAN GESER BALOK

Input Data Balok =

260.276 kNm = 4 - 0,60

113.677 kNm = 6.40 mf'c 22.5 Mpafy 370 MPa Data Geser Balok B2 dari SAP2000

b 250 mm = 161.946 kN

h 500 mm = -161.946 kN

441 mm

7.00 m

0.60 m

Perhitungan1 Gaya geser akibat beban gempa

Ve = (Mpr -) + (Mpr +) Ve = 58.4301 kNLnetto

= 260.276 + 113.677 A B6.4

= 58.43005852 kN

2 Gaya geser akibat beban gravitasi 161.946 kN

= 161.946 kN Vg

= -161.946 kNA B

161.946 kN3 Menghitung gaya geser ultimate (Vu)

Vu = Ve + Vg Vu= 220.38 kN= 220.376 kN

y = 174.11

x = 2h-103.516 kN

x = 1000 mm

Lnetto LB1- Lkolom

MPR -

MPR+

Vmax B2

Vmin B2

ddesak

LB2

Lkolom

Vmax B2

Vmin B2

Page 47: Perhitungan Balok

a. Daerah dalam sendi plastisVc = 1/6 x f'c x b x d

= 1/6 x 22,5 x 250 x441= 87.16 kN

Cek Jika Ve > 0,5 Vu Vc = 058.430059 > 110.1880293 Vc = 0

Vs = Vu - Vc

= 220.376 - 00.75

= 293.8347447 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 250 x441= 348.64 kNm

Syarat Vs < Kontrol293.83474 < 348.64

Jarak Begel (Sengkang)Jml. kaki = 2

= 10 mm

=

=

= 78.50

S =Vs

= 2 x 370 x 441 x 78,5293834.74469859

= 25617690293834.7447

= 87.1840 mm ≈ 80 mm

φgeser

…Ok!

Dtulangan

AP10 0.25 x π x D2

0.25 x 3.4 x 102

mm2

Jml kaki x fy x d x AP10

Page 48: Perhitungan Balok

0.25d = 110 mm8db = 152 mm24ds = 240 mm300 mm

digunakan P10-80b. Daerah luar sendi plastis

Vc = 1/6 x f'c x b x d= 1/6 x 22,5 x 250 x 441= 87 N

Cek Jika Ve > 0,5 Vu Vc = 058.430059 > 110.1880293 Vc = 0

Vs = y - Vc0.75

= 174.11 - 00.75

= 232.1466667 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 250 x441= 348.641112 Nmm

Syarat Vs < Kontrol232.14667 < 348.64

Jarak Begel (Sengakang)Jml. kaki = 2

= 10 mm

=

= 78.5

S =Vs

= 2 x 370 x441 x 78,5232146.67

= 25617690232146.67

= 110.351 mm ≈ 100 mm

0.5d = 221 mm600 mm

digunakan P10-100

Jadi hasil dari perhitungan diatas didapat hasil sebagai berikut :Tul. TumpuanDesak 2D19Tarik 5D19Tul Lapangan5D19Tul. Susut3D10Tul. Geserdalam sendi plastis digunakan P10-80

Smax Daerah dalam sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

…Ok!

Dtulangan

AP10 0.25 x π x D2

mm2

Jml kaki x fy x d x AP10

Syarat Smax daerah luar sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

Page 49: Perhitungan Balok

Luar sendi plastis digunakan P10-100

Page 50: Perhitungan Balok

PERENCANAAN BALOK 3

A PERENCANAAN BALOKI TULANGAN LENTUR BALOK

Input Data Balokb 200 mm Data Momen Balok dari SAP2000

f'c 22.5 Mpa = 45.26704 KNm

fy 370 Mpa = 26.72676 KNm

0.85φ 0.8ε 0.003

Es 200000

1 Tulangan TumpuanRasio Tulangan (ρ)

=x

600fy 600 + fy

=x

600370 600 + 370

= 0.0272

= ρ == 0,75 x 0,0272 = 0,5 x 0,0272 = 0.0204 = 0.0136

m = fy0,85 x f'c

= 3700,85 x 22.5

= 19.3464

= ρ x fy x (1-(0,5 x ρ x m))= 0.0136 x 370 x (1-(0,5 x 0,0136 x 19,3464))= 4.3668

= Mu/φ

=4.3668

= 12957584.353 mm

=b

= 12957584.353200

= 254.5347

Mu TumB3

Mu LapB3

β1

ρb 0,85 x β1 x f'c

0,85 x 0,85 x 22,5

ρmax 0,75 x ρb 0,5 x ρb

Koefisien Perlawanan (R1)

R1

bd2

R1

45.26704 x106/0.8

dperlu bd2

mm2

Page 51: Perhitungan Balok

Luas tarik effektif beton (SNI 03-2847-2002) Skema penampang (SNI 03-2847-2002)

Pusat berat tulangan baja desak d' = 40 mmPusat berat tulangan baja tarik z = 59 mm

== 313.5347 mm

Jadi, ukuran balok berdasarkan hitungan adalah :b = 200 mm

= 313.5347 mmSyarat

Diambil :

= 300 mm

Tinggi efektif desak : Tinggi efektif tarik :

= h - z = h - d'= 241 mm = 260.50 mm

a Tulangan Desakγ = 0.5

== 0.5 x4,3668= 2.1834

= = Mu-

= φ= 25.36308927805 KNm = 45.267

- 25.36310.8

= 31 KNmLuas tulangan perlu (As')

As' =fy x (d-d')

= 31220710.7219484370 x (241-40)

= 418.76Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan perlu :8 50.240 n = As'10 78.500 AsØ13 132.665 = 418.7616 200.960 283.38519 283.385 = 1.4777 tulangan, ambil 2 tulangan22 379.94025 490.625

hperlu dperlu + z

hperlu

hpakai < hperlu

hpakai

ddesak dtarik

R2 γ x R1

M1 R2 x b x d2 M2M1

2,1834 x 200 x (2412)

M2

mm2

AsØ (mm2) Coba tulangan D19 dengan AsØ=283,385 mm², maka :

Page 52: Perhitungan Balok

=

= 566.77

b Tulangan Tarik

= γ x ρ= 0.5 x 0.0136= 0.0068

As =

=

= 746.241Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D19 dengan AsØ=283,385 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'10 78.500 AsØ13 132.665 = 746.24116 200.960 283.38519 283.385 = 2.6333 tulangan, ambil 4 tulangan22 379.94025 490.625

=

= 1133.540

c

= 566.770

= 1133.540

Cc = 0.85 x f'c x a x b a = 0.85c= 3251.25 c

Cs = As' x εc x Es x c - d'

c= 340062

x c - 40

cTs = As x fy

= 419409.8

Dipakai 2D19

Luas tulangan perlu (As'perlu)

As'ada n x AsØ

mm2

ρbaru

Luas tulangan perlu (Asperlu)

(ρbaru x b x d) + As'

(0.0068 x 200 x 241) + 418.76

mm2

AsØ (mm2)

Dipakai 4D19

Luas tulangan perlu (Asperlu)

Asada n x AsØ

mm2

Kontrol Momen Tersedia1

Kontrol Momen Tersedia Mg-

As'ada mm2

Asada mm2

Page 53: Perhitungan Balok

Cc+ Cs -Ts = 03251.25 c + 340062

x c - 40 - 419409.8 = 0

c

3251.25 -79347.8 c - -13432449 = 0

-24.4053 c -4131.4722 = 0Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 24.4053 ± 17121.5092

= 24.4053 ± 130.84922

= 77.627 mm

= -53.222 mm

= 77.63 mm

fs' =c - d'

x εc x Esc

=77.63 - 40

x 0.003 x 20000077.63

= 294.695 Mpa < 370 Mpa Ok!

= fs'= 294.695 Mpa

a = 0.85 x c= 0.85 x 77.63= 65.983 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 86.154 KNm

= 0.8 x 316,067= 68.923 KNm > Mu = 45.267 KNm Aman!

=b x d

=1133.540200 x 241

= 0.0118

== 0.0118

b x d = 0.0204

=566.770

200 x 241 0.0118 < 0.0204 Aman!= 0.0235

d

= 566.770

= 1133.540d' = 40 mmz = 59 mm

= 260.50 mm

Cc = 0.85 x f'c x a x b a = 0.85c= 3251.25 c

Cs = As' x εc x Es x c - z

c= 680124 x c - 59

cTs = As x fy

= 566,77 x 370= 209704.9

c2

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg- Mn-

0.8Mg-

ρ'adaAsada'

ρadaAsada ρada-ρ'ada

ρmax

syarat ρada-ρ'ada < ρmax

Kontrol Momen Tersedia Mg+2

As'ada mm2

Asada mm2

dtarik

Page 54: Perhitungan Balok

Cc+ Cs -Ts = 03251.25 c + 680124 x c - 59 - 209704.9 = 0

c

3251.25 470419.1 c -40127316 = 0

144.6887 c -12342.1195 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac

2a

= -144.6887 ± 70303.2952

=-144.6887 ± 265.1477

2

= 60.229 mm

= -204.918 mm

= 60.23 mm

fs' =c - d'

x εc x Esc

=60.23 - 40

x 0.003 x 20000060.23

= 206.51 Mpa < 370 Mpa Ok!

= fs'= 206.505 Mpa

a = 0.85 x c= 0.85 x 60.23= 51.195 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 97.731 KNm

= 0.8 x 108,877= 78.185 KNm

2

Mu Lap = 26.72676 KNm m = fy0.85 x f'c

= = 370= 0.0204 0.85 x 22,5

= 19.3464b = 200 mmh = 300 mm

= h - z= 241 mm

= x d

=x 241

= 149.0721649485 mm

=== 95.03 mm

Mu = 0.85 x f'c x a x b x (d - a/2)φ

33.40845 = 3825.00 a x (241 - a/2)

33.40845 = 921825 a -1912.50Didapat persamaan :

1912.50 -921825 a 33408450 = 0

-482 a 17468.471 = 0

c2 +

c2 +

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg+ Mn-

0.8Mg+

Tulangan Lapangan Balok3

ρmax 0.75 x ρb

ddesak

cbεc x Es

εc x Es x fy0.003 x 200000

0.003 x 200000 x 370

amax 0.75 x β x cb

0.75 x 0.8 x 149.072165

a2

a2

a2

Page 55: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

a = b ± - 4ac2a

= 482 ± 162450.122

= 482 ± 403.0512

= 442.526 mm

= 39.474 mm

= 39.474 mmTulangan yang dignakan yaitu Tulangan sebelah

Cc = Ts0.85 x f'c x a x b = As x fy0.85 x 22,5x 39,474 x 200 = As x 370150989.9410 = As 370

As = 408.081Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.50013 132.665 = 408.08116 200.960 283.38519 283.385 = 1.4400 tulangan, ambil 2 tulangan22 379.94025 490.625

= 850.155Kontrol momen tersediaCc = Ts

0.85 x f'c x a x b =Maka :

a =0.85 x f'c x b

= 82.237 mmMn = 0.85 x f'c x a x b x (d - a/2)

= 62.87416103117 KNm

= 50.29932882494 KNm > Mu = 26.727 KNm Aman!

Jumlah maksimum tulangan dalam satu barisb - d'

=161

= 3.648 ≈4 buah tulangan25 + D 44

b2

a1

a2

Dari hitungan gunakan nilai a2 < amax = 95,03 mm

mm2

AsØ (mm2) Coba tulangan D19 dengan AsØ= 283,385 mm², maka :

AsØ

Dipakai 2D19

Luas tulangan perlu (Asada)

Asada mm2

Asada x fy

Asada x fy

φMn

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar. Ukuran balok pada perencanaan tulangan lapangan mengikuti ukuran balok padaperencanaan tulangan tumpuan. diameter tulangan yang digunakan harus sama dengan diameter pada tulangan tumpuan.

Secara teoritis, perencanaan ini tidak memerlukan tulangan desak karena a < amax , tetapi untuk dapat memasang sengkang, maka digunakan 4buah tulangan dengan diameter yang sama dengan diamater tulangan tarik

Page 56: Perhitungan Balok

Tulangan Susutfy = 370 Mpa

Tabel. Luas minimum tulangan susut (pasal 9.12)

Mutu Baja (fy) Asst0,0020.b.h > 0,0014.b.h

BJTD-40 0,0018.b.h > 0,0014.b.h≥BJTD-41 0,0018.b.h (400/fy) > 0,0014.b.h

Asst D10 =

= 108Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan susut :8 50.240 n = Asst D10

10 78.50013 132.665 = 10816 200.960 78.50019 283.385 = 1.3758 tulangan, ambil 2 tulangan22 379.94025 490.625

= 157

Momen Kapasitas Balok

Tarik

=

=

= 283.385

== 4 x 283,385

= 1133.540

Desak

=

=

= 283.385

== 2 x 283,385

= 566.770

Skema penampang dalam keadaan lentur batas (SNI 03-2847-2002)

Cc = 0.85 x f'c x a x b= 3251.25 c

Cs = As' x εc x Es x c - d'

c= 340062.00 x c - 40

cTs = As x 1.25fy

= 524262.25Cc+ Cs -Ts = 0

3251.25 c + 340062 x c - 40 - 524262.25 = 0

c

3251.25 -184200.25 c -13432449 = 0

≤BJTD-30

0.0018 x b x hbalok

mm2

AsØ (mm2) Coba tulangan D10 dengan AsØ=78.50 mm², maka :

AsØ

Dipakai 2D10

Luas tulangan perlu (Aspakai)

Aspakai mm2

Momen kapasitas negatif (Mpr- )5

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

Asada n x AsØ

mm2

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

As'ada n x AsØ

mm2

c2

Page 57: Perhitungan Balok

-56.6552 c -4131.4722 = 0c2

Page 58: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

c= b ± - 4ac

2a

c =56.6552 ± 19735.702

2= 56.6552 ± 140.4838

2

= 98.570 mm

= -41.914 mm

= 98.570 mm

fs' =c - d'

x εc x Esc

=98.570 - 40

x 0.003 x 20000098.570

= 359.5605 Mpa < 400 MPa Ok!

= fs'= 359.561 Mpa

a = 0.85 x c= 0.85 x 98.570= 83.784 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 104.872 KNm

= 83.898 KNm > Mu = 45.267 KNm Aman!

Tarik

=

=

= 283.385

== 2x 283,385

= 566.770Desak

=

=

= 283.385

== 4 x 379.940

= 1133.540Cc = 0.85 x f'c x a x b

= 3251.25 c

Cs= As' x εc x Es x

c - d'c

= 170031x

c - 40c

Ts = As x 1,25fy= 1133,54 x 1,25(370)= 262131.125

Cc+ Cs -Ts = 03251.25 c + 170031 x c - 40 - 262131.125 = 0

c

3251.25 -92100.125 c -10031829 = 0

-28.3276 c -3085.5299 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac

2a

=28.3276 ± 13144.573

2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR-

0,8MPR-

Momen kapasitas positif (Mpr+ )

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

As'ada n x AsØ

mm2

A1D19 0.25 x π xd2

0.25 x 3.14 x192

mm2

Asada n x AsØ

mm2

c2+

c2 -

b2

Page 59: Perhitungan Balok

=28.3276 ± 114.6498

2

= 71.489 mm

= -43.161 mm

= 71.489 mm

fs' =c - d'

x εc x Esc

=71.489 - 59

x 0.003 x 20000071.489

= 268.479 MPa < 400 MPa Ok!

= fs'= 268.479 MPa

a = 0.85 x c= 0.85 x 71.489= 60.765 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 70.300 KNm

= 56.240 KNm

II TULANGAN GESER BALOKInput Data Balok

104.872 kNm =

70.300 kNm = 4,00 - 0,60f'c 22.5 Mpa = 3.40 mfy 370 MPab 200 mm Data Geser Balok dari SAP2000

h 300 mm = 45 kN

241 mm = -45 kN

4 m

0.60 m

Perhitungan1 Gaya geser akibat beban gempa

Ve = (Mpr -) + (Mpr +) Ve = 51.5212 kNLnetto

= 104.872 + 70.300 A B3.4

= 51.52123552018 kN

2 Gaya geser akibat beban gravitasi 45.115 kN

= 45.115 kN Vg

= -45.115 kNA B

45.115 kN3 Menghitung gaya geser ultimate (Vu)

Vu = Ve + Vg Vu= 96.64 kN= 96.636 kN

6.406 kN y = 83.1

x = 2h

x = 600 mma. Daerah dalam sendi plastis

Vc = 1/6 x f'c x b x d= 1/6 x 22,5 x 200 x 241= 38.11 kN

Cek Jika Ve > 0,5 Vu Vc = 051.52124 > 48.31811776009 Vc = 0

Vs =Vu

- Vc

=96.636

- 0

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR+

0,8MPR+

MPR - Lnetto LB1- Lkolom

MPR+

Vmax B3

ddesak Vmin B3

LB3

Lkolom

Vmax B3

Vmin B3

φgeser

Page 60: Perhitungan Balok

=0.75

- 0

= 128.8483140269 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 200 x 241= 152.42 kNm

Syarat Vs < Kontrol128.8483 < 152.42

Jarak Begel (Sengkang)Jml. kaki = 2

= 10 mm

=

=

= 78.50

S =Vs

=2 x 370 x 241 x 78.50

128848.314026908

=13999690

128848.3140269= 108.6525 mm ≈ 100 mm

0.25d = 60 mm8db = 152 mm24ds = 240 mm300 mm

digunakan P10-100b. Daerah luar sendi plastis

Vc = 1/6 x f'c x b x d= 1/6 x 22,5 x 200 x 241= 38 N

Cek Jika Ve > 0,5 Vu Vc = 051.52124 > 48.31811776009 Vc = 0

Vs =y

- Vc0.75

=83.10

- 00.75

= 110.8 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 200 x241= 152.4217832201 Nmm

Syarat Vs < Kontrol110.8 < 152.42

Jarak Begel (Sengakang)Jml. kaki = 2

= 10 mm

=

= 78.5

S =Vs

= 2 x 370 x241 x 78.5110800.00

= 13999690110800.00

= 126.351 mm ≈ 120 mm

0.5d = 121 mm600 mm

digunakan P10-120

…Ok!

Dtulangan

AP10 0.25 x π x D2

0.25 x 3.14 x 102

mm2

Jml kaki x fy x d x AP10

Smax Daerah dalam sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

…Ok!

Dtulangan

AP10 0.25 x π x D2

mm2

Jml kaki x fy x d x AP10

Syarat Smax daerah luar sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

Page 61: Perhitungan Balok

PERENCANAAN BALOK 4

A PERENCANAAN BALOKI TULANGAN LENTUR BALOK

Input Data Balokb 200 mmf'c 22.5 Mpa Data Momen Balok dari SAP2000

fy 370 Mpa = 63.512 KNm

0.85 = 52.825 KNmφ 0.8ε 0.003Es 200000

1 Tulangan TumpuanRasio Tulangan (ρ)

=x

600fy 600 + fy

=x

600370 600 + 370

= 0.0272

= ρ == 0,75 x 0,0272 = 0,5 x 0,0272 = 0.0204 = 0.0136

m = fy0,85 x f'c

= 3700,85 x 22,5

= 19.3464

= ρ x fy x (1-(0,5 x ρ x m))= 0.0136 x 370 x (1-(0,5 x 0,0136 x 19,3464))= 4.3668

Mu TumB4

β1 Mu LapB4

ρb 0,85 x β1 x f'c

0,85 x 0,85 x 22,5

ρmax 0,75 x ρb 0,5 x ρb

Koefisien Perlawanan (R1)

R1

A B C D E F G H I J K L M N O P Q R S1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

Page 62: Perhitungan Balok

= Mu/φ

=4.3668

= 18180146.034 mm

=b

= 18180146.034200

= 301.4975

Luas tarik effektif beton (SNI 03-2847-2002) Skema penampang (SNI 03-2847-2002)

Pusat berat tulangan baja desak : d' = 38 mmPusat berat tulangan baja tarik : z = 56 mm

== 357.4975 mm

Jadi, ukuran balok berdasarkan hitungan adalah :b = 200 mm

= 357.4975 mmSyarat

bd2

R1

63.511946 x106/0.8

dperlu bd2

mm2

hperlu dperlu + z

hperlu

A B C D E F G H I J K L M N O P Q R S

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

Page 63: Perhitungan Balok

Diambil :

= 400 mm

Tinggi efektif desak : Tinggi efektif tarik :

= h - z = h - d'= 344 mm = 362.00 mm

a Tulangan Desakγ = 0.5

== 0.5 x4,3668= 2.1834

= = Mu -

= φ= 51.675531 KNm = 63.512 - 51.6755

0.8= 27.71440121 KNm

Luas tulangan perlu (As')

As' =fy x (d-d')

= 27714401.2108088370 x (344-38)

= 244.78Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.500 AsØ13 132.665 = 244.7816 200.960 200.96019 283.385 = 1.2181 tulangan, ambil 2 tulangan22 379.94025 490.625

=

= 401.92

hpakai < hperlu

hpakai

ddesak dtarik

R2 γ x R1

M1 R2 x b x d2 M2 M1

2,1834 x 200 x (3442)

M2

mm2

AsØ (mm2) Coba tulangan D16 dengan AsØ= 200,960 mm², maka :

Dipakai 2D16

Luas tulangan perlu (As'perlu)

As'ada n x AsØ

mm2

A B C D E F G H I J K L M N O P Q R S

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

Page 64: Perhitungan Balok

b Tulangan Tarik

= γ x ρ= 0.5 x 0.0136= 0.0068

As =

=

= 712.224Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D16 dengan AsØ= 200,960 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.500 AsØ13 132.665 = 712.22416 200.960 200.96019 283.385 = 3.5441 tulangan, ambil 4 tulangan22 379.94025 490.625

=

= 803.840

ρbaru

Luas tulangan perlu (Asperlu)

(ρbaru x b x d) + As'

(0.0068 x 200 x 344) + 256,48

mm2

AsØ (mm2)

Dipakai 4D16

Luas tulangan perlu (Asperlu)

Asada n x AsØ

mm2

A B C D E F G H I J K L M N O P Q R S118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

Page 65: Perhitungan Balok

c

= 401.920

= 803.840

Cc = 0.85 x f'c x a x b a = 0.85c= 3251.25 c

Cs = As' x εc x Es x c - d'

c= 241152

x c - 38

cTs = As x fy

= 297420.8

Cc+ Cs -Ts = 03251.25 c + 241152

x c - 38 - 297420.8 = 0

c

3251.25 -56268.8 c - -9163776 = 0

-17.3068 c -2818.5393 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 17.3068 ± 11573.6832

= 17.3068 ± 107.58112

= 62.444 mm

= -45.137 mm

= 62.44 mmfs' = c - d' x εc x Es

c= 87.16 - 38 x 0.003 x 200000

62.44= 234.872 Mpa < 370 Mpa Ok!

= fs'= 234.872 Mpa

a = 0.85 x c= 0.85 x 87.16= 53.077 mm

Kontrol Momen Tersedia1

Kontrol Momen Tersedia Mg-

As'ada mm2

Asada mm2

c2

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

A B C D E F G H I J K L M N O P Q R S

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

Page 66: Perhitungan Balok

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 93.338 KNm

= 0.8 x 66,197= 74.670 KNm > Mu = 63.512 KNm Aman!

=b x d

= 803.840200 x 344

= 0.0058

= = 0.0058

b x d = 0.0204= 401.920

200 x 344= 0.0117 0.0058 < 0.0204 Aman!

d

= 401.920

= 803.840d' = 38 mmz = 56 mm

= 362.00 mm

Cc = 0.85 x f'c x a x b a = 0.85c= 3251.25 c

Cs= As' x εc x Es x

c - zc

= 482304 x c - 56c

Ts = As x fy= 401,92 x 370= 148710.4

Cc+ Cs -Ts = 03251.25 c + 482304 x c - 56 - 148710.4 = 0

c

3251.25 333593.6 c -27009024 = 0

102.6047 c -8307.2738 = 0

Mg- Mn-

0.8Mg-

ρ'ada Asada'

ρada Asada ρada-ρ'ada

ρmax

syarat ρada-ρ'ada < ρmax

Kontrol Momen Tersedia Mg+2

As'ada mm2

Asada mm2

dtarik

c2 +

c2 +

A B C D E F G H I J K L M N O P Q R S

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

230

231

Page 67: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= -102.6047 ± 43756.8242

= -102.6047 ± 209.18132

= 53.288 mm

= -155.893 mm

= 53.288 mmfs' = c - d' x εc x Es

c= 53.90 - 38 x 0.003 x 200000

53.29= 172.14 Mpa < 370 Mpa Ok!

= fs'= 172.139 Mpa

a = 0.85 x c= 0.85 x 53.90= 45.295 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 103.627 KNm

= 0.8 x 126,351= 82.901 KNm

2Mu Lap = 52.82515 KNm m = fy

0.85 x f'c

= = 370= 0.0204 0.85 x 22,5

= 19.3464b = 200 mmh = 400 mm

= h - z= 344 mm

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg+ Mn-

0.8Mg+

Tulangan Lapangan Balok3

ρmax 0.75 x ρb

ddesak

A B C D E F G H I J K L M N O P Q R S232

233

234

235

236

237

238

239

240

241

242

243

244

245

246

247

248

249

250

251

252

253

254

255

256

257

258

259

260

261

262

263

264

265

266

267

268

269

270

271

Page 68: Perhitungan Balok

=x d

=x 344

= 212.78351 mm

=== 135.65 mm

Mu = 0.85 x f'c x a x b x (d - a/2)φ

66.03144 = 3825.00 a x (344 - a/2)

66.03144 = 1315800 a -1912.50Didapat persamaan :

1912.50 -1315800 a 66031437.5 = 0

-688 a 34526.242 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

a = b ± - 4ac2a

= 688 ± 335239.03272

= 688 ± 578.9982

= 633.499 mm

= 54.501 mm

= 54.501 mmTulangan yang dignakan yaitu Tulangan sebelah

Cc = Ts0.85 x f'c x a x b = As x fy0.85 x 22,5x 55.072 x 200 = As x 370208465.7491 = As 370

As = 563.421

cb εc x Esεc x Es x fy

0.003 x 2000000.003 x 200000 x 370

amax 0.75 x β x cb

0.75 x 0.8 x 210,9278

a2

a2

a2

b2

a1

a2

Dari hitungan gunakan nilai a2 < amax = 134,47 mm

mm2

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar. Ukuran balok pada perencanaan tulangan lapangan mengikuti ukuran balok padaperencanaan tulangan tumpuan. diameter tulangan yang digunakan harus sama dengan diameter pada tulangan tumpuan.

A B C D E F G H I J K L M N O P Q R S

272

273

274

275

276

277

278

279

280

281

282

283

284

285

286

287

288

289

290

291

292

293

294

295

296

297

298

299

300

301

302

303

304

305

306

307

308

309

310

311

312

313

314

315

316

317

Page 69: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.50013 132.665 = 563.42116 200.960 200.96019 283.385 = 2.8036 tulangan, ambil 3 tulangan22 379.94025 490.625

= 602.880

Kontrol momen tersediaCc = Ts

0.85 x f'c x a x b =Maka :

a =0.85 x f'c x b

= 58.318 mmMn = 0.85 x f'c x a x b x (d - a/2)

= 70.230218 KNm

= 56.184175 KNm > Mu = 52.825 KNm Aman!

AsØ (mm2) Coba tulangan D16 dengan AsØ= 200,96 mm², maka :

AsØ

Dipakai 3D16

Luas tulangan perlu (Asada)

Asada mm2

Asada x fy

Asada x fy

φMn

Perencanaan ini tidak memerlukan tulangan desak karena a < amax , tetapi untuk dapat memasang sengkang, maka digunakan 4buah tulangan dengan diameter yang sama dengan diamater tulangan tarik

A B C D E F G H I J K L M N O P Q R S318

319

320

321

322

323

324

325

326

327

328

329

330

331

332

333

334

335

336

337

338

339

340

341

342

343

344

345

346

347

348

349

350

351

352

353

354

355

356

357

Page 70: Perhitungan Balok

Jumlah maksimum tulangan dalam satu barisb - d'

=162

= 3.682 ≈ 4 buah tulangan25 + D 44

Tulangan Susutfy = 370 Mpa

Tabel. Luas minimum tulangan susut (pasal 9.12)Mutu Baja (fy) Asst

0,0020.b.h > 0,0014.b.hBJTD-40 0,0018.b.h > 0,0014.b.h

≥BJTD-41 0,0018.b.h (400/fy) > 0,0014.b.h

Asst D10 =

= 144Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan susut :8 50.240 n =Asst D10

10 78.50013 132.665 = 14416 200.960 78.50019 283.385 = 1.8344 tulangan, ambil 2 tulangan22 379.94025 490.625

= 157Momen Kapasitas Balok

Tarik

=

=

= 200.960

== 4 x 200,96

= 803.840

≤BJTD-30

0.0018 x b x hbalok

mm2

AsØ (mm2) Coba tulangan D10 dengan AsØ=78.50 mm², maka :

AsØ

Dipakai 2D10

Luas tulangan perlu (Aspakai)

Aspakai mm2

Momen kapasitas negatif (Mpr- )5

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

Asada n x AsØ

mm2

A B C D E F G H I J K L M N O P Q R S358

359

360

361

362

363

364

365

366

367

368

369

370

371

372

373

374

375

376

377

378

379

380

381

382

383

384

385

386

387

388

389

390

391

392

393

394

395

Page 71: Perhitungan Balok

Desak

=

=

= 200.96

== 2 x 200,96

= 401.920

Skema penampang dalam keadaan lentur batas (SNI 03-2847-2002)

Cc = 0.85 x f'c x a x b= 3251.25 c

Cs =As' x εc x Es x

c - d'c

= 241152.00 x c - 38c

Ts = As x 1.25fy= 371776

Cc+ Cs -Ts = 03251.25 c + 241152 x c - 38 - 371776 = 0

c

3251.25 -130624 c -9163776 = 0

-40.1765 c -2818.5393 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

c = 40.1765 ± 12888.3122

= 40.1765 ± 113.52672

= 76.852 mm

= -36.675 mm

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

As'ada n x AsØ

mm2

c2

c2

b2

c1

c2

A B C D E F G H I J K L M N O P Q R S396

397

398

399

400

401

402

403

404

405

406

407

408

409

410

411

412

413

414

415

416

417

418

419

420

421

422

423

424

425

426

427

428

429

430

431

432

433

434

435

436

437

438

439

440

441

442

443

444

Page 72: Perhitungan Balok

= 76.852 mmfs' = c - d' x εc x Es

c= 76.852 - 38 x 0.003 x 200000

76.852= 303.3244 Mpa < 400 MPa Ok!

= fs'= 303.324 Mpa

a = 0.85 x c= 0.85 x 76.852= 65.324 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 115.097 KNm

= 92.078 KNm > Mu = 63.512 KNm Aman!

Tarik

=

=

= 200.96

== 2x 200,96

= 401.920Desak

=

=

= 200.960

== 4 x 200,96

= 803.840Cc = 0.85 x f'c x a x b

= 3251.25 c

Dari hitungan gunakan nilai c1

fs'pakai

MPR-

0,8MPR-

Momen kapasitas positif (Mpr+ )

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

As'ada n x AsØ

mm2

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

Asada n x AsØ

mm2

A B C D E F G H I J K L M N O P Q R S

445

446

447

448

449

450

451

452

453

454

455

456

457

458

459

460

461

462

463

464

465

466

467

468

469

470

471

472

473

474

475

476

477

478

479

480

Page 73: Perhitungan Balok

Cs =As' x εc x Es x

c - d'c

= 120576x

c - 38c

Ts = As x 1,25fy= 803,84 x 1,25(370)= 185888

Cc+ Cs -Ts = 03251.25 c + 120576 x c - 38 - 185888 = 0

c

3251.25 -65312 c -6752256 = 0

-20.0883 c -2076.8185 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 20.0883 ± 8710.8132

= 20.0883 ± 93.33172

= 56.710 mm

= -36.622 mm

= 56.710 mmfs' = c - d' x εc x Es

c= 56.710 - 38 x 0.003 x 200000

56.710= 197.955 MPa < 400 MPa Ok!

= fs'= 197.955 MPa

a = 0.85 x c= 0.85 x 56.710= 48.204 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 75.190 KNm

= 60.152 KNm

c2+

c2 -

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR+

0,8MPR+

A B C D E F G H I J K L M N O P Q R S481

482

483

484

485

486

487

488

489

490

491

492

493

494

495

496

497

498

499

500

501

502

503

504

505

506

507

508

509

510

511

512

513

514

515

516

517

518

519

520

521

Page 74: Perhitungan Balok

II TULANGAN GESER BALOKInput Data Balok

115.097 kNm =

75.190 kNm = 7,00 - 0,60f'c 22.5 Mpa = 6.40 mfy 370 MPab 200 mmh 400 mm Data Geser Balok dari SAP2000

341 mm = 43.771 kN

7 m = -43.769 kN

0.6 m

Perhitungan1 Gaya geser akibat beban gempa

Ve = (Mpr -) + (Mpr +) Ve = 29.7324 kNLnetto

= 115.097 + 75.190 A B6.4

= 29.732407 kN

2 Gaya geser akibat beban gravitasi 66.678 kN

= 66.678 kN Vg

= -66.678 kNA B

66.678 kN3 Menghitung gaya geser ultimate (Vu)

Vu = Ve + Vg Vu= 96.41 kN= 96.410 kN

y = 81.17

x = 2h

-36.946 kN x = 800 mma. Daerah dalam sendi plastis

Vc = 1/6 x f'c x b x d= 1/6 x 22,5 x 200 x344= 53.92 kN

MPR - Lnetto LB4- Lkolom

MPR+

ddesak Vmax B3

LB4 Vmin B3

Lkolom

Vmax B4

Vmin B4

A B C D E F G H I J K L M N O P Q R S522

523

524

525

526

527

528

529

530

531

532

533

534

535

536

537

538

539

540

541

542

543

544

545

546

547

548

549

550

551

552

553

554

555

556

557

558

559

560

Page 75: Perhitungan Balok

Cek Jika Ve > 0,5 Vu Vc = 029.73241 > 48.205204 Vc = 0

Vs = Vu - Vc

= 96.410 - 00.75

= 128.54721 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 200 x344= 215.67 kNm

Syarat Vs < Kontrol128.5472 < 215.67 Ok!

Jarak Begel (Sengkang)Jml. kaki = 2

= 10 mm

=

=

= 78.50

S =Vs

= 2 x 370 x 344 x 78,5128547.209979995

= 19808690128547.21

= 154.0966 mm ≈ 150 mm

0.25d = 85 mm8db = 128 mm24ds = 240 mm300 mm

digunakan P10-150b. Daerah luar sendi plastis

Vc = 1/6 x f'c x b x d= 1/6 x 22,5 x 200 x 344= 54 N

Cek Jika Ve > 0,5 Vu Vc = 029.73241 > 48.205204 Vc = 0

Vs = y - Vc0.75

φgeser

Dtulangan

AP10 0.25 x π x D2

0.25 x 3.14 x 102

mm2

Jml kaki x fy x d x AP10

Smax Daerah dalam sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

A B C D E F G H I J K L M N O P Q R S561

562

563

564

565

566

567

568

569

570

571

572

573

574

575

576

577

578

579

580

581

582

583

584

585

586

587

588

589

590

591

592

593

594

595

596

597

598

599

600

601

602

603

604

605

606

Page 76: Perhitungan Balok

= 81.17 - 00.75

= 108.22667 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 200 x344= 215.66734 Nmm

Syarat Vs < Kontrol108.2267 < 215.67 Ok!

Jarak Begel (Sengakang)Jml. kaki = 2

= 10 mm

=

= 78.5

S =Vs

= 2 x 370 x344 x 78.5108226.67

= 19808690108226.67

= 183.030 mm ≈ 180 mm

0.5d = 171 mm600 mm

digunakan P10-180

Jadi hasil dari perhitungan diatas didapat hasil sebagai berikut :Tul. TumpuanDesak Dipakai 2D16Tarik Dipakai 4D16Tul LapanganDipakai 3D16Tul. SusutDipakai 2D10Tul. Geserdalam sendi plastis digunakan P10-150Luar sendi plastis digunakan P10-180

…Ok!

Dtulangan

AP10 0.25 x π x D2

mm2

Jml kaki x fy x d x AP10

Syarat Smax daerah luar sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

A B C D E F G H I J K L M N O P Q R S607

608

609

610

611

612

613

614

615

616

617

618

619

620

621

622

623

624

625

626

627

628

629

630

631

632

633

634

635

636

637

638

639

640

641

642

643

644

645

646

647

648

649

650

651

652

653

654

Page 77: Perhitungan Balok

PERENCANAAN BALOK 5

A PERENCANAAN BALOKI TULANGAN LENTUR BALOK

Input Data Balokb 200 mmf'c 22.5 Mpa Data Momen Balok dari SAP2000

fy 370 Mpa = 25.6052 KNm

0.85 = 9.0919 KNmφ 0.8ε 0.003Es 200000

1 Tulangan TumpuanRasio Tulangan (ρ)

=x

600fy 600 + fy

=x

600370 600 + 370

= 0.0272

= ρ =

= 0,75 x 0,0272 = 0,5 x 0,0272

= 0.0204 = 0.0136

m = fy0,85 x f'c

= 370

0,85 x 22,5= 19.3464

= ρ x fy x (1-(0,5 x ρ x m))= 0.0136 x 370 x (1-(0,5 x 0,0136 x 19,3464))= 4.3668

Mu TumB5

β1 Mu LapB5

ρb 0,85 x β1 x f'c

0,85 x 0,85 x 22,5

ρmax 0,75 x ρb 0,5 x ρb

Koefisien Perlawanan (R1)

R1

A B C D E F G H I J K L M N O P Q R S1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

Page 78: Perhitungan Balok

= Mu/φ

=4.3668

= 7329428.628 mm

=b

= 7329428.628200

= 191.4344

Luas tarik effektif beton (SNI 03-2847-2002) Skema penampang (SNI 03-2847-2002)

Pusat berat tulangan baja desak : d' = 38 mmPusat berat tulangan baja tarik : z = 56 mm

== 247.4344 mm

Jadi, ukuran balok berdasarkan hitungan adalah :b = 200 mm

= 247.4344 mmSyarat

bd2

R1

25,6052 x106/0.8

dperlu bd2

mm2

hperlu dperlu + z

hperlu

A B C D E F G H I J K L M N O P Q R S

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

Page 79: Perhitungan Balok

Diambil :

= 300 mm

Tinggi efektif desak : Tinggi efektif tarik :

= h - z = h - d'= 244 mm = 262.00 mm

a Tulangan Desakγ = 0.5

== 0.5 x4,3668= 2.1834

= Mu -

= φ

= = 25.605 - 25.9985= 25.998465647 KNm 0.8

= 6.00803435 KNmLuas tulangan perlu (As')

As' =fy x (d-d')

= 6008034.35274737370 x (244 - 38)

= 78.82Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D16 dengan AsØ= 200,960 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.500 AsØ13 132.665 = 78.8216 200.960 200.96019 283.385 = 0.3922 tulangan, ambil 2 tulangan22 379.94025 490.625

=

= 401.92

b Tulangan Tarik

= γ x ρ= 0.5 x 0.0135= 0.0068

As =

=

= 410.382

hpakai < hperlu

hpakai

ddesak dtarik

R2 γ x R1

M2 M1

M1 R2 x b x d2

2,1834 x 200 x (2412)

M2

mm2

AsØ (mm2)

Dipakai 2D16

Luas tulangan perlu (As'perlu)

As'ada n x AsØ

mm2

ρbaru

Luas tulangan perlu (Asperlu)

(ρbaru x b x d) + As'

(0.0068 x 200 x 244) + 78,82

mm2

A B C D E F G H I J K L M N O P Q R S

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

Page 80: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm) Coba tulangan D16 dengan AsØ= 200,960 mm², maka :6 28.260 Jumlah tulangan perlu :8 50.240 n = As'

10 78.500 AsØ13 132.665 = 410.38216 200.960 200.96019 283.385 = 2.0421 tulangan, ambil 3 tulangan22 379.94025 490.625

=

= 602.880

AsØ (mm2)

Dipakai 3D16

Luas tulangan perlu (Asperlu)

Asada n x AsØ

mm2

A B C D E F G H I J K L M N O P Q R S123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

Page 81: Perhitungan Balok

c

= 401.920

= 602.880

Cc = 0.85 x f'c x a x b a = 0.85c= 3251.25 c

Cs = As' x εc x Es x c - d'

c= 241152

x c - 38

cTs = As x fy

= 223065.6

Cc+ Cs -Ts = 03251.25 c + 241152

x c - 38 - 223065.6 = 0

c

3251.25 18086.4 c - -9163776 = 0

5.5629 c -2818.5393 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= -5.5629 ± 11305.1032

= -5.5629 ± 106.32552

= 50.381 mm

= -55.944 mm

= 50.38 mmfs' = c - d' x εc x Es

c= 50,38 - 38 x 0.003 x 200000

50.38= 147.451 Mpa < 370 Mpa Ok!

= fs'= 147.451 Mpa

a = 0.85 x c= 0.85 x 50,38= 42.824 mm

Kontrol Momen Tersedia1

Kontrol Momen Tersedia Mg-

As'ada mm2

Asada mm2

c2

c2

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

A B C D E F G H I J K L M N O P Q R S

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

Page 82: Perhitungan Balok

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 48.669 KNm

= 0.8 x 47,898= 38.935 KNm> Mu = 25.605 KNm Aman!

=b x d

= 602.880200 x 244

= 0.0082

= = 0.0041

b x d = 0.0204

= 401.920200 x 244 0.0041 < 0.0204 Aman!

= 0.0124

d

= 401.920

= 602.880d' = 38 mmz = 56 mm

= 262.00 mm

Cc = 0.85 x f'c x a x b a = 0.85c= 3251.25 c

Cs= As' x εc x Es x

c - zc

= 361728 x c - 56c

Ts = As x fy= 401,92 x 370= 148710.4

Cc+ Cs -Ts = 03251.25 c + 361728 x c - 56 - 148710.4 = 0

c

3251.25 213017.6 c -20256768 = 0

65.5187 c -6230.4554 = 0

Mg- Mn-

0.8Mg-

ρ'ada Asada'

ρada Asada ρada-ρ'ada

ρmax

syarat ρada-ρ'ada < ρmax

Kontrol Momen Tersedia Mg+2

As'ada mm2

Asada mm2

dtarik

c2 +

c2 +

A B C D E F G H I J K L M N O P Q R S

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

Page 83: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= -65.5187 ± 29214.5192

= -65.5187 ± 170.92262

= 52.702 mm

= -118.221 mm

= 52.70 mmfs' = c - d' x εc x Es

c= 52,70 - 38 x 0.003 x 200000

52.70= 167.38 Mpa < 370 Mpa Ok!

= fs'= 167.378 Mpa

a = 0.85 x c= 0.85 x 52,70= 44.797 mm

= = (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 63.659 KNm

= 0.8 x 63,659= 50.927 KNm

2Mu Lap = 9.0919 KNm m

=fy

0.85 x f'c

==

370= 0.0204 0.85 x 22,5

= 19.3464b = 200 mmh = 300 mm

= h - z= 244 mm

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

Mg+ Mn-

0.8Mg+

Tulangan Lapangan Balok3

ρmax 0.75 x ρb

ddesak

A B C D E F G H I J K L M N O P Q R S227

228

229

230

231

232

233

234

235

236

237

238

239

240

241

242

243

244

245

246

247

248

249

250

251

252

253

254

255

256

257

258

259

260

261

262

263

264

265

266

267

268

Page 84: Perhitungan Balok

=x d

=x 244

= 150.92783505 mm

=== 96.22 mm

Mu = 0.85 x f'c x a x b x (d - a/2)φ

11.364875 = 3825.00 a x (244 - a/2)

11.364875 = 933300 a -1912.50Didapat persamaan :

1912.50 -933300 a 11364875 = 0

-488 a 5942.418 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

a = b ± - 4ac2a

= 488 ± 214374.32682

= 488 ± 463.0062

= 475.503 mm

= 12.497 mm

= 12.497 mmTulangan yang dignakan yaitu Tulangan sebelah

Cc = Ts0.85 x f'c x a x b = As x fy0.85 x 22,5x 12,497 x 200 = As x 370

47801.4984 = As 370

As = 129.193

cb εc x Esεc x Es x fy

0.003 x 2000000.003 x 200000 x 370

amax 0.75 x β x cb

0.75 x 0.8 x 150,9278351

a2

a2

a2

b2

a1

a2

Dari hitungan gunakan nilai a2 < amax = 193,62 mm

mm2

Perencanaan tulangan lapangan balok sama dengan perencanaan tulangan tumpuan balok. Momen yang digunakan adalah momen pada daerah daerah lapangan balok yang terbesar. Ukuran balok pada perencanaan tulangan lapangan mengikuti ukuran balok padaperencanaan tulangan tumpuan. diameter tulangan yang digunakan harus sama dengan diameter pada tulangan tumpuan.

A B C D E F G H I J K L M N O P Q R S

269

270

271

272

273

274

275

276

277

278

279

280

281

282

283

284

285

286

287

288

289

290

291

292

293

294

295

296

297

298

299

300

301

302

303

304

305

306

307

308

309

310

311

312

313

314

Page 85: Perhitungan Balok

Diameter tulangan rencana :Luas satu tulangan

Ø (mm)

6 28.2608 50.240 Jumlah tulangan perlu :

10 78.500 n = As'

13 132.66516 200.960 = 129.19319 283.385 200.96022 379.940 = 0.6429 tulangan, ambil 2 tulangan25 490.625

= 401.920

Kontrol momen tersediaCc = Ts

0.85 x f'c x a x b =Maka :

a =0.85 x f'c x b

= 38.879 mmMn = 0.85 x f'c x a x b x (d - a/2)

= 33.394516284 KNm

= 26.715613027 KNm > Mu = 9.092 KNm Aman!

AsØ (mm2)

Coba tulangan D16 dengan AsØ= 200,96 mm², maka :

AsØ

Dipakai 2D16

Luas tulangan perlu (Asada)

Asada mm2

Asada x fy

Asada x fy

φMn

Perencanaan ini tidak memerlukan tulangan desak karena a < amax , tetapi untuk dapat memasang sengkang, maka digunakan 4buah tulangan dengan diameter yang sama dengan diamater tulangan tarik

A B C D E F G H I J K L M N O P Q R S315

316

317

318

319

320

321

322

323

324

325

326

327

328

329

330

331

332

333

334

335

336

337

338

339

340

341

342

343

344

345

346

347

348

349

350

351

352

353

354

Page 86: Perhitungan Balok

Jumlah maksimum tulangan dalam satu barisb - d'

=162

= 3.951 ≈ 4 buah tulangan25 + D 41

Tulangan Susutfy = 370 Mpa

Tabel. Luas minimum tulangan susut (pasal 9.12)Mutu Baja (fy) Asst

0,0020.b.h > 0,0014.b.hBJTD-40 0,0018.b.h > 0,0014.b.h

≥BJTD-41 0,0018.b.h (400/fy) > 0,0014.b.h

Asst D10 =

= 108Diameter tulangan rencana :Luas satu tulangan

Ø (mm)6 28.260 Jumlah tulangan susut :8 50.240 n =Asst D10

10 78.50013 132.665 = 10816 200.960 78.50019 283.385 = 1.3758 tulangan, ambil 2 tulangan22 379.94025 490.625

= 157

≤BJTD-30

0.0018 x b x hbalok

mm2

AsØ (mm2) Coba tulangan D10 dengan AsØ=78.50 mm², maka :

AsØ

Dipakai 2D10

Luas tulangan perlu (Aspakai)

Aspakai mm2

A B C D E F G H I J K L M N O P Q R S355

356

357

358

359

360

361

362

363

364

365

366

367

368

369

370

371

372

373

374

375

376

377

378

379

380

381

382

383

384

385

Page 87: Perhitungan Balok

Momen Kapasitas Balok

Tarik

=

=

= 200.960

== 3 x 200,96

= 602.880

Desak

=

=

= 200.96

== 2 x 200,96

= 401.920

Skema penampang dalam keadaan lentur batas (SNI 03-2847-2002)

Cc = 0.85 x f'c x a x b= 3251.25 c

Cs =As' x εc x Es x

c - d'c

= 241152.00 x c - 38c

Ts = As x 1.25fy= 278832

Cc+ Cs -Ts = 03251.25 c + 241152 x c - 40 - 278832 = 0

c

3251.25 -37680 c -9163776 = 0

-11.5894 c -2818.5393 = 0

Momen kapasitas negatif (Mpr- )5

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

Asada n x AsØ

mm2

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

As'ada n x AsØ

mm2

c2

c2

A B C D E F G H I J K L M N O P Q R S386

387

388

389

390

391

392

393

394

395

396

397

398

399

400

401

402

403

404

405

406

407

408

409

410

411

412

413

414

415

416

417

418

419

420

421

422

423

424

425

426

427

428

429

430

Page 88: Perhitungan Balok

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

c = 11.5894 ± 11408.4712

= 11.5894 ± 106.81042

= 59.200 mm

= -47.611 mm

= 59.200 mmfs' = c - d' x εc x Es

c= 59,2 - 83 x 0.003 x 200000

59.200= 214.8643 Mpa < 400 MPa Ok!

= fs'= 214.864 Mpa

a = 0.85 x c= 0.85 x 59,2= 50.320 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 59.911 KNm

= 47.929 KNm > Mu = 25.605 KNm Aman!

Tarik

=

=

= 200.96

== 2x 200,96

= 401.920Desak

=

=

= 200.960

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR-

0,8MPR-

Momen kapasitas positif (Mpr+ )

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

As'ada n x AsØ

mm2

A1D16 0.25 x π xd2

0.25 x 3.14 x162

mm2

A B C D E F G H I J K L M N O P Q R S431

432

433

434

435

436

437

438

439

440

441

442

443

444

445

446

447

448

449

450

451

452

453

454

455

456

457

458

459

460

461

462

463

464

465

466

467

468

469

470

471

472

473

474

Page 89: Perhitungan Balok

== 3 x 200,96

= 602.880Cc = 0.85 x f'c x a x b

= 3251.25 c

Cs =As' x εc x Es x

c - d'c

= 120576x

c - 38c

Ts = As x 1,25fy= 401,920 x 1,25(370)= 185888

Cc+ Cs -Ts = 03251.25 c + 120576 x c - 38 - 185888 = 0

c

3251.25 -65312 c -6752256 = 0

-20.0883 c -2076.8185 = 0

Gunakan rumus ABC untuk mencari niala c :Rumus:

c = b ± - 4ac2a

= 20.0883 ± 8710.8132

= 20.0883 ± 93.33172

= 56.710 mm

= -36.622 mm

= 56.710 mmfs' = c - d' x εc x Es

c= 56,71 - 38 x 0.003 x 200000

56.710= 197.955 MPa < 400 MPa Ok!

= fs'= 197.955 MPa

a = 0.85 x c= 0.85 x 56,71= 48.204 mm

= (0.85 x f'c x a x b x (d - a/2)) + As' x fs' x (d - d'))= 52.774 KNm

= 42.219 KNm

Asada n x AsØ

mm2

c2+

c2 -

b2

c1

c2

Dari hitungan gunakan nilai c1

fs'pakai

MPR+

0,8MPR+

A B C D E F G H I J K L M N O P Q R S

475

476

477

478

479

480

481

482

483

484

485

486

487

488

489

490

491

492

493

494

495

496

497

498

499

500

501

502

503

504

505

506

507

508

509

510

511

512

513

514

515

516

517

518

519

520

Page 90: Perhitungan Balok

II TULANGAN GESER BALOK

Input Data Balok =

59.911 kNm = 4,00 - 0,60

52.774 kNm = 3.40 mf'c 22.5 Mpafy 370 MPa Data Geser Balok dari SAP2000

b 200 mm = 32.188 kN

h 300 mm = -32.188 kN

241 mm

4 m

0.6 m

Perhitungan1 Gaya geser akibat beban gempa

Ve = (Mpr -) + (Mpr +) Ve = 33.1426 kNLnetto

= 59.911 + 52.774 A B3.4

= 33.142644434 kN

2 Gaya geser akibat beban gravitasi 66.678 kN

= 66.678 kN Vg

= -66.678 kNA B

66.678 kN3 Menghitung gaya geser ultimate (Vu)

Vu = Ve + Vg Vu= 99.82 kN= 99.821 kN

y = 79.82

x = 2h-33.535 kN

x = 600 mm

Lnetto LB5- Lkolom

MPR -

MPR+

Vmax B3

Vmin B3

ddesak

LB5

Lkolom

Vmax B4

Vmin B4

A B C D E F G H I J K L M N O P Q R S521

522

523

524

525

526

527

528

529

530

531

532

533

534

535

536

537

538

539

540

541

542

543

544

545

546

547

548

549

550

551

552

553

554

555

Page 91: Perhitungan Balok

a. Daerah dalam sendi plastisVc = 1/6 x f'c x b x d

= 1/6 x 22,5 x 200 x241= 38.11 kN

Cek Jika Ve > 0,5 Vu Vc = 033.142644 > 49.910322217 Vc = 0

Vs = Vu - Vc

= 99.821 - 00.75

= 133.09419258 kNm

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 200 x241= 152.42 kNm

Syarat Vs < Kontrol133.09419 < 152.42 Ok!

Jarak Begel (Sengkang)Jml. kaki = 2

= 10 mm

=

=

= 78.50

S =Vs

= 2 x 370 x 241 x 78,5133094.19257932

= 13999690133094.19258

= 105.1863 mm ≈ 100 mm

0.25d = 60 mm8db = 128 mm24ds = 240 mm300 mm

b. Daerah luar sendi plastisVc = 1/6 x f'c x b x d

= 1/6 x 22,5 x 200 x 241= 38 N

Cek Jika Ve > 0,5 Vu Vc = 033.142644 > 49.910322217 Vc = 0

Vs = y - Vc0.75

= 79.82 - 00.75

= 106.4267 kNm

φgeser

Dtulangan

AP10 0.25 x π x D2

0.25 x 3.14 x 102

mm2

Jml kaki x fy x d x AP10

Smax Daerah dalam sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil, digunakan P10-100

A B C D E F G H I J K L M N O P Q R S556

557

558

559

560

561

562

563

564

565

566

567

568

569

570

571

572

573

574

575

576

577

578

579

580

581

582

583

584

585

586

587

588

589

590

591

592

593

594

595

596

597

598

599

600

601

602

603

604

605

606

607

608

Page 92: Perhitungan Balok

Kontrol = 2/3 x f'c x b x d= 2/3 x 22,5x 200 x241= 152.42178322 Nmm

Syarat Vs < Kontrol106.42667 < 152.42 Ok!

Jarak Begel (Sengakang)Jml. kaki = 2

= 10 mm

=

= 78.5

S =Vs

= 2 x 370 x241 x 78,5106426.67

= 13999690106426.67

= 131.543 mm ≈ 130 mm

0.5d = 121 mm600 mm

digunakan P10-130

Jadi hasil dari perhitungan diatas didapat hasil sebagai berikut :Tul. TumpuanDesak Dipakai 2D16Tarik Dipakai 3D16Tul LapanganDipakai 2D16Tul. SusutDipakai 2D10Tul. Geserdalam sendi plastis digunakan P10-100Luar sendi plastis digunakan P10-130

Dtulangan

AP10 0.25 x π x D2

mm2

Jml kaki x fy x d x AP10

Syarat Smax daerah luar sendi plastis

Maka dari perhitungan jarak sengkang dan syarat Smax diambil yang terkecil,

A B C D E F G H I J K L M N O P Q R S609

610

611

612

613

614

615

616

617

618

619

620

621

622

623

624

625

626

627

628

629

630

631

632

633

634

635

636

637

638

639

640

641

642

643

644

645

646

647

648

649

650

651

652

653

654

655

Page 93: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

PLAT LANTAI 7 X 3.5 MPERHITUNGAN BEBAN PLAT LANTAI

Berdasarkan Peraturan Pembebanan Indonesia Untuk Gedung (PPIUG)1983a. Beban Mati (Qd)

Komponen Platvolume berat jenis hasil perkalian

1.Beton (12cm) 0.13 2400 3.12 kN/m²2.Spesi (2 cm) 2 21 0.42 kN/m²3.Pasir (3cm) 0.03 1800 0.54 kN/m²4.Keramik (0,5 cm) 0.5 24 0.12 kN/m²5Plafon+penggantung 0.18 kN/m²6.ME 0.25 kN/m²

Qd = 4.63 kN/m²

b.Beban Hidup (Ql)Beban hidup pada lantai gedung kampus adalah

Ql = 2.5 kN/m²

c. Beban Ultimate (qu)qu = 1.2 Qd+1.6Ql

= 9.556 kN/m²Perhitungan

Analisis dimensi platLy = 7 mLx = 3.5 m

= 2 dua arahTabel untuk menentukan momen plat (PBI - 1971)

Ly/Lx 2 Analisis tebal minimum platClx 41 S = Lx x 1000Cly 12 S = 3500 mmCtx 83Cty 57 h = S

28h = 125 mm

jadi dipakai 130 mm

Syarat tebal plat ≥ 120mmDipakai tebal plat

h = 125 mmjadi dipakai = 130 mm

f'c (Mpa) = 22.5 Mpafy (Mpa) = 240 MPa karena tulangan polos

Page 94: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

d.PERHITUNGAN MOMEN0.001 x qU x Clx x Lx² = 4.799501 KNm

0.001 X qU X Cly X Lx² = 1.404732 KNm

0.001 X qU X Ctx X Lx² = 9.716063 KNm

0.001 X qU X Cty X Lx² = 6.672477 KNm

1. Penulangan Arah Xa.Tulangan lapangan

4.799501 KNm

Rencana diameter tulangan (Ø) mm = 10 mmSelimut beton (Pb) = 25 mm

ds x = Pb + 0,5xØ= 30 mm

d = h plat - ds= 100 mm

Faktor momen pikul (K)interpolasi k maks untuk mencari nilai k maks dari f'c =22.5 dan fy = 370 data dari tabel faktor momen pikul maksimal dari Mpa

f'c20 5.3828

22.5 x25 6.7295

5=

1.31672.5 6.7295 -x

5x = 3.36075 - 33.64755x = -30.28675

x = 6.05735

K = Mu

= 0.599937625 Mpa < 6.057 Mpa aman

a = (1- √1 - (2 x K / 0.85 x f'c)) x d= 3.187737097 mm

Mlx ⁺=

Mly ⁺=

Mtx ¯=

Mty ¯=

Mlx ⁺=

Ø x b x d

Page 95: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 254.0227999

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

= (1.4 x b x d)/fy= 583.3333333

dipilih yang terbesar, jadi As pakai := 583.3333333

Perhitungan Jarak Tulangan (S)

Jarak maksimal tulangan (Pokok)Plat 1 arah : S ≤ 3.h dan S ≤ 450mm (Pasal 12.5.4)Plat 2 arah : S ≤ 2.h dan S ≤ 450mm (Pasal 15.3.2)

S = (1/4 x π x D² x S)/As,u= 134.5714286 mm

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 100 mm < 2.h

= 100 mm < 260 aman

Luas tulangan = (1/4 x π x D² x S)/S= 785 > As,u 583.3 aman

di gunakan P10-140b.Perhitungan tulangan tumpuan

= 9.716063 KNmRencana diameter tulangan (Ø) = 10 mm

K = Mu

= 1.214507875 Mpa < 6.057 Mpa aman

a = (1- √1 - (2 x K / 0.85 x f'c)) x d= 6.565924817 mm

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 523.2221339

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 583.3333333

mm²

As ≥(1.4xbxd)/fy

As,umm²

As,u mm²

Mtx¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

Page 96: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

dipilih yang terbesar, jadi As pakai :As,u = 583.3333333

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 134.5714286 mmuntuk mempermudah proses pemasangan tul. S pakai :

S pakai = 100 mm < 2.h 260 amanLuas tulangan = (1/4 x π x D² x S)/S

= 785 > As,u 583.3 amandi gunaka P10-140

b.Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) = 8 mm

Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400Mpa

Jarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 116.6666667

Asb = 0.002.b.h= 260

dipilih yang terbesar, maka Asb pakai :Asb,u = 260

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 193.2307692 mmuntuk mempermudah proses pemasangan tul. S pakai :

S = 150 mm < 5.h 650150 mm < 650 mm aman

Luas tulangan = (1/4 x π x D² x S)/S= 334.9333333 > Asb,u 260= 334.9333333 mm² > 260 mm² aman

Dari perhitungan diatas, maka dipakai tul.pokok :D 10 - 100

Dari perhitungan diatas, maka dipakai tul.susut :D 8 - 150

2. Penulangan Arah Ya.Tulangan lapangan

= 1.404732 KNm

Rencana diameter tulangan (Ø) = 10 mmSelimut beton (Pb) = 20 mm

ds y = Pb + Ø+0,5xØ= 35 mm

d = h plat - ds= 130 - 35= 95 mm

mm²

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Mly⁺

Page 97: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

K = Mu

= 0.194561219 Mpa < 6.057a = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 0.971414442 mm

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 77.40958838Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 554.1666667

dipilih yang terbesar, jadi As pakai :As,u = 554.1666667

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 141.6541353 mmuntuk mempermudah proses pemasangan tul. S pakai :

S pakai = 100 mm < 2.h 260 amanLuas tulangan = (1/4 x π x D² x S)/S

= 785 > As,u 554.167 aman

b.Perhitungan tulangan tumpuan= 6.672477 KNm

Rencana diameter tulangan (Ø) = 10

K = Mu

= 0.924165789 Mpa < 6.057a = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 4.707249547 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 375.1089483

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)

f'c < 31.36MpaAs,u = (1.4 x b x d)/fy

= 554.1666667

dipilih yang terbesar, jadi As pakai :As,u = 554.1666667

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 141.6541353 mm

Ø x b x d²

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

mm²

Mty¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 98: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 100 mm < 2.h 260 aman

Luas tulangan = (1/4 x π x D² x S)/S= 785 > As,u 554.167 aman

b.Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) = 8 mmLuas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 20% x 554.1666667= 110.8333333

Asb = 0.002.b.h= 260

dipilih yang terbesar, maka Asb pakai :Asb,u = 260

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 193.2307692 mm

untuk mempermudah proses pemasangan tul. S pakai :S = 150 mm < 5.h 650 aman

Luas tulangan = (1/4 x π x D² x S)/S= 334.9333333 > Asb,u 260 aman

Dari perhitungan diatas, maka dipakai tul.pokok :D 10 - 100

Dari perhitungan diatas, maka dipakai tul.susut :D 8 - 150

mm²

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Page 99: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

PLAT LANTAI 7 X 3.5 MPERHITUNGAN BEBAN PLAT LANTAI

Berdasarkan Peraturan Pembebanan Indonesia Untuk Gedung (PPIUG)1983a. Beban Mati (Qd)

Komponen Platvolume berat jenis

Beton (12cm) 0.13 2400 3.12 kN/m²Spesi (2 cm) 2 21 0.42 kN/m²Pasir (3cm) 0.03 1800 0.54 kN/m²Keramik (0,5 cm) 0.5 24 0.12 kN/m²Plafon+penggantung 0.18 kN/m²MEE 0.25 kN/m²

Qd = 4.63 kN/m²

b. Beban Hidup (Ql)Beban hidup pada lantai gedung kampus adalah

Ql = 2.5 kN/m²

c. Beban Ultimate (qu)qu = 1.2 Qd+1.6Ql

= 9.556 kN/m²perhitunganAnalisis dimensi plat

Ly = 4 mLx = 3.5 m

= 1.14285714 dua arah

Tabel untuk menentukan momen plat (PBI - 1971)Ly/Lx 1.142857143

Clx 32 Analisis tebal minimum platCly 18.7 S = Lx x 1000Ctx 70.3 3500 mmCty 57

h = s28

125 mm

Syarat tebal plat ≥ 120mmDipakai tebal plat

jadi h dipakai h = 125 mm= 130 mm

f'c (Mpa) = 22.5 Mpafy (Mpa) = 240 MPa karena tulangan polos

Page 100: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

d. PERHITUNGAN MOMEN0.001 X qU X Clx X Lx²

= 3.745952 KNm0.001 X qU X Cly X Lx²

= 2.1890407 KNm0.001 X qU X Ctx X Lx²

= 8.2293883 KNm0.001 X qU X Cty X Lx²

= 6.672477 KNm

1. Penulangan Arah Xa. Tulangan lapangan

3.745952 KNmRencana diameter tulangan (Ø) mm = 10Selimut beton (Pb) = 20 mm

ds x = Pb + 0,5xØ ds y = Pb + Ø+0,5xØ= 25 = 35

d = h plat - ds d = h plat - ds= 105 mm = 95 mm

Faktor momen pikul (K)K = Mu

= 0.42471 < K maksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 2.35823 mm

Mlx ⁺=

Mly ⁺=

Mtx ¯=

Mty ¯=

Mlx ⁺=

Ø x b x d

Page 101: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 187.921Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

= (1.4 x b x d)/fy= 612.5

dipilih yang terbesar, jadi As pakai := 612.5

Perhitungan Jarak Tulangan (S)Jarak maksimal tulangan (Pokok)Plat 1 arah : S ≤ 3.h dan S ≤ 450mm (Pasal 12.5.4)Plat 2 arah : S ≤ 2.h dan S ≤ 450mm (Pasal 15.3.2)

S = (1/4 x π x D² x S)/As,u= 128.163 mm

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 140 mm < 2.h 260 aman

Luas tulangan = (1/4 x π x D² x S)/S= 560.714 > As,u 612.5 aman

b. Perhitungan tulangan tumpuan= 8.22939 KNm

Rencana diameter tulangan (Ø) mm = 10

K = Mu

= 0.93304 Mpa < Kmaksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 5.25401 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 418.679

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 612.5

dipilih yang terbesar, jadi As pakai :As,u = 612.5

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 128.163 mm

mm²

As ≥(1.4xbxd)/fyAs,u

mm²

As,u mm²

Mtx¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 102: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 140 mm < 2.h 260 aman

Luas tulangan = (1/4 x π x D² x S)/S= 560.714 > As,u 612.5 td aman

b. Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) mm = 8Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 122.5

Asb = 0.002.b.h= 260

dipilih yang terbesar, maka Asb pakai :Asb,u = 260

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 193.231 mmuntuk mempermudah proses pemasangan tul. S pakai :

S = 200 mm < 5.h 650 aman

Luas tulangan = (1/4 x π x D² x S)/S= 251.2 > Asb,u 260 td aman

Dari perhitungan diatas, maka dipakai tul.pokok : D 10 - 140Dari perhitungan diatas, maka dipakai tul.susut : D 8 - 200

2. Penulangan Arah Ya. Tulangan lapangan

= 2.18904 KNmRencana diameter tulangan (Ø) mm = 10Selimut beton (Pb) = 20 mm

ds y = Pb + Ø+0,5xØ= 35 mm

d = h plat - ds= 95 mm

K = Mu

= 0.30319 Mpa < Kmaks

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Mly⁺

Ø x b x d²

Page 103: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

a = (1- √1 - (2 x K / 0.85 x f'c)) x d= 1.51818 mm

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 120.98Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 554.167

dipilih yang terbesar, jadi As pakai :As,u = 554.167

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 141.654 mmuntuk mempermudah proses pemasangan tul. S pakai :

S pakai = 150 mm < 2.h 260 amanLuas tulangan = (1/4 x π x D² x S)/S

= 523.333 > As,u 554.167td aman

b. Perhitungan tulangan tumpuan= 6.67248 KNm

Rencana diameter tulangan (Ø) mm = 10

K = Mu

= 0.92417 Mpa < Kmaksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 4.70725 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 375.109

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 554.167

dipilih yang terbesar, jadi As pakai :As,u = 554.167

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 141.654 mm

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

mm²

Mty¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 104: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 150 mm < 2.h 260 aman

Luas tulangan = (1/4 x π x D² x S)/S= 523.333 > As,u 554.167td aman

b. Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) mm = 8Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 110.833

Asb = 0.002.b.h= 260

dipilih yang terbesar, maka Asb pakai :Asb,u = 260

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 193.231 mmuntuk mempermudah proses pemasangan tul. S pakai :

S = 200 mm < 5.h 650 aman

Luas tulangan = (1/4 x π x D² x S)/S= 251.2 > Asb,u 260 td aman

Dari perhitungan diatas, maka dipakai tul.pokok : D 10 - 150Dari perhitungan diatas, maka dipakai tul.susut : D 8 - 200

mm²

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Page 105: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

PERHITUNGAN PLAT DAG ( AREA 6 m x 3 m )KELOMPOK III

1.1. Beban matiPlat lantai (12 cm) = T x ϒb

= 2.88 Kn/m3Pasir urug (3cm) = T x ϒ

= 0.054 Kn/m3Keramik (1cm) = T x ϒ

= 0.24 Kn/m3Spesi (2cm) = T x ϒ

= 0.42 Kn/m3Plafon & penggantung = 0.18 Kn/m3

1.2. Beban hidupfungsi bangunan ruang kuliah

qL = 2.5 Kn/m2

PerhitunganAnalisis dimensi plat

Ly = 7 mLx = 3.5 m

= 2 dua arahTabel untuk menentukan momen plat (PBI - 1971)

Ly/Lx 2Clx 41Cly 12Ctx 83Cty 57

Analisis tebal minimum platS = 3500 mmh = 125 mm

Syarat tebal plat ≥ 120mmDipakai tebal plat

h = 125.000 mm= 100 mm

f'c (Mpa) = 22.5 Mpafy (Mpa) = 240 MPa

Page 106: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

PERHITUNGAN BEBAN PLAT LANTAIBerdasarkan Peraturan Pembebanan Indonesia Untuk Gedung (PPIUG)1983a. Beban Mati (Qd)

Komponen PlatBeton (10cm) = 0.1 x 2400 = 2.4 kN/m²Spesi (1,5 cm) = 2 x 21 = 0.42 kN/m²Plafon+penggantung = = 0.18 kN/m²water proofing = 0.5 kN/m²

Qd = 3.5 kN/m²

b. Beban Hidup (Ql)Beban hidup pada lantai gedung kampus adalah

Ql = 2.5 kN/m²beban hujan (qR) = 0.5 kN/m²

c. Beban Ultimate (qu)qu = 1.2 Qd+1.6Ql

= 8.2 kN/m²

d. PERHITUNGAN MOMEN0.001 X qU X Clx X Lx²

= 4.11845 KNm0.001 X qU X Cly X Lx²

= 1.2054 KNm0.001 X qU X Ctx X Lx²

= 8.33735 KNm0.001 X qU X Cty X Lx²

= 5.72565 KNm

1. Penulangan Arah Xa. Tulangan lapangan

4.11845 KNmRencana diameter tulangan (Ø) mm = 10Selimut beton (Pb) = 20 mm

ds x = Pb + 0,5xØ ds y = Pb + Ø+0,5xØ= 25 = 35

d = h plat - ds d = h plat - ds= 75 mm = 65 mm

Faktor momen pikul (K)K = Mu

= 0.9152 < K maksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 3.6793 mmPerhitungan Tulangan Pokok

Mlx ⁺=

Mly ⁺=

Mtx ¯=

Mty ¯=

Mlx ⁺=

Ø x b x d

Page 107: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

As = (0.85 x f'c x a x b)/fy= 293.2

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

= (1.4 x b x d)/fy= 437.5

dipilih yang terbesar, jadi As pakai := 437.5

Perhitungan Jarak Tulangan (S)Jarak maksimal tulangan (Pokok)Plat 1 arah : S ≤ 3.h dan S ≤ 450mm (Pasal 12.5.4)Plat 2 arah : S ≤ 2.h dan S ≤ 450mm (Pasal 15.3.2)

S = (1/4 x π x D² x S)/As,u= 179.43 mm < 2.h 200 aman

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 170 mm

Luas tulangan = (1/4 x π x D² x S)/S= 461.76 > As,u 437.5 aman

b. Perhitungan tulangan tumpuan= 8.3373 KNm

Rencana diameter tulangan (Ø) mm = 10

K = Mu

= 1.8527 Mpa < Kmaksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 7.6565 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 610.13

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 437.5

dipilih yang terbesar, jadi As pakai :As,u = 437.5

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 179.43 mm < 2.h 200 aman

mm²

As ≥(1.4xbxd)/fyAs,u

mm²

As,u mm²

Mtx¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 108: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 175 mm

Luas tulangan = (1/4 x π x D² x S)/S= 448.57 > As,u 437.5 aman

b. Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) mm = 8Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 87.5

Asb = 0.002.b.h= 200

dipilih yang terbesar, maka Asb pakai :Asb,u = 200

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 251.2 mm < 5.h 500 amanuntuk mempermudah proses pemasangan tul. S pakai :

S = 250 mm

Luas tulangan = (1/4 x π x D² x S)/S= 200.96 > Asb,u 200 aman

Dari perhitungan diatas, maka dipakai tul.pokok : D 10 - 170Dari perhitungan diatas, maka dipakai tul.susut : D 8 - 250

2. Penulangan Arah Ya. Tulangan lapangan

= 1.2054 KNmRencana diameter tulangan (Ø) mm = 10Selimut beton (Pb) = 20 mm

ds y = Pb + Ø+0,5xØ= 35 mm

d = h plat - ds= 65 mm

K = Mu

= 0.3566 Mpa < Kmaks

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Mly⁺

Ø x b x d²

Page 109: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

a = (1- √1 - (2 x K / 0.85 x f'c)) x d= 1.2236 mm

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 97.504Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 379.17

dipilih yang terbesar, jadi As pakai :As,u = 379.17

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 207.03 mmuntuk mempermudah proses pemasangan tul. S pakai :

S pakai = 150 mm < 2.h 200 amanLuas tulangan = (1/4 x π x D² x S)/S

= 523.33 > As,u 379.167 aman

b. Perhitungan tulangan tumpuan= 5.7256 KNm

Rencana diameter tulangan (Ø) mm = 10

K = Mu

= 1.694 Mpa < Kmaksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 6.0377 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 481.13

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 379.17

dipilih yang terbesar, jadi As pakai :As,u = 379.17

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 207.03 mm

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

mm²

Mty¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 110: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 150 mm < 2.h 200 aman

Luas tulangan = (1/4 x π x D² x S)/S= 523.33 > As,u 379.167 aman

b. Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) mm = 8Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 75.833

Asb = 0.002.b.h= 200

dipilih yang terbesar, maka Asb pakai :Asb,u = 200

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 251.2 mm < 5.h 500 amanuntuk mempermudah proses pemasangan tul. S pakai :

S = 200 mm

Luas tulangan = (1/4 x π x D² x S)/S= 251.2 > Asb,u 200 aman

Dari perhitungan diatas, maka dipakai tul.pokok : D 10 - 150Dari perhitungan diatas, maka dipakai tul.susut : D 8 - 200

mm²

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Page 111: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

PERHITUNGAN PLAT DAG ( AREA 4 m x 3 m )KELOMPOK III

1.1. Beban matiPlat lantai (12 cm) = T x ϒb

= 2.88 Kn/m3Pasir urug (3cm) = T x ϒ

= 0.054 Kn/m3Keramik (1cm) = T x ϒ

= 0.24 Kn/m3Spesi (2cm) = T x ϒ

= 0.42 Kn/m3Plafon & penggantun = 0.18 Kn/m3

1.2. Beban hidupfungsi bangunan ruang kuliah

qL = 2.5 Kn/m2

PerhitunganAnalisis dimensi plat

Ly = 4 mLx = 3.5 m

= 1.1429 dua arahTabel untuk menentukan momen plat (PBI - 1971)

Ly/Lx 1.142857143Clx 32Cly 18.7Ctx 70.3Cty 57

Analisis tebal minimum platS = 3500 mmh = 125 mm

Syarat tebal plat ≥ 120mmDipakai tebal plat

h = 125.000 mm= 100 mm

f'c (Mpa) = 22.5 Mpafy (Mpa) = 240 MPa karena dipakai tulangan polos

Page 112: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

PERHITUNGAN BEBAN PLAT LANTAIBerdasarkan Peraturan Pembebanan Indonesia Untuk Gedung (PPIUG)1983a. Beban Mati (Qd)

Komponen PlatBeton (12cm) = 0.1 x 2400 = 2.4 kN/m²Spesi (1,5 cm) = 1.5 x 21 = 0.315 kN/m²Plafon+penggantu = = 0.18 kN/m²MEE = 0.25 kN/m²

Qd = 3.145 kN/m²

b. Beban Hidup (Ql)Beban hidup pada lantai gedung kampus adalah

Ql = 2.5 kN/m²beban hujan (qR) = 0.5 kN/m²

c. Beban Ultimate (qu)qu = 1.2 Qd+1.6Ql

= 7.774 kN/m²

d. PERHITUNGAN MOMEN0.001 X qU X Clx X Lx²

= 3.047408 KNm0.001 X qU X Cly X Lx²

= 1.78082905 KNm0.001 X qU X Ctx X Lx²

= 6.69477445 KNm0.001 X qU X Cty X Lx²

= 5.4281955 KNm

1. Penulangan Arah Xa. Tulangan lapangan

3.047408 KNmRencana diameter tulangan (Ø) mm = 10Selimut beton (Pb) = 20 mm

ds x = Pb + 0,5xØ= 25

d = h plat - ds= 75 mm

Faktor momen pikul (K)K = Mu

= 0.6772 < K maksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 2.7045 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy

Mlx ⁺=

Mly ⁺=

Mtx ¯=

Mty ¯=

Mlx ⁺=

Ø x b x d

Page 113: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

= 215.51 mm²

Page 114: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

= (1.4 x b x d)/fy= 437.5

dipilih yang terbesar, jadi As pakai := 437.5

Perhitungan Jarak Tulangan (S)Jarak maksimal tulangan (Pokok)Plat 1 arah : S ≤ 3.h dan S ≤ 450mm (Pasal 12.5.4)Plat 2 arah : S ≤ 2.h dan S ≤ 450mm (Pasal 15.3.2)

S = (1/4 x π x D² x S)/As,u= 179.43 mm

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 170 mm < 2.h 200 aman

Luas tulangan = (1/4 x π x D² x S)/S= 461.76 > As,u 437.5 aman

b. Perhitungan tulangan tumpuan= 6.6948 KNm

Rencana diameter tulangan (Ø) = 10

K = Mu

= 1.4877 Mpa < Kmaksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 6.0807 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 484.56

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 437.5

dipilih yang terbesar, jadi As pakai :As,u = 437.5

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 179.43 mm

As ≥(1.4xbxd)/fyAs,u

mm²

As,u mm²

Mtx¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 115: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 175 mm < 2.h 200 aman

Luas tulangan = (1/4 x π x D² x S)/S= 448.57 > As,u 437.5 aman

b. Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) = 8Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 87.5

Asb = 0.002.b.h= 200

dipilih yang terbesar, maka Asb pakai :Asb,u = 200

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 251.2 mmuntuk mempermudah proses pemasangan tul. S pakai :

S = 250 mm < 5.h 500 aman

Luas tulangan = (1/4 x π x D² x S)/S= 200.96 > Asb,u 200 aman

Dari perhitungan diatas, maka dipakai tul.pokok D 10 - 170Dari perhitungan diatas, maka dipakai tul.susut : D 8 - 250

2. Penulangan Arah Ya. Tulangan lapangan

= 1.7808 KNmRencana diameter tulangan (Ø) = 10Selimut beton (Pb) = 20 mm

ds y = Pb + Ø+0,5xØ= 35 mm

d = h plat - ds= 65 mm

K = Mu

= 0.5269 Mpa < Kmaks

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²

Mly⁺

Ø x b x d²

Page 116: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

a = (1- √1 - (2 x K / 0.85 x f'c)) x d= 1.816 mm

Perhitungan Tulangan PokokAs = (0.85 x f'c x a x b)/fy

= 144.72Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 379.17

dipilih yang terbesar, jadi As pakai :As,u = 379.17

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 207 mmuntuk mempermudah proses pemasangan tul. S pakai :

S pakai = 180 mm < 2.h 200 amanLuas tulangan = (1/4 x π x D² x S)/S

= 436.11 > As,u 379.167 aman

b. Perhitungan tulangan tumpuan= 5.4282 KNm

Rencana diameter tulangan (Ø) = 10

K = Mu

= 1.606 Mpa < Kmaksa = (1- √1 - (2 x K / 0.85 x f'c)) x d

= 5.7089 mmPerhitungan Tulangan Pokok

As = (0.85 x f'c x a x b)/fy= 454.93

Luas tulangan minimal platTulangan pokok (Pasal 12.5.1. SNI 04-2847-2002)f'c < 31.36Mpa

As,u = (1.4 x b x d)/fy= 379.17

dipilih yang terbesar, jadi As pakai :As,u = 379.17

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/As,u

= 207 mm

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

mm²

Mty¯

Ø x b x d

mm²

As,u ≥(1.4xbxd)/fy

mm²

mm²

Page 117: Perhitungan Balok

Tugas BesarPerancangan Bangunan Teknik Sipil

FST-UTY

untuk mempermudah proses pemasangan tul. S pakai :S pakai = 180 mm < 2.h 200 aman

Luas tulangan = (1/4 x π x D² x S)/S= 436.11 > As,u 379.167 aman

b. Perhitungan tulangan bagi (tul.susut)Rencana diameter tulangan (Ø) = 8Luas tulangan minimal platTulangan bagi/tul.susut (Pasal 9.12.2.1. SNI 04-2847-2002)fy < 300Mpafy = 400Mpafy > 400MpaJarak maksimal tulangan (Pokok)S ≤ 5.h dan S ≤ 450mm (Pasal 9.12.2.2)

Asb = 20% x As,u= 75.833

Asb = 0.002.b.h= 200

dipilih yang terbesar, maka Asb pakai :Asb,u = 200

Perhitungan Jarak Tulangan (S)S = (1/4 x π x D² x S)/Asb,u

= 251.2 mmuntuk mempermudah proses pemasangan tul. S pakai :

S = 200 mm < 5.h 500 aman

Luas tulangan = (1/4 x π x D² x S)/S= 251.2 > Asb,u 200 aman

Dari perhitungan diatas, maka dipakai tul.pokok D 10 - 180Dari perhitungan diatas, maka dipakai tul.susut : D 8 - 200

mm²

Asb ≥ 0.0020.b.hAsb ≥ 0.0018.b.hAsb ≥ 0.0018.b.h.(400/fy)

mm²

mm²

mm²

mm²