PERENCANAAN REVITALISASI PENERANGAN JALAN UMUM PADA RUAS JALAN UTAMA KOTA CIMAHI Revitalization Planning of Public Road Lighting On Primary Street Cimahi City SKRIPSI Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan Pendidikan Sarjana Terapan (D4) Program Studi Manajemen Aset di Jurusan Administrasi Niaga Disusun Oleh : RUSDINATA 135246013 POLITEKNIK NEGERI BANDUNG 2017
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PERENCANAAN REVITALISASI PENERANGAN JALAN
UMUM PADA RUAS JALAN UTAMA KOTA CIMAHI
Revitalization Planning of Public Road Lighting On Primary Street
Cimahi City
SKRIPSI
Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan Pendidikan Sarjana Terapan (D4) Program Studi Manajemen Aset
di Jurusan Administrasi Niaga
Disusun Oleh :
RUSDINATA
135246013
POLITEKNIK NEGERI BANDUNG
2017
PERENCANAAN REVITALISAI PENERANGAN JALAN
UMUM PADA RUAS JALAN UTAMA KOTA CIMAHI
Revitalization Planning of Public Road Lighting On Primary Street
Cimahi City
SKRIPSI
Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan Pendidikan Sarjana Terapan (D4) Program Studi Manajemen Aset
di Jurusan Administrasi Niaga
Disusun Oleh :
RUSDINATA
135246013
PROGRAM DIPLOMA IV MANAJEMEN ASET
KERJASAMA PEMERINTAH ROKAN HULU DENGAN
POLITEKNIK NEGERI BANDUNG
2017
iv
UCAPAN TERIMA KASIH
Pada proses pengerjaan Tugas Akhir Perencanaan Revitalisasi Penerangan
Jalan Umum Pada Ruas Jalan Utama Kota Cimahi, Penulis mendapatkan
dukungan dan bantuan dari berbagai pihak baik secara langsung atau tidak
langsung. Oleh karena itu, pada kesempatan ini Penulis ingin mengucapkan terima
kasih kepada :
1. Allah SWT dan Nabi Muhammad SAW atas nikmat, berkah, dan rahmat
yang telah diberikan kepada Penulis sehingga laporan tugas akhir ini dapat
diselesaikan.
2. Kedua orang tua Penulis, Jufri dan Ibu Maswita, , yang selalu memberikan
kasih sayang, do’a, dukungan, bantuan, dan semangat sejak awal hingga
akhir masa perkuliahan.
3. Dr. A. Gima Sugiama, SE, MP selaku ketua program studi Manajemen
Aset selama ini telah memberikan arahan, dukungan, dan motivasi bagi
Penulis selama menjadi mahasiswa Manajemen Aset, terutama dalam
proses penulisan tugas akhir.
4. Dr. Dra. Tri Setyowati, M.Si selaku dosen pembimbing yang telah
bersedia meluangkan waktu untuk memberikan bimbingan, masukan, dan
bantuan selama masa penyusunan tugas akhir .
5. Staf Administrasi Manajemen Aset, Ibu Yuni dan Ibu Yani, atas
bantuannya kepada Penulis dalam mengurus kegiatan administrasi selama
masa perkuliahan..
6. Seluruh anggota kelas Kerja Sama Manajemen Aset Rokan Hulu yang
telah menjadi rekan kerjasama, support system, sumber tawa, dan selalu
memberikan bantuan bagi Penulis selama menjalani masa perkuliahan.
7. Seluruh Mahasiswa angkatan 2013 D4 Manajemen Aset.
vi
DAFTAR ISI
Halaman
LEMBAR PENGESAHAN .............................................................................. i PERNYATAAN BEBAS PLAGIARISME ..................................................... ii KATA PENGANTAR ....................................................................................... iii UCAPAN TERIMA KASIH ............................................................................ iv
DAFTAR RIWAYAT HIDUP ......................................................................... v
DAFTAR ISI ...................................................................................................... vi DAFTAR LAMPIRAN ..................................................................................... viii DAFTAR GAMBAR ......................................................................................... ix DAFTAR TABEL ............................................................................................. x ABSTRAK ......................................................................................................... xii ABSTRACT ........................................................................................................ xiii
1.1 Latar Belakang Masalah ............................................................................. 1 1.2 Identifikasi Proyek ..................................................................................... 5 1.3 Tujuan dan Manfaat Proyek ....................................................................... 6 1.4 Lokasi dan Jadwal Proyek .......................................................................... 7
BAB II TINJAUN PUSTAKA ......................................................................... 8 2.1 Manajemen Aset ........................................................................................ 8
2.1.1 Pengertian dan Tujuan Manajemen Aset ........................................... 8 2.1.2 Jenis Aset ...........................................................................................10 2.1.3 Siklus Manajemen Aset .....................................................................11
2.2 Perencanaan Kebutuhan Aset .....................................................................14 2.3.1 Pengertian Perencanaan Kebutuhan Aset ..........................................14 2.3.2 Proses Perencanaan Kebutuhan Aset .................................................16 2.2.3 Kriteria Perencanaan Kebutuhan Aset ...............................................20 2.2.4 Perencanaan Revitalisasi ...................................................................21
2.3 Anggaran dan Estimasi Biaya .....................................................................22 2.3.1 Anggaran ............................................................................................22 2.3.2 Estimasi Biaya ....................................................................................23 2.4 Jalan dan Penerangan Jalan Umum .............................................................27 2.4.1 Jalan ...................................................................................................27 2.4.2 Penerangan Jalan Umum ....................................................................29 BAB III METODE PERANCANGAN PROYEK ..........................................38 3.1 Obyek/Unit Analisis ....................................................................................38 3.2 Prosedur Proyek ..........................................................................................38 3.3 Teknik Pengumpulan Data ..........................................................................41 3.4 Kerangka Acuan Kerja ................................................................................42 3.5 Metode Analisis Data ..................................................................................44
vii
BAB IV HASIL PROYEK................................................................................45 4.1 Kondisi Eksisting Penerangan Jalan Umum ...............................................45 4.1.1 Lampu PJU pada Ruas Jalan Utama Kota Cimahi .............................45 4.1.2 Tiang PJU pada Ruas Jalan Utama Kota Cimahi ...............................48 4.1.3 Sistem Penempatan PJU pada Ruas Jalan Utama Kota Cimahi .........52 4.2 Perencanaan Revitalisasi Penerangan Jalan Umum ....................................53 4.2.1 Perencanaan Lampu PJU....................................................................53 4.2.2 Perencanaan Tiang PJU......................................................................57 4.2.3 Perencanaan Sistem Penempatan PJU ...............................................59 4.2.4 Layout Perencanaan Revitalisasi........................................................60 4.3 Estimasi Biaya .............................................................................................62 4.3.1 Biaya Penggantian Lampu .................................................................62 4.3.2 Biaya Pembongkaran .........................................................................63 4.3.3 Biaya Pembangunan ...........................................................................68 4.3.4 Biaya Pemeliharaan ............................................................................76 4.3.5 Biaya Operasional ..............................................................................77 4.5 Implikasi Manajerial ...................................................................................78 BAB V KESIMPULAN DAN SARAN ............................................................79
4.30 Akumulasi Biaya Pemeliharaan PJU Jalan Utama Kota Cimahi ................. 77
4.31 Akumulasi Biaya Operasional PJU Jalan Utama Kota Cimahi ................... 78
xii
ABSTRAK
Kinerja penerangan jalan umum pada ruas jalan utama Kota Cimahi belum optimal, yaitu lampu yang mati, tiang karatan serta jumlah penerangan jalan umum dan jarak antar tiang belum sesuai dengan SNI 7391,2008. Tujuan dari proyek ini adalah membuat perencanaan revitalisasi penerangan jalan umum pada ruas jalan utama Kota Cimahi yang sesuai dengan SNI 7391,2008 dan estimasi biaya yang dibutuhkan untuk melakukan perencanaan tersebut.Dalam proyek ini teori adalah teori Perencanaan Kebutuhan aset yang disesuaikan dengan SNI 7391 2008 tentang Spesifikasi Penerangan Jalan di Kawasan Perkotaan dan perhitungan estimasi biaya untuk mendapatkan biaya penggantian lampu, pembongkaran, pembangunan, pemeliharaan dan operasional dengan menggunakan Analisis Harga Satuan Pekerjaan (AHSP). Metode penelitian yang digunakan adalah metode deskriptif menggunakan data primer dan data sekunder yang diperoleh melalui observasi dan studi dokumentasi. Hasil proyek ini adalah melakukan penggantian lampu yang mati 39 unit, pembongkaran 114 armature dan stang
armature dari tiang PLN, pembangunan 305 penerangan jalan umum, pemangkasan 30 pohon yang menghalangi pencahayaan penerangam jalan umum dan total estimasi biaya yang dibutuhkan untuk perencanaan revitalisasi sebesar Rp. 11.030.908.428 Kata Kunci : Perencanaan Kebutuhan aset, Penerangan Jalan Umum, Jalan Utama
xiii
ABSTRACT
The performance of public road lighting on primary street Cimahi City has not
been optimal, they are the lamp off, the poles rusts and the amount of public road
lighting and the distance between the poles are not in accordance with SNI
7391,2008. The purpose of this project is to make revitalization planning of public
road lighting on primary street Cimahi City accordance with SNI 7391,2008 and
cost estimation needed to do the planning. In this project theory is theory of Needs
Planning Needs of assets adjusted to SNI 7391 2008 about Specification of Road
Lighting in Urban Area and calculation of cost estimation to make cost of lamp
replacement, disassembly, installation, maintenance and operation with using
Analisi Harga Satuan Pekerjaan (AHSP). The research method used is descriptive
method using primary and secondary of data with obtained through observation
and documentation study. The result of this project is to replace 39 lamps, 114
armatures and stang armatures from poles of PLN, construction of 305 public
road lighting, cuts 30 tree blocking illumination of public road lighting and total
estimated cost required for revitalization planning of Rp. 11.030.908.428.
Keywords: Needs Planning of Asset, Public Road Lighting, Primary Street