V-401

Letaknya Vertikal

Carbon Steel

L/D = 3

Volume Vessel = 34,7 m3

Kondisi Operasi ,

P = 99 kPa = 14.36 psi

T = 65 ᵒC= 149 ᵒF

Asumsi ,

Grade SA285

Type head = torispherichal

E = 1 (full)

S = 12900 psi pada T = 149 ᵒF

Corrosion allowance = 0,125 inch

Design Vessel (V-401)

Page 3: Perancangan Alat Proses Styrene Production

= (2*0,0778*D3) + (π*0,5D2*3D)

•D = (34,7/2,5106)^1/3

= 2,39984937 m

= 94,48225866 inchi

•R = 47,24112933 inchi

•L/D = 3 L = 3*D = 3*2,39984937 = 7,199 m = 283,45 inch

Pembuktian volume vessel

Volume Vessel =(2*0,0778*D3) + (π*0,5D2*3D)

= (2*0.0778*2.3998 m 3) + (3.14*(0.5*2.3998m) 2*3*2.3998m)

= 2.15 + 32.55 = 34.7 m 3

(Hasil yang diperoleh sama dengan volume vessel dalam data)

Volume Vessel = (2*V head ) + V silinder

Page 4: Perancangan Alat Proses Styrene Production

Thickness Cylinder (Buku Towler)

= (14.36 psi*94.48inch)/(2*12900*1-14.36)

= 0.0526 inch + 0.125 = 0.178 inch

Thickness Torispherical

= 0.885*(14.36psi*47.24inch)/(12900-(0.1*14.36))

= 0.0465 inch + 0.125 = 0.1715 inch

t = (P*D)/(2*S*E-P)

t = 0,885*(P*R/(S*E-0,1*P))

Page 5: Perancangan Alat Proses Styrene Production

V-402

Letaknya Horizontal

Carbon Steel

L/D = 3

Volume Vessel = 5 m3

Kondisi Operasi ,

P = 66 kPa = 9.57 psi

T = 65 ᵒC= 149 ᵒF

Asumsi ,

Grade SA285

Type head = torispherichal

E = 1 (full)

S = 12900 psi pada T = 149 ᵒF

Corrosion allowance = 0,125 inch

Design Vessel (V-402)

Page 6: Perancangan Alat Proses Styrene Production

= (2*0,0778*D3) + (π*0,5D2*3D)

•D = (5 /2,5106)^1/3

= 1.258 m

= 49.527 inchi

•R 24.764 inchi

•L/D = 3 L = 3*D = 3* 49.527 inch = 148.581 inch

Pembuktian volume vessel

Volume Vessel = (2*0,0778*D3) + (π*0,5D2*3D)

= (2*0.0778* 1.258 m 3) + (3.14*(0.5* 1.258 m) 2*3* 1.258 m)

= 0.3098 + 4.6885 = 5 m 3

(Hasil yang diperoleh sama dengan volume vessel dalam data)

Volume Vessel = (2*V head ) + V silinder

Page 7: Perancangan Alat Proses Styrene Production

Thickness Cylinder (Buku Towler)

= (9.57 psi*49.527inch)/(2*12900*1- 9.57)

= 0.0184 inch + 0.125 = 0.143 inch

Thickness Torispherical

= 0.885*(9.57 psi*24.764 inch)/(12900-(0.1* 9.57))

= 0.016 inch + 0.125 = 0.141 inch

t = (P*D)/(2*S*E-P)

t = 0,885*(P*R/(S*E-0,1*P))

Page 8: Perancangan Alat Proses Styrene Production

V-403

Letaknya Horizontal

Carbon Steel

L/D = 3

Volume Vessel = 5 m3

Kondisi Operasi ,

P = 66 kPa = 9.57 psi

T = 119.5 ᵒC= 247.1 ᵒF

Asumsi ,

Grade SA285

Type head = torispherichal

E = 1 (full)

S = 12900 psi pada T = 149 ᵒF

Corrosion allowance = 0,125 inch

Design Vessel (V-403)

Page 9: Perancangan Alat Proses Styrene Production

= (2*0,0778*D3) + (π*0,5D2*3D)

•D = (5 /2,5106)^1/3

= 1.258 m

= 49.527 inchi

•R 24.764 inchi

•L/D = 3 L = 3*D = 3* 49.527 inch = 148.581 inch

Pembuktian volume vessel

Volume Vessel = (2*0,0778*D3) + (π*0,5D2*3D)

= (2*0.0778* 1.258 m 3) + (3.14*(0.5* 1.258 m) 2*3* 1.258 m)

= 0.3098 + 4.6885 = 5 m 3

(Hasil yang diperoleh sama dengan volume vessel dalam data)

Volume Vessel = (2*V head ) + V silinder

Page 10: Perancangan Alat Proses Styrene Production

Thickness Cylinder (Buku Towler)

= (9.57 psi*49.527inch)/(2*12900*1- 9.57)

= 0.0184 inch + 0.125 = 0.143 inch

Thickness Torispherical

= 0.885*(9.57 psi*24.764 inch)/(12900-(0.1* 9.57))

= 0.016 inch + 0.125 = 0.141 inch

t = (P*D)/(2*S*E-P)

t = 0,885*(P*R/(S*E-0,1*P))

Page 11: Perancangan Alat Proses Styrene Production

Design Tower (T-401)Kondisi Operasi ,

P = 66 kPa = 9.57 psi

T = 119,5 ᵒC = 247,1 ᵒF

Asumsi ,

Grade SA285

Type head = torispherichal

E = 1 (full)

S = 12900 psi , T = 247,1 ᵒF

Corrosion allowance = 0.125

α = 30ᵒ

L= 28 m = 1102,36 inchi

topDiameter (D) = 3,6 m =141,73 inchi

Bottom Diameter (d) = 2,7 m = 106,29 inchi

H = 0,2887*(D-d)

= 0,2887*(3,6-2,7)

= 0,2598 m

Volume Tower

Torisperichal

Vo = 0,0778*D3

= 0,0778*(3,6)3

= 3,6298 m3

Cylindrical Shell

V = π*r2*t

= 3,14*(1,82)*28

= 284,86 m3

Cone

V = 0,262*H*(D2+Dd+d2)

= 0,262*0,2598*(3,62+(3,6*2,7)+2,72)

= 2,04 m3

Vtot = 3,6298 m3 + 284,86 m3 + 2,04 m3= 290,48 m3

Page 12: Perancangan Alat Proses Styrene Production

Thickness Torispherical Head

t = 0,885*(P*R)/(S*E-0,1*P))

= 0,046 inch

t = t + 2*CA

= 0,046 inch + (2* 0,125)

= 0,171 inchi

Thickness Cylindrical Shell

t = P*D/(2*S*E-P)

= 0,0526 inchi

t = t + 2*CA

= 0,0526 inch + (2* 0,125)

= 0,1776 inchi

Thickness Conical

t = P*D/(2*cosα*(S*E-0,6*P))

= 0,061 inchi

t = t + 2*CA

= 0,061 + (2*0,125)

= 0,186 inchi

Page 13: Perancangan Alat Proses Styrene Production

Design Tower (T-402)Kondisi Operasi ,

P =210 kPa = 30,45 psiT = 124,5 ᵒC = 256,1 ᵒF

Asumsi , Grade SA285Type head = torispherichalE = 1 (full)S = 13800 psi , T = 256,1 ᵒFCorrosion allowance = 0.125

t = 34,5 m = 1358,27 inchiD = 4,1 m = 161,42 inchiL/D = 42/5Volume Tower = 465,981 m3

Volume Tower

TorisperichalV = 0,0778*D3

= 0,0778*(4,1)3

= 5,362 m3

Vtot head = 2*V = 10,724 m3

Cylindrical ShellV = π*r2*t

= 3,14*(2,052)*34,5= 455,257 m3

Vtot = 10,724 m3 + 455,257 m3= 465,981 m3

Page 14: Perancangan Alat Proses Styrene Production

Thickness Torispherical Head

t = 0,885*(P*R)/(S*E-0,1*P))

= 0,158 inch

t = t + 2*CA

= 0,158 + (2* 0,125 )

= 0,4836 inchi

Thickness Cylindrical Shell

t = P*D/(2*S*E-P)

= 0,178 inchi

t = t + 2*CA

= 0,178 + (2* 0,125 )

= 0,428 inchi