www.dot.state.pa.us PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director
23

PennDOT Maintenance-IQ System - GIS-T · PDF PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

Feb 06, 2018

Download

Documents

phamcong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

PennDOT Maintenance-IQ System

Matt LongCenter for Program Development and Management

Nate ReckGeoDecisions, Director

Page 2: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

PennDOT Structure and Facts

• 67 counties in Pennsylvania• Counties are assigned to one

of the 11 Engineering Districts• Maintenance Responsibilities

– Central office develops overall policies

– The district office provides oversight and ensures employees are trained and have adequate resources

– The county maintenance organizations are responsible for executing highway maintenance plans and operations

Central Office

Engineering District 1

County Maintenance Organization

1A

County Maintenance

organization 1B

Engineering District 2

County Maintenance Organization

2A

Page 3: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

PennDOT Structure and Facts

• Department assets– Nation’s fifth largest state maintained roadway network– Over 80,000 lane miles (12’ equiv.) of roadway to maintain – Over 4,000 permanent equipment operators– 2,300 Dump trucks– 1,371 Units of roadway resurfacing equipment– 513 Front end loaders– 282 Digging units (backhoes and excavators)– 426 crew stockpile sites

• Highway usage– over 225,000,000 vehicle miles traveled daily on PA state highways

• Maintenance Budget– $1.3 Billion

Page 4: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

What is Maintenance at PennDOT?

Page 5: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

System Development

• Why? To improve the planning and scheduling of

maintenance activities Eliminate out-of-sequence re-work

Don’t pave a road and go back and do a pipe replacement and rip up new road.

Support getting maintenance “on-cycle” Make sure your regular maintenance activities are

going in order of the years that they are supposed to be done. If you should do litter pick-up before you mow the grass on the interstates.

Page 6: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

System Development

• Who? The Bureau of Maintenance and Operations

(BOMO) partnered with:• The Bureau of Planning and Research• The Innovations Office• District Office and County staff• GeoDecisions

Page 7: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

System Development

• What? Provide the ability to easily integrate, analyze,

and visualize disparate data from multiple sources

Page 8: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Maintenance-IQ

Page 9: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Data Sources

• Main sources for features inventory- Roadway Management System (RMS)

• Roadway, Guiderail, Pipes, etc.- Bridge Management System (BMS2)

• Bridge locations, details, etc.

• Main sources for deficiencies- SAP Plant Maintenance

• Projects – planned/actual through SAP notifications- RMS

• IRI, OPI, etc.• STAMPP

- BMS2• Bridge Condition Ratings

Page 10: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

SAP / Plant Maintenance

County Planning

Page 11: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

SAP / Plant Maintenance

Screen print off planned MPMS project

District Planning

Page 12: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

SAP / Plant Maintenance

Department-Force Production

Page 13: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

SAP / Plant Maintenance

Screen print of completed project in ECMS

Contract Production

Page 14: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Maintenance-IQ Outputs/Components

• Canned Maps- 5 Year Surface Improvement Projects (SIP)- Prep work prior to SIPs- Cycle maintenance- Work Plan visualization- Poor IRI with no planned SIP - SRs not

resurfaced in over 10 years with no planned SIP (35 years for concrete surfaces)

Page 15: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Canned Maps Example

Page 16: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Maintenance-IQ Outputs/Components

• Simple Custom Maps- Made from layers and user defined filters

Page 17: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Custom Maps Example

Page 18: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Additional Features

• Googler-Like Search– AOI, Layers, Maps

• Interactive Grid• Ability to import and

map data from MS Excel spreadsheets

• Embedded support for:– Google

StreetView– VideoLog– Electronic

Documents (EDMS)

Page 19: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Benefits

• Improve planning and eliminate or reduce re-work

• Identify coordination opportunities (regionalization)

• Increase operational efficiency• Scope maintenance needs• Conduct cycle maintenance• Monitor program status (visualize planned vs.

completed maintenance)• Perform data validation (quality assurance)• Manage assets

Page 20: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Benefits

• Comply with SEMP (MS4 permit requirement, PCSM inspections and inventory, illicit discharge and detection, erosion and sedimentation control, urban watersheds)

• Improve knowledge management – help transform PennDOT from a historically “data rich but information poor” organization to being both data and information rich

Page 21: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Role of Project in Enterprise GIS

• Based on a configurable JavaScript framework for specific business needs

• Consistent with PennDOT’s enterprise GIS technology and upgrade initiatives

• Part of PennDOT’s new set of GIS tools and mapping services focused on reusability, scalability, flexibility, and affordability

Page 22: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Technical Environment

• AngularJS

• NodeJS

• Bootstrap

• .NET REST Services

• Oracle Spatial 11g

• Esri ArcGIS for Server 10.2.2

• Python

Page 23: PennDOT Maintenance-IQ System - GIS-T · PDF   PennDOT Maintenance-IQ System Matt Long Center for Program Development and Management Nate Reck GeoDecisions, Director

www.dot.state.pa.us

Questions

• Thank You!!

• Questions, please contact:Matt Long, PennDOT, Center for Program Development and Management

[email protected]

Nate Reck, GeoDecisions

[email protected]