Top Banner
LKPP JAKARTA 1 AGUSTUS 2019 RIAD HOREM & SAMUDRA GUNADHARMA PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) DESIGN & BUILD
35

PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

Oct 05, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LKPP JAKARTA 1 AGUSTUS 2019

RIAD HOREM & SAMUDRA GUNADHARMA

PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI)

DESIGN & BUILD

Page 2: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

2014

FO KUNINGAN KUNING SELATAN

FO PERMATA HIJAU

JLKB PAKET ADAM MALIK

JLKB PAKET KOSTRAD

JLKB PAKET SESKOAL

JLKB PAKET KEBAYORAN LAMA

JLKB PAKET TAMAN PURING

JLKB PAKET TRUNOJOYO

JLKB PAKET SANTA

JLKB PAKET TANDEAN

2016

FO CIPINANG LONTAR

FO BINTARO

FO PANCORAN

UP MAMPANG - KUNINGAN

JLKB PAKET SESKOAL

JLKB PAKET KEBAYORAN LAMA

UP MATARAM

UP KARTINI

RIAD HOREM FOR DINAS BINAMARGA DKI 2014-2016

Page 3: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

OJK, JAKARTA 24 JUNI 2019

RIAD HOREM & SAMUDRA GUNADHARMA

PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI)

DESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 4: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

SISTIM KONTRAKTUAL

PELAKSANAAN

PENGAWASAN PENGAWASAN

DISAIN, PELAKSANAAN & PEMELIHARAAN

PENGAWASAN

KONTRAKTUAL

TUNGGAL

DISAIN PEMELIHARAANDISAIN,

PELAKSANAAN & PEMELIHARAAN

SWAKELOLA

SKEMA EKSEKUTIF No. O1

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

DESIGN & BUILD (DB)TERINTEGRASI/ RANCANG BANGUN

Page 5: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

BUKAN DESIGN & BUILD

DESIGN & BUILD

1 23

USULAN vs ANGGARAN

1 KONSEP DISAIN

2 DED/ TAHAPAN DED

3 DED/ TAHAPAN DED SELESAI

KESESUAIAN PERENCANAANDENGAN TEKNOLOGI KONSTRUKSI DI LAPANGAN(DESIGN DEVELOPMENT)

DISAIN PELAKSANAAN

MULAI DESAIN DAN PELAKSANAAN

DESIGN & BUILD (DB)TERINTEGRASI/ RANCANG BANGUN

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

SKEMA EKSEKUTIF No. O2

SELESAI DESAIN DAN

PELAKSANAAN

PERENCANAAN DIKERJAKAN BERSAMAAN (TERINTEGRASI) DENGAN PELAKSANAAN TERHINDAR CCO (PERUBAHAN NILAI KONTRAK) DAN PERUBAHAN WAKTU

Page 6: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

MULAI PELAKSANAANDBB

DISAIN

PELAKSANAAN/ BUILDPERENCANAAN/ DESIGN

DESIGN – BID – BUILD (DBB) TUNGGAL/ KONVENSIONAL

AKHIRPELAKSANAAN

TENDER/ BID DBB

MULAI PERENCANAAN

AKHIR PERENCANAAN

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

SKEMA EKSEKUTIF No. O3

DESIGN TELAH TERSEDIAPELAKSANAAN TAK TERHINDAR CCO (PERUBAHAN NILAI KONTRAK) DAN PERUBAHAN WAKTU

Page 7: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

PENGGUNA JASA

PENYEDIA JASA TERINTEGRASI (KONSTRUKSI+KONSULTAN)

PERENCANA TEKNIS (DESIGN)

SUB KONSULTAN

KONSTRUKSI (CONSTRUCTION)

SUB KONTRAKTOR

|BASIC DESIGN/CRITERIA| |PAGU ANGGARAN| |HARGA

PER SATUAN |PANJANG/LUAS|

|KONSEP DESIGN| |PENAWARAN| |LUMPSUM-

CONTRACT|

|METODE| |FIX PRICE| |TAHAPAN DED| |DED|

|ASBUILT DRAWING|

SKEMA EKSEKUTIF No. O4

DESIGN & BUILD (DB)TERINTEGRASI/ RANCANG BANGUN

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 8: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

PENGGUNA JASA

PENYEDIA JASA KONSTRUKSI

SUB KONTRAKTOR

|DED| |HPS| |LUMPSUM|

|HARGASATUAN|

|DED||PENAWARAN| |LUMSUM| |HARGA

SATUAN||SHOPDRAWING|

|METODE||REVIEW/ REVISI DED| |ADENDUM|

SKEMA EKSEKUTIF No. 05

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

DESIGN – BID – BUILD (DBB) TUNGGAL/ KONVENSIONAL

Page 9: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

TERSEDIA DESAIN.

SPESIFIKASI

PERUBAHAN WAKTU

MULAI SELESAIPHO/FHO

HAKIKAT PELAKSANAAN KONTRAK MERUPAKAN EKSEKUSI PENGUJIAN KONSEP DESAIN

DILAPANGAN

AKIBAT BASIC/CRITERIA DESIGN BELUM MENYIKAPI KONDISI LAPANGAN MAKA RENTAN TERHADAP PENYESUAIAN WAKTU DAN KETENTUAN PENGGUNA

KONDISI LAPANGAN

MENJADI OUTPUT FISIK

PERUBAHAN KETENTUAN PENGGUNA

PPK, PENYEDIA, TIM PENGENDALI & KONSULTAN

SKEMA EKSEKUTIF No. O6

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

DESIGN & BUILD (DB)TERINTEGRASI/ RANCANG BANGUN

Page 10: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

TERSEDIA DESAIN.

SPESIFIKASI

PERUBAHAN WAKTU

MULAI SELESAIPHO/FHO

HAKIKAT PELAKSANAAN KONTRAK MERUPAKAN EKSEKUSI PENGUJIAN DESAIN/ SPESIFIKASI

DILAPANGAN

AKIBAT DESAIN BELUM MENYIKAPI KONDISI LAPANGAN MAKA RENTAN TERHADAP PENYESUAIAN WAKTU DAN BIAYA./CCO

KONDISI LAPANGAN

MENJADI OUTPUT FISIK

PERUBAHAN BIAYA/CCO

PPK, PENYEDIA, TIM PENGENDALI & KONSULTAN

SKEMA EKSEKUTIF No. O7

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

DESIGN – BID – BUILD (DBB) TUNGGAL/ KONVENSIONAL

Page 11: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

TENDER▪ BASIC/

CRITERIA DESIGN

▪ KETENTUAN PENGGUNA

▪ NILAI PAGU

PENAWARAN▪ KONSEP

DISAIN▪ PENAWARAN

PENYEDIA (LUMPSUM –FIX PRICED)

1DESIGN DEVELOPMENT

(PENGEMBANGAN DESAIN)

PERUBAHAN KETENTUAN PENGGUNA

KONSEP DISAIN

BASIC/ CRITERIA

DED/ TAHAPAN

34

5

FINAL CONTRACT▪ ASB DRW▪ LUMPSUM –

FIX PRICED

6

NILAI KONTRAK TETAP (LUMPSUM)

2

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

DESIGN & BUILD (DB)TERINTEGRASI/ RANCANG BANGUN

SKEMA EKSEKUTIF No. O8

Page 12: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

TENDER▪ DED▪ SPESIFIKASI▪ NILAI PAGU

PENAWARAN▪ PENAWARAN

PENYEDIA▪ LUMPSUM▪ HARGA

SATUAN

1KONDISI LAPANGANPERUBAHAN DESAIN

DED/SPECSHOP DRMC-NOL

CCO

34

5

FINAL CONTRACT▪ ASB DRW▪ LUMPSUM▪ HARGA SAT

6

NILAI KONTRAK TETAP ATAU BERUBAH

2

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

SKEMA EKSEKUTIF No. O9

DESIGN – BID – BUILD (DBB) TUNGGAL/ KONVENSIONAL

Page 13: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

STUDI RANCANGAN DISAINPENJELASAN TENDER PELAKSANAAN PEMELIHARAAN

SURVEY RANCANGAN

DISAIN

BASIC DESIGN CRITERIA

NILAI PROYEK/ PAGU ANGGARAN

PENINJAUAN LAPANGAN

SURVEY PELAKSANAAN

MAINTENANCE

START-UP

IMPLEMENTASI

SELESAIPROCUREMENT CONSTRUCTIONKEBUTUHAN

SURVEY STUDY

RANCANGAN

PENJABARAN

BRIEFING KONSEP DISAIN

NILAI PENAWARAN

DED/ TAHAPAN DED

CONSTRUCTION

PRA TENDER PASCA TENDER

KONSULTAN MK

SKEMA EKSEKUTIF No. 10

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

TUGAS DAN TANGGUNG JAWAB

KONSULTAN MK : PRA TENDER – PASCA TENDER

Page 14: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 11

TIM PEMILIHAN 1/2TAHAPAN DOKUMEN, KEGIATAN & WAKTU

DESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

No DOKUMEN KEGIATAN OLEH WAKTU

1HPSBASIC DESIGN

PENGAJUAN KE SATKER PPK

PERSETUJUAN SATKER

2KAKCRITERIA DESIGN

PENGAJUAN KE PPK TIM TEKNIS

PERSETUJUAN PPK

3 DOKUMEN KUALIFIKASI PENYIAPAN TIM TEKNIS

PESETUJUAN PPK

PENYAMPAIAN TIM TEKNIS

PENGUMUMAN TIM PEMLIHAN

PEMASUKAN PENAWARAN PENYEDIA

EVALUASI TIM PEMILHAN

PENGUMUMAN HASIL EVALUASI TIM PEMILIHAN

MASA SANGGAH TIM PEMILIHAN

Page 15: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 12

TIM PEMILIHAN 2/2TAHAPAN DOKUMEN, KEGIATAN & WAKTU

DESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

No DOKUMEN KEGIATAN OLEH WAKTU

4 DOKUMEN PEMILIHAN PENGAJUAN KE PPK TIM TEKNIS

PERSETUJUAN PPK

PENYAMPAIAN KE TIM PEMILIHAN/ PENGUMUMAN/UNDANGAN

TIM TEKNIS

UPLOAD TIM PEMILIHAN

PEMBERIAN PENJELASAN TIM PEMILIHAN

PEMASUKAN PENAWARAN PENYEDIA

EVALUASI TIM TEKNIS

PENGUMUMAN HASIL EVALUASI TIM PEMLIHAN

PEMASUKAN PENAWARAN PENYEDIA

MASA SANGGAH TIM PEMILHAN

SPPBJ TIM PEMILIHAN

PENANDATANGAN KONTRAK PPK

Page 16: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 13

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

KONSULTAN MK TIM PEMILIHANPENYEDIA JASA TEINTEGRASI

SATUAN KERJA

PRA T

ENDER

KAKCRITERIA DESIGNPERHITUNGAN PAGUBASIC DESIGNDRAF DOK KUAL/PML

DOKUMEN KUALIFIKASIDOKUMEN PEMILIHAN

TIM PEMILIHAN 1/6TAHAPAN PRA TENDER, TENDER, KONTRAK & PELAKSANAAN KONTRAK

DESIGN & BUILD

Page 17: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 14

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

KONSULTAN MK TIM PEMILIHANPENYEDIA JASA TEINTEGRASI

SATUAN KERJA

PENAWARAN TAHAP I

EVALUASI

TENDER

PENAWARAN TAHAP II

GUGUR

TIM PEMILIHAN 2/6TAHAPAN PRA TENDER, TENDER, KONTRAK & PELAKSANAAN KONTRAK

DESIGN & BUILD

Page 18: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 15

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

KONSULTAN MK TIM PEMILIHANPENYEDIA JASA TEINTEGRASI

SATUAN KERJA

EVALUASI

TENDER

PERINGKAT 1PERINGKAT 2

GUGUR

USULAN PEMENANG PENETAPAN PEMENANG

TIM PEMILIHAN 3/6TAHAPAN PRA TENDER, TENDER, KONTRAK & PELAKSANAAN KONTRAK

DESIGN & BUILD

Page 19: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 16

TIM PEMILIHAN 4/6TAHAPAN PRA TENDER, TENDER, KONTRAK & PELAKSANAAN KONTRAK

DESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

KONSULTAN MK TIM PEMILIHANPENYEDIA JASA TEINTEGRASI

SATUAN KERJA

PELA

KSANAAN K

ONTRAK

TT KONTRAKSPMK

BA ST LAPANGAN

SURVEI/INVESTIGASI LAPANGAN

(TOPOGRAFI, GEOTEKNIK DLL)

KOORDINASI INT/EKSMOBILISASI DLL

DETAIL PERENCANAAN (BANGUNAN BAWAH, ATAS, PELENGKAP & LINGKUNGAN DLL)

PERIKSAKETENTUAN KRITERIA & SPESIFIKASI

Page 20: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 17

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

KONSULTAN MK TIM PEMILIHANPENYEDIA JASA TEINTEGRASI

SATUAN KERJA

PELA

KSANAAN K

ONTRAK

MEMENUHIPERSETUJUAN

PELAKSANAAN

PENGAJUAN TERMIN

REQUEST OF WORKS

TIM PEMILIHAN 5/6TAHAPAN PRA TENDER, TENDER, KONTRAK & PELAKSANAAN KONTRAK

DESIGN & BUILD

Page 21: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

LAMPIRAN EKSEKUTIF No. 18

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

KONSULTAN MK TIM PEMILIHANPENYEDIA JASA TEINTEGRASI

SATUAN KERJA

PELA

KSANAAN K

ONTRAK PENGENDALIAN

UNIT MUTU DOK PENDUKUNG

MEMENUHI PERSETUJUAN

TERMIN DIBAYAR

FISIK 100% PHO

TIM PEMILIHAN 6/6TAHAPAN PRA TENDER, TENDER, KONTRAK & PELAKSANAAN KONTRAK

DESIGN & BUILD

Page 22: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

KEGIATAN & TATA CARADESIGN & BUILD

NO URAIAN TATA CARA

1 PEMILIHAN PENGADAAN RANCANG DAN BANGUN (TERINTEGRASI) DENGAN SPSE

2 METODE PEMILIHAN PELELANGAN TERBATAS/PELELANGAN UMUM.

3 BENTUK DOKUMEN PENGADAAN PRAKUALIFIKASI

4 JENIS KONTRAK LUMP SUM

5 METODE PEMASUKAN PENAWARAN

DUA SAMPUL

6 METODE EVALUASI TEKNIS SISTEM NILAI DENGAN AMBANG BATAS MINIMUM

7 PENETAPAN PEMENANG NILAI TERENDAH DARI KOMBINASI NILAITEKNIS DAN HARGA DENGAN PERBANDINGAN30% (TEKNIS) : 70% (HARGA)

LAMPIRAN EKSEKUTIF No. 19

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 23: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

1. KERANGKA ACUAN KERJA2. CRITERIA DESIGN (PEKERJAAN KONSTRUKSI)3. BASIC DESIGN (PEKERJAAN KONSTRUKSI)4. PERHITUNGAN HPS (HARGA SATUAN) JASA KONSULTANSI MANAJEMEN

KONSTRUKSI DAN PENGGUNAAN PAGU ANGGARAN PEKERJAAN KONSTRUKSI DESIGN & BUILD (LUMPSUM)

5. DOKUMEN KUALIFIKASI6. DOKUMEN PEMILIHAN7. FORMAT EVALUASI PENAWARAN

CATATANSEBELUM MELAKUKAN PELELANGAN, POKJA ULP SUDAH MEMPUNYAI JADWAL PELELANGANNYA DAN DOKUMEN YANG DIPERLUKAN ADALAH DARI NO 1 SAMPAI NO 5, SEMENTARA NO 6 DAN NO. 7 DAPAT DISUSULKAN

LAMPIRAN EKSEKUTIF No. 20

DOKUMEN TENDERDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 24: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

▪ LATAR BELAKANG DAN TUJUAN ADANYA KEBUTUHAN PENGADAAN INI

▪ LOKASI DARI PEKERJAAN YANG AKAN DILELANG

▪ JENIS KONTRAK YANG AKAN DILAKSANAKAN (BERDASARKAN CARA PEMBAYARANNYA, PEMBEBANAN TAHUN ANGGARAN, SUMBER PENDANAANNYA DAN JENIS PEKERJAANNYA)

▪ BESARNYA DANA ANGGARAN YANG TERSEDIA

▪ PENGGUNA ANGGARANNYA DAN PEJABAT PEMBUAT KOMITMEN

▪ METODE PELELANGAN YANG AKAN DILAKUKAN DAN WAKTU PELELANGANNYA SERTA WAKTU PELAKSANAANNYA

▪ KUALIFIKASI ATAU KLASIFIKASI DARI PERUSAHAAN YANG IKUT PELELANGAN

▪ PERSONIL YANG DIPERLUKAN MELIPUTI JABATANNYA, TUGAS DAN TANGGUNG JAWABNYA SERTA JUMLAHNYA

▪ PERALATAN YANG MENDUKUNG

LAMPIRAN EKSEKUTIF No. 21

KERANGKA ACUAN KERJA (KAK)DESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 25: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

MERUPAKAN STANDAR UKURAN NORMATIF (BATASAN MUTU, DIMENSI DLL) UNTUK MENCAPAI TUJUAN DED :

▪ MUDAH PELAKSANAAN▪ LINGKUNGAN (NYAMAN)▪ EKONOMIS▪ HEMAT ENERJI▪ MUDAH PERAWATAN

LAMPIRAN EKSEKUTIF No. 22

CRITERIA DESIGNDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 26: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

1. PERHITUNGAN HPS (HARGA SATUAN) UNTUK JASA KONSULTANSI MANAJEMEN KONSTRUKSI

2. PENGGUNAAN PAGU ANGGARAN UNTUK PEKERJAAN KONSTRUKSI DESIGN & BUILD (LUMPSUM)

KETERANGAN▪ HARGA SATUAN, MENGACU PADA PERATURAN YANG DIKELUARKAN

OLEH BAPPENAS (PERSONIL)▪ LUMPSUM, PERHITUNGAN PAGU DENGAN MEMBANDINGKAN PADA

PROYEK SEJENIS

LAMPIRAN EKSEKUTIF No. 23

HARGA PERKIRAAN SENDIRI & PAGU ANGGARANDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 27: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

DOKUMEN KUALIFIKASI :MEMBERIKAN BATASAN TERHADAP PERUSAHAAN SESUAI DENGAN KEMAMPUANNYA/ KLASIFIKASINYA

▪ MEMASTIKAN BAHWA PERUSAHAAN TERSEBUT MEMPUNYAI BADAN HUKUM

▪ MEMPUNYAI KEMAMPUAN KEUANGAN▪ MEMPUNYAI PENGALAMAN DALAM BIDANGNYA

LAMPIRAN EKSEKUTIF No. 24

DOKUMEN KUALIFIKASIDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 28: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

1. Umum

2. Pengumuman Prakualifikasi

3. Instruksi Kepada Peserta4. Lembar Data Kualifikasi

5. Bentuk Pakta Integritas

6. Bentuk Formulir Isian Kualifikasi

7. Petunjuk Isian Formulir Kualifikasi

8. Tatacara Evaluasi Kualifikasi

1. Umum

2. Instruksi Kepada Peserta3. Lembar Data Pemilihan

4. Bentuk Dokumen Penawaran5. Bentuk Rancangan Kontrak6. Syarat - Syarat Umum Kontrak

7. Syarat - Syarat Khusus Kontrak

8. Persyaratan Teknis dan Gambar

9. Daftar Kuantitas Keluaran dan Harga

10. Bentuk Dokumen Lain

1. Penawaran Administrasi 2. Penawaran Teknis3. Penawaran Harga

1. Addendum Surat Perjanjian (bila ada)

2. Pokok Perjanjian3. Surat Penawaran 4. Syarat - Syarat Khusus Kontrak

5. Syarat - Syarat Umum Kontrak

6. Persyaratan Teknis dan Gambar

8. Daftar Kuantitas Keluaran dan Harga

8. Dokumen Lainnya

DOKUMEN PEMILIHAN

DOKUMEN KUALIFIKASI

DOKUMEN PENAWARAN

DOKUMEN KONTRAK

LAMPIRAN EKSEKUTIF No. 25

DOKUMEN KUALIFIKASI - KONTRAKDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 29: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

A. PEKERJAAN PERENCANAAN TEKNIS:1. PEKERJAAN PERENCANAAN TEKNIS BERDASARKAN KRITERIA DESAIN YANG

DITETAPKAN DALAM DOKUMEN PEMILIHAN DAN SESUAI LINGKUP PEKERJAAN KONSTRUKSI PADA HURUF B DIBAWAH.

2. DALAM PELAKSANAAN PERENCANAAN TEKNIS JEMBATAN, HARUS DILAKUKAN PEMUTAKHIRAN BERDASARKAN SURVAI DETAIL DAN INVESTIGASI LAPANGAN SEBELUM PELAKSANAAN PEKERJAAN KONSTRUKSI.

B. PEKERJAAN KONSTRUKSI MELIPUTI :1. NAMA PEKERJAAN : .............

2. LOKASI : ........

3. DIMENSI/ UKURAN :

C. SUMBER DANA :1. PEKERJAAN INI DIBIAYAI DARI SUMBER PENDANAAN: ....................... TAHUN

.................. TOTAL PAGU DANA SEBESAR RP. ______________ DENGAN RINCIAN BERIKUT :a. TAHUN 20.... SEBESAR RP. _________________

b. TAHUN 20.... SEBESAR RP. _________________

c. TAHUN 20.... SEBESAR RP. _________________

d. DAN SETERUSNYA .________________________

LAMPIRAN EKSEKUTIF No. 26

SCOPE OF WORKSDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 30: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

SSUK PASAL 27.1.

SEBELUM PELAKSANAAN PEKERJAAN KONSTRUKSI, PENYEDIA JASA HARUSMENYIAPKAN DETAIL DESAIN BERDASARKAN USULAN/PROPOSAL DESAINDALAM PENAWARAN TEKNIS DAN KRITERIA DESAIN YANG DITETAPKAN,SETELAH MELAKUKAN SURVAI DAN INVESTIGASI LAPANGAN SECARADETAIL UNTUK SEMUA PEKERJAAN UTAMA, PELENGKAP DAN PENUNJANGSERTA MEMENUHI SPESIFIKASI TEKNIS YANG DIUSULKAN.

SSUK PASAL 27.2.

PENYEDIA JASA BERTANGGUNGJAWAB DAN MENELITI DENGAN CERMATATAS KEAKURATAN DAN KELENGKAPAN INFORMASI YANG DIGUNAKANDALAM PEMBUATAN DETAIL DESAIN TERMASUK PERHITUNGANNYA. DANSEGALA PERBEDAAN, KESALAHAN ATAU KELALAIAN DALAM PEMBUATANDETAIL DESAIN MERUPAKAN TANGGUNGJAWAB PENYEDIA JASAWALAUPUN TELAH MENDAPATKAN PERSETUJUAN DARI DIREKSI TEKNISDAN/ATAU PPK.

LAMPIRAN EKSEKUTIF No. 27

TANGGUNG JAWAB DESAINDESIGN & BUILD 1/2

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 31: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

SSUK PASAL 27.4.SEMUA DESAIN, DOKUMEN TEKNIS DAN PEKERJAAN KONSTRUKSI YANGDISELESAIKAN HARUS MEMENUHI NORMA, STANDAR, PEDOMAN DAN MANUAL(NSPM) SERTA KETENTUAN LINGKUNGAN YANG BERLAKU DAN STANDAR LAINYANG DITETAPKAN DALAM DOKUMEN KONTRAK.

APABILA TERDAPAT STANDAR BARU YANG DIBERLAKUKAN SETELAHPEMASUKAN PENAWARAN, KONTRAKTOR HARUS MENYAMPAIKAN KEPADAPENGGUNA JASA MENGAJUKAN USULAN PERUBAHAN SEBAGAI PEMENUHANSTANDAR DESAIN DENGAN KETENTUAN:

✓ PENGGUNA JASA MENENTUKAN BAHWA BERUBAHAN KETENTUAN TERSEBUTDIPERLUKAN; DAN/ATAU

✓ USULAN UNTUK PERUBAHAN TERSEBUT MERUPAKAN SUATU VARIASIKONTRAK.

LAMPIRAN EKSEKUTIF No. 28

TANGGUNG JAWAB DESAINDESIGN & BUILD 2/2

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 32: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

SSUK PASAL 28.1.

PENYEDIA JASA HARUS MELENGKAPI DALAM STRUKTUR ORGANISASINYA SEBAGAI UNIT PENGENDALI MUTU (UPM) YANG MERUPAKAN SUATU UNIT TERTENTU BERANGGOTAKAN PERSONIL YANG MEMENUHI SYARAT, MEMPUNYAI TUGAS UNTUK MENGEVALUASI SECARA TERUS MENERUS PEMENUHAN MUTU PEKERJAAN YANG DISYARATKAN. UNIT PENGENDALI MUTU BERTANGGUNG JAWAB UNTUK MENGHASILKAN DAN MENYAJIKAN INFORMASI YANG DIPERLUKAN OLEH DIREKSI PEKERJAAN MELIPUTIRINCIAN DATA HASIL PENGUJIAN MUTU, KELENGKAPAN INFORMASI STATUS PEKERJAAN, MEMBERIKAN SELURUH INFORMASI YANG DIPERLUKAN TENTANG PENGELOLAAN MUTU PEKERJAAN.

SSUK PASAL 28.4.

UNIT PENGENDALI MUTU HARUS MEMBUAT LAPORAN PENGENDALIAN MUTU KEPADA PPK DAN DIREKSI PEKERJAAN SETIAP PELAKSANAAN DAN PENYELESAIAN PEKERJAAN SEBAGAIMANA TELAH DITENTUKAN DALAM KONTRAK.

LAMPIRAN EKSEKUTIF No. 29

UNIT PENGENDALI MUTUDESIGN & BUILD

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 33: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

No ITEM PEKERJAAN RENCANA (BOBOT%)KUMULATIF REALISASI

(BOBOT%)

I Main Item A 20 18

1. Sub item a12. Sub item a2

515

60100 S

II Main Item B 50 38

1. Sub Item b12. Sub Item b23. Sub item b3

102515

200 S60 S20

III Main Item C 30 25

1. Sub Item c12. Sub Item c2

1020

5070 S

Total 100 81

MODEL PEMBOBOTAN PELAKSANAAN KONTRAKDESIGN & BUILD

LAMPIRAN EKSEKUTIF No. 30

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

Page 34: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

URAIANPEMBAYARAN/ ANSURAN

KE

KUMULATIF PRESTASI

PEKERJAAN (%)

KUMULATIF PEMBAYARAM

SEBELUM POTONGAN (%)

▪ PEMBAYARAN PRESTASI PEKERJAAN UNTUK KONTRAK LUMP SUM DILAKUKAN DENGAN CARA TERMIJN/ANGSURAN DAN PEMBAYARAN SETIAP TAHUNNYA TIDAK MELEBIHI PAGU DANA INDIKATIF YANG DITETAPKAN.

▪ PEMBAYARAN PRESTASI PEKERJAAN DILAKUKAN DENGAN CARA DENGAN KETENTUAN SEBAGAI BERIKUT

1 3 2

2 7 6

3 12 10

4 20 18

5 28 25

6 36 33

7 45 44

8 55 50

9 65 60

10 75 70

DSTNYA

LAMPIRAN EKSEKUTIF No. 31

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019

MODEL PEMBAYARAN PELAKSANAAN KONTRAKDESIGN & BUILD

Page 35: PEKERJAAN KONSTRUKSI RANCANG BANGUN (TERINTEGRASI) …

SELESAI

RIAD HOREM & SAMUDRA GUNADHARMA UNTUK OJK PEKERJAAN KONSTRUKSI DESIGN & BUILD 2019