Summary of Affected Buildings and Lots
Section 1
Section 2
Section 3
Section 4
Section 5
Summary of Affected Buildings and Lots
Section
No.Description
Length
(km)
Nos. of Affected BuildingsNos. of
Affected
LotsResidential Commercial Religious
Minor
Structures(Shed, stalls, stores
etc.)
Squatters
1
Gurney I/C
To Jln Bagan
Jermal/ Jln
Gottlieb
1.8 81
(Single storey
building)
1(Hindu
Temple)
3 0 67
2
Jln Gottlieb
To Paya
Terubong
6.8
+ 0.9 (Utama I/C)
7(4 nos within
tunnel
section)
0 0 3 078
(57 lots within
tunnel section)
3
Paya
Terubong
Link
0.8
+ 3.2 (Paya
Terubong Link)
1129
(All single storey
buildings)
1(Chinese
Temple)
26 3 119
4
Paya
Terubong To
Relau4.0
13(8 nos within
tunnel
section)
0 0 0 027
(15 nos within
tunnel section)
5Relau To Tun
Dr LCE I/C6.1 23 0
2(Chinese
Temple & Kafa
Religious
School)
16 79 85
Total
19.5
+ 4.1 (Utama I/C &
Paya Terubong
Link)
62(12 nos
within tunnel
section)
30(Single storey
buildings)
4 48 82376
(74 nos within
tunnel section)
Grand Total 226 376
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the
detailed design stage
3
SECTION 1 –
GURNEY I/C TO JLN BAGAN
JERMAL / JLN GOTTLIEB
4
N
Section 1 - Gurney I/C To Jln Bagan Jermal / Jln Gottlieb
Youth Park
Sect 1A
Sect 1B
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
1A 2 0 0 2 0 48
1B 6 1 1 (Hindu Temple)
1 0 19
Total 8 1 1 3 0 67
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
5
Section 1A - Jalan Bagan JermalSummary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
1A 2 0 0 2 0 48
Tun Dr LCE I/C
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
Phor Tay School
Indian
Association
St Nicholas
Home
6
Phor Tay School
• Phor Tay School not affected.
• PIL 1 does not encroach into Phor Tay School’s Lot Boundary
Phor Tay School
7
Overall width
24.5m
SJK (C) Phor Tay School
Fen
cin
g
Lo
t bo
un
dary
ROWROW
Lo
t bo
un
dary
1.5mWalkway
20.1m
To be relocated
MS
2x3.25m
Carriageway
0.5m
3.6m
1.5mWalkway
Median
1.6m
Carriageway
3x3.5m
Carriageway
3x3.5m
MSMS
0.5m
1.8m
0.5m
1.0m
7.2m
Well Known Souvenir &
Batik Centre
Phor Tay School
8
Indian
Association
Indian Association• Indian Association not affected.
• PIL 1 not encroaches into Indian Association’s Lot Boundary
9
0.5m
ROW
Overall width 24.5m
Median
1.6m
Carriageway
3x3.5m
Carriageway
3x3.5mMSMS
0.5m 0.5mROW
GILL’S VETRINARY
CLINIC GILL’S VETRINARY
CLINIC
Lo
t Bo
un
da
ry
Lo
t Bo
un
da
ry
Fe
nc
ing
PERSATUAN INDIA
PULAU PINANG (FIELD)
1.5m
Walkway
2x3.25m
CarriagewayMS
19.4m7.6m 1.8m
2x3.25m
Carriageway
0.5mMS
0.25m 0.25m0.5m
1.44m1m
To be relocated: 5.08m
Indian Association
10
St Nicholas Home
St Nicholas
Home
4.1m
• St Nicholas Home’s Buildings not affected.
• PIL 1 only encroaches into the edge of St Nicholas
Home’s compound
11
St Nicholas Home
Overall width
24.5m
1.6m 0.5m3.5m
Median MS
3.5m 3.5m3.5m3.5m3.5m0.5m
MS
0.5m
MS
3.25m3.25m0.25m
MS
3.25m3.25m3.25m0.5m
MS
1.5m
Walkway
1.5m
Walkway
JERMAL COURT
APARTMENT COMPOUND
ST NICHOLAS HOME
COMPOUND
22m4.1m
2.6m
0.25m
MS
12
Section 1B - Jalan Gottlieb
Gurney
I/C
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
1B 6(Quarters of Jabatan
Taman Botani)
1 1(Hindu Temple)
1 0 19
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
Penang
Chinese Girl
School
13
PENANG CHINESE GIRLS HIGH SCHOOL
Penang Chinese Girl
School
• Penang Chinese Girl School not affected.
• PIL 1 does not encroach into Penang Chinese Girl
School’s Lot Boundary
14
Overall width
24.5mROWROW
Median
1.6m
Carriageway
3x3.5m
Carriageway
3x3.5m
MSMS
0.5m
1.0m
0.5m
1.13m
Lo
t bo
un
dary
Lo
t bo
un
dary
Fen
cin
g
MS
0.25m2x3.25m 0.5m
Carriageway
3x3.25m
MS
0.25m
MS
0.25m
MS
0.88m
Carriageway
1.0m
Walkway
1.5m
Walkway
1.8m30.0m
6.12m
Service Road +
Road Side Car
Park
3-STOREY SHOPS
PENANG CHINESE GIRLS
HIGH SCHOOL (Field)
PENANG CHINESE GIRLS HIGH SCHOOL
15
110m 120m250m
40m40m
20m31m
Youth Park (Cable Stayed Bridge)
Jln Kebun
Bunga
Hindu Temple
AMPHITHEATRE
TNB
110m 250m 120m40m
AMPHITHEATRE
16
SECTION 2 –
JLN GOTTLIEB TO PAYA TERUBONG
17
Section 2 – Jalan Gottlieb to Paya Terubong
N
Youth Park
Penang Hill Special Area Plan (SAP)
Kek Lok Si
Temple
Ayer Itam Dam
Tu
nn
el T
2
Sect 2A
Sect 2B
Sect 2C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
2A 0 0 0 2 08
(2 lots within
tunnel section)
2B3
(2 nos within tunnel
section)
0 0 1 049
(42 lots within
tunnel section)
2C 4(2 nos within tunnel
section)
0 0 0 021
(13 lots within
tunnel section)
Total7
(4 nos within tunnel
section)
0 0 3 078
(57 lots within
tunnel section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
18
Section 2A - Youth Park / Utama I/C
Christian Cemetery
Youth ParkN
Pusat
Information
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
2A 0 0 0 2 08
(2 lots within
tunnel section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
19
Section 2B - Ayer Itam
N
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
2B3
(2 nos within tunnel
section)
0 0 1 049
(42 lots within
tunnel section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
20
Section 2C - Paya Terubong
N
MA
INL
INE
Gurney
I/C
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
2C 4(2 nos within tunnel
section)
0 0 0 021
(13 lots within
tunnel section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
21
SECTION 3 –
PAYA TERUBONG LINK
22
N
Sect 3A
Sect 3BSect 3C
Section 3 - Paya Terubong Link
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
3A 11 29 1 (Chinese Temple)
12 0 98
3B 0 0 0 3 3 13
3C 0 0 0 11 0 8
Total 11 29 1 26 3 119
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
23
Section 3A - Paya Terubong Interchange
Gurney
I/C
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
3A 11 29 1(Chinese Temple)
12 0 98
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
24
Section 3B - Paya Terubong Interchange
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
3B 0 0 0 3 3 13
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
25
Section 3C - Paya Terubong Interchange
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
3C 0 0 0 11 0 8
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
26
SECTION 4 –
PAYA TERUBONG TO RELAU
27
Section 4 - Paya Terubong to Relau
Sect 4B
Sect 4A
N
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
4A 4(All within tunnel
section)
0 0 0 08
(All within
tunnel section)
4B 9 (4 nos within tunnel
section)
0 0 0 019
(7 nos within
tunnel section)
Total 13(8 nos within tunnel
section)
0 0 0 027
(15 nos within
tunnel section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
28
Section 4A – Paya Terubong
NGurney
I/C
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
4A4
(All within tunnel
section)
0 0 0 08
(All within tunnel
section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
29
Section 4B – Jalan Tun Sardon
N
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
4B9
(4 within tunnel
section)
0 0 0 019
(7 nos within
tunnel section)
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
30
SECTION 5 –
RELAU TO TUN DR LCE I/C
31
N
Section 5 - Relau to Tun Dr LCE I/C
Sect 5A
Sect 5B
Sect 5C
Sect 5D
Sect 5E
Penang
Airport
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
5A 6 0 0 0 0 31
5B 15 02
(Chinese Temple & Kafa
Religious School)
3 0 34
5C 2 0 0 0 48 12
5D 0 0 0 12 0 4
5E 0 0 0 1 31 4
Total 23 0 2 16 79 85
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
32
Section 5A - Relau to Sg Ara
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
5A 6 0 0 0 0 31
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
33
Section 5B - Sg Ara to Jalan Dato Ismail Hashim
Linear Park
Gurney
I/C
Tun Dr LCE
I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
5B15 0
2(Chinese Temple & Kafa
Religious School)
3 0 34
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
34
Awang I/C
Section 5C - Jalan Dato Ismail Hashim to Jalan Tun Dr Awang
Gurney
I/C
Tun Dr LCE I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
5C 2 0 0 0 48 12
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
35
Gurney
I/C
Section 5D - Jalan Mayang Pasir
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
5D 0 0 0 12 0 4
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW
36
Section 5E - Fisherman Huts (LCE Interchange)
Gurney
I/C
Summary of Affected Buildings and Lots
Sec
No.
Nos. of Affected Buildings Nos. of
Affected
LotsResidential Commercial ReligiousMinor
StructuresSquatters
5E 0 0 0 1 31 4
Note:
The above summary is only a preliminary estimate and is subject to further refinements during the detailed design stage
Legend
ROW