P-25 ProjectBartholomew County

November 13, 2014

Page 2: P-25 Project Bartholomew County November 13, 2014.
Page 3: P-25 Project Bartholomew County November 13, 2014.

Bartholomew County P-25 Project1. Set a Plan

Implementation of P-25 status – March 2015.

Set benchmarks and timelines-set- February 2015?

Set scheduled meetings – monitor progress.

Discuss and determine how cost can be reduced?

Page 4: P-25 Project Bartholomew County November 13, 2014.

P-25 Bartholomew County

1. Step one- Inventory radios

As of November 13th, the following agencies have submitted inventories.

Clay Township, County Highway, Col Regional Hospital, CPD, Col Township, EMA, E911, Harrison Township, Co Fire Inspector, Comm. Corrections, CFD, Hartsville FD, German Township, Coroner’s Office, Etown Fire Dept. Southwest Fire, Sheriff’s Dept. Hope Fire, Hope PD.

Page 5: P-25 Project Bartholomew County November 13, 2014.

P-25 Project

Inventories PendingClifford Fire, Co Health Dept.

Waynesville Fire, Col Animal Control, Hartsville PD

Page 6: P-25 Project Bartholomew County November 13, 2014.

P-25 Project Bartholomew County

2. Step Two- Design Templates

Determine how many templates your agency will need?

CPD/Sheriff –work together to design a standard?

CFD/Co Fire – work together to design a standard?(example where Mutual Aid Channels are located more uniformed)

Page 7: P-25 Project Bartholomew County November 13, 2014.

P-25 Bartholomew County

Determining who will design Templates?

*Option #1- pay vendor to design the Templates with the guarantee they will work correctly.

*Option #2 – Have the trained officers develop Templates- very time consuming and no guarantee they will work- this may take an extended amount of time and requires a lot of patience. IF this does not work, then it is possible a vendor will have to build them anyway.

Page 8: P-25 Project Bartholomew County November 13, 2014.

P-25 Project Bartholomew County

Determine who will Flash the radios?

Option #1- have trained personnel flash Templates in radios. Saves $50.00 per radio.

- Key information1. Batteries must be fully charged.2. Computer must not go into sleep mode.

3. If any of the above occurs radio cost approx. $300.004. Flashing takes approximately 30-60 mins. Per radio

Option #2- have vendor flash Templates in radios at $50.00 per radio.

Page 9: P-25 Project Bartholomew County November 13, 2014.

P-25 Bartholomew County

Page 10: P-25 Project Bartholomew County November 13, 2014.

P-25 Bartholomew County

Page 11: P-25 Project Bartholomew County November 13, 2014.

Next Meeting

Project Goals by November 13, 2014

1. Have all inventories completed.

2. Determine the design of the Templates?/How many per agency?

3. Determine who will build the Templates?

4. Determine who will Flash the radio’s?

Page 12: P-25 Project Bartholomew County November 13, 2014.

P-25 Project-update