AMBER ELECTROTECH LTD.
Organization at a glance Profile
Head Office : F-3/3, Okhla Industrial Area, Phase I, New Delhi 110 020 Phone No. : 011- 2681 4026, 2671 9404 Fax No. : 011 - 2681 9406 Email id. : [email protected] Our Presence in Mauritius: Jummah Mosque Street, Room No. - 304, Level – 3, Jade Court, Port Louis, Mauritius Port Louis BRN: C18156388
Amber Electrotech Limited
Profile Evolution 1 of 1
ANNEXURE-1
EVOLUTION
AMBER ELECTROTECH LTD. is backed by almost five decades of extensive
experience, having been founded by our founder chairman Shri Surinder Singh
way back in the year 1958, with a humble beginning in the field of electrical
contracting under the name and style of Amber Electronics.
With a vision of growing at an exponential scale, by means of exceeding customers
expectations, the organization evolved from an electrical contracting agency into a turn
key solution provider with activities ranging from Substation, Internal & External
electrification for conventional as well as Intelligent Fire Alarm System, CCTV, PA
System, BMS, Telephone and Data Networking.
In the visualized stride for growth and to further augment our professional working the
organization transformed itself into a limited company to be able to further consolidate
volumes and efficiency.
Today, we have some of the most prestigious Projects to feel pride of. The organization
successfully executed varied projects ranging from Hospitals, Hotels, Stadiums, Airports,
Maharashtra States Electricity Distribution Co. Ltd.
Ministry of Health & Family Welfare Government of India
NBCC Ltd.
NDMC
Amber Electrotech Limited
Profile Approvals & Association 3 of 3
NTPC Ltd.
Power Grid Corporation of India Ltd.
Sports Authority of India.
D. CIVIL CONSTRUCTION COMPANIES Ahluwalia Contracts (I) Ltd
Ahuja Builder ,Delhi.
Arora Construction Company Pvt. Ltd., Faridabad.
Consolidated Construction Consortium Ltd. Delhi.
C&C Constructions Ltd. Delhi
Chitwon Co-E Nepal (P) Ltd., Kathmandu
Dewan Chand, Delhi.
Era Infra Engineering Ltd., Delhi
Globe Civil Projects Pvt. Ltd. Delhi
H.S. Nag & Associates, Delhi
Imperia Structures Ltd. Delhi.
Jaypee Infratech Ltd.
Jaiprakash Associates Ltd. Noida.
JMC Projects Ltd., Ahmedabad
Kitano Construction Co., Tokyo
K.S. Chamankar & Associates, Mumbai.
Larsen & Tourbo Ltd., New Delhi.
Mahagun India Pvt. Ltd.
Nagarjuna Construction Ltd., Gurgaon
Pratibha Industries Ltd.,Mumbai
Rattan Singh Builders Pvt. Ltd. Delhi.
Swadeshi Construction Co. Delhi.
Simplex Projects Ltd., Delhi & Kolkata
Unity Infra Projects Ltd., Mumbai
United Builders Pvt. LTd., Kathmandu
Amber Electrotech Ltd.
S.N. CLIENT / PROJECT DESCRIPTION CLIENT
ARCHITECTS / CONSULTANTS /
PROJECT MANAGEMENT CONSULTANTS
TOTAL PROJECT COST IN INR
(Lacs)
A HOSPITALS
1 Construction of A.I.I.M.S. Hospital Complex at Bhopal, Madhya Pradesh
Internal & External Electrical Works MOHFW/ AIIMS Prem Chaudhary &
Associates Pvt. Ltd. 4726
2 Construction of 100 Bedded ENT Hospital at Vacoas, Mauritius.
Fire Fighting, Electrical, HVAC & IT Works HSCC (India) Ltd. HSCC (India) Ltd. 4560
3 Construction of Electrical Substation at National cancer Institute Jhajjar, Haryana External Electrical Works HSCC (India) Ltd. HSCC (India) Ltd. 3200
4 Construction of A.I.I.M.S. Hospital Complex at Bhubaneswar, Orissa
Internal, External & Substation Works MOHFW/ AIIMS
Construction of Hospital, Academic Block, ResidentialCampus and Allied Buildings, etc. and theirMaintenance during Defect Liability Period onComprehensive Design, Engineering, Procurementand Construction (EPC) basis for AIIMS, Rajkot
66/11 GRID Substation, 11KV
Substation, Internal, External , LV & Solar
System Works
HSCC (India) Ltd./ NKG Infrastructure
LimitedHSCC (India) Ltd. 10799
2 Electrical & HVAC Works for Construction ofTeaching Hospital at FLACQ, Mauritius
3Electrical & LV Works for Construction of PermanentCampus of Indian Institute of Management (IIM)Bodhgaya, at Bihar (Phase-1)
Electrical Internal/ External, Sub Station
& ELV Works
CPWD Delhi/ Ramacivil India
Construction Pvt. Ltd.
C. P. Kukreja Architect 5297
4Construction for left out building works for OPD, IPDand Accident & Emergency (A&E) Block under forLHMC & Associated Hospitals, New Delhi.
Internal, External , LV & Solar System Works HSCC (India) Ltd. HSCC (India) Ltd. 4734
5 Construction of New Hospital at Siraspur, New Delhi(On EPC Mode - I)
Internal & External Electrical works
including Electrical works of HVAC
System
PWD Delhi/Ramacivil India Construction Pvt.
Ltd.
Design Associates INC/V Consulting 4424
6Electrical Works for Construction of Main Campus ofIndian Institute of Technology, Jammu in Phase-1C onEPC Basis.
Internal, External, Substation & UPS
Works
CPWD Jammu / Ramacivil India
Construction Pvt. Ltd.
Sikka Associates Architects 4032
7 Construction of New Cancer Center, Mauritius.Internal, External Substation & LV
Works
HSCC (India) Ltd./Swadeshi Civil
Infrastructure Pvt. Ltd. HSCC (India) Ltd. 3495
8
Electrical Works for Super Speciality Block (3Basements + Ground floor + 11 upper floors andHelipad on terrace floor) in RML Hospital Complex,New Delhi.
Internal, External & Substation Works and
Solar
CPWD Delhi/ Ramacivil India
Construction Pvt. Ltd.CPWD Delhi 3360
9Electrical Works for Construction of Permanentcampus under Phase-1 for IIM Jammu at JagtiJammu.
Internal, External & Substation Works and
Solar
CPWD Jammu / Ramacivil India
Construction Pvt. Ltd.
Sikka Associates Architects 3360
10 SITC of Electrical Works for 700 Beds Indira GandhiHospital Sector-9, Dwarka at New Delhi.
Internal, External & Substation Works PWD (GNCTD)/L&T PWD (GNCTD) 2970
11 Construction of Super Specialty Block at GOA Internal, External & Substation Works MOHFW/ AIIMS HSCC (India) Ltd. 2312
12 Construction of Mini Campus under Package-I for NITat Narela, Delhi. Package-1
Internal, External, Substation & LV
WorksNBCC Ltd.
Design Forum International /
Paradise Consultants2077
13 Construction of Hospital and Medical College atAIIMS, Raebareli.
14Supply, Installation, Testing, Commissioning &Handing Over of Electrical Work of Mother & ChildAIIMS, New Delhi
Internal, External & Substation Works AIIMS, New Delhi HSCC (India) Ltd. 1753
15Supply, Installation, Testing, Commissioning &Handing Over of Electrical Work of OPD Block,AIIMS, New Delhi.
Internal Electrical Works AIIMS, New Delhi HSCC (India) Ltd. 1630
16 Indira Gandhi Bhawan, Delhi Internal, External & Substation Works All India Congress Ltd.
`Hafeez Contractor/ Chettiar Consulting
Engineers723
17 Humayun's Tomb Site Muesuem at Delhi Internal Electrical & Substation Works Aga Khan Foundation
Vir Mueller Architects/ Jhaveri
Associates401
18
Execution of Left out Electrical Works of SurgicalBlock and its Operation & Maintenance during DefectLiability Period within AIIMS Campus, Ansari Nagar,New Delhi
It is certified that Mls Amber Electrotech Ltd., F 3/3, Okhla Industrial Area, Phase - I,New Delhi-110020 has been awarded the work of Internal E.I. through compositetripartite agreement between Mls JMC Projects (India) Ltd., Mls Amber Electrotech Ltd.and CPWD, as per following details»
Name of Work : Up-gradation, renovation and new construction at Indira GandhiStadium Complex for Commonwealth Games-2010 [SH: Up-gradation of structure and new finishing works for existing indoorstadium ilc structural retrofitting and repair] - (E & M works.).
Agreement No.Agreement AmountStipulated Date of StartStipulated Date of CompletionTime AllowedStatus of WorkUpto date PaymentTotal value of work done
It is certified that Mls Amber Electrotech Ltd., F 3/3, Okhla Industrial Area, Phase - I,New Delhi-11 0020 has been awarded the work of External Lighting through agreementMls Amber Electrotech Ltd. and CPWD, as per following details:-
Name of Work : Up gradation, Renovation and New Construction for CommonwealthGames 2010 at IGI Stadium, New Delhi. (SH: Providing ExternalLighting for the IGI Complex).
Agreement No.
Agreement AmountStipulated Date of StartStipulated Date of CompletionTime AllowedStatus of WorkUpto date PaymentTotal value of work done
04/EE(E)/CGED-11/2009-10Rs. 3,62,27,204/-08.05.200902.01.2010240 DaysCompletedRs. 7,64,18,504/-Rs. 10 Crore (Approx.) - Final bill under process
The firm has carried out the work as per specifications and the performance of the firmis satisfactorily.
This Certificate is being issued on the request of Mls Amber Electrotech Ltd.
[Er. SU~daVlExecutive Engineer (E)
Commonwealth Games Electrical Division-IICPWD, IGI Stadium Complex, New Delhi-11 0002
Amber Electrotech Limited
Profile Execution Resources 1 of 2
ANNEXURE-7
EXECUTION RESOURCES
A. TOOLS-PARTIAL LIST QTY.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Chase Cutting Machines Chain Pulley Blocks Gas Welding Set Stove Concrete Drilling M/c. Drill Machines Melting Pot Hand Kits Vacuum Blower Angle Cutter Grinder Blow Lamp Brushes Solders Dividers Files Set Dowell’s Crimping M/C (Hydraulic) Dowell’s Crimping M/C (Manual) Cable Jointing Kit Complete Welding Machine
40
6
4
20
24
36
20
40
8
12
8
20
24
24
20
36
8
18
12
4
Amber Electrotech Limited
Profile Execution Resources 2 of 2
TESTING & MEASURING INSTRUMENTS:
B. TESTING EQUIPMENTS QTY.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Dehydration M/c . Transformer Oil Testing kit H.V.D.C. Tester Earth Tester Megger 1 KV Megger 2.5 KV Megger 5 KV Relay Testing Kits Resistance Testers Tong Tester Power Factor Meter KWH Meter Continuity Tester Phase Sequence Indicator Millimeter Digital Clam On Tester Verneir Calipers Screw Gauge Battery Tester DB Meter
Amber Electrotech Limited F-3/3, Okhla Industrial Area Phase-I, New Delhi-110020
Independent Practitioner's Certificate on the Statement of financial data for the last Three Financial
Years, i.e., 2017-2018 to 2019-20
l. This Certificate is issued in accordance with the terms of our agreement dated 21/01/2021
2. The details of Statement of financial data for the last Three Financial Years, i.e., 2017-2018 to 2019-20 (hereinafter referred together as the "Statement") contains the details as required pursuant to compliance with the terms and conditions of the Tender.
Management's Responsibility for the Statement
3. The preparation of the Statement is the responsibility of the Management of Amber Electrotech
Limited (hereinafter the "Company") including the preparation and maintenance of all accounting and other relevant supporting records and documents. This responsibility includes the design,implementation and maintenance of internal control relevant to the preparation and presentation of the Statement and applying an appropriate basis of preparation; and making estimates that are reasonable in the circumstances.
4. The Management is also responsible for ensuring that the Company complies with the requirements of
the Tender Document.
Practitioner's Responsibility
s. Pursuant to the requirements of the Tender Document, it is our responsibility to provide a reasonable
assurance whether:
i) the amounts of Statement of financial data for the last Three Financial Years, i.e., 2017-2018 to 2019-20 have been accurately extracted from the audited financial statements;
6. The audited financial statements referred to in paragraph 5 above, have been audited by us, on which we issued an unmodified audit opinion in our Certificate(s) . Our audits of these financial statements were conducted in accordance with the Standards on Auditing and other applicable authoritative pronouncements issued by the Institute of Chartered Accountants of India. Those Standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements
are free of material misstatement.
7. We conducted our examination of the Statement in accordance with the Guidance Note on Certificates
or Certificates for Special Purposes issue f Chartered Accountants of India.
The Guidance Note requires that we comply with the ethical requirements of the Code of Ethics issued by the Institute of Chartered Accountants of India.
8. We have complied with the relevant applicable requirements of the Standard on Quality Control (SQC) 1, Quality Control for Firms that Perform Audits and Reviews of Historical Financial Information, and Other Assurance and Related Services Engagements.
Opinion
9. Based on our examination, as above, we are of the opinion that:
i) the amounts in the Statement in respect of Annual Turnover and Goods and Services Tax ( wherever applicable ) and financial data have been accurately extracted from the audited financial statements and books of accounts for the last Three Financial Years, i~., 2017-2018 to 2019-20 are as under:
TURNOVER F.VAER TURN OVER GST INCL. GST
2017-2018 621 ,063 ,114 65,863,362 686,926,476
2018-2019 823,738,892 63,040,049 886,778,941
2019-2020 I ,020,903,510 87,229,075 1,108,132,585
Avg. Annual 821,901,839 893,946,001 Turnover
For Year For Year For Year S.No. Particulars 2017-2018 2018-2019 2019-2020
1 Total Assets 612,119,724 622,149,144 707,992,650
2 Current Assets 537,083,866 548,875,394 615,097,688 Total
3 Liabilities 612,119,724 622,149,144 707,992,650 Current
4 Liabilities 418,608,222 377,601,626 417,960,677 Profit Before
5 Tax 35,231,160 43,824,745 60,013,126 Profit After
6 Tax 24,759,214 31,017,002 44,811,877
7 Net Worth 147,566,166 178,583,168 223,395,045
We have verified the above from books of accounts and other relevant records produced before us upon which we have relied.
Restriction on Use
10. The certificate is addressed to and provided to the Board of Directors of the Company solely for the purpose to enable comply with requirement of Tender Document and should not be used by any other person or for any other purpose. Accordingly, we do not accept or assume any liability or any duty of care
N.SHARMA & CO., CHARTERED ACCOUNTANTS 512-A,SUNEJA TOWER-II, DISTT. CENTRE,
The Board Of Directors Amber Electrotech Limited F-3/3, Okhla Industrial Area Phase-I, New Delhi-110020
Independent Practitioner's Certificate on the Statement of Annual Turnover for financial years ended 31st March 2018 to 31st March 2020
1. This Certificate is issued in accordance with the terms of our agreement dated 21/01/2021
2. The details of Annual Turnover for financial years ended 31st March 2018 to 31st March 2020 (hereinafter referred together as the "Statement") contains the details as required pursuant to compliance with the terms and conditions of the Tender.
Management's Responsibility for the Statement
3. The preparation of the Statement is the responsibility of the Management of Amber Electrotech Limited (hereinafter the "Company") including the preparation and maintenance of all accounting and other relevant supporting records and documents. This responsibility includes the design, implementation and maintenance of internal control relevant to the preparation and presentation of the Statement and applying an appropriate basis of preparation; and making estimates that are reasonable in the circumstances.
4. The Management is also resp~rnsible for ensuring that the Company complies with the requirements of the Tender Document.
Practitioner's Responsibility
5. Pursuant to the requirements of the Tender Document, it is our responsibility to provide a reasonable assurance whether:
i) the amounts of Annual Turnover for the year 31st March 2018 to 31st March 2020 have been accurately extracted from the audited financial statements;
6. The audited financial statements referred to in paragraph 5 above, have been audited by us, on which we issued an unmodified audit opinion in our Certificate(s). Our audits of these fina.ncial statements were conducted in accordance with the Standards on Auditing and other applicable auth~ritative pronouncements issued by the Institute of Chartered Accountants of India. Those Standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement.
7. We conducted our examination of the Statement in accordance with the Guidance Note on Certificates or Certificates for Special Purposes issued by the Institute of Chartered Accountants of India.
The Guidance Note requires that we comply with the ethical requirements of the Code of Ethics issued
by the Institute of Chartered Accountants of India.
8. We have complied with the relevant applicable requirements of the Standard on Quality Control (SQC) 1, Quality Control for Firms that Perform Audits and Reviews of Historical Financial Information,
and Other Assurance and Related Services Engagements.
Opinion
9. Based on our examination, as above, we are of the opinion that:
i) the amounts in the Statement in respect of Annual Turnover and Goods ana Services Tax ( wherever
applicable ) have been accurately extracted from the audited financial statements and books of
accounts for the years ended 31st March 2018 to 31st March 2020 are as under:
Annual Turnover Data for the Last 3 Years F. Year Turnover Add : Goods and Turnover Amount
10. The certificate is addressed to and provided to the Board of Directors of the Company solely for the purpose to enable comply with requirement of Tender Document and should not be used by any other person or for any other purpose. Accordingly, we do not accept or assume any liability or any duty of
care for any other purpose or to any other person to whom this certificate is shown or into whose hands
it may come without our prior consent in writing.
For N Sharma and Co. Chartered Accountants FRN07780N
We at Am ber Electrotech aim to be the leading provider of h ighest-quality techno-
commercial solutions for all Electrical Projects.
Hereby we commit ourselves to:
Understand, meet and exceed our customers’ expectations by miles
Develop and innovate advanced technologies to serve our customers in a better way
On-time delivery of projects without compromising on quality
At AMBER Electrotech, we have a team of highly-skilled professionals who know the best
when it comes to providing the highest-quality electrical services for Internal and External
Electrification and Substation jobs. However this is not all. We also have a separate team of
QC to maintain the highest-standards of quality at all levels. Here are the three critical steps
of maintaining and controlling quality:
Incoming Material Inspections for the Critical Components
WIP Inspections as per the Approved Drawings and Evaluation by the Design Team
FG Inspection of the Main Capital Equipments Prior to Offering for Final Inspection
Company Safety Policy
Our Company is committed to a strong safety program that protects its staff and property from accidents. We sincerely believe that good safety performance is based on of the leading indicators of a well managed, efficient and profitable operation.
We will develop, implement and maintain an up-to-date safety and health program consistent with what we believe to be the best established management practices in a sincere effort to prevent the pain, suffering and economic losses attributable to accidents.
We realize that accident prevention is a shared responsibility and in order to achieve our goal, all employees must work together to identify and eliminate or control the hazards present in our work environment.
In pursuit of this goal, the Company will go to any reasonable expense to:
Train all employees in good safety and health practices. Provide necessary personal protective equipment and instruction for its use and care. Investigate every accident, promptly and thoroughly, to find out what caused it and to
correct the problem so that it won’t happen again.
It is the employee’s responsibility to:
Carry out their activities in the most knowledgeable and safest manner thereby avoiding injury to themselves or fellow employees;
To point out unsafe conditions and acts; To use all devices and wear all articles of clothing and personal protective equipment
specified in the company Safety Rules, Safe Job procedures and the Workplace Safety and Health Act.
Any accident is a reflection that, somewhere, we have failed in our responsibilities. We trust that all of you will co-operate fully and join us in a personal commitment to make safety a way of life.
The safety information in this policy does not take precedence over The Workplace Safety and Health Act or the Regulations.