Urban Traffic Management System OPTIMIZATION OF URBAN TRAFFIC CONTROL SYSTEM Riza Atiq Abdullah bin O.K. Rahmat
13

Optimization of urban traffic control system

Jun 24, 2015

Download

Business

This slide is part of Urban Traffic Control course
http://www.eng.ukm.my/riza/UTMS/UrbanTMS.htm
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Optimization of urban traffic control system

Urban Traffic Management System

OPTIMIZATION OF URBAN TRAFFIC CONTROL SYSTEM

Riza Atiq Abdullah bin O.K. Rahmat

Page 2: Optimization of urban traffic control system

Data collection

Optimum cycle time and green time split

Offset determination

Phasing sequences

Setting up signal controller on site

Traffic control expert system

Proposed automatic and intelligent urban traffic control

Page 3: Optimization of urban traffic control system

Peak hours classified traffic count at all approaches of the intersection under study.

16-hour traffic count at road links between intersections under this study

Travel time survey along the study arterial route

Queue length and delay survey at all approaches of the intersections under this study

Step 1

Page 4: Optimization of urban traffic control system

Bangi

Kajang Toll

I-1I-2I-3I-4I-5

Page 5: Optimization of urban traffic control system

I-1I-2I-3

I-4I-5

Peak Hour Traffic Count

Page 6: Optimization of urban traffic control system

Bangi

Kajang Toll

I-1I-2I-3I-4I-5

Step 2

Page 7: Optimization of urban traffic control system

Step 3: Optimazation

Page 8: Optimization of urban traffic control system

1G=49A=3Rall=2

I-1

2G=9A=3Rall=2

3G=47A=3Rall=2

1G=78A=3Rall=2

I-2

2G=8A=3Rall=2

3G=19A=3Rall=2

1G=72A=3Rall=2

I-3

2G=13A=3Rall=2

3G=20A=3Rall=2

1G=72A=3Rall=2

I-4

2G=11A=3Rall=2

3G=22A=3Rall=2

I-5

1G=24A=3Rall=2

2G=21A=3Rall=2

3G=27A=3Rall=2

4G=28A=3Rall=2

Page 9: Optimization of urban traffic control system

0

500

1000

1500

2000

2500

3000

0 100 200 300 400 500 600

Time (s)

Dis

tan

ce (

m)

Step 4

Uncoordinated Signalised Intersection

Page 10: Optimization of urban traffic control system

0

500

1000

1500

2000

2500

3000

0 100 200 300 400 500 600

Time (s)

Dis

tan

ce (

m)

Bandwidth

Step 4

Coordinated signalised intersection, providing progressive flow

Page 11: Optimization of urban traffic control system

Microsoft Excel Worksheet

Step 4: calculation of offset

Page 12: Optimization of urban traffic control system

Figure 22 Offset Setting

Step 4Bangi

Kajang Toll

I-1I-2I-3I-4I-5

1=78+2+3

2=8+2+3

0

3=19+2+3

Cy/Time=120s

6

1=72+2+3

2=13+2+3

03=

20+2+3

Cy/Time=120s

23

1=49+2+3

2=9+2+3

03=47+2+3

Cy/Time=120s

Relative Offset = 0, Absolute Offset =0

Relative Offset = -6, Absolute Offset =-6 Relative Offset = 23, Absolute Offset =0+23=23

1=24+2+3

2=21+2+3

03=

27+2+3

Cy/Time=120s

47

Relative Offset = 24, Absolute Offset =23+24 = 47

1=72+2+3

2=11+2+3

03=

22+2+3

Cy/Time=120s

Relative Offset = 6,Absolute Offset =6-6 = 0

2=28+2+3

Page 13: Optimization of urban traffic control system

TRAFFIC CONTROL CENTRE

MP

MP

MP

MP

Smart CameraMicroprocessor

Fixed-point to fixed-point communications