Transcript
Page 1: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

OPERATIONS RESEARCH Industrial Engineering

Page 2: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

TRANSPORTASI

Page 3: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE ANALISA TRANSPORTASI PROGRAMA LINEAR

Metode transportasi programa linear merupakan metode yang cukup sederhana dalam memecahkan permasalahan alokasi. Metode ini mempresentatifkan permasalahan ke dalam bentuk tabel yang terdiri dari beberapa parameter/variabel perhitungan:

Sumber (Source)

• Sumber disini ditunjukkan dengan kapasitas supply dari masing-masing sumber tersebut untuk periode waktu tertentu. Sumber ditunjukkan dengan notasi Fi. Dan kapasitas sumber dinotasikan dengan Si.

Tujuan alokasi (Destination)

• Tujuan alokasi menunjukkan lokasi dimana supply akan didistribusikan. Tujuan alokasi dinotasikan sebagai Aj dengan jumlah permintaan dari masing-masing tujuan alokasi dinotasikan dengan Dj.

Page 4: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE ANALISA TRANSPORTASI PROGRAMA LINEAR

Biaya Transportasi per unit (Unit shipping cost).

• Biaya pengiriman untuk 1 unit produk (bisa juga dimasukkan sebagai biaya produksi per unit) dari sumber i ke tujuan j, dinotasikan sebagai Cij.

Alokasi pasokan (distribusi)

• Besarnya jumlah pengiriman barang (alokasi) per route/sel adalah variabel yang akan ditentukan dalam analisa ini. Besarnya alokasi dinotasikan sebagai Xij.

Total biaya transportasi.

• Total biaya transportasi merupakan kriteria pokok dalam analisa alokasi ini, Total

biaya transportasi diformulasikan sebagai : Z =Cij x Xij

Page 5: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

PERMASALAHAN ALOKASI

Besarnya jumlah permintaan yang mengakibatkan terbatasnya supply yang dapat diberikan oleh sumber-sumber pemasok, merupakan permasalahan utama dalam analisa alokasi ini.

Seperti yang dideskripsikan pada slide berikut, jumlah supply sebesar 9.900 ton/minggu sedangkan jumlah pemintaan lebih banyak yaitu sebesar 11.400 ton/bulan. Sehingga diperlukan suatu analisa pengalokasiaan supply tersebut ke beberapa demand, sehingga menimbulkan total biaya yang paling minimal.

Page 6: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

PERMASALAHAN ALOKASI

S13000 ton/minggu

S22500 ton/minggu

S34400 ton/minggu

D1 2700 ton/minggu

D23400 ton/minggu

D3 3100 ton/minggu

D4 2200 ton/minggu

SUPPLYDEMAND

Page 7: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE PENYELESAIAN

Metode yang akan digunakan untuk memecahkan permasalahan alokasi adalah metode programa linear.

Aplikasi metode-metode program linear dapat digunakan untuk permasalahan sbb:

• Distribusi supply dari beberapa sumber untuk beberapa lokasi tujuan (permintaan)

• Pemilihan lokasi atau penempatan fasilitas

• Penentuan pemenuhan demand (estimasi) terhadap kapasitas produksi.

Page 8: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

MATRIKS NOTASISUMBER

TUJUAN Kapasitas

A1 A2 A3 A4

F1 X11 ?

$ C11

X12 ?

$ C12

X13 ?

$ C13

X14 ?

$ C14

S1

F2 X21 ?

$ C21

X22 ?

$ C22

X23 ?

$ C23

X24 ?

$ C24

S2

F3 X31 ?

$ C31

X32 ?

$ C32

X33 ?

$ C33

X34 ?

$ C34

S3

Permintaan D1 D2 D3 D4 Si = Dj

Zmin = Cij x Xij

SEL MATRIK

Untuk lebih memperjelas notasi-notasi variabel diatas, dibawah ini ditampilkan sel matrik untuk penyelesaian permasalahan alokasi dengan programa linear.

Page 9: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SYARAT KONDISI

Kondisi yang harus terpenuhi dalam metodeprogram linear :

• Pengalokasian harus feasible, sesuai dengan batasan supply & demand,

• Alokasi memenuhi seluruh kemungkinan alokasi (sel matrik)(i+j-1)

• Alokasi pada sel matrik tidak membentuk lintasan tertutup

Page 10: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

FORMULASI

jiX

jDX

iSX

ST

XCz

ij

j

m

i

ij

i

n

j

ij

m

i

n

j

ijij

,.............................0

......................

......................

min

1

1

1 1

Page 11: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH SOAL

Pada sel matrik di slide berikut, diketahui adanya permintaan sebesar 10,000 ton dari 4 buah lokasi permintaan dengan kemampuan supply yang sama besar dari 3 buah sumber.

Page 12: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH SOAL :

SUMBERTUJUAN

KapasitasA1 A2 A3 A4

F1

$ 10 $ 8 $ 5 $ 6

2400 ton

F2

$ 5 $ 2 $ 6 $ 3

4000 ton

F3

$ 9 $ 7 $ 4 $ 7

3600 ton

Permintaan 2300 ton 3400 ton 2500 ton 1800 ton 10000 ton

Page 13: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE HEURISTIC

Least Cost Assignment Routine

Method (Matrix Minimum Method)

Metode Northwest-Corner

Rule

Metode Vogel’s Approximation

Page 14: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LEAST COST ASSIGNMENT ROUTINE METHOD

Metode ini bertujuan untuk meminimumkan biaya total untuk alokasi/distribusi supplyproduk untuk setiap tujuan alokasi.

Metode ini cukup sederhana dan cepat dalam penyelesaian alokasi, namun hasil dari metode ini tidak seoptimal hasil dari metode lainnya.

Prinsip metode Least Cost adalah alokasi demand sebesar-besarnya pada lokasi sumber yang memberikan biaya transportasi yang sekecil-kecilnya secara berturut-turut.

Berdasarkan contoh soal, dengan menggunakan metode Least Cost akan ditentukan besarnya alokasi ke sel tertentu sbb:

Page 15: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LANGKAH PENYELESAIAN DENGAN LEAST COST:SUMBER

TUJUAN

KapasitasA1 A2 A3 A4

F1 1200

$ 10 $ 8 $ 5

1200

$ 6

2400 ton(6) (4)

F2

$ 5

3400

$ 2 $ 6

600

$ 3

4000 ton(1) (2)

F3 1100

$ 9 $ 7

2500

$ 4 $ 7

3600 ton(5) (3)

Permintaan 2300 ton 3400 ton 2500 ton 1800 ton 10000 ton

Page 16: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

TOTAL BIAYA LC

Z = (1200x$10) + (1100x$9) + (3400x$2) +

(2500x$4) + (1200x$6) + (600x$3)

= $47700

Page 17: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE NORTHWEST- CORNER RULE

Prinsip dari metode ini adalah :

• “alokasi pertama pada sel kiri atas, kemudian alokasi horizontal ke sel kanan dan kemudian vertikal ke bawah, dst....”

Dengan menggunakan contoh persoalan yang sama pada metode heuristic, akan dilakukan penyelesaian dengan metode Northwest:

Page 18: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE NORTHWEST- CORNER RULE

SUMBERTUJUAN

KapasitasA1 A2 A3 A4

F1 2300

$ 10

100

$ 8 $ 5 $ 6

2400 ton(1) (2)

F2

$ 5

3300

$ 2

700

$ 6 $ 3

4000 ton(3) (4)

F3

$ 9 $ 7

1800

$ 4

1800

$ 7

3600 ton(5) (6)

Permintaan 2300 ton 3400 ton 2500 ton 1800 ton 10000 ton

Page 19: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

TOTAL BIAYA NWC

Z = (2300x$10) + (100x$8) + (3300x$2) +

(700x$6) + (1800x$4) + (1800x$7)

= $ 54400

Page 20: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

METODE VOGEL’S APPROXIMATION

Metode ini lebih panjang prosesnya dibandingkan dengan metode sebelumnya namun hasil (Zij) dari proses metode ini umumnya jauh lebih optimal dibanding metode-metode sebelumnya.

Prinsip dari metode ini adalah :

• “Alokasi ditentukan berdasarkan selisih terbesar antara 2 unit biaya (Cij) terkecil dalam satu kolom atau satu baris, Perhitungan selisih biaya terbesar berlanjut sebanyak iterasi yang dilakukan, Alokasi suplai maksimal pada sel yg terpilih”

Dengan menggunakan permasalahan yang sama dengan metode sebelumnya, penyelesaian permasalahan dengan metode Vogel

Page 21: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LANGKAH 1 :

SUMBERTUJUAN

Kapasitas CijA1 A2 A3 A4

F1

$ 10 $ 8 $ 5 $ 6

2400 ton(6-5)

1

F2

$ 5

3400

$ 2 $ 6 $ 3

4000 ton(3-2)

1(1)

F3

$ 9 $ 7 $ 4 $ 7

3600 ton(7-4)

3

Permintaan 2300 ton 3400 ton 2500 ton 1800 ton

10000 tonCij (9-5)

4

(7-2)

5

(5-4)

1

(6-3)

3

Page 22: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LANGKAH 2 :

SUMBERTUJUAN

Kapasitas CijA1 A2 A3 A4

F1

$ 10 $ 8 $ 5 $ 62400 ton

(6-5)

1

F2 600$ 5

3400$ 2 $ 6 $ 3

600 ton(5-3)

2(2) (1)

F3

$ 9 $ 7 $ 4 $ 73600 ton

(7-4)

3

Permintaan 2300 ton 3400 ton 2500 ton 1800 ton

6600 tonCi

(9-5)

4

(5-4)

1

(6-3)

3

Page 23: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LANGKAH 3 :SUMBER

TUJUAN Kapasita

sCij

A1 A2 A3 A4

F1

$ 10 $ 8 $ 5 $ 6

2400 ton(6-5)

1

F2 600

$ 5

3400

$ 2 $ 6 $ 3

600 ton(5-3)

2(2) (1)

F3

$ 9 $ 7

2500

$ 4 $ 7

3600 ton(7-4)

3(3)

Permintaan 1700 ton 3400 ton 2500 ton 1800 ton

6000 tonCi

(10-9)

1

(5-4)

1

(7-6)

1

Page 24: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LANGKAH 4 :SUMBER

TUJUANKapasitas Cij

A1 A2 A3 A4

F1

$ 10 $ 8 $ 5

1800

$ 6

2400 ton(10-6)

4(4)

F2 600

$ 5

3400

$ 2 $ 6 $ 3

600 ton (5-3) 2(2) (1)

F3

$ 9 $ 7

2500

$ 4 $ 7

1100 ton(9-7)

2(3)

Permintaan 1700 ton 3400 ton 2500 ton 1800 ton

3500 tonCij

(10-9)

1

(5-4)

1

(7-6)

1

Page 25: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LANGKAH 5 :

SUMBERTUJUAN

Kapasitas CijA1 A2 A3 A4

F1 600

$ 10 $ 8 $ 5

1800

$ 6

600 ton 4(5) (4)

F2 600

$ 5

3400

$ 2 $ 6 $ 3

600 ton(5-3)

2(2) (1)

F3

110

0

$ 9 $ 7

2500

$ 4 $ 7

1100 ton 9(5) (3)

Permintaan 1700 ton 3400 ton 2500 ton 1800 ton

1700 tonCi

(10-9)

1

(5-4)

1

(7-6)

1

Page 26: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

HASIL AKHIR :

SUMBERTUJUAN

KapasitasA1 A2 A3 A4

F1 600

$ 10 $ 8 $ 5

1800

$ 6

1600 ton(5) (4)

F2 600

$ 5

3400

$ 2 $ 6 $ 3

600 ton(2) (1)

F3 1100

$ 9 $ 7

2500

$ 4 $ 7

1100 ton(5) (3)

Permintaan 1700 ton 3400 ton 2500 ton 1800 ton 1700 ton

Page 27: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

TOTAL BIAYA VOGEL

Z = (600x$10) + (600x$5) + (1100x$9) +

(3400x$2) + (2500x$4) + (1800x$6)

= $46500

Page 28: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

HASIL AKHIR

Nilai total cost yang dihasilkan dari metode Vogel ini lebih minimal dibandingkan dengan kedua metode sebelumnya.

Sehingga alokasi terbaik yang dapat ditentukan adalah sesuai dengan hasil dari metode Vogel ini yaitu dengan alokasi sbb:

• Alokasi dari Sumber F1 ke Lokasi Tujuan A1 sebesar 600 ton/minggu.

• Alokasi dari Sumber F1 ke Lokasi Tujuan A4 sebesar 1800 ton/minggu.

• Alokasi dari Sumber F2 ke Lokasi Tujuan A1 sebesar 600 ton/minggu.

• Alokasi dari Sumber F2 ke Lokasi Tujuan A2 sebesar 3400 ton/minggu.

• Alokasi dari Sumber F3 ke Lokasi Tujuan A1 sebesar 1100 ton/minggu.

• Alokasi dari Sumber F3 ke Lokasi Tujuan A3 sebesar 2500 ton/minggu.

Page 29: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

PERBANDINGAN HASIL

METODE HASIl (Z)

LEAST COST $47700

NORTHWEST $ 54400

VOGEL $46500

Dari tabel diatas diketahuibahwa metode VOGEL dapatmencapai hasil terbaik.

Untuk menguji apakah hasilyang didapat telah mencapaititik optimal, diperlukanlangkah selanjutnya yaitudengan menggunakan metodeStepping Stone

Page 30: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH 1

Page 31: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH 1

1 2 3 4 5 6

1 10 12 13 8 14 19 18

2 15 18 12 16 19 20 22

3 17 16 13 14 10 18 39

4 19 18 20 21 12 13 14

10 11 13 20 24 15 ∑Si = ∑Dj = 93Dj

Si

source

destinationcij

Page 32: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

NORTHWEST CORNER RULEcij

10 12 13 8 14 19

1 2

15 18 12 16 19 20

3 4 5

17 16 13 14 10 18

6 7 8

19 18 20 21 12 13

9

∑Si = ∑Dj = 93

14 24 1

14

13 6

24 15

10 8

3

source

Dj

18

22

39

14

10 11 13 20

2 3 4 5 6Sixij

1

2

3

4

destination

1

Total Cost = 10(10) + 8(12) + 3(18) + 13(12) + 6(16) +

14(14) + 24(10) + 1(18) + 14(13)

= 1138

Page 33: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

LEAST COST/MATRIX MINIMUM METHOD

cij

10 12 13 8 14 19

1

15 18 12 16 19 20

6 3

17 16 13 14 10 18

8 7 5 2 9

19 18 20 21 12 13

4

∑Si = ∑Dj = 9315

14 14

Dj 10 11 13 20 24

22

3 1 11 2 24 1 39

18

2 9 13

source

1 18

4

xijdestination

Si1 2 3 4 5 6

Total Cost = 18(8) + 9(15) + 13(12) + 1(17) + 11(16) +

2(14) + 24(10) + 1(18) + 14(13)

= 1096

Page 34: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

VOGEL APPROXIMATIONcij

10 12 13 8 14 19

1

15 18 12 16 19 20

6 4

17 16 13 14 10 18

7 8 5 3 9

19 18 20 21 12 13

2

∑Si = ∑Dj = 9315

14 14

Dj 10 11 13 20 24

22

3 1 11 2 24 1 39

18

2 9 13

source

1 18

4

xijdestination

Si1 2 3 4 5 6

Total Cost = 18(8) + 9(15) + 13(12) + 1(17) + 11(16) +

2(14) + 24(10) + 1(18) + 14(13)

= 1096

Page 35: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

MENCARI OPTIMAL SOLUTION

Page 36: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH 1 (NCR), TOTAL COST = 1138

1 2 3 4 5 6

1 10 12 13 8 14 19 14

2 15 18 12 16 19 20 20

3 17 16 13 14 10 18 18

4 19 18 20 21 12 13 13

4 2 8 4 8 0

cijdestination

ui

source

vj

Page 37: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

ZIJ – CIJ = UI – VJ – CIJz46 – c46 = u4 – v6 – c46

0 = u4 - 0 - 13

u4 = 13

z36 – c36 = u3 – v6 – c36

0 = u3 - 0 - 18

u3 = 18

z35 – c35 = u3 – v5 – c35

0 = 18 – v5 - 10

v5 = 8

z34 – c34 = u3 – v4 – c34

0 = 18 – v4 - 14

v4 = 4

z24 – c24 = u2 – v4 – c24

0 = u2 - 4 - 16

u2 = 20

z23 – c23 = u2 – v3 – c23

0 = 20 – v3 - 12

v3 = 8

z22 – c22 = u2 – v2 – c22

0 = 20 – v2 - 18

v2 = 2

z12 – c12 = u1 – v2 – c12

0 = u1 - 2 - 12

u1 = 14

z11 – c11 = u1 – v1 – c11

0 = 14 – v1 - 10

v1 = 4

z13 – c13 = u1 – v3 – c13

= 14 - 8 - 13

= -7

Page 38: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

MENGHITUNG (ZIJ – CIJ)

1 2 3 4 5 6

1 0 0 -7 2 -8 -5 14

2 1 0 0 0 -7 0 20

3 -3 0 -3 0 0 0 18

4 -10 -7 -15 -12 -7 0 13

4 2 8 4 8 0

source

vj

zij - cijdestination

ui

Page 39: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 10 8 (-θ) +θ

2 3 (+θ) 13 6 (-θ)

3 14 24 1

4 14

xijdestination

source

Page 40: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SOLUSI BARU 1

1 2 3 4 5 6

1 10 2 6

2 9 13

3 14 24 1

4 14

xijdestination

source

Total Cost = 10(10) + 2(12) + 6(8) + 9(18) + 13(12) +

14(14) + 24(10) + 1(18) + 14(13)

= 1126

Page 41: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 10 12 13 8 14 19 12

2 15 18 12 16 19 20 18

3 17 16 13 14 10 18 18

4 19 18 20 21 12 13 13

2 0 6 4 8 0

ui

source

vj

cijdestination

Page 42: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 0 0 -7 0 -10 -7 12

2 1 0 0 -2 -9 -2 18

3 -1 2 -1 0 0 0 18

4 -8 -5 -13 -12 -7 0 13

2 0 6 4 8 0

zij - cijdestination

ui

source

vj

Page 43: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 10 2 (-θ) 6 (+θ)

2 9 13

3 +θ 14 (-θ) 24 1

4 14

source

xijdestination

Page 44: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SOLUSI BARU 2

1 2 3 4 5 6

1 10 8

2 9 13

3 2 12 24 1

4 14

xijdestination

source

Total Cost = 10(10) + 8(8) + 9(18) + 13(12) + 2(16) +

12(14) + 24(10) + 1(18) + 14(13)

= 1122

Page 45: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 10 12 13 8 14 19 12

2 15 18 12 16 19 20 20

3 17 16 13 14 10 18 18

4 19 18 20 21 12 13 13

2 2 8 4 8 0

cijdestination

ui

source

vj

Page 46: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 0 -2 -9 0 -10 -7 12

2 3 0 0 0 -7 0 20

3 -1 0 -3 0 0 0 18

4 -8 -7 -15 -12 -7 0 13

2 2 8 4 8 0

source

vj

zij - cijdestination

ui

Page 47: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 10 (-θ) 8 (+θ)

2 +θ 9 (-θ) 13

3 2 (+θ) 12 (-θ) 24 1

4 14

xijdestination

source

Page 48: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SOLUSI BARU 3

1 2 3 4 5 6

1 1 17

2 9 13

3 11 3 24 1

4 14

xijdestination

source

Total Cost = 1(10) + 17(8) + 9(15) + 13(12) + 11(16) +

3(14) + 24(10) + 1(18) + 14(13)

= 1095

Page 49: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 10 12 13 8 14 19 12

2 15 18 12 16 19 20 17

3 17 16 13 14 10 18 18

4 19 18 20 21 12 13 13

2 2 5 4 8 0

ui

source

vj

cijdestination

Page 50: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

1 2 3 4 5 6

1 0 -2 -6 0 -10 -7 12

2 0 -3 0 -3 -10 -3 17

3 -1 0 0 0 0 0 18

4 -8 -7 -12 -12 -7 0 13

2 2 5 4 8 0

zij - cijdestination

ui

source

vj

Tidak ada (zij – cij) yang positif Solusi baru 3 = solusi optimal

Page 51: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH 2

1 2 3 4

1 2 3 4 9 20

2 14 12 5 1 30

3 12 15 9 3 40

10 10 20 50 ∑Si = ∑Dj = 90Dj

Sicijdestination

source

Page 52: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SOLUSI AWAL CONTOH 2 (MMM)

cij

2 3 4 9

2 3 6

14 12 5 1

1

12 15 9 3

5 4

∑Si = ∑Dj = 90Dj 10 10 20 50

30

3 20 20 40

20

2 30source

1 10 10 0

xijdestination

Si1 2 3 4

Page 53: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH 3

1 2 3 4

1 2 3 4 9 20

2 14 12 5 1 50

3 12 15 9 3 40

10 10 20 50 ∑Si = 110 ≠ ∑Dj = 90

Si

Dj

cijdestination

source

Page 54: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SOLUSI AWAL CONTOH 3 (MMM)

cij

2 3 4 9 0

3 4 7

14 12 5 1 0

2 1

12 15 9 3 0

6 5

∑Si = ∑Dj = 110

xijdestination

Si1 2 3 54

20

2 20 5030

1 10 10 0

40

Dj 10 10 20 20

20

50

source

3 20

Page 55: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

CONTOH 4

1 2 3 4

1 2 3 4 9 20

2 14 12 5 1 30

3 12 15 9 3 40

10 20 20 50 ∑Si = 90 ≠ ∑Dj = 100

cijdestination

Si

source

Dj

Page 56: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

SOLUSI AWAL CONTOH 4 (MMM)

cij

2 3 4 9

2 3 6

14 12 5 1

1

12 15 9 3

5 4

M M M M

7

∑Si = ∑Dj = 100

20 203

Dj 10 20 20 50

30

4 10 10

20

2 30

40

source

1 10 10 0

xijdestination

Si1 2 3 4

Page 57: Operations Research - radiasari.lecture.ub.ac.idradiasari.lecture.ub.ac.id/files/2017/11/13-14.-Transportasi.pdf · Metode transportasi programa linear merupakan metode yang ... Berdasarkan

END