Stockton University FY 2019 Operational and Capital Report as of January 31, 2019
Stockton University
FY 2019 Operational and Capital Report
as of January 31, 2019
Page
Operational Budget Summary: University, Auxiliaries, and Agency 1
Capital Projects Summary 2
Internal Capital Projects Summary 3‐4
External Capital Projects and Other Funding Summary 5
Capital Grants Summary 6
Stockton University
FY 2019 Operational and Capital Report
as of January 31, 2019
Table of Contents
Original Revised FY19 Year‐to‐Date %REVENUE Budget Budget Revenues Realized
University RevenueState Appropriation 18,391,000.00$ 18,391,000.00$ 10,728,081.00$ 58%Central Appropriation ¹ 32,216,000.00 32,216,000.00 15,312,780.80$ 48%Undergraduate Tuition ² 73,749,265.56 73,299,907.17 73,299,907.17 100%Graduate Tuition ² 9,939,129.25 10,565,724.87 10,565,724.87 100%Educational & General Fee ² 30,909,299.74 30,806,511.82 30,806,511.82 100%Facilities Fee ² 8,667,994.93 8,649,683.41 8,649,683.41 100%Other Fees/Income 4,514,525.00 4,514,525.00 3,351,748.69 74%Summer Gross Revenue 6,000,000.00 6,000,000.00 2,363,337.94 39%Admin Cost Recovery ³ 823,650.00 500,000.00 309,018.00 62%
Subtotal University Revenue 185,210,864.48$ 184,943,352.27$ 155,386,793.70$ 84%
Housing Revenue ² 28,967,054.72$ 28,967,054.72$ 28,835,903.06$ 100%Student Activity Revenue ² 1,216,090.31$ 1,223,983.31$ 1,133,665.48$ 93%Health Activity Revenue ² 1,755,854.30$ 1,679,747.48$ 1,679,747.48$ 100%Seaview Revenue ‐$ ‐$ 1,632,055.58$
Fund Balance 4,410,871.68 1,588,275.99 ‐ 0%
Total Available Funds 221,560,735.49$ 218,402,413.77$ 188,668,165.30$ 86%
Original Revised FY19 Year‐to‐Date FY19 Year‐to‐Date %EXPENSES Budget Budget Expenses Commitments Realized
University ExpensesPresident 4,691,365.87$ 4,166,826.47$ 1,991,041.47$ 1,271,485.64$ 78%Academic Affairs 68,511,035.21 68,931,880.41 34,507,341.19 24,789,203.93 86%Student Affairs 5,202,367.64 5,234,577.63 2,653,157.61 1,420,518.41 78%Enrollment Management 3,823,247.18 4,445,450.20 2,617,137.65 1,451,855.02 92%Athletics 1,771,375.64 1,855,445.62 897,912.67 561,657.26 79%Executive Vice President 6,060,915.30 6,466,622.70 3,095,092.31 1,945,319.80 78%Administration & Finance 4,504,316.71 4,070,586.62 1,999,817.54 1,477,944.20 85%Facilities and Operations 17,871,975.52 17,930,406.01 8,724,161.34 5,832,526.07 81%Information Technology Svs 8,169,095.20 8,244,701.03 4,703,543.08 2,193,606.59 84%Student Aid 17,071,950.00 17,071,950.00 9,611,827.14 ‐ 56%Institutional General ⁴ 5,409,963.76 4,250,303.94 8,038,878.41 2,451,177.02 247%Student Life 11,348,267.95 11,348,267.95 6,093,556.21 1,722,642.52 69%Recreational Program 1,292,444.09 1,292,444.09 725,839.48 292,413.60 79%Fringe Benefits 33,583,832.84 32,836,725.52 17,219,697.29 ‐ 52%Salary/Operational Savings ⁵ (2,000,000.00) 0%
Subtotal University Expenses 189,312,152.91$ 186,146,188.19$ 102,879,003.39$ 45,410,350.06$ 80%
Housing Expenses 28,967,054.72$ 28,967,054.72$ 10,583,368.67$ 3,652,125.45$ 49%Student Activity Expenses 1,216,090.31$ 1,223,983.31$ 588,586.95$ 150,506.57$ 60%Health Activity Expenses 2,065,437.55$ 2,065,187.55$ 932,719.45$ 640,839.20$ 76%Seaview Expenses ‐$ ‐$ 1,568,342.58$
Total Expenses 221,560,735.49$ 218,402,413.77$ 116,552,021.04$ 49,853,821.28$ 76%
Notes:
‐ Commitments include estimated salary expenses for the remainder of the fiscal year.
3 The Admin. Cost Recovery was revised due to the salary and benefits recovery change.4 The realized percentage is higher throughout the fiscal year, since the credit for the Adminstrative Charge is not applied until year‐end.5 This includes the budgeted salary and non‐salary estimated savings.
STOCKTON UNIVERSITYOperational Budget Summary: University, Auxiliaries, and Agency
as of January 31, 2019
‐ Year‐to‐date expenses do not include depreciation.
1 Central Appropriation is an estimated amount that the State pays for fringe benefits. The University reimburses the State on a quarterly
basis for non‐state funded positions and auxiliaries enterprises.2 The realized percentages represent the receipt of tuition and fee payments for the Spring 2019 semester.
1
FY19 FY19 FY19 FY19
Carryforward Budget Expenses Encumbrances Available Budget
Internal, External, and Other Capital Projects
Internal Capital Projects ‐ Galloway 3,457,867$ 6,567,264$ 3,143,162$ 1,515,784$ 5,366,185$
Internal Capital Projects ‐ Atlantic City ‐ 450,127 199,150 101,938 149,039
External Projects & Other Funding ‐ Galloway 1,835,614 316,211 339,941 656,776 1,155,108
External Projects & Other Funding ‐ Atlantic City 3,045,493 ‐ 4,031,518 ‐ (986,025)
Total Internal, External, and Other Capital Projects 8,338,974$ 7,333,602$ 7,713,771$ 2,274,498$ 5,684,307$
Capital Grants
State Grant Projects ‐$ 773,518$ 213,642$ 141,401$ 418,475$
State Grant Projects ‐ University Match 331,672 76,664 48,893 206,115
Total Capital Grants ‐$ 1,105,190$ 290,306$ 190,294$ 624,590$
Total Capital Projects & Capital Grants 8,338,974$ 8,438,792$ 8,004,077$ 2,464,792$ 6,308,897$
Capital Projects Summaryas of January 31, 2019
2
Fund Description FY18 Carryforward FY19 Budget FY19 Expenses
FY19
Encumbrances
FY19 Available
Budget
Facilities & Operations ‐ Galloway
Science Building‐College Fund 328,304$ ‐$ 147,983$ 75,281$ 105,040$
College Signage 14,351 300,000 34,160 ‐ 280,191
AC Gateway Admin Bldg 1,849 ‐ ‐ ‐ 1,849
Parking & Sidewalk (Lot 6 & 5 Exp) 751,727 69,911 434,488 176,009 211,141
Building 31‐Hot Water Boilers 97,174 ‐ 64,239 12,935 20,000
Building 32‐3 Cooling Towers&Cntrls ¹ 4,421 ‐ (5,992) 5,992 4,421
Replace Lift Station 1 296,020 ‐ 5,300 8,770 281,950
Health Science Ctr 3rd Floor Renova 327,318 ‐ 327,318 ‐ ‐
USC2 Equipment 539,131 185,000 478,491 47,323 198,317
Health Science Equipment 229,259 ‐ 199,812 ‐ 29,447
Electrical Proj (Switchgear Maint) 487,382 39,800 91,100 356,482
Water Plant Upgrades/Restoration 650,000 ‐ ‐ 650,000
Roof Replacement A&S, C/D, Gallery 1,800,000 11,800 7,298 1,780,902
Flooring/Furniture Upgrds/Replcmnts 3,392 155,471 76,190 28,473 54,200
Electrical/Mechanical Upgrds/Rplcmn 2,020 200,000 59,496 62,002 80,522 Grounds Equip & Material Hndlng Nds ‐ 75,000 433 3,500 71,067
Restroom Accessibility Improvements 67,860 ‐ 3,755 14,225 49,880
HVAC system renov‐Presidents Suite ‐ ‐ ‐ ‐ ‐
Nacote Creek, Leach/Septic Tank Rep 9,500 9,500 ‐ ‐
Gas Tank Removal & Replacement 125,000 ‐ ‐ 125,000
K‐Wing Structural Plaza Study ‐ ‐ ‐ ‐
Mobile Emergency Generator 190,000 2,647 185,237 2,116
CMMS Work Order System ‐ ‐ ‐ ‐
K‐Wing Access Ctrl/President's Area ‐ ‐ ‐ ‐
Bldg 70 HVAC Upgrades Design (A&E) 21,000 ‐ ‐ 21,000
North Athletic Complex & Pomona Rd. ‐ ‐ ‐ ‐
Motor Pool Needs 350,000 99,210 250,232 558
Student Life Maintenance
Flooring/Furn Upgrades/Replacement ‐$ ‐$ ‐$ ‐$ ‐$
MPRC floor replacement‐Sports Cntr 150,000 72 101 149,827
SL Grounds Equip & Maint Hndlng 50,000 50,000 ‐ ‐
SL Sprng/Summ Grnd/Fld Maint/Refurb 13,737 70,000 33,137 512 50,088
Big Blue Underground Water line rep 44,482 ‐ 23,184 ‐ 21,298
St Life Floor/Furnit Upgrade/Replac 50,000 7,753 4,140 38,107
Housing Maintenance ‐ Galloway
Housing 1 Tub Liner Replacement 76,704$ ‐$ 76,704$ ‐$ ‐$
HSG 1 ROOF C,D&F 242,587 ‐ ‐ 236,500 6,087
Housing 2 & 3 Access Cntrl Upgrade 250,000 ‐ ‐ 250,000
Hsg Summer Refurb, Paint, Maint. 5,710 ‐ 688 5,022 ‐
Hsg Flooring/Furn Upgrades/Replcmnt 4,259 250,000 58,353 9,240 186,666
TRLC Meeting Room‐Replace HVAC 84,765 50,000 107,898 10,702 16,165
Housing Sumr Refurb, Paint, Maint 164,000 44,196 11,341 108,463
Housing 1 Reno Feasibility Study 100,000 25,085 9,840 65,075
1 ($5,992) expense is for accrued retainage for contracted services.
Internal Capital Projects Summaryas of January 31, 2019
Galloway
3
Fund Description FY18 Carryforward FY19 Budget FY19 Expenses
FY19
Encumbrances
FY19 Available
Budget
Internal Capital Projects Summaryas of January 31, 2019
Information Technology Services ‐ Galloway
Academic Facilities Equip Replcmnt 10,665$ ‐$ 10,665$ ‐$ ‐$
Network Equipment Replacement 15,157 ‐ ‐ ‐ 15,157
I‐Wing Gym AV Upgrade 10,000 ‐ 10,000 ‐ ‐
Telephone Switch Upgrade 70,540 ‐ 70,418 ‐ 122
Business Intell Reporting Tool 20,989 ‐ ‐ ‐ 20,989
Firewall IDS 125,318 ‐ 125,318 ‐ ‐
Sports Center AV Upgrade 70,128 ‐ 4,417 ‐ 65,711
Academic Facilities Equip Replace 420,000 52,371 33,220 334,409
Enterprise Datacenter Server Replac 60,000 ‐ ‐ 60,000
Genetec Software Suite 175,000 73,173 88,871 12,956
CCTV Equipment 115,000 22,082 92,918 ‐
CCTV Camera Equipment Replacement 45,000 ‐ 45,000 ‐
Seaview Miscellaneous Repairs ‐$ ‐$ 359,018$ ‐$ (359,018)$
Total Internal Capital Projects ‐ Galloway 3,457,867$ 6,567,264$ 3,143,162$ 1,515,784$ 5,366,185$
Facilities & Operations ‐ Atlantic City
AC Real Estate ‐$ 150,000$ 101,427$ 3,073$ 45,500$
Vehicle Needs (Security & Maint.) 99,244 ‐ 98,865 379
Grounds Equip & Material Handling 85,000 56,723 ‐ 28,277
Academic Sumr Refurb, Paint, Maint 1,000 1,000 ‐ ‐
‐
Housing Maintenance ‐ Atlantic City
Housing Sumr Refurb, Paint, Maint. ‐$ 5,000$ 5,000$ ‐$ ‐$
Grounds Equip. & Material Handling 35,000 35,000 ‐ ‐
Athletic Equip & Facility Flooring ‐ ‐ ‐ ‐
Information Technology Services ‐ Atlantic City
Yr 1 IT Cap Costs IT/AV Infrastruct ‐$ ‐$ ‐$ ‐$ ‐$
‐
Campus Police ‐ Atlantic City ‐
Patrol/Security Transportation ‐$ 25,000$ ‐$ ‐$ 25,000$
Automated External Defibrillators 2,400 ‐ ‐ 2,400
Radio Console & Portables 25,958 ‐ ‐ 25,958
Technology Hardware & Software ‐ ‐ ‐ ‐
Logging Recorder System 16,325 ‐ ‐ 16,325
Safety/Security Firearms 5,200 ‐ ‐ 5,200
Total Internal Capital Projects ‐ Atlantic City ‐$ 450,127$ 199,150$ 101,938$ 149,039$
Total Internal Capital Projects 3,457,867$ 7,017,391$ 3,342,312$ 1,617,722$ 5,515,224$
Atlantic City
4
Fund Description
FY18 Carryforward FY19 Budget FY19 Expenses FY19 Encumbrances FY19 Available
Budget
External Capital Projects
Funded by 2016A
Anatomy & Physiology Lab 166,136$ ‐$ 145,622$ 20,514$ ‐$
Unified Science Building Expansion ¹ ‐ 34,956 (409,522) 221,088 223,390
Additional Classroom 438,136 34,955 45,910 383,471 43,710
Back Fill 2016A 572,159 ‐ ‐ ‐ 572,159
Backfill 614,183 3,000 534,931 4,703 77,549
Total 2016A Funding 1,790,614$ 72,911$ 316,941$ 629,776$ 916,808$
Ullman Family Holocaust Room ‐ Fdntn 45,000$ 243,300$ 23,000$ 27,000$ 238,300$
Total External Capital Projects 1,835,614$ 316,211$ 339,941$ 656,776$ 1,155,108$
Other Funding
AC Information Technology
AC Academic Info Tech 482,919$ ‐$ 290,303$ ‐$ 192,616$
AC HSG & Garage Info Tech 166,646 ‐ 93,642 ‐ 73,004
Total AC Information Technology 649,565$ ‐$ 383,945$ ‐$ 265,620$
AC Academic Building 2,395,928$ ‐$ 3,647,573$ ‐$ (1,251,645)$
Total Other Funding 3,045,493$ ‐$ 4,031,518$ ‐$ (986,025)$
Total External Projects & Other Funding 4,881,107$ 316,211$ 4,371,459$ 656,776$ 169,083$
1 ($409,522) expense is for accrued retainage for contracted services.
Galloway
External Capital Projects and Other Funding Summaryas of January 31, 2019
Atlantic City
5
Original FY19 FY19 FY19 FY19
State Grants Projects Budget Budget Expenses Encumbrances Available Budget
HETI‐Education Technology Infrastructure 775,000$ ‐$ ‐$ ‐$ ‐$
ELF‐Education Technology Project 1,195,000 ‐ ‐ ‐ ‐
ELF‐Science Equipment Grant 6,400,000 32,071 8,017 24,054 ‐
GO‐Science Building Addition 21,465,000 20,246 19,758 484 4
GO‐Additional Classroom Building 13,522,950 257,434 151,626 105,808 ‐
CIF‐Carnegie Chiller Replacement 300,000 ‐ ‐ ‐ ‐
CIF‐Utility Plant Infrastructure 3,100,000 448,407 18,881 11,055 418,471
CIF‐Modernization HVAC Equipment 3,000,000 ‐ ‐ ‐ ‐
CIF‐A&S Reno‐Exterior Repair 2,100,000 ‐ ‐ ‐ ‐
CIF‐A&S Reno‐Modern of Utilities 2,100,000 15,360 15,360 ‐ ‐
CIF ‐ 144‐02 Academic AC 14,667,400 ‐ ‐ ‐ ‐
Total State Grant Projects 68,625,350$ 773,518$ 213,642$ 141,401$ 418,475$
State Grant Projects ‐ University Match
HETI‐Education Technology Match 775,000$ ‐$ ‐$ ‐$ ‐$
ELF‐Education Technology Match ‐ ‐ ‐ ‐ ‐
ELF‐Science Equipment Match ‐ 10,690 2,672 8,018 ‐
GO‐Science Building Addition Match 7,155,000 6,749 6,586 161 2
GO‐Additional Classroom Building Match 4,507,650 85,811 50,542 35,269 ‐
CIF‐Carnegie Chiller Replacement Match ‐ ‐ ‐ ‐ ‐
CIF‐Utility Plant Infrastructure Match ‐ 220,857 9,299 5,445 206,113
CIF‐Modernization HVAC Equipment Match ‐ ‐ ‐ ‐ ‐
CIF‐A&S Exterior Repair Match ‐ ‐ ‐ ‐ ‐
CIF‐A&S Modern of Utilities Match ‐ 7,565 7,565 ‐ ‐
CIF ‐ 144‐02 Academic AC MATCH 7,332,600 ‐ ‐ ‐ ‐
Total State Grant Projects ‐ University Match 19,770,250$ 331,672$ 76,664$ 48,893$ 206,115$
Total Capital Grants and Match 88,395,600$ 1,105,190$ 290,306$ 190,294$ 624,590$ *Budget and Expenses as they appear in Banner Chart 1 (does not include reimbursements).