Top Banner
Operation TF Kotaro/Abas
51

Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Mar 27, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Operation TF

Kotaro/Abas

Page 2: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Agenda

• Brief summary of operation since the last meeting (abazh)

• Network Events and Incidents (abazh)

• Unsyiah Setup (abazh) • Two-Hop BDL (abazh)

• UDbox Status (kotaro)• Two-UDL Experiment (kotaro)• UDL 13Mbps Status (kotaro)

• Bandwidth Allocation for Future Operation (haruhito)

• Reviewing AI3 and SOI Asia Agreement (kotaro)– Proposal Agreement

• UDL Policy Implementation (kotaro)

• ToDos based on Site Update (all)

Page 3: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Network Events and Incidents

• 22 Oct 2005: UNSYIAH started operation• 9 Nov 2005: IOIT advertised IPv6 default route• 18 Jan 2006: UDL Feed trouble• 21 Jan 2006: SFC stopped transmission due to heavy snow• 9 Mar 2006: JCSAT-3 maintenance, all stopped• 16 Mar 2006: JCSAT-3 trouble• 18 Mar 2006: Unibraw SMTP open-relay• 7 Apr 2006: UDL Feed trouble• 12 Apr 2006: 13Mbps UDL test

Page 4: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Unsyiah Setup

Page 5: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Unsyiah Setup

• In cooperation with WIDE, KEIO, JSAT and ITB

• Unsyiah – SFC BDL (512k/512k)

• UDL using SONY box

• Started operation 22 Oct. 2005

• Unsyiah – ITB BDL during classes– Started March 2006

Page 6: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Unsyiah Network Topology

Page 7: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Bandwidth Utilization of Two-Hop BDL Sites

Page 8: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

ITB-UNIBRAWDaily

Weekly Monthly

Yearly

Page 9: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

ITB-UNSYIAH

• No data..

Page 10: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AIT-TUDaily

Weekly Monthly

Yearly

Page 11: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Two-hop BDL

Page 12: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Current Status

• AIT – TU (128k/128k)

• ITB – Unibraw (512k/128k)– Becomes ITB – Unsyiah (512k/512k) During

ITB-Unsyiah classes by changing Rx freq

• Continue to do two-hop BDL?– Or connect them to SFC

Page 13: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Issues in Connecting to SFC

• Modem– SFC has spare modems to accommodate both sites

– What to do with modems at AIT and ITB?

• Address– ITB – Unibraw BDL uses ITB address

• Changing links (ITB-Unsyiah class)– Must to UAT before and after each class

• SFC stops transmission to give a freq for ITB transmission

Page 14: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Two-UDL Experiment

Page 15: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Two-UDL Experiment

• Result: Failed• Cisco bridge at BDL doesn’t forward Ethernet frames due

to MAC learning– MAC filtering at catalyst doesn’t help

• Fallback Plan as solution based on the current situation– SFC transmit 128Kbps

• Minimum just for routing protocol exchange

– Partner transmit 1Mbps/0.5Kbps• Feedback and commodity from partner site

– Design the routing so that traffic goes from SFC to partner via UDL, and from partner to SFC via BDL

Page 16: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Objective

• Reduce BDL bandwidth by:– Using the current BDL as

UDL from partner to SFC, and

– Using UDL as the forward path from SFC to partner

SFC Router

Partner Router

Page 17: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Experiment TopologyFR

RR

Catalyst F

Catalyst R

UDStation

SDM 2020

Upcon

UDbox

Cisco B

Cisco B

SDM 300A

SDM 300A

EthernetSerialCoax

1

2 3

1

2 3

Page 18: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Two-UDL Fallback Plan

sfc-sat2 udl-feed

bdl-gw rr

GW

128k 512k or 1M

13M

Page 19: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Comments? Ideas?

Proposal from USM?

Page 20: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Reviewing AI3 and SOI Asia Agreement

Page 21: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AI3 and SOI Asia Agreement (1/3)

1. Traffic Classification and Priority[S1] SOI-ASIA lectures

[S2] SOI-ASIA related traffic (web, etc.)

[S3] SOI-ASIA multicast transfer (MTM)

[P1] Policy routed traffic

[P2] UDL prefix’s generated traffic

[M1] Traffic for network management

[E1] Traffic for Emergency situations

Page 22: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AI3 and SOI Asia agreement (2/3)

AI3 team is to operate the network following priority policy[E1] is for the emergency sitesSOI-ASIA multicast traffic [S1][S3] is for everyonePolicy routing [P1] is to be operationalThere is no need to generate unnecessary traffic from UDL prefixes [P2]Limit the use to certain clients [S2]

Management of traffic priority should be decided by AI3 operational team

The definition of emergency traffic should be decided jointly by SOI-Asia steering committee and AI3 directors

Page 23: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AI3 and SOI Asia Agreement (3/3)

6. Satellite transponder capacity and the cost– The carrier bandwidth allocation of satellite

transponder and the traffic priority should be reviewed and agreed by AI3 directors meeting and SOI Asia steering committee every six months.

– If any changes are necessary, the decision is to be made at the AI3 directors meeting.

Page 24: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Proposal Agreement

Page 25: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AI3 and SOI Asia Agreement (1/3)

1. Traffic Classification and Priority[S1] SOI-ASIA lectures

[S2] SOI-ASIA related traffic (web, etc.)

[S3] SOI-ASIA multicast transfer (MTM)

[P1] Transit Traffic to Specific AS

[P2] Traffic Generated within AI3 AS

(P1) Commodity Traffic

[M1] Traffic for network management

[E1] Traffic for Emergency situations

Page 26: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AI3 and SOI Asia agreement (2/3)

AI3 team is to operate the network following priority policy[E1] is for the emergency sitesSOI-ASIA multicast traffic [S1][S3] is for everyoneTransit Traffic to Specific AS[ P1]There is no need to generate unnecessary traffic from UDL prefixes [P2]Limit the use to certain clients [S2]

Management of traffic priority should be decided by AI3 operational team

The definition of emergency traffic should be decided jointly by SOI-Asia steering committee and AI3 directors

Page 27: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

AI3 and SOI Asia Agreement (3/3)

6. Satellite transponder capacity and the cost– The carrier bandwidth allocation of satellite

transponder and the traffic priority should be reviewed and agreed by AI3 directors meeting and SOI Asia steering committee every six months.

– If any changes are necessary, the decision is to be made at the AI3 directors meeting.

Page 28: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Comments?

Page 29: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

UDL Policy Implementation

Page 30: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

HFSC Terms

• Guaranteed rate– 1Mbps = can use up to 1Mbps without any loss

• Link share percent– 10% = can use 10% of the available bandwidth

Page 31: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Current ALTQ 9M No-Class

TOTAL 8800k / 100%

• Control traffic 250k / 5%– routing, SNMP, SSH

• SOI-ASIA multicast 2M / 10%

• SOI-ASIA unicast 250k / 5%

• Policy Routing 3M / 40%

• UDL prefix 1M / 30%

Page 32: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Current ALTQ 9M Class

TOTAL (8800-X)k / 100%

• Control traffic 250k / 5%– routing, SNMP, SSH

• SOI-ASIA class – Multicast 5 M / 10%– Unicast 250k / 5%

• Others 1.5-X M / 75%

Page 33: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

ALTQ Web Config

Page 34: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Proposals

• After Two-UDL transition- Stop Policy Routed Traffic

• For 13M- Allocate additional bandwidth into P1 & P2

• For Emergency– To be allocated by following the guideline

which will be decided later

Page 35: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Comments?

Page 36: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

UDbox Status

Page 37: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

UDBox Status

• Total 12 Boxes– 6 Shipped to Partner

• ITB/AIT/ASTI/USC/USM/AIMST• AIT has trouble on the BOX

– 1 Operational in SFC– 3 Stocked in SFC– 2 Broken in SFC

• SONY Box operation on UDL– More than 10

Page 38: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Proposal on UDL Receiver

• Purchase additional UDbox to distribute to SONY-Box partners

• No technical support available for SONY-*

• 13Mbps + Standard codec– Need Section Packing mode of MPEG-2 TS– ULE(?) as a light-weight data link protocol

Page 39: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

13Mbps Status

Page 40: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

UDL 13Mbps Status

• Status: Not completed yet– Failure on SFC SONY-Feed

• Suitable configuration not implemented

• No technical support

– Failure on JSAT SONY-Feed• Suitable configuration not implemented

• Availability unknown for technical support

– Failure on UDStation• JSAT codec not completed (Need padding for SONY-BOX)

• Modify to activate Pdding on UDStation

Page 41: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

What is the cause of failure?

• JSAT codec is not completed on UDstation– UDstation uses packing– Padding is not available on SONY-Receiver, which causes packet

loss on SONY-Receiver when it receives traffic• What is padding / section packing?• What does UDStation (Section Packing) causes on SONY-RECV

(Padding-only)?

• Performance / Interoperability Problem?– When we send packet no to cause section packing…

• UDStation -> UDbox is Good• UDStation -> SONY-box is bad

Page 42: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Padding and Section Packing

Padding

Section Packing

Page 43: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Direction

• Wait for UDstation completing the JSAT codec

• Migrate to UDstation from SONY-FEED• Migrate to 13Mbps

– Feed: UDstaion– Receiver: SONY-BOX + UDbox

• Be careful not to disturb SOI-Asia Classes– Detail is in the next page

Page 44: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Todos & Schedule

• ~ Beginning of May– Complete JSAT codec on UDStation to migrate from SONY-Feed

• ~ Middle of May– Test 13Mbps configuration in IF Environment

• UDstation in mixed environment• SONY-Recv + UDBox

• ~ End of May– Fix the new bandwidth allocation for 13Mbps with Two-UDL

fallback plan– Finalize the instruction for 13Mbps migration

• Beginning of June ~– Ready for 13Mbps Migration in RF– Concern on SOI-Asia classes

Page 45: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Bandwidth Allocation for Future Operation

Page 46: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Other Topics for Discussion

Page 47: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Routing

• Unicast– Redesign to incorporate two-UDL– Cost recalculation + BGP redesign(?)

• Multicast – Wait for XORP to support SSM– M6bone: wait for WIDE Fujisawa NOC to be ready;

MBGP peer with WIDE– Hardware addition

• Use cisco from WIDE Fujisawa NOC as sfc-gate and also MBGP peer with APAN-JP

• Current sfc-gate becomes backup

Page 48: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Upgrade to FreeBSD 6

• FreeBSD 4 is legacy

• Ask SOI Asia interns to help study the feasibility to upgrade SFC hosts to FreeBSD 6

Page 49: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

ToDo from Site Update

Page 50: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

Summarizing Site Update

Page 51: Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.

ToDo based on Site Update