One Empire Plaza October 1, 2015 12.18.15
One Empire Plaza
October 1, 2015
12.18.15
One Empire Plaza
December 18, 2015Observations- The sixth floor tenant will occupy on Monday 12.21.15. - A temporary partition in main lobby has been installed to separate
construction activities from tenant activity.RWU - 5th Floor is ready for framing and in-wall inspections. Minor framing
needs to be completed at HVAC and stair shafts. Overall very good progress. Drywall loaded and ready for installation as soon as inspections occur.
- 4th Floor same status of 5th floor- 3rd Framing substantially complete, electrical rough-in installation
underway.- 2nd Floor drywall partition layout underway. South easterly stair work
area has been isolated and heavy demo for wider stair imminent.- 1st Floor stairway demo and structural work being coordinated and will
begin soon.
4 th Floor Future Law School Space 12.18.15
2nd Floor
Note: Column enclosure now in place
Former Rest room demo complete
2nd floor looking North East2nd Floor looking
South East
Future School of Education Classroom 5th Floor 12.18.15