On Schedule with the Last Planner System Workshop Become certified by LCI-Canada as a Lean Project Coordinator [email protected] or more info www.leanlab.ca
On Schedule with the Last Planner System Workshop
Become certified by LCI-Canada as a Lean Project Coordinator
[email protected] or more info www.leanlab.ca
Traditional Lean Project Delivery
Over Budget, Late NetZero, Early Completion
Lean Design Workshop Part 1
1. Business Case• Busted Budgets, Broken Schedules• Inefficiency & Bad Behavior• There is a Better Way
2. How Lean Creates Value• Customer • Solve Problems/Eliminate Waste• Create Flow
TEAM
Moneyball
What does Beane know about TEAMS
Billy Beane Keynote at LCI San Francisco
Not a Team
It takes a TEAM to deliver a WOW Project
Team
Lean Design Workshop Part 2 1. Getting Started with the Last Planner System
• Assemble the TEAM• Define the Milestones• Commit to the Schedule
2. Last Planner System• Develop a Plan• Collaborate • Commit Design to Target
3. Commitment Tools• Pull Planning• 6 Week Look Ahead (Constraints) • Weekly and Daily Coordination• Checklists
Design with DISCIPLINE
ValueDesign
Plan with DISCIPLINE
Manage PRODUCTION
Stop to fix PROBLEMS
JIDOKA
University of Winnipeg Science Complex& Richardson College for the Environment
Integrate Team & Systems
BOOT Camp Okanagan College
Boot Camp Objectives
• Last Planner System (LPS) is a Production Control System• We Learn LPS a hands on simulation (Villego)• Main Learning Objectives
• Understand Last Planner System • How to get work to Flow • How to collaborate as a TEAM
Getting Started• Short Introduction• Name • Why you’re here?• Your best day Ever!
• Teams 1,2,3 • Select a CM• Establish Team Roles, Get your Hats On • Let’s Get Started
On Schedule with Lean Construction
Hey you Made it to the End!
Let us know what you think about taking this or other Lean Lab Workshops
[email protected] or more info www.leanlab.ca