1 Jordan Atomic Energy Commission JRTR Khalifeh AbuSaleem ة ي ن رد الأ ة ري ة الذلطاق ا ة ي ي هNuclear Research Opportunities in Jordan Dr. Khalifeh AbuSaleem Commissioner for Nuclear Research NSDD Meeting, Jan. 27- 31, 2013 Kuwait, January 29, 2013
Nuclear Research Opportunities in Jordan. Dr. Khalifeh AbuSaleem Commissioner for Nuclear Research. NSDD Meeting, Jan. 27- 31, 2013 Kuwait, January 29, 2013. ENSDF. A=71 with Balraj Singh (NDS 112) A=249 Published (NDS 112) A=228 Submitted A=250 in preparation. Kuwait, January, 2013. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Jordan Atomic Energy Commission
JRTR Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
Nuclear Research Opportunities in Jordan
Dr. Khalifeh AbuSaleemCommissioner for Nuclear Research
NSDD Meeting, Jan. 27- 31, 2013Kuwait, January 29, 2013
2
Jordan Atomic Energy Commission
JRTR Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
ENSDF
Kuwait, January, 2013
A=71 with Balraj Singh (NDS 112)A=249 Published (NDS 112)A=228 SubmittedA=250 in preparation
Bird’s Eye View of the Site
Jordan Atomic Energy Commission
Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
JRTR
4
Jordan Atomic Energy Commission
JRTR Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
KAERI-Daewoo Consortium
JRTR: In and Out of core facilities
Jordan Atomic Energy Commission
JRTR Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
TC
ST1ST2
CNNR
Main activities of the project
– The Preliminary Safety Analysis Report (PSAR) has been submitted to JNRC on July 31, 2011. JNRC has thoroughly reviewed the PSAR and recently announced that there are no major concerns that jeopardize the safety of the reactor
– Construction of the Nuclear Research and Training Center (NRTC) has started in March 2011– Site excavation started in March 2012– The NRTC was attacked by a misinformed group of people on July 12, 2012– Metrological Tower has been put in operation in August 2012– Environmental Impact Assessment (EIA) investigation has started in November 2012.
Expected to be concluded in February 2013– Construction Permit by the Jordanian Nuclear Regulatory Commission (JNRC) is expected by
March 2013 based on two Limited Work Authorizations (LWA) that have been issued (Feb. 2012 and Nov. 2012)
– An agreement with a Consortium of Consultant Services (NucAdvisor) has been signed in September 2013 to advise JAEC in the construction and operation of JRTR
– First Concrete work (Basemat concrete) is expected in early February 2013
Jordan Atomic Energy Commission
Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
JRTR
RTR will enable a large spectrum of activities governed in the following categorieS:
• Education and training;• Research and development;• Production of medical and industrial radioisotopes (Iodine, Iridium, Molybdenum,
…etc.)
• Since the agreement with the KAERI-Daweoo Consortium (KDC) to construct JRTRThe progress is estimated at 44%.• This progress can be categorized into three main activities:- Engineering Discipline where the achievement is around 84%- Procurement Discipline: 37%, and the - Construction Discipline: 21%
Jordan Atomic Energy Commission
Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
JRTR
Research Reactor UtilizationEducation & TrainingNeutron Activation Analysis
(NAA)Radioisotope ProductionNeutron RadiographySupporting power reactor
programmesNeutron ScatteringMaterial science investigationsFuel testing and qualificationNeutron transmutation doping
Jordan Atomic Energy Commission
JRTR Khalifeh AbuSaleem
األردنيـــة الذريــة الطاقه هيئة
Radioactive Isotope Production:(at the start our RIPF, equipped to produce):