Public Meeting to Discuss ASME/ANS Trial Use PRA Standards and Multi-Module Risk Standards and Multi Module Risk June 26 2014 June 26, 2014
37

NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Mar 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Public Meeting to Discuss ASME/ANS Trial Use PRA

Standards and Multi-Module RiskStandards and Multi Module Risk

June 26 2014June 26, 2014

Page 2: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Agendag

TIME TOPIC

8:00 am – 8:10 am Opening Remarks & Introductions

8:10 am – 8:40 am ASME/ANS presentation on trial use standards

8:40 am – 9:10 am NRC endorsement of trial use standards

9:10 am – 10:00 am Open discussion on endorsement of trial use standards

10:00 am - 10:15am Break

10:15 am – 12:00 pm NRC criteria for evaluation of multi-module risk

12:00 pm - 12:15 pm Wrap-up

12:15 pm Adjourn

2

Page 3: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

NRC Endorsement of Trial Use PRA St d dPRA Standards

Mary [email protected]

Page 4: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Outline

• Purpose of meeting

• History of past PRA standard development

• Relationship of RG 1.200 to regulatory activities

• ASME/ANS Schedule of future standards

• Future standard development/endorsement• Future standard development/endorsement

• Wrap-up

4

Page 5: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Purpose of Meetingg

• To communicate staff’s plans for review of trial use standard and final endorsement of t d dstandards

• Solicit stakeholder input

5

Page 6: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

History of PRA Standards and NRC Endorsement

Standard Standard Published RG 1.200 NRC Date Published

ASME RA S 2002 April 2002 DG 1122 Nov 2002

and NRC Endorsement

ASME RA-S-2002 April 2002 DG 1122 Nov 2002

ASME RA-Sa-2003 Dec 2003 RG 1.200, Rev 0 Feb 2004

ASME RA-Sb-2005 Dec 2005 DG-1161RG 1.200 Rev 1

Sep 2006Jan 2007

ASME RA-Sc-2007, Addendum C July 2007 NRC reviewed and endorsed this standard when it reviewed and endorsed ASME/ANS RA-S-2008

ANS 58.21 External Hazards for Operating Reactors 2004 DG-1138 Aug 2004

Revision 1 of this standard was reviewed and endorsed inRevision 1 – ANS 58.21 March 2007 Revision 1 of this standard was reviewed and endorsed in ASME/ANS RA-S-2008

ANS 58.22Low Power /Shutdown for Operating Reactors These standards are being issued as part of the joint ASME/ANS standard which is the standard the

NRC will review and endorse.ANS 58.23Internal Fire

ASME/ANS RA-S-2008 April 2008 DG-1200 June 2008

ASME/ANS RA-Sa-2009 Feb 2009 RG 1.200, Rev 2 March 2009

NRC does not plan to review and endorse plans to review andASME/ANS RA-Sb-2013 CY 2013NRC does not plan to review and endorse, plans to review and endorse the new edition, which addresses NRC issues

Page 7: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Relationship of RG 1.200 to Regulatory ActivitiesRegulatory Activities

LicensingRisk

informed licensing changes

Tech SpecRisk

informed tech spec changes

10 CFR 50.69Risk informed categorization

and special treatment

10 CFR 52Early Site Permit and

Combined Licenses for Nuclear Power Plants

Application

RG 1.174

RG 1.177

RG 1.201

RG 1.206

Application Specific

Regulatory Guide

Generic Supporting Regulatory

Regulatory Guide 1.200

7

g yGuide

PRA Standards and Industry Programs

Page 8: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Proposed ASME/ANS Schedule

Trial Use Publication

• Next Edition* Sept-2016ALWR J 2015

Standard Date

• ALWR Jan-2015• Level 2 PRA Nov-2014• Level 3 PRA Dec-2014

LP/SD PRA N 2014• LP/SD PRA Nov-2014• NLWR Dec-2013• SFP PRA Cancelled

*Unclear whether next edition is published for trial use or for use

8

Page 9: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Proposed NRC Endorsement

Trial Use Publication NRC Endorsement

• Next Edition Sept-2016

Standard Date Date

To be determined

• ALWR Jan-2015• Level 2 PRA Nov-2014• Level 3 PRA Dec 2014

Initiate review and

• Level 3 PRA Dec-2014• LP/SD PRA Nov-2014

endorsement in Revision 3 to RG 1.200

• NLWR Dec-2013 NRC does not plan to review and endorse

9

Page 10: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

NRC Position on Trial Use StandardsStandards

• NRC supports pilots to test the standard

Performing pilots without knowledge of NRC• Performing pilots without knowledge of NRC position can result in unnecessary staff objections

• NRC expectation that licensees will take advantage of the trial use standard and staff

iti d t it f th i d iposition and not wait for the one year period prior to fuel load or 4 year update to meet the standard

10

Page 11: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Proposed NRC Endorsement

• NRC review for developing staff position would occur in parallel with trial use pilots– Initiation of revision to RG 1.200 would occur with

publication of standard for trial usep– Draft guide (DG) would include language that the DG

does not constitute NRC endorsement• NRC official endorsement would occur after• NRC official endorsement would occur after

ASME/ANS (ANSI) publication of standard for use• Issuance of DG during trial use period:

– Will allow staff concerns to be factored into the pilot process

– Will inform licensees of staff position prior to publication p p pof RG allowing licensees to start modifying their models as appropriate

11

Page 12: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Schedule for Publication of Revision 3 of RG 1 200Revision 3 of RG 1.200

2016-2017 2018-2019 20202015ASME/ANS issues

standard for

NRC issues DG, for public review and comment, NOT FOR ENDORSEMENT

NRC reviews trial use standards for preliminary view

ASME/ANS (ANSI) issues standard for use

Trial use standard revised based on lessons learned from pilots

ASME/ANS pilots trial use standard

Public

standard for trial use

Revising Staff position in RG 1.200 based on ISGs and insights from other

regulatory activities

Public review and comment

ENDORSEMENT

Public comments

Public meeting

NRC review of

Public meeting

Public review and comment

g y

NRC issuesRG 1.200, R 3 f

NRC review and disposition of

public comments

ACRS Review

Public meeting

standard for endorsement

Rev 3 for use, INCLUDES STAFF ENDORSEMENT

Final Concurrence

p

Page 13: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Relationship to Fuel Loading and 4 Year Updateand 4 Year Update

RG 1.200, Rev 3, NRC d t f L l 2

RG 1.200, Rev 4, NRC endorsement of updated

ASME/ANS PRA standards less than one year prior to 4

year update, need to meet

10 CFR 50.71:(h)(1) No later than the scheduled date for initial loading of fuel, each holder of a combined license under subpart C of 10 CFR part 52 shall develop a level 1 and a level 2

Fuel Loading

endorsement of Level 2 and LPSD ASME/ANS

PRA standards one year prior to fuel load, need to

meet RG 1.200 Rev 3 PRA to be updated (completed) every 4 years from date of fuel loading

RG 1.200, Rev 3p pprobabilistic risk assessment (PRA). The PRA must cover those initiating events and modes for which NRC-endorsed consensus standards on PRA exist one year prior to the scheduled date for initial loading of fuel.

RG 1.200, Rev 3, NRC endorsement of Level 2 and

LPSD ASME/ANS PRA standards less than one year prior to fuel loading need to

RG 1.200, Rev 4, NRC endorsement of updated

ASME/ANS PRA standards one year prior

(2) Each holder of a combined license shall maintain and upgrade the PRA required by paragraph (h)(1) of this section. The upgraded PRA must cover initiating events and modes of operation contained in NRC-endorsed consensus standards on PRA in effect one year prior to each required

prior to fuel loading, need to meet RG 1.200, Rev 2,

ASME/ANS RA-Sa-2009

standards one year prior to 4 year updateupgrade. The PRA must be upgraded every

four years until the permanent cessation of operations under § 52.110(a) of this chapter.

Page 14: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Wrap-upp p

• Maintain continual dialogue with ASME/ANS gand other stakeholders

• NRC would expect updates (at bi-annual i i )committee meetings):

– Schedule/status of pilots and issuance of standards for use

– Insights from the pilots• Staff working on communication plan to keep

stakeholders informed; e gstakeholders informed; e.g.,– Website– Public meetings– Public meetings

14

Page 15: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Multi-Module Risk Evaluationu t odu e s a uat o

Suzanne [email protected]

Page 16: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

PurposePurpose

• Discuss reasons for evaluating multi-Discuss reasons for evaluating multimodule risk

• Discuss the process the staff used to• Discuss the process the staff used to develop multi-module risk criteriaDi d l ti it i f• Discuss proposed evaluation criteria for multi-module risk

06/26/2014 16

Page 17: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

The WhyThe Why

• Understand risk insights of the multi-Understand risk insights of the multimodule designs

• For completeness making sure the staff• For completeness - making sure the staff has looked at the full pictureP id id t ll d l• Provide guidance to small, modular reactor (SMR) applicants

• To ensure there’s no undue risk to the public health and safety

06/26/2014 17

Page 18: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Working Group MembersWorking Group Members

• Working group members included staffWorking group members included staff from:

Office of New Reactors (NRO)– Office of New Reactors (NRO) • Division of Safety Systems and Risk Assessment

(DSRA)( )• Division of Site Safety and Environmental Analysis

(DSEA)Di i i f Ad d R d R l ki• Division of Advanced Reactors and Rulemaking (DARR)

– Office of Nuclear Reactor Regulation (NRR)– Office of Nuclear Reactor Regulation (NRR)– Office of Nuclear Regulatory Research (RES)

06/26/2014 18

Page 19: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Working Group ActivitiesWorking Group Activities• Two phasesp

– Phase 1: Determined high-level parameters for guidance

– Phase 2: Developed detailed guidancep g• Held 9 working group meetings (Phase 1)• Held four half-day workshops to develop

evaluation criteria for multi module risk (Phase 2)evaluation criteria for multi-module risk (Phase 2)• Broadly discussed group’s activities at:

– ASME/ANS Joint Standards Meeting (09/13 and g (02/14)

– International Topical Meeting on Probabilistic Safety Assessment and Analysis (09/13)

– Regulatory Information Conference (03/14)06/26/2014 19

Page 20: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

A brief historyA brief history…

• Currently we only look at Level 1 andCurrently, we only look at Level 1 and Level 2 PRAs for single units for new reactorsreactors– Current PRA Standard (ASME/ANS RA-Sa-

2009) requires that multi-unit sites with2009) requires that multi unit sites with shared systems include multi-unit site initiators that may impact the model

– Also requires multi-unit sites to include multi-unit fire and flood areas, if necessary

06/26/2014 20

Page 21: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Multi-Module ≠ Multi-UnitMulti Module ≠ Multi Unit

Multi Module Multi UnitMulti-Module• Designed to be built and

operated as multiples

Multi-Unit• Designed and built as

semi-independent unitsp p• Closer proximity• Multiple modules

t d b i l

• Operator is only operating a single unit

• Explicit Commissionoperated by a single licensed operator

• No explicit Commission

Explicit Commission direction to not require consideration of multi-unit riskNo explicit Commission

Policy on riskrisk

• Current RES Level 3 PRA project

06/26/2014 21

Page 22: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Reference plantReference plant

Module Module 1 2

Module 33

06/26/2014 22

Page 23: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Module 1 Risk – New ReactorsModule 1 Risk New Reactors

Module Module 1 2

Module 33

06/26/2014 23

Page 24: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Module 2 Risk – New ReactorsModule 2 Risk New Reactors

Module Module 1 2

Module 33

06/26/2014 24

Page 25: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Module 3 Risk – New ReactorsModule 3 Risk New Reactors

Module Module 1 2

Module 33

06/26/2014 25

Page 26: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

3 Levels of PRA3 Levels of PRA

Level 1 (Core Damage Frequency - CDF)

Level 2 (Large Release Frequency - LRF)L l 3 (D tLevel 3 (Dose to the public)

06/26/2014 26

Page 27: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

New ReactorsNew Reactors

Level 1 (CDF)

Level 2 (LRF)

Level 3

06/26/2014 27

Page 28: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

The WhyThe Why

• Understand risk insights of the multi-Understand risk insights of the multimodule designs

• For completeness making sure the• For completeness - making sure the staff has looked at the full pictureP id id t ll d l• Provide guidance to small, modular reactor (SMR) applicants

• To ensure there’s no undue risk to the public health and safety

06/26/2014 28

Page 29: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Multi-Module RiskMulti Module Risk

Module Module 1 2

Module 33

04/01/2014 29

Page 30: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Working Group Process (Phase 1)

• Started with a blank slateStarted with a blank slate• Researched history of multi-unit risk policy

and agency activitiesand agency activities• Considered ALL options, including:

– Quantitative criteria for multi-module riskQuantitative criteria for multi module risk– Qualitative criteria for multi-module risk– Using the Quantitative Health ObjectivesUsing the Quantitative Health Objectives– Frequency-consequence curves– Developing a new radiological release metricp g g

06/26/2014 30

Page 31: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Working Group Process (Phase 1)

• Started with a blank slateStarted with a blank slate• Researched history of multi-unit risk policy

and agency activitiesg y• Considered ALL options, including:

– Quantitative criteria for multi-module risk–Qualitative criteria for multi-module

risk– Using the Quantitative Health Objectives– Frequency-consequence curves– Developing a new radiological release metric

06/26/2014 31

Page 32: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Parameters for Guidance(Transition from Phase 1 to Phase(Transition from Phase 1 to Phase

2)• Guidelines for development:Guidelines for development:

– traditional risk metrics (CDF and LRF) for a single module

– and new qualitative criteria for evaluating the risk from accidents involving multiple modulesmodules

• ConsiderationsB i t t ith hi h l l C i i– Be consistent with high-level Commission objectives

• Focus on Level 1 and Level 2 PRA results (i.e.,Focus on Level 1 and Level 2 PRA results (i.e., core damage frequency and large release frequency)06/26/2014 32

Page 33: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Working Group Process (Phase 2)

• Brainstormed OptionsBrainstormed Options• Identified the purpose, pros, and cons of

each optionseach options– Wanted to have pieces for prevention and

mitigationmitigation• Culled the brainstorm list• Evaluated the remaining options to

develop criteria

06/26/2014 33

Page 34: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Example OptionExample OptionProposed Criteria Purpose Pros Cons Comments

H l i N d t d fiHelps in design-basis accident

Need to define credible; need to define risk;

More of a qualitative review;

Demonstrate that the risk of Preventio

n of multi-

(DBA) space (event classification

;credible is used for DBAs; how it is done

e review; if credible is used in

multi-module accidents is not credible

n of multi-module accidents

classification); could be qualitative i th t

how it is done is up in the air; does not

id h

DBA, it may makenot credible piece that

focuses on means of

provide much additional guidance to

make more (or less) senseprevention

gapplicants sense

06/26/2014 34

Page 35: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Proposed CriteriaProposed CriteriaFor small, modular integral pressurized water reactor designs, the staff reviews the results and description of the applicant’s risk assessmentreviews the results and description of the applicant s risk assessment for a single reactor module; and, if the applicant is seeking approval of an application for a plant containing multiple modules, the staff reviews the applicant’s assessment of risk from accidents that could affect multiple modules* to ensure appropriate treatment of important insightsmultiple modules* to ensure appropriate treatment of important insights related to multi-module design and operation. [*Current wording in SRP 19.0, draft Rev. 3, the text below would be an addition.]The staff will verify that the applicant has:i. Used a systematic process to identify accident sequences,

including significant human errors, that lead to multiple module core damages or large releases and described them in the application pp

ii. Selected alternative features, operational strategies, and design options to prevent these sequences from occurring and demonstrated that these accident sequences are insignificant contributors to risk These operational strategies should alsocontributors to risk. These operational strategies should also provide reasonable assurance that there is sufficient ability to mitigate multiple core damages accidents.

06/26/2014 35

Page 36: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

Next StepsNext StepsTask TimeframePublic Meeting June 26, 2014

Issue draft for comment August 2014August 2014

Public comment period* September 2014

Issue final for comment* October 2014

*Dates subject to change.

06/26/2014 36

Page 37: NRC Slides for Public Meeting on Trial Use PRA Standards ... · occur in parallel with trial use pilots – Initiation of revision to RG 1.200 would occur with publication of standard

AcronymsAcronyms• ANS – American Nuclear Society• CDF – core damage frequency• DARR – Division of Advanced Reactor Rulemaking• DBA – design basis accident• DBA – design basis accident• DSEA – Division of Site Safety and Environmental

AnalysisDSRA Di i i f S f t S t d Ri k• DSRA – Division of Safety Systems and Risk Assessment

• LRF – large release frequency• NRO – Office of New Reactors • NRR – Office of Nuclear Reactor Regulation• PRA – probabilistic risk assessmentPRA probabilistic risk assessment• RES – Office of Nuclear Regulatory Research06/26/2014 37